Maharashtra State Electricity TransmissionCompany Ltd.
Daily system Report
04/Jul/2013
for
State Load Dispatch Center,Airoli
0 of 8
7/27/2019 dr0_04072013
2/9
Daily system Report for 04/Jul/2013
State Load Dispatch Center,Airoli (MSETCL)
THURSDAY
I GENERATION (MUs) II EXCHANGES (MUs)A) MSGENCO Daily Monthly
1) Thermal
3) Gas
2) Hydro
Total MSGENCO
B) 1) JSW JAIGAD
5) Wind Generation
4) Other CPP / IPP
C) TPCL & REL
1) TPCL Thermal
2) TPCL Hydro
TOTAL TPCL3) REL Thermal
D) STATE
1) Thermal
2) Hydro3) Gas4) Wind
TOTAL STATE
(A1+C1+C3)
(A2+B5+C2)
(A3)
(B4)
E) Central Sector Daily Monthly
1) Gujrat
2) Madhya Pradesh
3) Chattisgarh
4) Maharashtra
8) Pench (Excess)
# Total Cent. Sector
F) Other Exchanges
1) With TPCL (Excess)
1) MSEDCL Bilateral
H) ENERGY CATERED (MUs)
1) MSEDCL
2) TPCL
3) REL
TOTAL STATE
DETAILS OF MAHARASHTRA STATE PEAK DEMAND(MW)
MSGENCO Thermal
MSGENCO Hydro
MSGENCO Gas
MSGENCO Total Generation
Central Sector Receipt
Exchange with Mumbai
MSEDCL DEMAND MET
MSEDCL DEMAND
TPCL GENERATION
R-INFRA GENERATION
TPCL+R-INFRA DEMAND
STATE DEMAND MET
STATE DEMAND
Frequency (Hz)
FREQUENCY PARTICULARS
MAXIMUM FREQ. MINIMUM FREQ. AVERAGE FREQ. FREQ. BELOW 49.2 Hz
* Displayed for information, not added in total. # Total Cent. Sector includes MSEDCL and TPCL bilateral power.
PARTICULARS
72.217 322.643
7.419 21.377
10.305 42.144
89.941 386.16420.503 65.949
29.281 110.861
4.697 32.591
24.169 93.279
4.886 20.012
29.055 113.29111.950 45.841
108.336 461.763
12.647 42.591
10.305 42.144
29.281 110.861
216.729 810.973
13.532 37.917
17.428 73.109
3.460 26.720
55.802 227.775
-0.342 -1.202
94.778 385.315
-17.441 -71.103
39.013 148.717
253.061 1046.893
38.455 151.063
19.988 79.169
311.504 1277.125
3203
A. Morning Peak at 11Hrs
B. Evening Peak at 20Hrs
C. Night Minimum at 5Hrs
178
428
3809
4555
-1157
11168
11225
1283
526
2966
14134
14191
49.96 49.82 50.04
50.36 Hz at 17.08 Hrs 49.64 Hz at 19.45 Hrs 50 0 % of Time(min)
2827
689
3945
429
4969
-707
11398
11469
1475
525
2707
14105
14176
3028
77
3554
449
2993
-450
9676
9732
841
398
1689
11365
11421
Shift Engineer Shift Incharge
G) Bilateral Power *
Include PX -1.230 -2.0092) MUMBAI Bilateral 12.363 54.798
Include PX 1.970 5.019
3) MUMBAI Schedule 12.363 54.798
WIND 1368 898 1272
6) PENCH (MS) 0.342 1.202
5) CPP 56.160 153.614(B1+B2+B3)
CPP / IPP 2593 2267 2280
Load Shedding 57 71 56
5) Goa
6) TAPS 1&2 Injection
7) RGPPL Injection
-5.166 -19.193
3.713 14.812
6.351 25.377
2) WPCL 7.920 32.034
3) ADANI 23.040 103.880
1 of 8
7/27/2019 dr0_04072013
3/9
Daily and Progressive Generation,Maximum,Minimum,OLC Details for 04/Jul/2013
