Draugen Subsea Boosting
Shell @ FFU 2017
Jan-Olav HallsetTeam Lead - Subsea Controls & UmbilicalsA/S Norske Shell
1February 2017Draugen Subsea Boosting
Copyright of AS Norske Shell
Jan-Olav Hallset, CV
1992: PhD, NTNU, Dept. of Engineering Cybernetics.
1993 - 2014: Oceaneering, Hitec, Poseidon, Siemens
2014 - now: Norske Shell - Team Lead for Subsea
Controls & Umbilicals.
February 2017 3Draugen Subsea Boosting
Copyright of AS Norske Shell
Shell OperatedAssets in Norway
February 2017 4Draugen Subsea Boosting
43
2
1
Knarr FPSO, Norwegian North Sea
4
1 Draugen – Norwegian Sea Ormen Lange and Nyhamna 32
Copyright of AS Norske Shell
Draugen Field
February 2017 5Draugen Subsea Boosting
Haltenbanken area, 140km North of Kristiansund
Discovered in 1984 and production start 1993
First and only Single-leg GBS platform
Water Depth ~ 250-280 m
Peak Production 225 000 bbl/day
Continuous project activity and investments
underway to make Draugen a high integrity
producer
Copyright of AS Norske Shell
Partners
February 2017 6Draugen Subsea Boosting
Copyright of AS Norske Shell
Draugen Infill Drilling Campaign
February 2017 7Draugen Subsea Boosting
4x New Subsea Production Wells
Subsea Boosting Pump
Subsea Tee Manifold @ Rogn South
19 km of New Flowlines
11 km of New Umbilicals
52 tie-ins
113 GRP Covers
245 000 m3 Rock Installation
Copyright of AS Norske Shell
Vision, Mermaid and Clipper
February 2017 8Footer
Copyright of AS Norske Shell
Draugen Pump System - Simplified
10Draugen Subsea Boosting February 2017
MPP1
MPP2
Flow Splitter
Flow Mixer
Bypass
From Wells To Draugen
Re-circulation loop
Copyright of AS Norske Shell
Subsea Pump System and Purpose
Reservoir
2. Power
Umbilical
What we want: Reduce back pressure “seen” by reservoir => MORE OIL IN TOTAL
Accelerate End-of-Field Life production => MORE OIL PER DAY
3. Pump
Station
Production flowline
1. Power and
Control Module
11February 2017
Copyright of AS Norske Shell
Draugen Pump Manifold installed – July 2014
February 2017 12Draugen Subsea Boosting
Size Protection Structure: 15m x 33m x11m
Size Pump Manifold: 13m x16m x 8m
Weight Protection Structure: 294 MT
Pump Station Weight: 301 MT
2 year after contract award
Safe and on schedule
Copyright of AS Norske Shell
Topside – Power & Control Module (PCM)
February 2017 13Draugen Subsea Boosting
Name Dim (WxL x H) [m] Weight Power Control Module 12x9x7 200 MT
2 Siemens Variable Speed Drives
Barrier Fluid System
Control Fluid System
Pump Controls
Air cooling unit and other utilities
Copyright of AS Norske Shell
PCM Installed – May 2016
February 2017 14Draugen Subsea Boosting
Size of Power and Control Module: 9m x 12m x 7m
Weight: 200 MT
After 2 years in storage
Successfully lifted onto Draugen
Copyright of AS Norske Shell
Pump Umbilical installed – July 2016
February 2017 15Draugen Subsea Boosting
Length ~4km; Diameter 169 mm
Termination Assembly ~20MT
Services: Medium Voltage, Low Voltage, Fiber optic,
Hydraulics, Chemicals
Successfully tested & installed after 2 years in storage
Copyright of AS Norske Shell
Helico-Axial Multiphase Pumps
February 2017 16Draugen Subsea Boosting
Design pressure: 220 barg
Process operating temperature: 4 to 75 ºC
Max pump differential pressure: 50 bar
Pump suction pressure: 21 - 29 bara
Pump suction GVF: 10 - 32% (75%)
Pump flow rate: 643 - 855 Am3/h
Pump speed: 1500 – 4200 rpm
Pump motor shaft power: 2300 kW
Water Depth: 268 m
2 x Subsea Pump Modules
Size: ~4,3m x 3,3m x 6,3 m
Weight ~43 MT
Copyright of AS Norske Shell
Vision 2nd Campaign – Pump Modules
February 2017 17Footer
2 x Subsea Pump Modules
Size: ~4,3m x 3,3m x 6,3 m
Weight ~43 MT
Copyright of AS Norske Shell
Extensive Hook-up & Testing, Example: Control & Power
18Draugen Subsea Boosting February 2017
VSD1 VSD2 HPU Control Fluid
HPU Barrier Fluid
Electronic Power Unit
Topside Controller
MPP 1 MPPP 2
Subsea Control Module
Process Sensors
Process Actuators
Hang-Off
UTA
Copyright of AS Norske Shell
Draugen Subsea Boosting- First Results
February 2017 19Draugen Subsea Boosting
Results per 2017:
MORE OIL IN TOTAL => YES, we have reduced back pressure a lot
MORE OIL PER DAY => YES, we are producing significantly more
Copyright of AS Norske Shell
Shell Houston
Stones Field
Shell Brazil
Shell Stavanger
BC-10 Field
Draugen Field
PerdidoField
Ormen Lange Field
Shell Subsea Processing- A Global Activity
20
Operating Fields:BC-10 – ESP Caisson Pumps since 2009Perdido – ESP Caisson Pumps since 2010
Execution phase:Draugen – Mudline Pump (MLP)BC 10 MLP PilotStones MLP
Assess Phase: Ormen Lange Late Life Compression