DPWH STRATEGIC INFRASTRUCTURE PROGRAMS
AND POLICIES
SECRETARY MARK A. VILLARDepartment of Public Works and Highways
April 13, 2018
BOLDEST, MOST AMBITIOUSINFRASTRUCTURE PROGRAM IN HISTORY (% TO GDP)
Source: Philippine Institute for Development Studies
AVERAGE FOR PAST SIX (6) ADMINISTRATION IN 50 YEARS
DUTERTE YEAR 1(2017 Budget)
2
DPWH Mandate: The DPWH is mandated to undertake (a) the planning of infrastructure, such as national roads and bridges, flood control, water resources projects and other public works, and (b) the design, construction, and maintenance of national roads and bridges, and major flood control systems.
Road Network Total (km) Paved (km) % of Paved
National PrimarySecondaryTertiary
32,8687,067
14,24911,553
31,0357,066
13,52410,445
94.42%99.98%94.91%90.41%
Local RoadProvincialMunicipalCityBarangay
177,59530,15115,34915,331
116,765
33,47910,7035,3759,4587,943
18.85%35.50%35.02%61.69%6.80%
Total 210,463 64,514 30.65%
Total Permanent % Permanent
No. Lm. No. Lm. No. Lm.8,260 367,864 8,204 365,301 99.32% 99.30%
Philippine Road Network:
National Bridges:
4 4
DPWH MAJOR STRATEGIC INFRASTRUCTURE PROGRAM AND POLICIES:
FY 2017 FY 2018
Traffic Decongestion Program(Implement High Standard Highways/Expressways; Construct / widen national roads and bridges;
Construct by-passes/diversion roads; Construct flyovers; interchanges and underpasses)
P 113.1 B($2.3B)
P 149.7 B($3.0B)
Integrated and Seamless Transport System(Mindanao Infrastructure Logistics Network, MLIN; Construct/improve roads leading to growth corridors
in Western Mindanao; Study and implement Inter-island linkage projects; Connect gaps along national
roads; Construct/replace bridges)
P 88.0 B($1.8B)
P 101.5 B($2.0B)
Convergence and Rural Road Development Program(Construct/upgrade local access roads to designated tourism destinations, RORO ports / seaports and
airports; Construct/improve roads leading to industrial trade corridors.)
P 18.1 B($0.4B)
P 49.8B($1.0B)
Livable, Sustainable & Resilient Communities
Integrated Water Resources Management Program
(Construct/rehabilitate flood mitigation structures along major river basins and principal rivers; Construct
water impounding projects; Construct water supply/septage & sewerage/rain collectors; Upgrade
drainage capacity)
Disaster Risk Reduction and Climate Change Adaptation Program(Rehabilitate, retrofit and strengthen existing bridges; Provide safe access to highly vulnerable areas;
Improve national roads vulnerable to flooding, landslide and slope failure; Build evacuation centers)
P 106.8 B($2.1B)
P 165.0 B($3.3B)
US $ 1 = Php 506
CAR – P 19.85 B
Region I – P 28.94 B
Region II – P 19.80 B
Region III – P 55.86 B
NORTHERN LUZON – P124.45B (21.75%)
Region XIII – P 31.36 B
Region X – P 55.59 B
Region IX – P 23.09 B
Region XI – P 56.03 B
Region XII – P 23.87 B
MINDANAO – P189.94B (33.19%)
NCR – P42.66B (7.46%)
Region IV-A – P 46.99 B
Region IV-B – P 32.33 B
Region V – P 41.34 B
SOUTHERN LUZON – P120.65B (21.08%)
Region VI – P 31.96 B
Region VII – P 27.66 B
VISAYAS – P94.51B (16.52%)
Region VIII – P 34.90 B
TOTAL : P 572.22 B
* Excludes Inter-Regional/Nationwide-P39.55B7
DPWH 2018 BUDGET BY REGION (CAPITAL OUTLAYS):
START: 2017
COMPLETION: 2020
INTEGRATED DISASTER RISK REDUCTION
AND CLIMATE CHANGE ADAPTATION
MEASURES IN THE LOW LYING AREAS OF
PAMPANGA BAYShortens flood duration from 66 days to 17 days
Sample Picture Only
PROJECT COST:
LP:
GOP:
P 4.22 B ($84.4M)
P 3.27 B
P 0.95 B
8
Metro Manila Logistics
Improvement ProjectFrom 30 bridges to 42 bridges crossing Pasig
River, Marikina River and Manggahan Floodway
BINONDO-INTRAMUROS BR.