State Load Dispatch Center,Airoli (MSETCL)
Generating
unit
Generation
Daily
(Mus)
OLC
(MW)Monthly
(Mus)
Max
(MW)
Min
(MW)
Koradi
2.28 154 0 1302.28Unit 5
3.17 150 100 11012.48Unit 6
0.00 0 0 00.00Unit 7
5.44 14.77Total 240Bhusawal
3.10 145 100 16014.16Unit 2
2.84 140 95 16013.98Unit 3
5.30 335 0 21517.38Unit 4
0.00 0 012.40Unit 5
11.24 57.92Total 535
Parli
0.00 0 00.00Unit 3
0.00 0 00.00Unit 4
0.00 0 00.00Unit 5
0.00 0 00.00Unit 6
0.00 0 00.00Unit 7
0.00 0.00Total
Chandrapur
3.37 147 128 16013.37Unit 1
3.32 147 130 15013.98Unit 2
0.00 0 0 08.81Unit 3
0.00 0 0 00.00Unit 4
4.36 200 155 20020.28Unit 5
3.38 184 115 15016.62Unit 6
5.07 240 185 20022.35Unit 7
19.50 95.40Total 860
Paras4.06 193 153 16016.03Unit 3
4.13 190 150 17016.88Unit 4
8.18 32.91Total 330
Khaparkheda
2.28 110 65 1209.42Unit 1
0.00 0 0 06.80Unit 2
3.36 154 125 1509.27Unit 3
3.38 155 130 14016.46Unit 4
6.38 290 240 30029.77Unit 5
15.39 71.72Total 710
Nasik4.18 190 170 19516.72Unit 3
4.17 181 170 18016.57Unit 4
4.11 192 162 19516.65Unit 5
12.46 49.93Total 570
Uran
10.30 450 233 43042.14All Units
10.30 42.14Total 430
PENCH (MS)
0.34 27 01.20Pench (MS)
0.34 1.20Total
Koyna
1.98 440 40 5206.42Stage 1-2
1.56 443 0 2501.70Stage 4
1.47 160 0 2405.12Stage 3
Generating
unit
Generation
Daily
(Mus)
OLC
(MW)Monthly
(Mus)
Max
(MW)
Min
(MW)
5.00 13.24Total 1010
Hydro
0.00 0 0 00.00KDPH
0.00 0 0 610.56VTRNA
0.00 0 0 600.60TILLARI0.00 0 00.00BHTGR/VEER
0.51 81 0 801.92BHIRA T.R.
0.05 2 20.05RNGR+BHTSA
0.28 34 00.29BHANDARDRA
0.00 0 00.00ELDARY
0.24 10 10 00.97SMLHY_PTN
1.35 250 03.76GHATGHAR
2.42 8.14Total 201
Wind
2.06 5.55MalharPeth
2.71 8.55Vankuswadi
1.38 2.22ATIT
0.76 3.04Kale
2.60 27.26Satara
1.37 3.31Shirala
1.60 1.96K Mahankal
0.53 1.43Supa
4.29 14.57Vita
6.82 26.87Dondaicha
1.41 4.45Sakri
0.70 2.66Nandurbar
1.66 4.71Khandke
1.40 4.30Khaparale29.28 110.86Total
CPP
20.50 927 781 79065.95JSW_JAIGAD
7.92 376 244 34532.03WARDHA
23.04 1220 550 1234103.88Adani
4.70 032.59Other_CPPs
56.16 234.45Total 2369
Tata
0.00 0 0 00.00Trombay 4
10.35 502 318 50039.04Trombay 5
3.71 202 147 50014.41Trombay 62.90 123 114 12011.67Trombay 7A
1.61 68 65 606.47Trombay 7B
5.59 253 188 25021.68Trombay 8
4.89 387 0 44720.01TATA Hydro
29.06 113.29Total 1877
REL
11.95 526 398 50045.841&2
11.95 45.84Total 500
Cent_Sect
4793Share
Total 4793
72.22 322.64 3245
7.42 21.38 1211
State Total 216.73 810.97 14425Total
Hydro
Thermal
89.94 386.16 4886
MSPGCL
Thml+Gas 82.52 364.79 36753.53 8.12 770Koyna 12&4 Total
2 of 8
7/27/2019 dr0_04072013
4/9
State Load Dispatch Center,Airoli (MSETCL)
Hourly Load Data As on 04/Jul/2013
THM HY GAS
TOTALCS
SHARECS
RECPTMum.S
CH.
