PRESENTATION: 31 MARCH 2010AT 10:00AMCOUNCIL CHAMBER OUDTSHOORN MUNICIPALITY
DRAFT REVIEW IDP FINANCIAL YEARS 2010/2011KOnSEP GOP FINANSIELE JAAR 2010/2011
Ucwangciso oludityanisiweyo lophuhliso lonyaka mali2010/2011
CONTENTS Mayor’s Foreword and Foreword of the Municipal Manager
Vision and Mission Statements of the Oudtshoorn Municipality
5 Phases of IDP Processes
Key Focus Areas
Key Strategic Objectives
Key Action 15 Points Plan – Turn Around Strategy 2010 – 2011 Financial Years
Internal Departmental Needs 2010 / 2011 Financial Years
Community Inputs 2010 / 2011 Financial Years
IGR Projects and Budget Plan 2010 / 2011 Financial Years
Legislative
Monitoring and Evaluation
MAYOR FOREWORD
Nestled between the majestic Swart- and Outeniqua mountains lies the GreaterOudtshoorn. The Municipality of Greater Oudtshoorn comprises of Oudtshoorn –the main town with the smaller villages of, Dysselsdorp and De Rust. The smallrural hamlets of Volmoed and Schoemanshoek and many farm areas areincorporated into the Municipality of the Greater Oudtshoorn. The Municipality ofOudtshoorn is incorporated in the District Municipality of Eden.
The annual Integrated Development Plan (IDP) is the synergy of expectations,results, requests from all the residents of the Greater Oudtshoorn. Publicparticipation is the “Vox Populi” and orchestrates the final success of the IDP. Bythoughtful planning and financial discipline exacerbation is restricted.
The vision of the municipality is to endeavour the permanence of affordable andsustainable services to all residents in the Greater Oudtshoorn. The municipalitystrives to improve the quality of life of all our residents.
Worldwide there is “Fifa-mania” and yet slow recovery economically andfinancially. The impact of the recession has scared our towns. Poverty andunemployment are on the rise. The challenge is to create economic opportunitiesand maximize the development of skills. Council must move to broaden ourindigent policy beyond free basic services.
MAYOR FOREWORD
The housing crisis needs full attention. The LED has a committal to encourageinvestment. Many new developments are proof of our economic progress andinvestor confidence
The Fifa World Cup will bring fringe benefits for the total community. Progressand stability are zenith pillars for a workable IDP.
In conclusion allow me an appreciative acknowledgement to all our dedicatedofficials and councillors for their endless engagement to procure a good workableIDP. The ward based participation is to be congratulated. May every citizen of theGreat Oudtshoorn be a proud citizen who experiences our vision of “a strong andcaring Municipality striving to improve the quality of life to all our citizens in asustainable manner”
With humble submission, I as Executive Mayor present the 2010 IDP. It is mystaunch belief that our Municipality has a purposeful vision for a future ofprogressive challenge and rewarding success.
Once again I endorse my appreciation for your ongoing commitment, loyalty andexuberance to bring glory to the Greater Oudtshoorn.
“The best of the Little Karoo”
VISION STATEMENTOF OUDTSHOORN MUNICIPALITY VISION:
“A Strong and caring municipality that strive to improve the quality oflife of all our citizens in a sustainable manner.”
VISIE:
“Die munisipale raad van die Groter Oudtshoorn is doelgerig en gee om viralle inwoners en strewe om hul lewenskwaliteit op ‘n volhoubare wyse teverbeter.”
USHICILELO LOMBONO:
“Umasipala okhathalayo nowomeleleyo ozama ngandlela Zonkeukuphucula umgangatho wobomi boluntu ngendlela engaphanziyo.”
MISSION STATEMENT OF OUDTSHOORN MUNICIPALITY
MISSION:
“To provide a better service, improve lives of the people, alleviate poverty and
create a conducive environment for sustainable economic and social
development”
MISSIE:
“Om gehalte diens te verseker, die lewens van alle inwoners van die dorp te
verbeter, armoede te beveg en om ‘n gunstige omgewing daar te stel vir
volhoubare ekonomiese en sosiale ontwikkeling.”
USHICILELO LWENJONGO ZOMASIPALA:
Ukunikezela ngenkonzo engcono, ukuphucula ubomi boluntu Ukudambisa
ubuhlwempu nokumisela imo efanelekileyo.
KEY FOCUS AREAS
Infrastructure and Basic Services
Local Economic Development
Institutional Development
Good Government
Financial Viability
Integrated Human Settlement
Human Development
KEY STRATEGIC OBJECTIVES
Productive Oudtshoorn with Robust Economy.
Well Serviced Oudtshoorn
Integrated Settlement in Sustainable Environment
Inclusive and Resilient Community
Well Governed Oudtshoorn
KEY ACTIONS
Investment Destination.
Sector Support.
Focus on the Poor.
Skills Development.
Physical Infrastructure.
