Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 2: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

FOREWORD

21 AUGUST 1995

The EWR 127-1 Range User Handbook was written to increase your awareness of the RangeSafety Program and to assist you in meeting your mission objectives in the most efficient, safestmanner possible. Obtaining final Range Safety approval to launch can be a tedious and difficultobjective to achieve; however, with an understanding of the process, proper planning, andproper engineering, you can accomplish this goal in a manner that is consistent with missionobjectives with little or no impact to your program budget or schedule. The Range Safety officewill support you in your effort to achieve a successful and safe mission.

Although this Handbook is not regulatory except when repeating or referencing EWR 127-1, itdoes contain guidance that will make the Range Safety approval to launch process simpler andmore expedient. The Handbook is divided into four separate sections. Section 1 presents thehistorical basis for EWR 127-1, explains the organization of the chapters in the Range SafetyRequirements, and describes the organization and management of the 45th and 30th SpaceWings with a focus on the Offices of Safety and those groups impacting the safety approval proc-ess. In addition, print and electronic accessibility to a variety of Range Safety documents is dis-cussed. The section ends with an overview of the “Range Safety Concept to Launch” processand associated Range User inputs and Range Safety outputs.

Corresponding to the seven Chapters in EWR 127-1, Section 2 of the Handbook provides chap-ter-by-chapter details for meeting the scheduling and documentation requirements described inthe “Concept to Launch” process. Additionally, Range User tools and information not ad-dressed in EWR 127-1 are included. Range User inputs and Range Safety outputs for each of theEWR 127-1 Chapters are also presented.

Section 3 provides blank Change Request, Tailoring Request, and Noncompliance Request formsfor Range User use. In addition, examples of completed forms and an example of a portion of aTailored EWR 127-1 are included. The Section 4 Appendixes contain additional informationsuch as Range Safety Directories, 45 SW/SES Authorized Ordnance Test Equipment, EasternRange Test Console description, and the NASA/KSC Approved Plastic Film List that are alsoavailable on the Range Safety Bulletin Board System. Suggestions to improve this Handbook,EWR 127-1, the Range Safety Bulletin Board System, and the Range Safety Program are appre-ciated and should be communicated to the Offices of the Chiefs of Safety at each of the Ranges.

Downloaded from http://www.everyspec.com

Page 3: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Table of Contents

i

Glossary of Abbreviations and Acronyms ............................................................................................................... iii

SECTION 1: OVERVIEW OF RANGE SAFETY PROGRAM

Introduction ....................................................................................................................................................... 1-1Historical Perspective.......................................................................................................................................... 1-1Current Document............................................................................................................................................... 1-4Accessibility ....................................................................................................................................................... 1-5Referenced Documents ....................................................................................................................................... 1-7Organization ....................................................................................................................................................... 1-7Range Safety “Concept to Launch” Process....................................................................................................... 1-10Range User Input/Range Safety Output ............................................................................................................. 1-12

SECTION 2: OVERVIEW OF EWR 127-1 CHAPTERS

Introduction ....................................................................................................................................................... 2-1

Chapter 1: Eastern and Western Range Safety Policies and ProcessesChapter Overview......................................................................................................................................... 2-2Responsibilities and Authorities .................................................................................................................... 2-3Range Safety “Concept to Launch” Process.................................................................................................. 2-5Range User Inputs/Range Safety Outputs..................................................................................................... 2-7Critical Timelines.......................................................................................................................................... 2-8Range User Tools and Aids .......................................................................................................................... 2-9

Chapter 2: Flight Analysis Requirements

Chapter Overview....................................................................................................................................... 2-10Responsibilities and Authorities .................................................................................................................. 2-10Range Safety “Concept to Launch” Process................................................................................................ 2-11Range User Inputs/Range Safety Outputs................................................................................................... 2-12Critical Timelines........................................................................................................................................ 2-14

Chapter 3: Launch Vehicle, Payload, and Ground Support EquipmentDocumentation, Design, and Test Requirements

Chapter Overview....................................................................................................................................... 2-15Responsibilities and Authorities .................................................................................................................. 2-15Range Safety “Concept to Launch” Process................................................................................................ 2-16Range User Inputs/Range Safety Outputs................................................................................................... 2-17Critical Timelines........................................................................................................................................ 2-19Range User Tools and Aids ........................................................................................................................ 2-20

Chapter 4: Airborne Range Safety System Documentation, Design, and Test Requirements

Chapter Overview....................................................................................................................................... 2-21Responsibilities and Authorities .................................................................................................................. 2-21Range Safety “Concept to Launch” Process................................................................................................ 2-22Range User Inputs/Range Safety Outputs................................................................................................... 2-23Critical Timelines........................................................................................................................................ 2-24Range User Tools and Aids ........................................................................................................................ 2-25

Chapter 5: Facilities and Structures Documentation, Design, Construction, Test,and Inspection Requirements

Chapter Overview....................................................................................................................................... 2-26Responsibilities and Authorities .................................................................................................................. 2-26Range Safety “Concept to Launch” Process................................................................................................ 2-27Range User Inputs/Range Safety Outputs................................................................................................... 2-28Critical Timelines........................................................................................................................................ 2-29

Downloaded from http://www.everyspec.com

Page 4: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Table of Contents

ii

Chapter 6: Ground Personnel, Equipment, Systems, and Materials Operations Safety Requirements

Chapter Overview....................................................................................................................................... 2-30Responsibilities and Authorities .................................................................................................................. 2-30Range Safety “Concept to Launch” Process................................................................................................ 2-31Range User Inputs/Range Safety Outputs................................................................................................... 2-32Critical Timelines........................................................................................................................................ 2-33Range User Tools and Aids ........................................................................................................................ 2-34

Chapter 7: Flight Control Documentation, Systems, and Procedural Requirements

Chapter Overview....................................................................................................................................... 2-35Responsibilities and Authorities .................................................................................................................. 2-36Range Safety “Concept to Launch” Process................................................................................................ 2-39Range User Inputs/Range Safety Outputs................................................................................................... 2-40Critical Timelines........................................................................................................................................ 2-41

SECTION 3: SAMPLE FORMS AND COMPLETED EXAMPLES

EWR 127-1 Change Request Form............................................................................................................... 3-1EWR 127-1 Change Request Form Example ................................................................................................ 3-2127-1 Noncompliance Request Form............................................................................................................ 3-3127-1 Noncompliance Request Example....................................................................................................... 3-4127-1 Tailoring Request Form ..................................................................................................................... 3-5127-1 Tailoring Request Example ................................................................................................................. 3-6Example of Tailored Page............................................................................................................................. 3-7

SECTION 4: APPENDIXES

Appendix A: Range Safety Directory45th Space Wing ...................................................................................................................................A-130th Space Wing ...................................................................................................................................A-2

Appendix B: NASA/KSC Approved Plastic Film List .....................................................................................B-1Appendix C: 45 SW/SES Authorized Ordnance Test Equipment...................................................................C-1Appendix D: Eastern Range Ordnance Test Console Description .................................................................D-1Appendix E: Example of Compliance Checklist ............................................................................................E-1