Mum.NET
EXCH.
MSEDCLDEMAND
MET
LOADSHEDDI
NG
MSEDCLDEMANDWITH LS
TPCL + R-INFRA
DEMAND
STATEDEMAND
FREQ.(Hz)
MSPGCL GEN.TIMESR.NO.
WINDCPP /IPP
1 2981 91 441 3513 3445 3354 50.042025102598810171-683-405 122841586 2375
2 2946 86 444 3476 3268 3092 49.9418489971569915-610-385 118191539 2392
3 3021 86 446 3553 3229 2876 50.0017649908569852-531-376 116721575 2353
4 3017 65 446 3528 3203 2900 50.1816999850569794-468-361 115491510 2298
5 3028 77 449 3554 2844 2993 50.0416899732569676-450-355 114211272 2280
6 3038 156 450 3644 3324 3323 49.991779104035610347-483-369 121821327 2509
7 2992 140 447 3579 3755 3875 50.021911109905610934-585-432 129011399 2640
8 3096 153 449 3698 4129 3902 50.052075111035611047-546-432 131781340 2640
9 3110 170 444 3724 4137 3923 50.052394110945611038-542-432 134881294 2639
10 3144 183 429 3756 4405 4221 49.922723109825610926-873-524 137051175 2647
11 3203 178 428 3809 4778 4555 49.962966112255711168-1157-768 141911368 2593
12 3029 101 427 3557 4673 4578 49.963018105985710541-1073-807 136161190 2289
13 3049 92 432 3573 4397 4353 49.9429831044811710331-1079-761 134311264 2220
14 2978 168 435 3581 4158 4262 50.062873103236110262-932-536 131961100 2251
15 2995 318 428 3741 4467 4000 50.032912103996110338-903-658 133111257 2243
16 3039 194 432 3665 4458 4145 50.042909104516110390-902-657 133601261 2221
17 3086 166 436 3688 4256 3813 50.112888102236110162-881-610 131111213 2329
18 2967 173 436 3576 3578 3493 50.15283410013619952-854-444 128471211 2509
19 2790 186 438 3414 3830 3979 50.032714104326110371-713-468 131461226 2454
20 2827 689 429 3945 4525 4969 49.822707114697111398-707-508 1417689 8 2 26 7
21 2820 1349 433 4602 4479 4581 49.8726121153410511429-608-525 1414680 2 2 02 8
22 2998 1048 435 4481 4610 4639 49.932502114688011388-581-538 1397083 9 1 98 6
23 2995 823 438 4256 4419 4447 49.892378109866310923-606-529 1336480 9 1 99 4
24 3068 727 233 4028 4342 4505 49.942243107706210708-674-484 1301382 6 2 00 3
72.22MUs 7.42 10.30 89.94 96.71 94.78 -12.36 -17.44 253.06 1.57 254.63 58.45 313.08 50.00
NOTE : ALL VALUES IN MWMumbai Sch./Net Exch is shown with reference to MSETCL System. (+) indicates Mum. to MSETCL and (-) indicatesMSETCL to Mum. Mumbai Schedule is calculated for MSETCL periphery (taking 4% loss for import & 4.85% MSETCL loss
29.28
# Without Applying Load Diversity Factor
56.16
3 of 8
7/27/2019 dr0_04072013
5/9
State Load Dispatch Center,Airoli (MSETCL)
Details of Generating Unit Outages/Trippings for 04/Jul/2013Position as on 6.30 Hrs of 05/Jul/2013
Name of Generating
Unit
Tripped
Date
Trippe
d TimeSync.Date
Sync.