Community Infrastructure.
Housing Delivery.
Neighbourhood.
Revitalisation.
Effective Planning.
CONTINUES
Sustainable Practices.
Vulnerable Group Support.
Early Childhood Development.
Health.
Community Safety.
Leadership.
Institutional Capacity.
Community Participation.
Partnerships.
SECTOR PLANS – 2010 / 2011
TS
DATE OF ESTABLISH
MENT
STATUS COMPLIANCE LINK TO IDP REVIEWAL
MARCH 2008 PLAN YES YES NO
JUNE 2008 PLAN YES YES NO
agement MARCH 2008 PLAN YES YES NO
POLICY YES YES NO
Human IN PROCESS NO YES NO
Transport MARCH 2008 POLICY YES YES NO
nagement POLICY YES YES NO
omic
nt Strategy
SEPTEMBER 2008 POLICY Completed NO YES NO
opment NO NO YES NO
ategy NO FINAL DETAILS NO NO YES NO
egy SERVICE PROVIDER NO NO YES NO
ood SERVICE PROVIDER IN PROCESS NO YES NO
CONTUNUES
S
DATE OF ESTABLISH
MENT
STATUS COMPLIANCE LINK TO IDP REVIEWAL
wal IN PROCESS NO YES NO
pment NO NO YES NO
cy IN PROCESS NO YES NO
rategy IN PROCESS NO YES NO
opment OCTOBER 2008 POLICY YES YES NO
viation NO NO YES NO
opment AUGUST 2009 IN PROCESS NO YES NO
on
licy
IN PROCESS NO YES NO
Equity POLICY YES YES NO
nts / Aids POLICY YES YES NO
CONTINUES
ME OF
CUMENTS
DATE OF
ESTABLISH MENT
STATUS COMPLIANCE LINK TO IDP REVIEWAL
PROCESS
t Collection POLICY YES YES NO
es and Tariffs POLICY YES YES NO
mmunication
ategy
DRAFT NO YES NO
mmunity
ticipation
ategy
DRAFT NO YES NO
formance
nagement
ategy
NO NO YES NO
d Strategy NO NO YES NO
tial
elopment
mework/
ategy
MARCH 2009 IN PROCESS NO YES NO
15 POINTS PLAN - TURN AROUND STRATEGY 2010 – 2011
Focus Area Department ResponsibilityWard based planning process & strengthening of ward committees
Municipal Manager
L Coetzee
Address backlogs in basic services specifically the rural areas
Infrastructure J Nel
Repair & Maintenance of existing infrastructure
Infrastructure J Nel
De Rust correction of Free KW Electricity Finance K Jordaan Develop & update of sector plans Municipal
Manager L Coetzee
Eradication of bucket systems in Bongolethu (16-20 houses)
Infrastructure J Nel
Electrification of NEPPON area Infrastructure J Nel Develop & implement water development strategy
Infrastructure J Nel
CONTINUES
Focus Area Department ResponsibilityEstablishment of effective administration Corporate D Visagie Address issues of all informal settlements, GG Camp, Ntinga Taka
Corporate D Visagie
Implement economic development/ job creation projects specially in Rural Areas
Municipal Manager
L Coetzee
Rebates to farmers providing basic services to farm workers
Finance K Jordaan
Provide assistance to sub-economic initiatives, ECD, old age homes etc.
Municipal Manager
L Coetzee
Develop & implement strategy on management off all councils buildings
Corporate Services
D Visagie
INTERNAL DEPARTMENTAL INPUTS 2010 - 2011
DEPARTMENT (Corporate Services) NEEDS ASSESSMENTersonnel Employees should be allowed to claim before attend th
courseEmployees supportive systemRedress: “Batho Pele Principles”General Personnel MeetingEncourage diversity and work relationsContinuous CommunicationStaff Meetings Training of Management
DEPARTMENT (Finance Services) NEEDS ASSESSMENTersonnel Renovation of offices
Corporate ImageIdentify a proper smoking areaProvide office space with ventilationsStrengthen DisciplineSecurity gates / access cardsProper photocopies for efficient and effective client serviceContinuous trainingNewly appointed orientation program, moral
INTERNAL DEPARTMENTAL INPUTS 2010 - 2011
DEPARTMENT (Technical Services) NEEDS ASSESSMENTElectricityCleaning Services
Skills Development / Career PathingProper Parking Areas and Safety GearsTraining for SupervisorsLack of discipline and Moral BehaviorSafety GlovesLack of CommunicationSubsidized HousesK53 for the workersTeam Building ActivitiesWorking unpaid overtime (Particularly on Sunday)Safety kits and proper masks (Spraying of Poison) Unclear cleaning blocksAppointment of temporary employees permanentlyViolation of Human Rights ( Swearing on employees, Harassment and intimidationsThere are members with two job descriptionsUpgrading of the cleaning services store roomProhibition of members to be transfer to other unit within the sectionEntertainment / Recreational Room
INTERNAL DEPARTMENTAL INPUTS 2010 - 2011
ENT (Community Services) NEEDS ASSESSMENTNONE
MUNICIPALITY NEEDS ASSESSMENTt and Personnel Sufficient Institutional Budget
Proper and additional vehiclesAdvanced technology machinesAdditional Personnel ToiletsSupport to technical services personnelFire Fighter / Ambulance Services
AVES NEEDS ASSESSMENTLong Service Award (Mr Adonis Orkers 31 years of servBetter the conditions, Post levels and RemunerationQuality uniforms for all personnel, safety and hygiene and masks)Improve the working hours / shifts (working 11 days ireceive 6 days off in a month)Working extra-ordinary hours
ORP MUNICIPALITY NEEDS ASSESSMENTnd Management Close work relation between management in ODN and
M i O d h l i i i h
COMMUNITY INPUTS
d Technical Services Needs Community Services NeedsFlood Lights in dangerous areas.Access to Water ( Mullersbank / De Hoop ).Cleaning sidewalks ( Welbedacht ).Proper Toilets ( Volmoed )
Old Aged Home.Sport Field Pavilion and Flood Lights.Proper Cemetery. ( Wynandsrivier ).