Downloaded from http://www.everyspec.com

Page 5: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Glossary of Abbreviations and Acronyms

iii

30 CEG/CEF - 30th Civil Engineer Group, FireProtection

30 SW/SEGP - 30th Space Wing, OperationsSafety

30 SW/SEO - 30th Space Wing, Mission FlightControl

30 SW/SEY - 30th Space Wing, Flight Analysis

45 CES/CEF - 45th Civil Engineer Squadron, FireProtection

45 SEOO - 45th Space Wing, Mission FlightControl

45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

45 and 30 SW - 45th and 30th Space Wings

45/30 CES - 45th and 30th Civil EngineeringGroup

45/30 LG - 45th and 30th Logistics Group

45/30 MDG/SGPB - 45th and 30th MedicalGroup, Bioenvironmental Engineering

45/30 MDG/SGPH - 45th and 30th Medical Group,Radiation Protection

45/30 MS - 45th and 30th Maintenance Squadrons

45/30 OG - 45th and 30th Operations Groups

45/30 RANS - 45th and 30th Range Squadrons

45/30 SUG - 45th and 30th Support Groups

45/30 SW/CC - 45th and 30th Space Wing Com-manders

45/30 SW/SE - 45th and 30th Space Wings, Officesof the Chiefs of Safety

45/30 SW/SEG - 45th and 30th Space Wings,Ground Safety

45/30 SW/SEOE and SEOS - 45th and 30th Op-erations Support and Analysis

45/30 SW/SES - 45th and 30th Space Wings,Systems Safety

45/30 WS - 45th and 30th Weather Squadrons

ACO - Area Control Officer

AFM - Air Force Manual

ANSI - American National Standards Institute

ASME - American Society of Mechanical Engi-neers

ASTM - American Society for Testing Materials

CCAS - Cape Canaveral Air Station

cDR - Conceptual Design Review

CDR - Critical Design Review, Command DestructReceiver

CMR - Center Materials Representative

COLA - Collision Avoidance Windows

DAIP - Danger Area Information Plan

DEP - Directed Energy Plans

DOD - Department of Defense

EED - electroexplosive device

ELV - expendable launch vehicle

EOD - Explosive Ordnance Disposal

ER - Eastern Range

ESP - Explosive Site Plan

EWR - Eastern and Western Range

FCA - Flight Caution Area

FFDP - Final Flight Data Package

FFPA - Final Flight Plan Approval

FHA - Flight Hazard Area

FSDP - Facility Safety Data Package

FSPO - Flight Safety Project Officer

FTS - Flight Termination System

GOP - Ground Operations Plan

GSE - ground support equipment

ISP - Intended Support Plans

KSC - Kennedy Space Center

LRR - Launch Readiness ReviewLST - Launch Support Team

Downloaded from http://www.everyspec.com

Page 6: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Glossary of Abbreviations and Acronyms

iv

MFCO - Mission Flight Control Officer

MSP - mission support positions

MSPSP - Missile System Prelaunch Safety Pack-age

NASA - National Aeronautics and Space Admini-stration

NEC - National Electrical Code

NOTAM/NTM - Notice to Airmen and Mariners

NSD - Nuclear Source Data

OpsSup - Operations Supplement

OSC - Operations Safety Console

OSM - Operations Safety Manager

OSP - Operations Safety Plan

OTC - Ordnance Test Console

PDR - Preliminary Design Review

PFDP - Preliminary Flight Data Package

PFPA - Preliminary Flight Plan Approval

PPE - Personal Protective Equipment

ROC - Range Operations Controller

RSBBS - Range Safety Bulletin Board System

RSDS - Range Safety Display System

RSOR - Range Safety Operating Requirement

RSS - Range Safety System

RSSR - Range Safety System Report

RTS - Range Tracking System

S&A - Safe and Arm Device

SCAPE - Self-Contained Atmospheric ProtectionEnsemble

SCBA - Self-Contained Breathing Apparatus

SCD - Surveillance Control Display

SOP - Standard Operating Procedures

STS - Space Transportation System

TBD - To Be Determined

TDTS - Telemetry Data Tracking System

THA - Toxic Hazards Assessment

TIM - Technical Interchange Meeting

TRA - Toxic Risk Assessment

TRCP - Toxic Release Contingency Plan

USAF - United States Air Force

USCG - United States Coast Guard

VAFB - Vandenberg Air Force Base

WR - Western Range

Downloaded from http://www.everyspec.com

Page 7: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

SECTION 1

Downloaded from http://www.everyspec.com

Page 8: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 1

1-1

SECTION 1

OVERVIEW OF RANGE SAFETY PROGRAM

INTRODUCTION Section 1 provides the historical foundation for EWR 127-1, anoverview of the organization of the current document, and adescription of the print and electronic availability of EWR 127-1 andother documents related to the Range Safety Program. In addition,information concerning the location of documents referenced in EWR127-1 is provided. The 45th and 30th Space Wing organizations aredescribed and the overall Range Safety “Concept to Launch” processis discussed. The section ends with an overview of the systems, tools,and documents that Range Safety provides, as a result of Range Userinputs, to ensure that each launch is conducted safely and efficiently.

HISTORICAL PERSPECTIVE With the advent of rocket technology in the United States after theSecond World War, the United States Congress establishedrequirements for Joint Long Range Proving Grounds for guidedmissiles in 1949. One sentence--“From a safety standpoint, they(guided missiles) will be no more dangerous than conventionalairplanes flying overhead”--provided the basis for the concept ofRange Safety. Both of the Ranges developed and implementedseveral documents describing Range Safety requirements from1949 to the present. For simplicity, the diagram on the next pageshows the evolution of EWR 127-1.

Eastern and Western RangeTest Manuals

In 1956, Public Law 10 was passed to define similar safetyrequirements for ordnance storage and operations. With thepassage of these laws, the Air Force Military Test Center and theDepartment of Defense issued memoranda defining theresponsibility of the Commander and the Deputy Commander andholding them personally liable for safety on the proving grounds. To implement the safety policy of the Commander, theDirectorate of Center Safety was established. The first documentwritten to address those safety requirements was the Air ForceWestern Test Range Manual 127-1, published in August 1969. Public Law 29, the Occupational Health and Safety Act, passedin 1971 defined the requirements for protecting the civilian workforce; and the Air Force Occupational Safety and Health Manual,published in 1972 further refined these requirements. Shortlyafterwards, the Air Force Eastern Test Range Manual, AFETRM127-1 was published.

Downloaded from http://www.everyspec.com

Page 9: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 10: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 1

1-3

Eastern and Western Spaceand Missile Center Regula-tions

In 1983 and 1984, revised editions of the manuals were issued andthe names changed to reflect the change in names of the test centers.The manuals were changed to regulations that were considered moredirective and binding. The responsibilities of the Center Commanderwere further clarified as a result of Department of Defense Directive3200.11.

Eastern and Western RangeRegulation 127-1

Shortly after the 1984 edition was published, Congress passed theCommercial Space Launch Act to accommodate private sectoraerospace companies that wanted to use military facilities to launchsatellites for commercial purposes. In response to this law, theDepartment of Defense issued Directive 3230.3 in 1986, furtherclarifying the Department's safety responsibilities and supportrequirements for commercial launch activities. Again in 1988,Congress addressed commercial launches with an update to theCommercial Space Launch Act, assigning the Department ofTransportation the responsibility for licensing commercial launches.During the same period, safety, policy, and criteria for the launchof any launch vehicle from the Range were established in the 80series of the Air Force regulations; and the goals andresponsibilities of the Commander and other personnel for theprevention of mishaps were described in the 127 series. The 1993editions of the regulations incorporated the requirements of thepublic laws, the Department of Defense Directives, and the AirForce regulations. Because private sector aerospace companiesare not directly bound by military regulations, standards, andspecifications in the launch of launch vehicles and payloads fromthe Ranges, the 1993 editions were much more comprehensive,providing the minimum standards for the safe conduct ofoperations on the Ranges.