TimeReason of OutageCapacity
Expected
Date
PLANNED OUTAGE
Parli Unit 4 28/11/2012 02.37 Continued. water shortage.210
Cent_Sect Tarapur 2 31/12/2012 17.05 Continued. Refuelling work160
Parli Unit 625/01/2013 19.49 Continued.
Water Shortage/AOH from
06.03.2013250
Parli Unit 3 13/02/2013 23.50 Continued. Water Shortage210
Parli Unit 5 14/02/2013 22.45 Continued. Water Shortage210
Parli Unit 7 17/02/2013 01.00 Continued. Water Shortage.250
Chandrapur Unit 4 15/06/2013 13.33 Continued. Annual Overhaul210
Koyna Unit 5 01/07/2013 07.35 Continued. Maint.Work.80FORCED OUTAGE
CPP Adani U-2 22/04/2013 13.47 Continued. ID fan problem.660
Dabhol 3B 28/05/2013 21.58 Continued. Gas shortage.230
Dabhol 1B 28/05/2013 22.02 Continued. Gas shortage.230
Koyna Unit 11 04/06/2013 13.25 Continued. Rotar Fault.80
Dabhol 3A 06/06/2013 08.28 Continued. Gas Shortage230
Dabhol 3X 06/06/2013 08.28 Continued. Gas Shortage290
Dabhol 2A 06/06/2013 09.10 Continued. Gas Shortage230
CPP WPCL U-4 12/06/2013 03.27 Continued. Turbine Balancing.135
Uran Unit 8 21/06/2013 10.15 Continued. Gas Shortage.108
Dabhol 1X 27/06/2013 21.46 Continued. Gas Shortage290
Dabhol 1A 27/06/2013 21.47 Continued. Gas Shortage230
Koradi Unit 730/06/2013 09.42 Continued.
GC-2 Heavy Gland Flag
Leakage.210
Khaparkheda Unit 2 02/07/2013 23.43 05/07/2013 05.21 Boiler Vailidity Extention.210
Chandrapur Unit 3 03/07/2013 10.50 Continued. Boiler Tube Leakage.210
CPP VIPL 03/07/2013 12.29 Continued. CHP Problem.300
Bhusawal Unit 5 03/07/2013 23.40 Continued. ESP Problem.500
Koradi Unit 5 04/07/2013 11.05 04/07/2013 15.08 Low Vaccum.200
Bhusawal Unit 4 04/07/2013 17.42 04/07/2013 20.43 Bus Fault.500
CPP Adani U1 04/07/2013 20.11 Continued. BOILER TUBE LEAKAGE660
Uran Unit 6 04/07/2013 23.11 Continued. Turbine Trip.108
Uran Unit 5 05/07/2013 00.30 Continued. Turbine Trip.108
Bhusawal Unit 4 05/07/2013 00.50 05/07/2013 02.40 Drum Level High.500
4 of 8
7/27/2019 dr0_04072013
6/9
Details of Line outages/Trippings for 04/Jul/2013
State Load Dispatch Center,Airoli (MSETCL)
Position as on 6.30 Hrs of 05/Jul/2013
Name of LineTripped
Date
Tripped
Time
Synchronise
d Date
Synchronise
d TimeReason of Outage
InterState
400KVVoltage Level : PLANNED OUTAGEOutage Type
Lamboti - Solapur (PGCIL) 03/07/2013 09.30 04/07/2013 06.12 Replacement of R Ph CVT.(RFC)400KVVoltage Level : HAND TRIPPEDOutage Type
Kolhapur - Mapusa - I 06/06/2013 16.44 Continued. Over Voltage
Chandrapur-Bhadravti - I 09/06/2013 16.16 Continued. Over Voltage
Kolhapur-Solapur (PG) II 13/06/2013 17.07 Continued. Over Voltage.
