    Town Center CommitteeTown Center CommitteeReston Master Plan Special Study Task ForceReston Master Plan Special Study Task Force

    Report to the Task Force on the Current StateReport to the Task Force on the Current Stateof the Draft Committee Reportof the Draft Committee Report

    Task Force MeetingTask Force MeetingJuly 27, 2010July 27, 2010

  • 8/9/2019 Draft Reston TC Committee Presentation 7-27-10

    2/20

    22

    TC Committee MembersTC Committee Members

    Pete Otteni and Robert Goudie, CoPete Otteni and Robert Goudie, Co--ChairsChairs

    Bill KeefeBill Keefe

    Mark LooneyMark Looney Susan MockenhauptSusan Mockenhaupt Rae NoritakeRae Noritake

    TerriPhillipsTerriPhillips Joe StowersJoe Stowers Phil TobeyPhil Tobey

  • 8/9/2019 Draft Reston TC Committee Presentation 7-27-10

    3/20

    33

    Committee Methodology:Committee Methodology:

    Collaborative ApproachCollaborative Approach

    Atevery meeting, public and landowners atthetableAtevery meeting, publicand landownersatthetable Open Forum every meetingOpen Forum every meeting

    Wide lat

    itude

    toallow commen

    tary even during mee

    tingsWide l

    atitude

    toallow commen

    tary even during mee

    tings Landownersnoton Committeeactively attended and participatedLandownersnoton Committeeactively attended and participated

    County Staffacross departmentsCounty Staffacross departments RMAGRMAG ParksAuthorityParksAuthority Interdepartmental dialogueInterdepartmental dialogue

    Pla

    nningPla

    nning OthersOthers

    MWAAMWAA USGS USGS

  • 8/9/2019 Draft Reston TC Committee Presentation 7-27-10

    4/20

    44

    Topics Not AddressedTopics Not Addressed

    Infrastructure NeedsAssessmentInfrastructure NeedsAssessment Ne cessary preconditionNecessary precondition

    Not justTC buttotality ofTFsrecommendationsNot justTC buttotality ofTFsrecommendations

    Beyond CommitteesscopeBeyond Committeesscope

    Air RightsAir Rights Position:Position: embed pylonsnowembed pylonsnow

    PreservefutureairrightsPreservefutureairrights nextevolutionofTCnextevolutionofTC

    Discussairrights visionforTCasairrights becomesDiscussairrights visionforTCasairrights becomeseconomically feasible, notnoweconomically feasible, notnow

  • 8/9/2019 Draft Reston TC Committee Presentation 7-27-10

    5/20

    55

    VisionVision

    Overarching vision: TC Metro will beaOverarching vision: TC Metro will beadynamic, balanced, mixed usedynamic, balanced, mixed usedestinationdestination--originationstationoriginationstation

    Key drivers will be extending urbanKey drivers will be extending urban

    coresouthtothe Metroand incentingcoresouthtothe Metroand incentingnew residentialnew residential

  • 8/9/2019 Draft Reston TC Committee Presentation 7-27-10

    6/20

    66

    Area VisionsArea Visions

    Metro North (parcels D3, 4, and 5)Metro North (parcels D3, 4, and 5) Extensionoftheurbancoresouthto MetroExtensionoftheurbancoresouthto Metro

    Urbanplaza withsignatureretail, dynamicnightlife, hotelUrbanplaza withsignatureretail, dynamicnightlife, hotel

    withconventioncapacity, new officeand residentialwithconventioncapacity, new officeand residential

    Metro South (parcels E3, 4, and 5)Metro South (parcels E3, 4, and 5) Re zonefromsuburbanofficeparktonew mixed useRezonefromsuburbanofficeparktonew mixed use

    space; notan extensionofurbancore butownidentityspace; notan extensionofurbancore butownidentity(thinknew villagecenter withheaviercommercial)(thinknew villagecenter withheaviercommercial)

    TCN (Inovaand County land units)TCN (Inovaand County land units) Moreurban withcentral focuson governmentuses, townMoreurban withcentral focuson governmentuses, town

    green, and new residential withsupporting retailgreen, and new residential withsupporting retail

  • 8/9/2019 Draft Reston TC Committee Presentation 7-27-10

    7/20

    77

    Essential Framework toEssential Framework to

    Implement the VisionImplement the Vision MusthavehigherFARs (muchofareaMusthavehigherFARs (muchofarea

    already builtoutcommercial somustincentalready builtoutcommercial somustincenttocreatemixed use)tocreatemixed use)