Downloaded from http://www.everyspec.com

Page 11: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 1

1-4

Eastern and Western Range127-1

Throughout the life of these two Range documents, attempts wereundertaken to make the requirements common to both Ranges;however, it was not until 1994 that a concerted effort was made tohave a document common to both Ranges. In March 1995,Eastern and Western Range 127-1, Range Safety Requirementswas signed by the Wing Commanders and published.

Range User Handbook In addition to the requirements and due to popular demand, RangeSafety developed the Range User Handbook to provide anoverview of the Range Safety Program and to help Range Usersachieve final Range Safety Approval for launch as quickly andsafely as possible.

Range Safety Bulletin BoardSystem

During the development of EWR 127-1, Range Safety introduceda Range Safety Bulletin Board System (RSBBS) to provide anelectronic means for review of the document as it was beingdeveloped and to serve as a forum for Range Safety issues.

CURRENT DOCUMENT Eastern and Western Range 127-1, Range Safety Requirementsis divided into seven Chapters. Chapter 1 provides the safetypolicies and procedures for operating on the Eastern and WesternRanges. It is a critical Chapter because it includes policies, pro-cedures, and processes such as Tailoring, Noncompliance Re-quests, and Change Requests that are common to all the remain-ing Chapters. Chapter 2 describes the requirements for develop-ing a flight plan, while Chapter 3 focuses on the design and testrequirements for hazardous and safety critical systems associatedwith launch vehicles, payloads, and ground support equipment. In addition, design and test criteria for acoustics, non-ionizing andionizing radioactive materials, hazardous materials, ordnance,electrical and electronic equipment, computing systems and soft-ware, and vehicles are addressed. Chapter 4 covers the designand test requirements for airborne Range Safety Systems (RSS). Chapter 5 includes the design, construction, test, and initial in-spection requirements for facilities and structures used on theRanges. Chapter 6 provides the details for operating the hazard-ous and safety critical systems addressed in Chapter 3 for prelaunchprocessing. Chapter 7 describes the systems and procedures re-quired to maintain positive control of launch vehicles duringcountdown and flight from the Ranges.

Each Chapter includes the following information in the ordershown below:

� Contents� Glossary of Abbreviations, Acronyms, and Definitions

Downloaded from http://www.everyspec.com

Page 12: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 1

1-5

� Referenced Documents� Body of Chapter� Appendixes, as applicable

The body of each Chapter begins with an introduction that pro-vides an overview of the Chapter content. The second sectiondescribes the responsibilities and authorities of the 45th and 30thSpace Wings as well as those of the Range Users. The thirdsection provides policy issues that relate to the content of theChapter, while the fourth section defines all of the documentationneeded to meet the technical requirements of the Chapter. Theremaining sections provide the detailed requirements. BecauseChapter 1 addresses overall Range Safety policy, its organizationis slightly different.

As applicable, appendixes to each Chapter provide guidance inthe completion and submittal of the documentation requirementsand other information related to the specific Chapter. Chapter 3also provides an appendix related to flight pressure system designrequirements, and Chapter 4 includes extensive appendixes forrequired RSS test plans. In addition, a table of contents and indexare provided for the entire document. The compiled index is atthe end of the document.

ACCESSIBILITY Range Safety Master Distribution List

The Range Safety Office maintains a master distribution list of allparties interested in or affected by Range Safety issues. This listis used to notify those parties of Range Safety issues. You areencouraged to verify that you are on the list. Information requiredincludes name, organization, street address, telephone number,and fax number. You can provide this information via a RangeSafety Bulletin Board System (RSBBS) message, by fax, or bycalling one of the Range Safety Offices. Where possible,organizations should limit themselves to one point of contact andperform their own internal reproduction and distribution of RangeSafety documents. Appendix A in Section 4 of this Handbook isa directory of Range Safety personnel names and telephonenumbers for each of the Ranges.

Range Safety Bulletin Board System (As of 17-Apr-98, thisRSBBS is no longer existed, see EWR127-1 chapter 1,section 1.12 for more details)

The Range Safety Bulletin Board System (RSBBS) is a tool usedto supply Range Users with up-to-date Range Safety information,as a database of Range Safety documentation, as a forum forRange Users to pose questions regarding Range Safety, and as ameans for Range Safety to poll Range Users on important RangeSafety concerns.

Downloaded from http://www.everyspec.com

Page 13: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 1

1-6

System Description: The RSBBS uses Wildcat software on anIBM compatible 486-33 desktop computer with one dedicatedphone line using a 14400 baud modem. Most text files arecompressed and are in Word for Windows 2.0 or 6.0 format.Word for Windows 6.0 is the standard.

Loaded Files: As of the publication date of this handbook, thefollowing major files are loaded on the RSBBS:

� RSBBS Information and Instructions� EWR 127-1 (31 March 1995)� ERR 127-1 (June 1993)� ESMCR 127-1 (October 1984)� EWR 127-1 Range Users Range Safety Handbook� EWR 127-1 Change Requests and Range Safety Responses� 127-1 Tailored Change Request Form, Word 6.0

Template� 127-1 Noncompliance Request Form Letter� EWR 127-1 Change Request Form, Word 6.0 Template� EWR 127-1 Change Notices� EWR 127-1 Compliance Checklists, Word 6.0 Templates

Files that may be Loaded in the Future:

� Operations Safety Plans and SOPs� KSC Approved Plastics List� KSC Approved Material Selection List for Type J and

Fluid Service� Eastern Range Safety Approved Ordnance Test

Equipment List� Danger Area Information Plan� Toxic Release Contingency Plan� Range Safety Organization Chart, Information, and Directory

Access: Access to the RSBBS is free; however, since it iscurrently limited to one line, a time limit of two hours per call hasbeen imposed. The RSBBS is on line 24 hours a days, 7 days aweek, 365 days a year. The phone number is (407) 494-7221 andthe modem protocol is 8-N-1. As the RSBBS evolves, it will havean Internet address for file transfer and E-Mail.

Downloading: All files can be downloaded; however, they maybe in READ ONLY format.

Uploading: Range Users can upload messages consisting ofquestions, comments, or answers to Range Safety questions posedon the RSBBS.

Downloaded from http://www.everyspec.com

Page 14: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 1

1-7

REFERENCED DOCUMENTS EWR 127-1 referenced documents are currently available from avariety of sources including the following:

� Federal Regulations are available from the Superintendentof Documents, Government Printing Office, Washington,DC 20402 (telephone 202-783-3238). Charges apply.

� Department of Defense, Air Force, Air Force Space Com-mand, 45th and 30th Space Wing, and NASA Regulationsare available through the 45th Space Wing Office of Infor-mation Management, 45 SW/MIS and 30 SW customeraccount representatives or the Office of PrimaryResponsibility. These documents are available for reviewand limited reproduction in the Bidder's Library only tocontractors under contract to the Air Force. They are alsoavailable on a limited basis under the Freedom ofInformation Act. Charges may apply.

� Industry Standards, such as ASME, NEC, ANSI, andASTM are available through the society producing thestandards or through commercial publishing houses.

Range Safety is in the process of establishing a technical librarythat includes all the documents referenced in EWR 127-1. Youwill be notified when the technical library is available.