Seoni-Wardha-II 765KV. 14/06/2013 10.54 Continued. Over Voltage
Solapur PG - Parly PG - I 01/07/2013 17.10 Continued. Over Voltage.
Dhule-Sar'Sarovar - II 03/07/2013 21.06 04/07/2013 19.32 Over Voltage.
Akola - Wardha - II 04/07/2013 03.20 04/07/2013 05.53 Over Voltage.
Warora - Tiroda - II 04/07/2013 19.44 Continued. Over Voltage.( One Unit on Bar)
400KVVoltage Level : TRIPPEDOutage Type
Koradi-Satpur 14/06/2013 02.02 Continued. Over Voltage.
Akola - Aurangabad- II 03/07/2013 14.51 Continued.Bus Bar Protection
Operated.(Opportunity Outage)
Koradi-Bhilai 03/07/2013 21.40 04/07/2013 13.17 Over Voltage.
Akola - Wardha - I 04/07/2013 13.06 04/07/2013 20.01 Over Voltage.
Akola - Aurangabad - I 04/07/2013 16.00 05/07/2013 07.21Bus Bar Protection Operated @
Aurangabad Main Bus - II.
Solapur - Solapur (PG) 04/07/2013 18.36 05/07/2013 06.45 Over Voltage.
Akola - Wardha - I 05/07/2013 02.21 05/07/2013 05.49 Over Voltage.
Akola - Wardha - II 05/07/2013 02.21 Continued. Over Voltage.
IntraState
400KVVoltage Level : PLANNED OUTAGEOutage Type
400/220 KV 500 MVA ICT-
I @ Deepnagar07/06/2013 17.03 Continued.
ICT charged through Tie Bay due to
higher Tan Delta Values of HV side R
Phase Bus-II CT
Bus - I @ Lonikand 04/07/2013 10.25 04/07/2013 19.45 Conductor Repair Work.
400/220 KV 500 MVA ICT
- I @ Solapur04/07/2013 11.26 05/07/2013 06.07 Replacement of Y Ph.CVT.
Bus - I @ Lamboti 04/07/2013 11.26 05/07/2013 06.07 Replacement of Y Ph.CVT.
400/220 KV 315 MVA ICT- I @ Aurangabad
04/07/2013 18.24 04/07/2013 18.26 For Bus Arrangement.
220KVVoltage Level : PLANNED OUTAGEOutage Type
Main CB of 220/100kV 200
MVA ICTIII @ Padgha22/05/2013 10.46 Continued.
Repl.of A bus,B bus isolator under
JICA scheme.ICT on TBC.
Wadkhal - NDIL - I 04/07/2013 10.03 04/07/2013 16.32 Pilot Wire Replacement Work.
Vankushwadi - MIDC
Satara.04/07/2013 10.43 04/07/2013 14.15 Due to Outage on Bus @ Vankuswadi.
Vankuswade-Malharpeth 04/07/2013 10.47 04/07/2013 14.12 Due to Outage on Bus @ Vankuswadi.
Main Bus @ Vankushwadi 04/07/2013 10.47 04/07/2013 14.00 Replacement of Insulator String.
Bhugaon-Pusad 04/07/2013 11.06 04/07/2013 15.19 Repl.of Defective R Ph.Insulator String.
Lonand - SonaAlloys 04/07/2013 13.55 04/07/2013 19.37 Scada Work @ Sonaalloy S/S.
220KVVoltage Level : FORCED OUTAGEOutage Type
Wardha Power -Warora -II 04/07/2013 00.22 04/07/2013 02.20To Attend Hot Spot on B Ph.Wave
Trap.
Jejuri-Phursungi - I 04/07/2013 15.42 04/07/2013 15.49 To Remove Crow Nest from W/T.