    Valueproposition: ToachieveFARs beyondValueproposition: ToachieveFARs beyondcurrentzoning developersmustprovide:currentzoning developersmustprovide: GridGrid

    GreenGreen Distinctive DesignDistinctiveDesign 1:1 SFresidential:commercial balance1:1 SFresidential:commercial balance

  • 8/9/2019 Draft Reston TC Committee Presentation 7-27-10

    8/20

    88

    1. Grid/Connectivity1. Grid/Connectivity

    Key isintraKey isintra-- and interand inter--parcelparcelconnectivityconnectivity

    Some land unitsa grid, othersnotSome land unitsa grid, othersnot

    CompletestreetsCompletestreets Accommodateall modesoftravelAccommodateall modesoftravel

    Bike/ped sepa

    rat

    ionBike/ped sepa

    rat

    ion Improved crossingsImproved crossings

    Bikeparking and sharingBikeparking and sharing

  • 8/9/2019 Draft Reston TC Committee Presentation 7-27-10

    9/20

    99

    2. Green2. Green Open SpaceOpen Space

    Planfromtheoutset; setgoalsPlanfromtheoutset; setgoals Challengeinspacesalready builtoutChallengeinspacesalready builtout

    Needaddi

    tion

    al discussiononhow

    toNeed

    addi

    tion

    al discussiononhow

    toincent/accommodateincent/accommodate

    Central greensafocusaugmented with:Central greensafocusaugmented with: TrafficcalmingTrafficcalming Pedestrianpathwaysthrough blocksPedestrianpathwaysthrough blocks

    Land unitbuffersasappropriateLand unitbuffersasappropriate Capitalizeonstorm waterpondsCapitalizeonstorm waterponds Innovativeusesofbuilding rooftopsInnovativeusesofbuilding rooftops

  • 8/9/2019 Draft Reston TC Committee Presentation 7-27-10

    10/20

    1010

    3. Distinctive Design3. Distinctive Design

    KeepTC leading edgeKeepTC leading edge

    Strong messageforthe designreviewStrong messageforthe designreviewmechanismmechanism

  • 8/9/2019 Draft Reston TC Committee Presentation 7-27-10

    11/20

    1111

    4. 1:1 for Higher FARs4. 1:1 for Higher FARs

    Whatishealthy,mixed useTOD (healthyWhatishealthy,mixed useTOD (healthymeaning dynamicspace butalsotrafficmitigation)?meaning dynamicspace butalsotrafficmitigation)?

    GMU cites Ballstonasmodel:GMU cites Ballstonasmodel: 4:1 jobs:households4:1 jobs:households 1:1 SFresidential:office1:1 SFresidential:office SeealsoCrystal City (moving to 1:1 SFres:office)SeealsoCrystal City (moving to 1:1 SFres:office)

    TCa

    reacurren

    tly morehe

    avily commerci

    alTC

    areacurren

    tly morehe

    avily commerci

    al Partly organicPartly organic

    Partly becauseresidential inRCIG prohibitedPartly becauseresidential inRCIG prohibited

    CompPlancurrentlyCompPlancurrently 40:60 SFres:non40:60 SFres:non--resres

  • 8/9/2019 Draft Reston TC Committee Presentation 7-27-10

    12/20

    1212

    1:1 contd1:1 contd

    Apply toany property subjecttoazoningApply toany property subjecttoazoningapplicationapplication

    Encouraging jointorcollaborativezoningEncouraging jointorcollaborativezoning So long asoverall application 1:1, okSo long asoverall application 1:1, ok

    Residential notrequired to be builtatsameResidential notrequired to be builtatsame

    timeascommercialtimeascommercial Lag possible, butgetresidential land banksLag possible, butgetresidential land banks

  • 8/9/2019 Draft Reston TC Committee Presentation 7-27-10

    13/20

    1313

    Why Push 1:1?Why Push 1:1?

    Need residential tomitigate (noteliminate)trafficNeed residential tomitigate (noteliminate)trafficimpacts (walkto work/Metro/nightlife)impacts (walkto work/Metro/nightlife)

    Residential can beharderto build (often lessROI)Residential can beharderto build (often lessROI)

    SeeCenterforTransitSeeCenterforTransit--Oriented Development, p.8Oriented Development, p.8

    ((http://www.reconnectingamerica.org/public/show/http://www.reconnectingamerica.org/public/show/tod202tod202) (toughestchallengeinalready) (toughestchallengeinalready--builtoutbuiltoutTODareasis getting residential built).TODareasis getting residential built).