ORGANIZATION Range Safety is the responsibility of all 45th and 30th SpaceWing organizations, tenants, contractors, subcontractors, RangeUsers, and visitors to the Ranges. The organization charts on thenext two pages show the current 45th and 30th Space Wingorganizations. Organizations with specific Range Safetyresponsibilities and authorities per EWR 127-1 are shaded. EachChapter of EWR 127-1 and Section 2 of this Handbook contain a“Responsibilities and Authorities” section that summarizes safetyresponsibilities associated with the particular Chapter.

Downloaded from http://www.everyspec.com

Page 15: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 16: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 17: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 1

1-10

RANGE SAFETY “CONCEPTTO LAUNCH” PROCESS

Active Range Safety involvement in a program from the earliestconcept phases through launch enhances the chances for a safeprogram with increased mission reliability, lower cost, and theability to launch on schedule. The 11 by 17 inch foldout on thenext page shows the Range Safety “Concept to Launch” processfor a major new launch vehicle. Each of the icons represents amilestone in the process. Below each icon is a list of the pertinentinformation required to meet the milestone. The following keyidentifies each item in the list.

The following is a brief description of the items in the key:

� Safety Milestones: those events that must occur in order fora program to launch safely from the ER or WR.

� EWR 127-1 Chapter: the Chapter dealing with the safetymilestone

� 45/ 30 SW/SE POC: the 45 or 30 SW/SE section responsiblefor the safety milestone and EWR 127-1 Chapter.

� Required Technical Interchange Meeting or Activity: theforum at which the activity is formally discussed orperformed per EWR 127-1.

� Primary Document: the formal primary documentationrequired for review and approval by 45 or 30 SW/SE sectionsper EWR 127-1.

� Approval Required Prior To: those events that can not occuruntil the formal documentation is approved.

� Time Frame: the typical period of performance based on a 5year cycle for a new major launch vehicle; this time may becompressed to as little as a year or less for smaller launchvehicles, launch vehicle modifications, and payloads.

A further breakdown of this process is detailed in Section 2 of thisHandbook. The Range Safety “Concept to Launch” process canbe tailored for payloads, launch vehicle modifications, groundsupport equipment, and/or facilities. EWR 127-1, Appendix 1Fhas a specific tailored process for generic payload busses. It isalso extremely important to note that in many cases, themilestones may overlap or even occur in a different order thanpresented here except when specifically prohibited in thisHandbook or in EWR 127-1.

Downloaded from http://www.everyspec.com

Page 18: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 1

1-11

‘Click on hdbk1-11.ppt to view "Concept to Launch"Process

Downloaded from http://www.everyspec.com

Tom A Luu
Tom A Luu
Page 19: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 1

1-12

RANGE USER INPUT/RANGESAFETY OUTPUT

Range Safety not only reviews and approves requireddocumentation, but also uses this information togenerate, update or modify the required systems,software, tools, studies, and documentation to ensurepublic, launch area, and launch complex safety from thetime a program arrives at CCAS or VAFB throughlaunch. Range Safety and other organizations requiresubstantial lead times for documentation per EWR 127-1 for the review and approval and the completion of thiswork. Such systems, software, tools, and documentsinclude, but are not limited to, the following:

� Operations Safety Console� Range Safety Displays� Mission Rules� Range Safety Operating Requirements� Operations Supplement� Operations Safety Plans� Danger Area Information Plan� Launch Support Team Plan� Notices to Airmen and Mariners� Explosive Ordnance Disposal Plans� Toxic Release Contingency Plan (Cape Aural

Warning Plan)� Toxic Hazard Corridor� Systems Safety (45 or 30 SW/SES) Console

Operating Instructions� Flight Termination System (FTS) Need

Determination� Launch Complex Selection� Mission Flight Control Officer (MFCO)

Training Plans� Collision Avoidance Windows (COLAS)� Flight Safety Project Officer Checklist

It is not the intent of this Handbook to go into a detailedexplanation of this list; however, Section 2 providesmore specific information as it pertains to each EWR127-1 Chapter.

Downloaded from http://www.everyspec.com

Page 20: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

SECTION 2

Downloaded from http://www.everyspec.com

Page 21: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-1

SECTION 2

OVERVIEW OF EWR 127-1 CHAPTERS

INTRODUCTION

This section of the Handbook provides guidance in meeting therequirements of each of the Chapters in EWR 127-1. The sectionis divided into seven subsections, each one addressing a separateEWR 127-1 Chapter. In the subsections, the following topics arecovered:

� Chapter Overview� Responsibilities and Authorities� The Range Safety "Concept to Launch" Process

� Range User Inputs/Range Safety Outputs� Critical Timelines� Range User Tools and Aids

The “Chapter Overview” provides a quick synopsis of the contentof the Chapter. “Responsibilities and Authorities” summarizesthe different Space Wing organizations involved in the review andapproval processes described in the Chapter. The “Range SafetyConcept to Launch Process” further defines those aspects of theprocess that apply to the technical requirements of the Chapter.The “Range User Inputs/Range Safety Outputs” subsectiondescribes what Range Safety does with all of the information youprovide to them and gives you a better understanding of their needfor data. The “Critical Timelines” subsection provides EWR127-1 required documentation submittal deadlines, 45 and 30SW/SE review and approval time required, additional 45 and 30SW approvals required, and the events that cannot beaccomplished without 45 and 30 SW/SE and other 45 and 30 SWrequired approvals. Keep in mind that even critical timelines aretailorable. “Range User Tools and Aids” lists print and electronicaids available to make your role as a Range User easier.

Downloaded from http://www.everyspec.com

Page 22: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 23: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 24: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-4

The 45/30 Operations Groups are responsible for complying with,implementing, and enforcing the Range Safety Program; review-ing and accepting all prelaunch and launch operations proceduresat CCAS and VAFB for Air Force programs, including hazardousand safety critical procedures that may affect public or launcharea safety after ensuring they have been approved by RangeSafety. As a control authority, in accordance with the RangeSafety Training and Certification Plan, they review and approveprelaunch and launch operations procedures for Air Force pro-grams that are limited to launch complex safety concerns.

45/30 LG

The 45/30 Logistics Groups ensure that all required instrumenta-tion, computers, communications, command systems, and RangeSafety Display Systems necessary for Range Safety to carry outits functions perform to the prescribed level of reliability and meetspecified design requirements.

45/30 SUG

The 45/30 Support Groups ensure facility construction meetssafety requirements. 45/30 Civil Engineering Squadron/Groups(45 CES and 30 CEG) are responsible for determining, coordi-nating, and enforcing fire safety, environmental engineering, andexplosive ordnance disposal requirements.

45/30 MDG

The 45/30 Medical Groups provide medical support to RangeUsers as required. These groups determine, coordinate, and en-force medical, biological, and radiological health requirements.

Downloaded from http://www.everyspec.com

Page 25: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 26: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-6

System Safety Program Plan

As a Range User. you establish a System Safety Program Plan tosupport efficient and effective achievement of overall systemsafety objectives. The System Safety Program Plan, described inEWR 127-1, Chapter 1, Appendix 1B reflects the safetymanagement system you plan to use to implement the provisionsof EWR 127-1.

Range Safety Training and Certification Plan

As the control authority, the single commercial user, full timegovernment tenant organization, or USAF squadron/detachmentcommander, has the responsibility for launch complex safety andexercises the function in accordance with the Range Safety Trainingand Certification Plan requirements. If the control authority does notassume this responsibility, the Chiefs of Safety will be responsible forlaunch complex safety. A Range Safety Training and CertificationPlan must be submitted by the control authority and reviewed andapproved by Range Safety prior to taking launch complex safetyresponsibility. Further information about the Training andCertification Plan can be obtained from the Range Safety offices.