NORTH & SOUTH HARBOR BR.
PALANCA-VILLEGAS BR.
BEATA-MANALO BR.
BLUMENTRITT-ANTIPOLO BR.
STA. MONICA-LAWTON BR.
MARIKINA-VISTA REAL BR.
J.P. RIZAL-LOPEZ JAENA BR.
J.P. RIZAL-ST. MARY BR.
MERCURY-EVANGELISTA BR.
EAST BANK-WEST BANK BR. 1
EAST BANK-WEST BANK BR. 2
ESTRELLA-PANTALEON BR.
GUADALUPE BR.
LAMBINGAN BR.
9
Inter-Island Linkage
ProjectMINDORO-BATANGAS SUPER
BRIDGE, 15km
PANAY-GUIMARAS-NEGROS LINK
BRIDGE, 19.2 km
CEBU-NEGROS LINK BRIDGE, 7km
LEYTE-SURIGAO LINK BRIDGE,
23km
BOHOL-LEYTE LINK BRIDGE, 35km
CEBU-BOHOL LINK BRIDGE, 27.5km
CAMARINES-CATANDUANES
FRIENDSHIP BRIDGE, 10.7km
LUZON-SAMAR LINK BRIDGE,
25.4km
10
PANGUIL BAY BRIDGE, 3.77km
Luzon Spine
Expressway NetworkFrom 385 km to 1,040 km High Standard
Highways in Luzon. La Union to Bicol in 8
hours and 15 minutes.
11
CLLEX-Phase I30 km expressway from Tarlac City to
Cabanatuan City, Nueva Ecija. Travel time
will be reduced from 70 minutes to 20
minutes.
START: 2016
COMPLETION: 2020
PROJECT COST:
LP:
GOP:
P 14.94 B ($298.8M)
P 12.59 B
P 2.34 B
12
CLLEX, Phase II(Cabanatuan-San Jose, Nueva Ecija)Length: 35.70 km
Indicative Cost: P9.46 B ($189.2M)
PLARIDEL BY-PASS, PHASE II24.61 km - 2 lane by-pass road. It will reduce
travel between Balagtas and San Rafael,
Bulacan from 69 minutes to 24 minutes
START: 2014
COMPLETION: 2018
Actual Picture
PROJECT COST:
LP:
GOP:
P 3.68 B ($73.6M)
P 2.86 B
P 0.81 B
Plaridel By-Pass, Phase IIIDescription: Widening of 24.61 km bypass road from 2 lane
to 4 lane including 12 bridges, drainage facilities, and slope
stabilization works.
Indicative Cost: P5.26 B ($105.2M)
Schedule: 2018-2021
13
START: 2014
COMPLETION: 2022
BAGAC- MARIVELES ROADImprovement/concreting of 20.61 km road sections that will
connect the Bataan Export Zone (BEZ) and Subic Bay Freeport
Zone (SBFZ). Travel time between Mariveles, Bataan and Subic,
Zambales will be reduced from 120 minutes to 90 minutes.
PROJECT COST: P 716.290 M
14Status: On-going, 94.50%
CAPAS-BOTOLAN ROAD81.63 km east – west road connecting Capas, Tarlac and
Botolan, Zambales. Travel time will be reduced from 3 hours to
1 hour and 20 minutes.
PROJECT COST: P 5.91 B
15
Status: On-going, 58.42%
START: 2015
COMPLETION: 2021
NEW CLARK-BAMBAN-CAPAS ACCESS ROAD16 km road that will provide a direct link from the Clark
Freeport Zone to the New Clark City. Travel time between
Clark Freeport Zone, Pampanga and Capas, Tarlac will be
reduced from 120 minutes to 90 minutes.
PROJECT COST: P 980.00 M
16
Status: Ongoing, 47.53%
START: 2016
COMPLETION: 2021
NEW CLARK CITY-MAC ARTHUR ACCESS
ROAD6.98 km access road that will provide a direct link from the
Mac Arthur Highway to the New Clark City. Travel time
between Manila North Road and New Clark City will be
reduced from 90 minutes to 30 minutes.
PROJECT COST: P 450.00 M
17
Status: Ongoing, 18.52%