Marius Spies and Moreson need access to water. Spieskamp need a refuse dumpster for garden compose or refuse. Paul Smit, Haaskloof onderplaas need access to electricity, water. Daantjie Botha, Boomplaas need access to water, electricity. Barnard plaas and Matjiesrivier need access to water and electricity. Bertus de Jager and Buffelsdrift, Mantjiesrivier need street lights. Francois De Kock and Mantjiesrivier need access to water and electricity.
d f d
Piet Strydom and Spieskamp need the smthe chicken eggs to be deal with.Decent Cemetery Marius Spies need farmers to stop dumpdead ostriches into rivers where water isfor consumption. Fannie Schoeman digged holes on the roprevent farm workers or dwellers to accthe sport field.
CONTINUES
2,3 Regular Maintenance of streets.Resealing of Aschman, Fourie, RademeyerStreets, park to buitekant 1 and part of Keyter Street.Upgrading of open spaces / parks (Boompark between Pauline Smith Street and Park Road North, die stegie tussenElley Street and Locketz Streets.Voorsiening van ‘n begroting omrommelstrooiery op verskeie plekke in die wyk te bekamp (Rademeyer Street, Aschman Street, Pauline Smith Street, Church Street West)Die invoer van fase 2van die Kerk Street West sypaadjie. Die opgradering van die laagwaterbruggie in Albert Street)
NONE
& 4 Speed hump at smartie town main entrance Street and Paving of all streets. Park for the children is allocated next to the refuse container, therefore it is requested that it should be removed to a
f d h lth i t
Soup kitchen needed at Smartietown. Abattoir smells at Smartie town, municipality should intervene.
CONTINUES
attoir smells - municipality should intervene. grading of sidewalks at Tierweg. shes in Kloof between wolfweg and rocky-hill ould be cleaned it became a danger zone. grading of Leeuweg.
otea school a speed hump for pedestrian crossing.
Request soup kitchen points that areaccessible to all.Old Cairo’s building to be used for olcentre. Clarity on purchasing of Cairo’s builRequest for a netball pitch at MariusPotgieter Avenue.
tween Du Toit and Du Plessis streets refuse oblems.ot numbers is still a problem and municipality ould intervene (Rosebank). avei van sypaadjies om erosie te voorkom. o speed humps at Du Toit Street aning of the area at the back of the Toekomsrus
mmunity hall.ilig maak van bou areas Mandela hoogte (Tulip aat en Akasia strate)
avlei van sypaadjie in 5de laanoedwalle in Malgasstraat, Lupinstraat en tunialaanavlei van Klooflaan
Voetoorgang by begraafplaas plus dreunstroke.Ontspanningsfasiliteit
CONTINUES
h avenue for speed hump. perman straat tavern Alle bak 3 keer per week. usbrief
eek vullisbak aan brand Lynnerstraat / De anstraat nie bak he. 11, 12, plavei of teer
avei van sypaadjies om erosie te voorkom:Deanstraat-Rossouw Straat
Opgradering van sportkompleks en fasaliteiteHulp verleen aan eks gevangenesHIV/VIGS, TB, drank en dwelm misbruprogramme vir die jeug en volwasseneHuis nommers moet aangebring word huise. Abattoir reuke nogsteeds probleem
ainage & Storm water (Thabe Mbeki Square, m 4 way stop to 1st avenue and 2nd Avenue ngolethu). gular maintenance of streets (speed hump ible signage all streets in Bongolethu).eed humps at 1st and buitekant Street, paving of eets (12th Avenue, 13th Avenue and 14th Avenue ngolethu). ving of Avontuur Street and Muller Street in
idgton. ood lights at dark areas in Bongolethu (kortaat en Johansenstraat, Old Fezekile School and
d Primary School in Bongolethu).