  • 8/9/2019 Draft Reston TC Committee Presentation 7-27-10

    14/20

    1414

    1:1 contd1:1 contd

    TBD: hotel, retail, and/orothernonTBD: hotel, retail, and/orothernon--peakpeakusesoutsidetheratio?usesoutsidetheratio?

    Issue: should we encourageusesthatdontIssue: should we encourageusesthatdontgeneratepeak load traffics (asoffice does)?generatepeak load traffics (asoffice does)?

    All makestrong neighborhood contributions:All makestrong neighborhood contributions:

    HotelHotel low impacttoinfrastructurelow impacttoinfrastructure

    RetailRetail Essential tocreating dynamic destinationEssential tocreating dynamic destination

    OtherOther museums, arts, otherpublicamenitiesmuseums, arts, otherpublicamenities

  • 8/9/2019 Draft Reston TC Committee Presentation 7-27-10

    15/20

    1515

    1:1 contd1:1 contd

    Alternativesargued:Alternativesargued: 2.5:1 SFtokeep jobs:2.5:1 SFtokeep jobs:workersworkers in balance goingin balance going

    forwardforward

    4:1 SFtocatchupforcurrent jobs:workers4:1 SFtocatchupforcurrent jobs:workersimbalanceimbalance

    Majority opposes:Majority opposes: NoprecedentNoprecedent

    Couldfree

    zenew developmen

    tCould

    free

    zenew developmen

    t

    1:1 SFafloornotceiling1:1 SFafloornotceiling DecideTCand then lookto GreaterRestonasaDecideTCand then lookto GreaterRestonasa

    wholewhole maybemorethan 1:1 SFmaybemorethan 1:1 SF

  • 8/9/2019 Draft Reston TC Committee Presentation 7-27-10

    16/20

    1616

    Resulting FARsResulting FARs

    TBD: 5.0 placeholderTBD: 5.0 placeholder

    Letgood projectsnotFAR limits driveLetgood projectsnotFAR limits drivedecisionsdecisions

    Ceiling mustbehigh enoughtopermitCeiling mustbehigh enoughtopermit

    realizationofTC visionReston wantsrealizationofTC visionReston wants Notstarting fromscratch; profitablecommercialNotstarting fromscratch; profitablecommercialspacealready onthe groundspacealready onthe ground

    Mustincenttoredeveloptonew visionMustincenttoredeveloptonew vision

  • 8/9/2019 Draft Reston TC Committee Presentation 7-27-10

    17/20

    1717

    Draft GraphicDraft Graphic

    PresentationPresentation NotpartofCompPlanNotpartofCompPlan

    One depictionofthemes; othersOne depictionofthemes; otherspossiblepossible

    Final TBDthroughnormal planningFinal TBDthroughnormal planningprocessesprocesses

  • 8/9/2019 Draft Reston TC Committee Presentation 7-27-10

    18/20

    1818

    TC Metro NorthTC Metro North

    Extend urbancoreto MetroExtend urbancoreto Metro

    Create dynamic, balanced, mixed useCreate dynamic, balanced, mixed use

    destinationdestination--originationstationoriginationstation Platformidea; urbanplazaPlatformidea; urbanplaza

    Signatureretail; restaurantsand nightlife;Signatureretail; restaurantsand nightlife;

    hotel wi

    thcon

    ferencec

    apa

    city; possiblyho

    tel wi

    thcon

    ferencec

    apa

    city; possiblyprominentpublicamenityprominentpublicamenity

    NN--SconnectivitySconnectivity

  • 8/9/2019 Draft Reston TC Committee Presentation 7-27-10

    19/20

    1919

    TC Metro SouthTC Metro South

    MovefromsuburbanofficeparktoMovefromsuburbanofficeparktomixed useidentity (rezone)mixed useidentity (rezone)

    Unlikely to extend urbancore; createUnlikely to extend urbancore; createitsownidentityitsownidentity

    Connectivity and openspacekeyConnectivity and openspacekey

    challengesch

    allenges

    ToreshapemusthaveadequateToreshapemusthaveadequateincentivesor will stay commercialincentivesor will stay commercial

  • 8/9/2019 Draft Reston TC Committee Presentation 7-27-10

    20/20

    2020

    Town Center North (TCN)Town Center North (TCN)

    Moreurban butnot extensionofurbanMoreurban butnot extensionofurbancorecore

    Strong focuson governmentcenterStrong focuson governmentcenter(consolidated)and town green(consolidated)and town green

    Key residential location withKey residential location with

    supporting re

    tailsuppor

    ting re

    tail

    BuscirculatortotietogetherBuscirculatortotietogether

    -- endend --