127-1 Noncompliance Requests

As a Range User, you are also responsible for identifying all 127-1noncompliances to Range Safety. It is to your advantage to identifyand resolve these noncompliances as early in the program as possible.Late identification can cause costly delays and schedule interruptions.The process for submitting noncompliance requests is described inChapter 1, Appendix 1C. A sample completed 127-1 NoncomplianceRequest can be found in Section 3 of this Handbook.

EWR 127-1 Change Requests

EWR 127-1 Change Requests may be submitted to Range Safetyfor review at any time. If the Change Request is accepted by bothRanges, 45 SW/SE and 30 SW/SE will jointly publish anddistribute formal EWR 127-1 Change Notices and provide changepages to the document, as necessary. The process for submittingchange requests can be found in Chapter 1, Appendix 1E.

Downloaded from http://www.everyspec.com

Page 27: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 28: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-8

Critical Timelines

*All references to days refer to calendar days. **2 years is worst case scenario. This timeline may be reduced de-

pending upon the deviation request.

Item Deadline*SE TimeRequired *

AdditionalApproval

RequiredBefore

ProgramDescription

Initial Range UserRange Safety TIM

None (verbal atmeeting)

N/A Full Range SafetySupport

Range SafetyTraining andCertificationPlan

45 days prior to finalSSSP

60 days NA CCAS/VAFB Op-erations

Draft SSPP Within 45days of contractaward

45 days N/A Any PDR

Final SSPP 45 days prior to anycDR

45 days N/A Any cDR

127-1 Tailor-ing

Ongoing Ongoing End of CDRs

Public SafetyDeviationRequest

2 yrs** prior to Engi-neering and Produc-tion

2 yrs** Range Commander Engineeringand Production

Non-PublicSafety Devia-tion Request

60 days prior toEngineering andProduction

60 days N/A Engineeringand Production

Public SafetyWaiver Re-quests

60 days prior tointended system use

60 days Range Commander System use

Non-PublicSafety WaiverRequest

60 days prior tointended system use

60 days N/A System use

Meets IntentCertificationand WaiverRequest

60 days prior tointended system use

60 days N/A System Use

EWR 127-1Change Re-quests

N/A 45 days If necessary, otherRange Users; add45 days

EWR 127-1Change Notice orRevision

Downloaded from http://www.everyspec.com

Page 29: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-9

Range User Tools and Aids

Forms

Section 3 of this Handbook has blank copies and filled inexamples of the following EWR 127-1 forms for your use:

� 127-1 Tailoring Request form� 127-1 Noncompliance Request form� EWR 127-1 Change Request form

Interactive 127-1 Tailoring Request, 127-1 NoncomplianceRequest, and EWR 127-1 Change Request templates are alsoavailable in Word 6.0 for Windows on the RSBBS.

Range Safety Directory

A list of Range Safety personnel at each of the Ranges by organi-zation and telephone numbers can be found in Section 4, Appen-dix A of this Handbook.

Compliance Checklists

An example of a Compliance Checklist can be found in AppendixE. The Compliance Checklists for each Chapter are available inhard copy from each of the Ranges. In addition, Word for Win-dows 6.0 checklist templates may be downloaded from theRSBBS.

Downloaded from http://www.everyspec.com

Page 30: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 31: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-11

Range Safety “Concept to Launch” Process

Flight Analysis, one segment of the Range Safety “Concept toLaunch” process, is addressed in EWR 127-1, Chapter 2. Somediscussion of Flight Analysis requirements occurs during the Ini-tial Range Safety/Range User TIM; however, specific FlightAnalysis TIMs will probably also have to be arranged.

You may have to submit a probability assessment to RangeSafety to determine if a Flight Termination System (FTS) isneeded. The probability assessment addresses the risk to the gen-eral public of a vehicle not having command (destruct) capability,generally in downrange locations.

You normally submit a Preliminary Flight Data Package (PFDP)and a Final Flight Data Package (FFDP) in sequential order al-though there may be some overlap of data. Formal PreliminaryFlight Plan Approval (PFPA) and formal Final Flight Plan Ap-proval (FFPA) are normally based on their supporting data. Youare not required to resubmit the PFDP for continuing programs.Only the items changed from the FFDP of previous missions arerequired.

You must also submit Intended Support Plans (ISPs) for formalRange Safety approval when you require the support of airplanes,ships, or other systems on the Eastern or Western Range. Nu-clear Source Data (NSD) must be submitted per Presidential Di-rective/NSC-25 for formal Range Safety approval when majornuclear sources are to be launched from the Eastern or WesternRange.

You submit Directed Energy Plans (DEPs) to Range Safety forformal approval when directed energy is to be released outside ofa contained area, such as a facility or dedicated test area, in asso-ciation with vehicle flight and/or in Eastern or Western Rangeairspace.

In general, the FFPA must be finalized prior to the LaunchReadiness Review; however, it is recognized that some particulardata may not be available until just prior to launch. These situa-tions are handled on a case-by-case basis.

PFDP

âPFPA

âFFDP

âFFPA NSD ISP DEP

â â â âLaunch Readiness Review

Downloaded from http://www.everyspec.com

Page 32: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 33: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-13

Collision Avoidance Windows

Range Safety provides Collision Avoidance Windows (COLAs)based on flight plans and available characteristics of manablespace objects.

Surveillance Control Displays

Range Safety develops hazardous launch areas for ships and air-craft and produces Surveillance Control Displays (SCD) forlaunch day operations and support.

30 SW Launch Risk Assessments

Because of atmospheric conditions at the Western Range, RangeSafety conducts a risk assessment prior to launch to determine ifthe potential for public injury due to debris or other hazards re-sulting from a launch failure are acceptable. The trajectory, mal-function turn, fragment, propellant, and failure rate data submit-ted in accordance with the requirements in Chapter 2 are used todevelop the data used by the risk assessment tools.

Downloaded from http://www.everyspec.com

Page 34: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-14

Critical Timelines

ItemSubmittalDeadline*

SE TimeRequired

AdditionalApproval

RequiredBefore*

Ballistic Missile PFDP 2 years/1 yearprior to launch

TBD N/A PFPA

Ballistic Missile FFDP 120/60 daysprior to launch

30 days N/A FFPA

Space Vehicle: SingleFlight Azimuth PFDP

2 years/1 yearprior to launch

TBD N/A PFPA

Space Vehicle: SingleFlight Azimuth FFDP

120/60 daysprior to launch

30 days N/A FFPA

Space Vehicle: VariableFlight Azimuth PFDP

2 years/1 yearprior to launch

TBD N/A PFPA

Space Vehicle: VariableFlight Azimuth FFDP

1 year prior tolaunch

30 days N/A FFPA

Cruise Missile/RemotelyPiloted Vehicle PFDP

2 years/1 yearprior to launch

TBD N/A PFPA

Cruise Missile/RemotelyPiloted Vehicle FFDP

120/60 daysprior to launch

30 days N/A FFPA

Small Unguided RocketPFDP

2 years/1 yearprior to launch

TBD N/A PFPA

Small Unguided RocketFFDP

120/60 daysprior to launch

30 days N/A FFPA

Aerostat/Balloon PFDP 2 years/1 yearprior to launch

TBD N/A PFPA

Aerostat/Balloon FFDP 120/60 daysprior to launch

30 days N/A FFPA

Projectile, Torpedo, Air-dropped Body or DevicePFPD

2 years/1 yearprior to launch

TBD N/A PFPA

Projectile, Torpedo, Air-dropped Body or DeviceFFDP

120/60 daysprior to launch

30 days N/A FFPA

Ship/Aircraft ISP 20 days prior tolaunch

15 days N/A 10 days priorto launch

Directed Energy Plan 1 Year/30 daysprior to launch

20 days N/A 10 days priorto launch

NSDP EIS 3 years prior tolaunch

N/A N/A LRR

NSDP SAR 1 year prior tolaunch

N/A N/A LRR

NSDP NSRP SER 7 months priorto launch

N/A N/A LRR

NSDP OSTP or NSCApproval Letter

10 days prior tolaunch

N/A N/A LRR

* All references to days refer to calendar days.