Transport for people Hiv/Aids. Activitimust be inclusive(OHANET) Improving all sports codes for the youtUpgrading of Bongolethu sport field (fllights, cricket pitch, changing rooms anrecreational room). K53 for youth of Oudtshoorn. - Continueducation on driver’s license.IDT ( need analysis and receive no feedenquiry) Upgrading of old primary school for sohousing
CONTINUES
GG Kamp: Ontwikkeling van basiesedienste; Stormwaterdreinering: Sand Valley;Elektrisiteit: GG Kamp en Sand ValleySanitation: Sand Valley; Rehabilitasie/ onderhoud van strate: Vaalhuise; Opgradeer Bongolethu Gemeenskapsaal; Plavei van 19de laan straat nuweuitbreiding. Opgradering van Bongolethu swembad en toerusting; Teer van al die kraghuis strate; 17 , 22de laan nuwe uitbreidingBongolethu: spoedwal;Paving of 18th Avenue / Street New ExtensionBusstop / skuilings by al die taxi op-, en aflaaipunte; Spreiligte in al die donker areas van Bongolethu; Fencing/ Heining by kanaal;
Transport vir HIV/VIGS inwonersVerbetering van alle sport fasaliteitedie jeug (improvement of facilities) Opgradering van BongolethuSportgronde( spreiligte, krieketveldbadkamers en rekreasie kamer) K53 opleiding vir die jeug van Oudtshoorn Veiligheid kinders Sand Valley;Removal of domestic animals from residential areas, areas must be identified for farming;Sport equipment for Navada HallNaming of streetsYouth development: programmesAmy Biehl centre: beneficiaries
CONTINUES0 Speed humps at Jumat Street.
Baadjies street speed hump. Flood lights at high crime areas: kloof by Belelie street Spreiligte agter die stadium Speelparke vir kinders:Bokkraal, Kerrieblok, agterkant van ScoreStormwater: Solomon Straat, Bokkraal(klaarbegroot) Speed humps at Jumat Street. Baadjies street speed hump. Flood lights at high crime areas:kloof by Belelie straatSpreiligte agter die stadium Speelparke vir kinders:Bokkraal, Kerrieblok, agterkant van ScoreStormwater: Solomon Straat, Bokkraal(klaarbegroot) Plavei agter Dysselsdorp skoolBeleli straat 68: oprit
Youth centre for youth development. Sport field to be upgraded and flood lights Satellite sponsored for 2010. Additional sport field to be upgraded for athletic. Intensify soup kitchens (Ward 12) Klubhuis by die krieketveldAktiwiteite vir jeugOpgradeer van tennisbaan: agterscore Upgrading of old cemetery.(kerke)
CONTINUES
Meer straatligte te verbeter (Blomnekinformal settlement) Finaliseer projek van Gloxalia Straat to complete it. Publieke Toilette for tourist and public Scarce water (study long term supply for the whole town)Replacement of water supply pipes (minimum two streets per year)Nuwe Straat om te teer.Recycling and Non-dumping site SignageGeen vullisverwydering (Containers)
Jeugsentrum en programme vir jeugontwikkelingSopkombuiseRekreasie gronde vir die kindersOpgradeer gemeenskapsaal ceiling, floorinsulatrion)Opgradeer sportveld, fasaliteite en spreiligte (in progress)
Vlakteplaas communities need access to water (Danie Schoeman & Gouws Van Jaarsveld) Middelplaas, Nelsrivier (Billy Kleyn & Peter Terblanche) Spoornet residences need access to water and electricity. (11Huise) Vlakteplaas RoadGeen vullisverwydering (Containers)
Vlakteplaas community needs access to Sport field /Nelsrivier MiddelplaasSopkombuise (Navrae oor wyk11 -infrastruktuur) MiddelplaasDistrikraad navraag oor sopkombuis in Snyberg
CONTINUES
12 Speed humps at Adonis Street (2+1). Speed humps at Jumat Street. Baadjies en tooch streets speed hump (paving en spoedwal). Flood lights at high crime areas (tooch en baadjies straat ligte). Parks and recreation for the children (Jumat straat en Raubenheimer straat) Storm water at Paradise View – Gelantstraat (Vaal should be maintained to prevent water running to the houses) Refused removed in front of the Catholic Church saal (die vullis bak moet geskeifword). Paving – (Du Toit straat, Raubenheimerstraat, Kok straat, akeies straat(mainhole), Arries straat, sweatz straat(ontheining van vuillis ake).Tooch straat en ander areas wat nieonthein nie (vuillis ake)Alle krag bokse moet onthein word.Sprayligte by gaatjie straat
Youth centre for youth development. Sport field to be upgraded and flood lights, sport facility and maintenance (consultation with Mr Rudi Claassen). Satellite sponsored for 2010. Additional sport field to be upgraded for athletic. Intensify soup kitchens (Ward 12). Cricket pitch and facilities. Upgrade cemetery.