5 of 8
7/27/2019 dr0_04072013
7/9
Details of Line outages/Trippings for 04/Jul/2013
State Load Dispatch Center,Airoli (MSETCL)
Position as on 6.30 Hrs of 05/Jul/2013
Name of LineTripped
Date
Tripped
Time
Synchronise
d Date
Synchronise
d TimeReason of Outage
400KVVoltage Level : HAND TRIPPEDOutage Type
400/220 KV 100 MVA
Spare Unit @ Koradi12/07/2012 07.11 Continued. Main Buchholz prot.operated
400/220 KV 105 MVA
Spare ICT Unit @
Bhusawal - II
02/02/2013 10.17 Continued. Low Oil Pressure Alarm Received.
Dabhol - Nagothane - I 06/06/2013 21.21 Continued. Over Voltage
Karad - Newkoyna - I 23/06/2013 16.36 Continued. Over Voltage
Dabhol - New Koyna - I 30/06/2013 10.42 Continued. Over Voltage.
Karad - Kolhapur - II 02/07/2013 21.23 Continued. Over Voltage.
Deepnagar-Aurangabad-I 03/07/2013 16.53 04/07/2013 18.18 Over Voltage.
Karad - Kolhapur - I 03/07/2013 20.53 04/07/2013 08.52 Over Voltage.
Lonikand- Koyna Stage IV 04/07/2013 00.19 Continued. Over Voltage.
Deepnagar-Aurangabad-I 04/07/2013 18.51 Continued. Over Voltage.
220KVVoltage Level : HAND TRIPPEDOutage Type
Kalwa-Mulund-I 04/07/2013 12.07 Continued.Sparking @ Y Ph Jumper Between
Bus & Isolator @ Mulund S/S.
400KVVoltage Level : TRIPPEDOutage Type
400/11.5KV 90 MVA STN
T/F III @ 400KV C'PUR25/09/2012 15.38 Continued.
Differential protection operated
Declared Faulty by Genco.
Koradi - II - Indiabull 03/07/2013 04.04 04/07/2013 09.10 Over Voltage.
Chandrapur - Parli - III 03/07/2013 21.40 04/07/2013 09.45 Over Voltage.
Koradi - New Koradi 03/07/2013 21.40 04/07/2013 08.58 Over Voltage.
Akola - Indiabull(Nandgaonpeth)
04/07/2013 02.40 04/07/2013 06.26 Over Voltage.
Koradi-Khaparkheda-I 04/07/2013 12.22 04/07/2013 14.57 Over Voltage.
Koradi - New Koradi 04/07/2013 13.06 04/07/2013 17.55 Over Voltage.
Koradi - II - Indiabull 04/07/2013 13.06 04/07/2013 19.25 Over Voltage.
Akola - Indiabull
(Nandgaonpeth)04/07/2013 13.06 Continued. Over Voltage.
Bableshwar-Aurangabad 04/07/2013 16.00 04/07/2013 18.13Bus Bar Protection Operated @
Aurangabad Main Bus - II.
400/220KV 315MVA ICT-II
@ Aurangabad.04/07/2013 16.00 04/07/2013 18.17
Bus Bar Protection Operated @
Aurangabad Main Bus - II.
400/220 KV 315 MVA ICT- I @ Aurangabad
04/07/2013 16.00 04/07/2013 16.51Bus Bar Protection Operated @Aurangabad Main Bus - II.
Aurangabad-Deepnagar-II 04/07/2013 16.00 04/07/2013 16.47Bus Bar Protection Operated @
Aurangabad Main Bus - II.
Main Bus- II @
Aurangabad04/07/2013 16.00 04/07/2013 17.39
Bus Bar Protection Operated @
Aurangabad Main Bus - II.
Dhule - Babhaleshwar - I 04/07/2013 16.16 04/07/2013 16.52 Over Voltage.
Deepnagar-Aurangabad-II 04/07/2013 17.42 04/07/2013 18.50Bus Bar Protection Operated While
Taking Spare ICT in Service.
Bus - II @ Deepnagar 04/07/2013 17.42 04/07/2013 18.18Bus Bar Protection Operated While
Taking Spare ICT in Service.