Downloaded from http://www.everyspec.com

Page 35: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 36: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 37: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 38: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-18

Explosive Quantity/Distance Site Plan

An Explosive Quantity Distance site plan must be generated orupdated for facilities used to store, handle, or process ordnanceitems or propellants at CCAS/VAFB. A minimum of six monthsis required for approval. Approval is required prior to construc-tion start for new facilities, and prior to the arrival of ordnanceand propellants for existing facilities.

SES Console Operating Instructions

SES Console Operating Instructions must be generated by 45SW/SES to support potential launch day safety concerns prior tothe Launch Readiness Review.

Downloaded from http://www.everyspec.com

Page 39: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-19

Critical Timelines

* All references to days refer to calendar days** Applicable data only

Item Deadline *SE Time Re-quired *

AdditionalApproval**

RequiredBefore

cDRMSPSP

45 days prior toMSPSP cDR

45 days 45/30 MDG/ SGPB45/30 MDG/ SGPH45 CES/CEF45 CES/CEV30 CEG/CEF30 CEG/CEV

PDRMSPSP

PDRMSPSP

45 days prior toMSPSP PDR

45 days 45/30 MDG/ SGPB45/30 MDG/ SGPH45 CES/CEF45 CES/CEV30 CEG/CEF30 CEG/CEV

CDRMSPSP

CDRMSPSP

45 days prior toMSPSP CDR

45 days 45/30 MDG/ SGPB45/30 MDG/ SGPH45 CES/CEF45 CES/CEV30 CEG/CEF30 CEG/CEV

Final MSPSP

Final MSPSP 45 days prior tohardware ship-ment toCCAS/VAFB

10 days 45/30 MDG/ SGPB45/30 MDG/ SGPH45 CES/CEF45 CES/CEV30 CEG/CEF30 CEG/CEV

Hardwareshipment toCCAS/VAFB

MSPSPCCAS/VAFBInitial TestProcedures/Plans

45 days prior tointended proce-dure use

45 days 45/30 MDG/ SGPB45/30 MDG/ SGPH45 CES/CEF45 CES/CEV30 CEG/CEF30 CEG/CEV

MSPSPCCAS/VAFB TestProcedures/Plan use

MSPSP CCASInitial TestReports

45 days prior tosystem use

10 days 45/30 MDG/ SGPB45/30 MDG/ SGPH45 CES/CEF45 CES/CEV30 CEG/CEF30 CEG/CEV

System use

Downloaded from http://www.everyspec.com

Page 40: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-20

Range User Tools and Aids

To aid you in meeting EWR 127-1 Section 3.10 Hazardous Mate-rials, the following information is provided.

NASA/KSC Approved Plastic Film List

Range Safety accepts the NASA/KSC Approved Plastic Film Listwithin its stated limitations (substituting NASA/KSC Safety withRange Safety as the approval authority). This list is updated pe-riodically. A condensed version of the most recent list (dated 04April 1994) is included in Appendix B. You are encouraged tocontact NASA/KSC to get on the distribution list. Updates mayalso be available on the RSBBS.

NASA/KSC Materials Selection Lists for Type J Fluid Service,Liquid Oxygen Service, and Gaseous Oxygen and Air Service

Range Safety accepts these lists within their stated limitations(substituting the KSC Systems Engineer and Center MaterialsRepresentative [CMR] with Range Safety as the approvalauthority). This list is updated periodically. Because they arelengthy, the most recent lists are available on the RSBBS.

45 SW/SES Approved Ordnance Checkout Equipment List

The 45 SW/SES Ordnance Checkout Equipment List is composedof approved ordnance checkout equipment used during continuityand stray voltage tests per EWR 127-1, Chapter 6. All of thelisted equipment can be used for 1 amp - 1 watt electroexplosivedevices; however, some of the equipment is approved for EEDswith no-fire levels less than 1 amp - 1 watt. You should consult45 SW/SES when choosing equipment off this list. The list isincluded in Appendix C. A copy and any updates may be avail-able on the RSBBS.

Downloaded from http://www.everyspec.com

Page 41: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 42: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-22

Range Safety “Concept to Launch” Process

Another segment of the Range Safety “Concept to Launch” proc-ess, the design of airborne Range Safety Systems, is found inEWR 127-1, Chapter 4.

If it is determined that an RSS is required, you will submit aRange Safety System Report (RSSR) to Range Safety prior toeach of the airborne RSS cDRs, PDRs, and CDRs. A finalRSSR is also normally required after final Range Safety commenton the CDR RSSR for formal approval. Modifications to the air-borne RSS components or systems must be submitted to RangeSafety well before implementation and normally require modifi-cation to the RSSR. The design reviews can coincide with thoserequired for launch vehicle, payload, and ground support equip-ment (Chapter 3), and/or facilities (Chapter 6).

You must also maintain an airborne RSS Component Test His-tory for each component except DC cabling. These test historieshave to be available to Range Safety upon request. RSS Accep-tance, Qualification, and Age Surveillance Test Plans, Proce-dures, and Reports must be submitted and approved by RangeSafety to verify design reliability under more than worst case en-vironmental conditions. You also need to submit antenna patternsto 45 RANS and 30 SW/SES for approval, as applicable.

You must also submit RSS Test Plans, Procedures, and Resultsto Range Safety for review and approval to verify airborne RSSinstallation and readiness for flight. Documentation required in-cludes the following:

� RSS Installation and Checkout Procedures� FTS Receiver/Decoder Prelaunch Test Results� FTS Battery Prelaunch Test Results� FTS Component Failure Reports� FTS System Test Failure Notices/Reports� RSS In-Flight Anomaly Notices/Reports

In general, all airborne RSS data requirements have to be for-mally approved by Range Safety prior to the Launch ReadinessReview; however, it is recognized that some tests are not com-pleted and test results such as those for the FTS Re-ceiver/Decoder are not available until after the Launch ReadinessReview. In such cases, formal Range Safety approval is not re-quired unless problems are encountered.