CONTINUES
12 BeligtingOrdentlike paaieOrdentlike Toilette (Die appie straat)Elektrisiteit / Kabel wat gesteel was (MnrBeren Smit), Die Appie straatOrdentlike Behuising / SudsidyWil nie die eskom se elektrisiteit pal he nie/ wag tot twee maande vir die krag(Mnr Johan Kruger)Obewoonbaar huis en kort krag (Mnr. Isaak Oktober )Huis omval (Mnr Jan Bailey) / langsvarkboer
Parke vir kindersSwembad vir kindersSport velde“n kleuter skool vir kinders
CONTINUES
Local Economic Development Needs Intergovernmental / Provincial Needs
Job Creation Werkskepping, naaldwerk, groentetuineImproving farm setting and conditions ( Volmoed / Welbedacht )
Eskom to provide Electricity.(MuldersbankWelbedacht, Uitvlucht, Eiland, Area) Kliploswak elek.Telkom provide public telephones oa in Lategansvlei.Dept. of Home Affairs – (ID document).Department of Communication (PoskantooKleuterskool Kliplokasie (Dept. of Social Development) Decent Houses (Dept. of Local GovernmentHousing).
NONE Marius Spies and Moreson need access to dhouses (Dept. of Local Government and Housing). Deduction of housing rent from farm work(Niel Wilkon and Mayfair farm). Daantjie Botha, Boomplaas need housing (of Local Government and housing). Marius Spies problems with housing (Dept
CONTINUES
3 Committee for Airport. Integrated human settlement (Dept. of Local Government and Housing).
4 Neighborhood development program should be intensified.Job creation and ownerships of projects.
Health and safety problems at RDP houses at smartie town (Dept. of Local Government and Housing). Housing, Social housing for middle income peo(Depart of Local Government and Housing). Problems with loud music at night (Depart of SAfrican Police Services). Shebeens should be removed from around schopremises (Dept. of South African Police ServicePurchasing of housing (Local Government and Department of South African Police Services).
Neighborhood development program should be intensified.Job creation and ownerships of projects.
Health and safety problems at RDP houses (DepLocal Government and Housing). Housing, Social housing for middle income peo(Depart of Local Government and Housing). Problems with loud music at night (Depart of SAfrican Police Services). Shebeens should be removed from around schopremises (Dept. of South African Police ServicePurchasing of housing (Local Government and Department of South African Police Services).
CONTINUES
asiliteit in klooflaan agter mandelaeel sentrum met motorhawe
Rose bank crèche vir kinders (Dept. of Social Development).Telefoon hokkies – Rosebank (Telkom)Mobiele polisiestasie in Rosebank ( Dept. of PoBehuising (Dept. of Local Government and HoJunior primere skool in Rosebank Dept. of EduKliniek Rosebank Area (Dept. of Health)Neppon en Siyabonga (klooflaan 29) Cleaning of the Beaufort-West Road. (DepartmTransport)Strook tussen Beaufort Wes Pad en ingang vanDept. of Transport)Telefoonhokkies (Telkom)
sgeleenthede vir werkloses gedurendeK skepping en LED programme
Smokkel huise moet gesluit word:Laan (DeparPolice) Containers, Zenophobia (All State DepartmentBehuising (Depart. Of Local Government and
rt project should involve communities. -purpose centre should start. bourhood Dev program should involve e.
House subsidies to be improved (Depart. Of LoGovernment and Housing). Upgrading of Bongolethu clinic and improvemservice (Department of Health).
CONTINUES
Lughawe projek moet die inwoners ookbetrekMulti-purpose sentrum moet nou begin Burgerlike Ontwikkelings program moetdie mense ook betrekToerisme moet ook na die informelenedersettings toe komFreedom Square- Museum Gemeenskaps betrokkenheid gedurendedie KKNK Verbeter Oudtshoorn se transport sisteemSMME’s vir die jeugJob creation promoting development through municipal functions;Werkskepping vir die jeug;
Behuising( GG Kamp) opgradering na sosiabehuising, Verhoging van huissubsidies, Vaalhuise in swak toestand, geen fondamenen dakke lek, lack of stormwater, water runhouses; Sosiale behuising by die ou BongolPrimere skool, Housing still a great need; Housing subsidies; (Dept. of Local Governmand Housing).Opgradering van die Bongolethu kliniek enverbetering van dienslewering daar, KliniePatients are dying at clinic; better service delivery; (Dept. of Health) Social grants - stress relief grant (Dept. of SDevelopment)
Tourism to be brought to township. Red door for small business for the youth. Small farming and stock for the youth. Werkskepping: ambagsmanne opleiA d li ti k
High school to be built (Dept. of Education)Decent Houses to be built, opgradering vanSwartberg Tuiste and Noodhuise: swak geb(Dept. of Local Government and Housing).Land made available for crèches or after ca(O dt h M i i lit d D t f S
CONTINUES
Klein boerderye vestigRed Door hulp verlening vir die jeugKKNK : werk vir die jeugWerkskepping vir jeug/volwassenes en LED programmeBBBEE, SMME en kleinboere
24h Kliniek oor naweke (Dept. of Health)Raad moet as agentskap optree vir subsid(Depart. Of Local Government and Housi
Vlakteplaas community needs access to Red Door. Satellite signal for access to SABC 1, 2, 3 & E TV
Vlakteplaas community needs access to dhouses, Houses need for Middleplaas, NeSpoornet land available for housing projeLocal Government and Housing).Health facility for 24hrs services and on wKliniek besoeke (Mobiele Kliniek) MiddeNelsrivier, Vlakteplaas (Dept. of Health).School children walk distances to schoolsEducation).Paaie (Werkskepping) (Dept. of TransporTelkom vir openbare telefone infrastruktcreche (Bambino se warmnessie)Ouderdomspensioene en uitbetaling (DepDevelopment) Homebase carers Navrae Suster BarnardMidd l l Vl kt l (D t f H
CONTINUES
Tourism to be brought to township. Red door for small business for the youth. Small farming and stock for the youth. Land Affairs to avail land for young people – SMME, BBBEE.