400/220 KV,500MVA ICT-II at Deepnagar. 04/07/2013 17.42 04/07/2013 18.26 Bus Bar Protection Operated WhileTaking Spare ICT in Service.
Dhule - Babhaleshwar - I 04/07/2013 23.50 05/07/2013 02.21 Over Voltage.
Koradi - II - Indiabull 05/07/2013 01.14 05/07/2013 06.43 Over Voltage.
Akola - Bhusawal 05/07/2013 02.21 Continued. Over Voltage.
220KVVoltage Level : TRIPPEDOutage Type
6 of 8
7/27/2019 dr0_04072013
8/9
Details of Line outages/Trippings for 04/Jul/2013
State Load Dispatch Center,Airoli (MSETCL)
Position as on 6.30 Hrs of 05/Jul/2013
Name of LineTripped
Date
Tripped
Time
Synchronise
d Date
Synchronise
d TimeReason of Outage
220/100 KV,200MVA ICT -
I at Padgha07/06/2013 17.48 Continued. Diff.Protection
220/132 KV 100 MVA T/F
- I @ Valve 04/07/2013 04.49 04/07/2013 07.15 Diff. Protection.220/132 KV 100 MVA T/F
- II @ Valve04/07/2013 04.49 04/07/2013 09.56 Diff. Protection.
Aurangabad-Jalna-I 04/07/2013 16.47 04/07/2013 16.54 Load Trimming Operated.
Aurangabad-Jalna-II 04/07/2013 16.47 04/07/2013 16.54 Load Trimming Operated.
132KVVoltage Level : TRIPPEDOutage Type
Nandurbar-Visarwadi 04/07/2013 03.35 04/07/2013 10.20 Distance Protection Z-I R Ph.
7 of 8
7/27/2019 dr0_04072013
9/9
Details of On Line Capacity for 05/Jul/2013
State Load Dispatch Center,Airoli (MSETCL)
Generating unitDerated Capacity
(MW)OLC (MW)
Koradi
200 150Unit 5
210 145Unit 6
210 0Unit 7
620 295
Bhusawal
210 130Unit 2
210 130Unit 3
500 210Unit 4
500 0Unit 5
1420 470
Parli
210 0Unit 3
210 0Unit 4
210 0Unit 5
250 0Unit 6
250 0Unit 71130 0
Chandrapur
210 160Unit 1
210 150Unit 2
210 0Unit 3
210 0Unit 4
500 200Unit 5
500 200Unit 6
500 250Unit 7
2340 960
Paras
250 200Unit 3
250 200Unit 4
500 400
Khaparkheda
210 160Unit 1
210 0Unit 2
210 170Unit 3
210 170Unit 4
500 350Unit 5
1340 850
Nasik
210 195Unit 3210 180Unit 4
210 195Unit 5
630 570
Uran
852 350All Units
852 350
PENCH (MS)
53Pench (MS)
53
Koyna
600 520Stage 1-2
1000 250Stage 4
320 240Stage 3
1920 1010
Hydro
40 0KDPH
60 61VTRNA
Generating unitDerated Capacity
(MW)OLC (MW)
60 60TILLARI
21 0BHTGR/VEER
80 80BHIRA T.R.
20 0RNGR+BHTSA
45 0BHANDARDRA23 0ELDARY
12 0SMLHY_PTN
250 0GHATGHAR
611 201
Wind
0MalharPeth
0Vankuswadi
0ATIT
0Kale
0Satara
0Shirala
0K Mahankal
0Supa
0Vita
0Dondaicha
0Sakri
0Nandurbar
0Khandke
0Khaparale
0
CPP
1200 900JSW_JAIGAD
405 340WARDHA1320 617Adani
300Other_CPPs
3225 1857
Tata
150 0Trombay 4
500 500Trombay 5
500 500Trombay 6
120 120Trombay 7A
60 60Trombay 7B
250 250Trombay 8
444 447TATA Hydro
2024 1877REL
500 5001&2
500 500
Cent_Sect
3455 4525Share
3455 4525