RSSR cDR, PDR, CDR, Final

↓Acceptance, Qualification, and Age

Surveillance Test Plans, Procedures,and Reports

↓CCAS/VAFB RSS Test Plans, Proce-

dures, and Reports

↓Launch Readiness Review

Downloaded from http://www.everyspec.com

Page 43: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 44: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-24

Critical Timelines

* All references to days refer to calendar days

Item Deadline *SE TimeRequired *

AdditionalApproval

RequiredBefore *

cDR RSSR 45 days prior toRSSR cDR

45 days N/A PDR RSSR

PDR RSSR 45 days prior toRSSR PDR

45 days N/A CDR RSSR

CDR RSSR 45 days prior toRSSR CDR

45 days N/A Final RSSR

Final RSSR 120 days prior tolaunch

10 days N/A 120 daysprior tolaunch

RSS Test Plans/Procedures

45/30 days prior tointended use

45 days N/A Plan/ Pro-cedure Use

RSS Test Results 30 days prior tointended use

N/A N/A N/A

RSS Installation andCheckout Procedures

45 days prior tointended use

45/30 days N/A Procedureuse

FTS Receiver/ De-coder Prelaunch TestResults

30 days prior toLaunch

N/A N/A N/A

FTS Battery Pre-launch Test Results

Not later than 24 hafter the test

N/A N/A N/A

FTS ComponentFailure Report

Failure Notice: Ver-bal 72 hWritten 14 daysReport 30 days

10 days N/A Launch

RSS System TestFailure Notice/ Report

Failure Notice: Ver-bal 72 HrWritten 14 daysReport 30 days

10 days N/A Launch

RSS In-Flight Anom-aly Notice/ Report

Failure Notice:Verbal ASAPReport 30 days

45 days N/A Next Launch

Modifications to RSSComponents or Sys-tems

60 days prior tointended implemen-tation

60 days N/A IntendedImple-mentation

RSS Antenna Pat-terns

Per RCC Document253

Per RCC 253N/A Launch

Downloaded from http://www.everyspec.com

Page 45: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-25

Range User Tools and Aids

45 SW/SES Approved Ordnance Checkout Equipment List

The 45 SW/SES Ordnance Checkout Equipment List is composedof approved ordnance checkout equipment used during continuityand stray voltage tests per EWR 127-1, Chapter 6. All of thelisted equipment can be used for 1 amp - 1 watt electroexplosivedevices; however, some of the equipment is approved for EEDswith no-fire levels less than 1 amp - 1 watt. You should consult45 SW/SES when choosing equipment off this list. The list isincluded in Appendix C. A copy and any updates may be avail-able on the RSBBS.

Ordnance Test Console

The Ordnance Test Console (OTC) is an ER asset available to allER users on a scheduled basis. The OTC is capable of benchtesting 1 amp - 1 watt EEDs and Electromechanical Safe andArm Devices (S&As). Details regarding the OTC can be foundin Appendix C. The need to use the OTC should be identifiedduring the Universal Documentation System process. This infor-mation may also be provided on the RSBBS.

Downloaded from http://www.everyspec.com

Page 46: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 47: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-27

Range Safety “Concept to Launch” Process

Another segment of the Range Safety “Concept to Launch” proc-ess addressed in EWR 127-1, Chapter 5 is the design and testingof facilities.

You must submit Explosive Site Plan (ESP) data per AFM 92-201 to 45/30 CES and 45/30 SW/SES as early as possible. Thisis a long lead item and most likely the critical path of any pro-gram. Without ESP final approval, liquid or solid fuels and ord-nance cannot be processed or stored on the site. ESPs must beapproved or coordinated by 45/30 SW/SE, 45 SW/CC, 45/30CES/CC, several other 45/30 SW organizations, 45/30 SWhigher head-quarters, and finally the Department of Defense Ex-plosives Safety Board.

You need to submit a Facility Safety Data Package (FSDP) toRange Safety and applicable data to 45/30 CES and 45/30 MDGfor approval prior to each of the FSDP cDRs, PDRs, CDRs, andFDRs. A final FSDP is also normally required after final com-ments on the final design review FSDP for approval. These de-sign reviews may coincide with those required for the launch ve-hicle, payload, and/or ground support equipment (Chapter 3)and/or the Range Safety System (Chapter 4), but are typicallystand alone.

Facility Test Plans, Procedures, and Reports verifying facilitydesign and readiness must be submitted for review and approvalto 45/30 SW/SES and, as applicable, to 45/30 CES and 45/30MDG. In general, you must have approval for all facility dataprior to Range Safety approval to use the facility.

Explosive Site Plan Data

↓FSDP cDR, PDR, CDR, FDR

↓CCAS/VAFB Facility SystemsTest Plans, Procedures, and

Results

↓Facility Use

Downloaded from http://www.everyspec.com

Page 48: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-28

Range User Inputs/Range Safety Outputs

In addition to approving Chapter 5 required documentation,Range Safety uses these documents to generate or update internaldocuments to provide public and launch site safety. The follow-ing documents must be generated and/or updated.

Explosive Quantity/Distance Site Plans

An Explosive Quantity/Distance Site Plan must be generated orupdated for facilities used to store, handle, or process ordnanceitems or propellants at CCAS/VAFB. A minimum of six monthsis required for approval. Approval is required prior to the start ofconstruction for new facilities and prior to the arrival of ordnanceor propellants for existing facilities.

Operations Safety Plans

Applicable Facility, Area, and/or Explosive Safety Plans must begenerated or updated to provide specific requirements due to thefacility operation or storage. These documents must be generatedprior to starting hazardous operations in the facility. NOTE:Range Safety, Operations Safety, and Range Users have jointresponsibility for developing OSPs. Operations Safety is respon-sible for publishing OSPs at the ER; the Range User is responsi-ble for publishing OSPs at the WR.

Toxic Release Contingency Plans

The Toxic Release Contingency Plans (TRCP) at the ER and theToxic Risk Assessment (TRA) at the WR may have to be updatedto include the facility for the purpose of notification to personneland as a possible source of toxic materials. If applicable, thisdocument must be updated prior to storing, handling, or process-ing toxic materials at the facility.

Chapter 5 RequiredDocuments

↓45/30 SW/SES

↓Explosive Quan-

tity/DistanceSite Plan

↓Operations Safety

Plans

↓Toxic Release Contin-gency Plan/ Toxic Risk

Assessment

Downloaded from http://www.everyspec.com

Page 49: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-29

Critical Timelines

* All references to days refer to calendar days.** Applicable data only

Item Deadline *SE Time

Required *AdditionalApproval**

RequiredBefore

Explosive FacilitySite Plan Data

180 days priorto intended facil-ity use or start ofconstruction

180 days 45 CES/30 CEGHigher HQDDESB

ExplosiveFacility Useor Construc-tion (New)

cDR FSDP 45 days priorto FSDP cDR

45 days 45/30 MDG/ SGPB45/30 CES/CEF45/30 CES/CEV30 CEG/CEF30 CEG/CEV

PDR FSDP

PDR FSDP 45 days priorto FSDP PDR

45 days 45/30 MDG/ SGPB45 CES/CEF45 CES/CEV30 CEG/CEF30 CEG/CEV

CDR FSDP

CDR FSDP 45 days priorto FSDP CDR

45 days 45/30 MDG/ SGPB45 CES/CEF45 CES/CEV30 CEG/CEF30 CEG/CEV

FDR FSDP

FDR FSDP 45 days priorto FSDP FDR

45 days 45/30 MDG/ SGPB45 CES/CEF45 CES/CEV30 CEG/CEF30 CEG/CEV

Facility Use

FSDP Test Plans 45 days priorto intended test

45 days 45/30 MDG/ SGPB45 CES/CEF45 CES/CEV30 CEG/CEF30 CEG/CEV

Test

FSDP Test Re-ports

45 days priorto system use

10 days 45/30 MDG/ SGPB45 CES/CEF45 CES/CEV30 CEG/CEF30 CEG/CEV

System use

Downloaded from http://www.everyspec.com

Page 50: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 51: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 52: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 53: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-33

Critical Timelines

* All references to days refer to calendar days.**Applicable data only.