High school to be built. Decent Houses to be built.Deurrings Kamp / selfbou.Upgrading of damaged government houses (Bosbou huise).
Werkskepping vir vroue Telefoon Hokkies (Telkom) Swaak dienste by dag hospital (Dept. of Health)
CONTINUES
Corporate Services Needs Financial Services Needs
Indigent policy of council should reach all the peopqualify for it.
Request for social housing. People should be explained between conventional apaid meters.
Biblioteek (Municipality) Refuse plastics are delivered late and inconsistentlAankoop van kragpunt.
Laat aflewering van vullissakke
21ste laan hoe waterrekening;
Free basic services and indigency;Opgradering van Kraghuise( Vaal huise)
Onwettige huiswinkels
CONTINUES
WARD
STRATEGIC SERVICES IN THE OFFICE OF THE MUNICIPAL MANAGER
1
2 & 11
1,2,3
3 & 4 Abattoir smells at Smartie town, municipality should intervene.
5
6
7 Hulp verleen aan eks gevangenes
8 Transport for people Hiv/Aids. Activities must be inclusive(OHANET) IDT ( need analysis and receive no feedback – enquiry)
9 Transport for people Hiv/Aids. Activities must be inclusive(OHANET)
10
11 CDW’s en wyks kommittees moet gevestig word
12
IGR PROJECT AND BUDGETDepartment Project Allocation Budget Period TimelineCape Nature
South African Police Services
Correctional Services
Justice & Constitutional Development
South African National Defence F
Public Works & Transport
ment Project Area Allocation Budget Period Timelinee Cape Nature Working for
waterR1,300.000 2010-2011 April-March
an ices
Street committees trained and established
BridgtonBongolethu
R20 000 Before Dec 2010
Apply for funds – March 2010
Monitor shebdrug outlets
2nd Hand dealers forum
All sectors - Every month Train and impnew act
CPF capacitate All sectors - Every month Build partners
Mobile police station Bongolethu Provincial Before Jan 2011
Police accessi
Youth month All sectors R20 000 June 2010 Apply for funds – April 2010
Address substabuse
Women’s month All sectors R20 000 August 2010 Apply for funds – June 2010
Violence prev
Safer Schools All sectors R40 000 Quarterly Apply funding quarterly Address truansafe schools
Car Watch project CBD R20 000 Quarterly Apply funding quarterly Address theft tourism safety
VFF Training All sectors R30 000 Bi Annually Apply funding May 2010
Address victimsupport
IGR PROJECT AND BUDGET
partment Project Area Allocation Budget Period Timeline
al lopment
Club Coffe bar Bridgton Being processed 2010/11 2010/11 Ke Moja (youth programme againsof drugs)
R PERSONS Ntinga Ntaka Club for the Elderly
Bongolethu Being processed 210/11 Ongoing Income generatiproject included
Matjiesrevier Service Centre
Matjiesrevier
Being processed 2010/11 Ongoing Older persons se
Volmoed Service Centre Volmoed Being processed 2010/11 Ongoing Older persons se
Coronation Old Age Home Bridgton Being processed 2010/11 Ongoing Older persons se
Sonstral Service Centre DeRust R33 600.00 2010/11 Ongoing Older persons se
Swartberg Service centre Dysselsdorp R217.800.00 2010/11 Ongoing Older persons se
Iliingelethu Service centre Bongolethu R52.800.00 2010/11 Ongoing Older persons se
ACVV Service Centre Oudtshoorn R228.360.00 2010/11 Ongoing Older persons se
Oudtshoorn Service Centre Bridgton R198.000.00 2010/11 Ongoing Older persons se
Belingenhof Old Age Home Oudtshoorn Being processed 2010/11 Ongoing Older persons se
IGR PROJECT AND BUDGET
artment Project Area Allocation Budget Period Timel
opment
Tuishuis Old Age home
Oudtshoorn Being processed 2010/11 Ongoing Older persservices
Lilies of Eden Toekomsrus Being processed 2010/11 Ongoing Older persservices
DISABILITY PROGRAMME:
2010/11 Ongoing Older persservices
APD Protective Workshop,
Bridgton Being processed Ongoing Ongoing Income geproject for
ECD PROGRAMME:Oudtshoorn crèches:♦ Babbels &
Krabbels crèche
Toekomsrus Registered for: 93 children
2010/11 Ongoing Early ChilddevelopmeSubsidisedaffordabilitmost vulne
♦ Bongolethu Child Care Centre
Bongolethu Registered for:58 children
2010/11 Ongoing ECD
♦ Bridgton crèche Bridgton Registered for: 130 children
2010/11 Ongoing ECD
♦ Bumble Bee’s Bongolethu Registered for:20 children
2010/11 Ongoing ECD
♦ Dassie Voorskoolse Sentrum
Bridgton Registered for:220 children
2010/11 Ongoing ECD
IGR PROJECT AND BUDGET
t Project Area Allocation Budget Period Tim♦ Helderliggies
RooiheuwelOudtshoorn Registered for:
45 children2010/11 Ongoing ECD
♦ IkhayaLabantwana Pre-School Centre
Bongolethu Registered for:162 children
2010/11 Ongoing ECD
♦ Kammaland Kleuterskool
Oudtshoorn Registered for:32 children
2010/11 Ongoing EDC
♦ Kango Nessie, Voorbedag
Primêr, Matjiesrivier, Odn
Registered for:24 children
2010/11 Ongoing ECD
♦ Karmenaadjie Voorskool
Buffelsdrift, Oudtshoorn
Registered for:35 children
2010/11 Ongoing ECD
♦ Katryntjie Voorskoolse Sentrum
Bridgton, Odn Registered for:150 children
2010/11 Ongoing EDC
♦ Katterjakkertjies Voorskoolse Sentrum
Bridgton, Odn Registered for:60 children
2010/11 Ongoing ECD
♦ Klipdrift Speelgroep
Klipdrift, Distrik Odn Registered for:20 children
2010/11 Ongoing ECD
♦ Lategansvlei Lategansvlei Registered for: 2010/11 Ongoing ECD
IGR PROJECT AND BUDGET
t Project Area Allocation Budget Period Tim♦ Protea
VoorskoolseSentrum
Protea Primary School, Bridgton
Registered for:80 children
2010/11 Ongoing ECD
♦ Saartjie Voorskoolse Sentrum
Toekomsrus, Oudtshoorn
Registered for:40 children
2010/11 Ongoing ECD
♦ Sacred Heart crèche (Bridgton, Oudtshoorn);
Registered for:200 children
2010/11 Ongoing ECD
♦ Sonskyn Voorskoolse
Sentrum (Bridgton, Odn);
Registered for:135 children
2010/11 Ongoing ECD
♦ Stolsvlakte Speelgroep
Stolsvlake, District, Odn
Registered for:15 children
2010/11 Ongoing ECD
♦ Swaeltjieland Kleuterskool
Le Mirage Plaas, District Odn
Registered for:25 children
2010/11 Ongoing ECD
♦ Vrederust Pre-Primer
Schoemanshoek, Odn Registered for:60 children
2010/11 Ongoing ECD
IGR PROJECT AND BUDGET
ment Project Area Allocation Budget Period Timopment ♦ St Konrad’s Speelgroep Dysselsdorp Registered for:
160 children2010/11 Ongoing ECD
DE RUST CRECHES:
♦ Aksie 5:14Sionsberg Pre-School
DeRustUnknown
2010/11 Ongoing ECD
♦ Diepkloof DeRust Registered for:71 children
2010/11 Ongoing ECD
♦ Elim crèche DeRust Plakkerskamp Unknown 2010/11 Ongoing ECD
♦ Kleine Kuikens DeRust, Middelplaas Registered for:35 children
2010/11 Ongoing ECD
♦ Sonstraal Voorskool, DeRust Blomnek Registered for:140 children
2010/11 Ongoing ECD
♦ Vlakteplaas Kleuterskool, Vlakteplaas
DeRust Registered for:50 children
2010/11 Ongoing ECD
HIV/ AIDS
Famsa Karoo Oudtshoorn Being processed 2010/11 2010/11 Suppoperson
IGR PROJECT AND BUDGET
tment Project Area Allocation Budget Period Timel
ment
YOUTH
Scrosoppi Oudtshoorn Being processed 2010/11 2010/11 Youth developm
SUSTAINABLE LIVELIHOODCNDC Dysselsdorp 813, 700 April 2010 – March 2011 2010/11 Feeing &
developmCNDC Oudtshoorn ( Urban )
1, 000, 232 April 2010 – March 2011 2010/11 Feeding &developm
CNDC Oudtshoorn ( Rural) 996, 156 April 2010 – March 2011 2010/11 Feeding &developm
CNDC Volmoed 259, 056 April 2010 – March 2011 2010/11 Feeding &developm
Vukuzenzele Clay Project -Bongolethu
429, 800 Ongoing 2010/11 Job creat
Hoop In Aksie –DysselsdorpLeather works
300, 000 April 2010 – March 2011 2010/11 Job creat
Car Wash Project 30,000 2010/11 2010/11 Job creat
IGR PROJECT AND BUDGET
VAN WYKSDOR
P
LADISMITH
ZOAR CALITZDORP
HAARLEM UNIONDALE
DE RUST
OASIS CENTRE
TOWN HALL MUNICIPALITY
COMMUNITYHALL
LIBRARY HALL
TOWN HALL COMMUNITY HALL
10H00 –14H00
10H00 –14H00
10H00 –14H00
10H00 –14H00
10H00 –14H00
10H00 –14H00
10H00 –14H00
08-MAR-2010 09-MAR-2010 10-MAR-2010 11-MAR-2010 01-MAR-2010 02-MAR-2010 03-MAR-2010
OPEN 23-MAR-2010 24-MAR-2010 25-MAR-2010 0PEN 16-MAR-2010 17-MAR-2010
28-APR-2010 06-APR-2010 07-APR-2010 08-APR-2010 12-APR-2010 05-APR-2010 14-APR-2010
OPEN 20-APR-2010 21-APR-2010 22-APR-2010 OPEN 19-APR-2010 28-APR-2010
26-MAY-2010 04-MAY-2010 05-MAY-2010 06-MAY-2010 10-MAY-2010 11-MAY-2010 12-MAY-2010
OPEN 18-MAY-2010 19-MAY-2010 20-MAY-2010 OPEN 25-MAY-2010 OPEN
14-JUN-2010 01-JUN-2010 02-JUN-2010 03-JUN-2010 07-JUN-2010 08-JUN-2010 09-JUN-2010
OPEN 15-JUN-2010 30-JUN-2010 17-JUN-2010 21-JUN-2010 22-JUN-2010 OPEN
12-JUL-2010 13-JUL-2010 14-JUL-2010 01-JUL-2010 05-JUL-2010 06-JUL-2010 07-JUL-2010
OPEN 27 JUL 2010 28 JUL 2010 15 JUL 2010 02 AUG 2010 20 JUL 2010 21 JUL 2010
IGR PROJECT AND BUDGET
R VAN WYKSDO
RP
LADISMITH
ZOAR CALITZDORP
HAARLEM UNIONDALE
DE RUST D
23-AUG-2010 10-AUG-2010 11-AUG-2010 12-AUG-2010 31-AUG-2010 03-AUG-2010 04-AUG-2010 05
OPEN 24-AUG-2010 25-AUG-2010 26-AUG-2010 13-SEP-2010 17-AUG-2010 18-AUG-2010 19
20-SEP-2010 07-SEP-2010 08-SEP-2010 09-SEP-2010 OPEN 14-SEP-2010 01-SEP-2010 0
OPEN 21-SEP-2010 22-SEP-2010 23-SEP-2010 11-OCT-2010 28-SEP-2010 15-SEP-2010 16
18-OCT-2010 05-OCT-2010 06-OCT-2010 07-OCT-2010 OPEN 12-OCT-2010 13-OCT-2010 14
OPEN 19-OCT-2010 20-OCT-2010 21-OCT-2010 08-NOV-2010 26-OKT-2010 27-OKT-2010 28
15-NOV-2010 02-NOV-2010 03-NOV-2010 04-NOV-2010-
29-NOV-2010 09-NOV-2010 10-NOV-2010 11
OPEN 16-NOV-2010 17-NOV-2010 18-NOV-2010 OPEN 23-NOV-2010 24-NOV-2010 25
13-DEC-2010 14-DEC-2010 15-DEC-2010 06-DEC-2010 09-DEC-2010 07-DEC-2010 01-DEC-2010 02
IGR PROJECT AND BUDGET
ment Project Allocation Budget Period Timeline
ure Eden Training R 590 000 Apr 10 – March
Business development R 410 000 Apr 10 – March
Ralph Strydom R 24 420 Apr 10 – March
Bakenskraal R 2 645 142 Apr 10 – M arc
home gardens Dysselsdorp R 500 000 2010/2011
community gardens Dysselsdorp R 150 000 2010/2011
planning & strategies Waaikraal R 1 500 000
MONITORING AND EVALUATION
Service Delivery Budget Implementation Plan.
Annual Report
Mid-Term Budget Performance Assessment
Performance Measurement System
THANK YOUDANKIEENKOSI