Item Deadline *SE Time

Required *AdditionalApproval**

Required Before

cDR GOP 45 days prior toMSPSP cDR

45 days N/A PDR GOP

PDR GOP 45 days prior toMSPSP PDR

45 days N/A CDR GOP

CDR GOP 45 days prior toMSPSP CDR

45 days N/A Final GOP

Final GOP 10 days prior toCCAS/VAFB proc-essing

10 days N/A CCAS/VAFBprocessing

Draft Hazardous andSafety Critical Proce-dures

45 days prior to intendedprocedure use

45/30 days 45/30 MDG/SGPB45/30 MDG/SGPH45 CES/CEF45 CES/CEV30 CEG/CEF30 CEG/CEV

Final Hazardousand Safety Criti-cal Procedure

Final Hazardous andSafety Critical Proce-dures

7 days prior to in-tended procedureuse

7 days 45/30 MDG/SGPB45/30 MDG/SGPH45 CES/CEF45 CES/CEV30 CEG/CEF30 CEG/CEV

Hazardous andSafety Criticalprocedure

Periodic Test Plans/Procedures

45 days prior tointended plan/ pro-cedure use

45/30 days 45/30 MDG/SGPB45/30 MDG/SGPH45 CES/CEF45 CES/CEV30 CEG/CEF30 CEG/CEV

Test Plan/ Pro-cedure Use

Periodic Test Results 10 days prior tointended system use

10 days 45/30 MDG/SGPB45/30 MDG/SGPH45 CES/CEF45 CES/CEV30 CEG/CEF30 CEG/CEV

System Use

Downloaded from http://www.everyspec.com

Page 54: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-34

Range User Tools and Aids

Range Safety Approved Ordnance Checkout Equipment List

The 45 SW/SES Ordnance Checkout Equipment List is composedof approved ordnance checkout equipment used during continuityand stray voltage tests per EWR 127-1, Chapter 6. All of thelisted equipment can be used for 1 amp - 1 watt electroexplosivedevices (EEDs); however, some of the equipment is approved forEEDs with no-fire levels less than 1 amp - 1 watt. You shouldconsult Range Safety when choosing equipment off this list. Thelist is included in Appendix C. A copy and any updates may beavailable on the RSBBS. The WR does not maintain such a list;instead, ordnance checkout equipment is approved on a case-by-case basis.

Ordnance Test Console

The Ordnance Test Console (OTC) is an ER asset available to allER users on a scheduled basis. The OTC is capable of benchtesting 1 amp - 1 watt EEDs and Electromechanical Safe andArm Devices (S&As). Details regarding the OTC can be foundin Appendix D. The need for use of the OTC should be identifiedduring the Universal Documentation System process. This infor-mation may also be provided on the RSBBS.

Personal Protective Equipment

Generally, the Ranges do NOT supply Personal ProtectiveEquipment (PPE). Some items such as self-contained atmos-pheric protection ensembles (SCAPE) and self-contained breath-ing apparatus (SCBA) are available for loan but on a very limitedbasis. You must plan on providing your own PPE. You can re-quest available PPE through the Universal Documentation Sys-tem.

Downloaded from http://www.everyspec.com

Page 55: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 56: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 57: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-37

Range User, they develop mission rules and perform near real-timerisk assessment in support of launch operations. At the WR, theyalso approve mission support positions (MSPs) for supporting Rangeassets and assess environmental factors during launch operations.

45/30 SW/SES

Systems Safety is responsible for coordinating with MissionFlight Control and Flight Analysis on the review and approval ofdocuments described in Chapter 7 and for approving andcertifying the airborne Range Safety System (RSS), including theFTS, the RTS, and the TDTS. At the ER, they also monitorprelaunch checkouts of the RSS, identify safety weatherconstraints for launch, and assess toxic and overpressure factorsduring launch operations. At the WR, they also determine thelaunch countdown FTS status.

Operations Safety, 45th Space Wing and 30 SW/SEG

Operations Safety, 45th Space Wing (a Range Contractor underthe functional management of Range Safety) and 30th SpaceWing (30 SW/SEGP), including the WR Launch Support Team(LST) chief, Flight Safety Project Officer (FSPO), the OperationsSafety Manager (OSM), and the Area Control Officer (ACO), areresponsible for verifying the Flight Caution Area (FCA) andFlight Hazard Area (FHA) are clear, verifying that theblockhouse is sealed, performing HOLDFIRE checks, anddetermining the launch countdown FTS status.

45/30 RANS

At the ER, the Range Squadron is responsible for printing anddistributing the RSOR and ensuring compliance by affectedagencies and for providing a 12-month forecast of expectedsupport requirements, updated quarterly. At the WR, thesquadron provides instrumentation support plans.

45/30 MS and 30 RANS/DM

These groups provide estimated and committed coverage intervalsof useable data from each optic, radar, and telemetry data sourceused to comply with Mission Flight Control and Range Safetyrequirements and produce Committed Coverage Plans.

45/30 WS

The Weather Squadrons provide prelaunch assessments for RangeSafety evaluation of launch weather constraint violations.

Downloaded from http://www.everyspec.com

Page 58: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-38

NASA

NASA provides operations support from NASA sites at theWallops Flight Facility in Virginia, the Bermuda Station, and theUnited Kingdom in accordance with applicable memoranda ofagreement with the ER.

USCG

The United States Coast Guard provides launch area surveillanceand liaison at the Flight Control Centers in accordance withapplicable memoranda of agreement.

Downloaded from http://www.everyspec.com

Page 59: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 60: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 61: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-41

Critical Timelines

* All references to days refer to calendar days.

Item Deadline *SE Time

Required *AdditionalApproval

RequiredBefore

TelemetryMeasurementList

315 days priorto launch

N/A N/A N/A

Firing Tables 10 days priorto launch

N/A N/A N/A

Countdown Proce-dure

10 days priorto launch

N/A N/A N/A

Launch Day Ac-cess Request

5 days priorto launch

2 days N/A LaunchReadinessReview

Range SafetyLaunch OperationsApproval Letter

N/A N/A N/A LaunchReadinessReview

Final Range SafetyApproval forLaunch

N/A N/A N/A Launch

Downloaded from http://www.everyspec.com

Page 62: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Section 2

2-42

Downloaded from http://www.everyspec.com

Page 63: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

SECTION 3

Downloaded from http://www.everyspec.com

Page 64: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

EWR 127-1 CHANGE REQUEST

RANGE USER: POC NAME: DATE:

ADDRESS: CITY: STATE ZIP: PHONE NO: ( ) - X FAX NO: E-MAIL ADDRESS:

TYPE: ADMINISTRATIVE TECHNICAL DATASUBMITTAL

ORIGINAL PARAGRAPH NUMBER(S) AND TEXT:

SUGGESTED PARAGRAPH NUMBERS AND TEXT:

RATIONALE FOR CHANGE:

4 5 / 3 0 S W / S E U S E O N L Y B E L O W T H I S L I N E45/30 SW/SE COMMENTS:

DISPOSITION:

APPROVED APPROVED WITH COMMENTS DISAPPROVED

DATE:

TRACKING NUMBER:

3-1

Downloaded from http://www.everyspec.com

Page 65: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

EWR 127-1 CHANGE REQUEST

RANGE USER: Example Welding CompanyPOC NAME: Joe WelderDATE: 99 Month 9999

ADDRESS: 1234 Any StreetCITY: Anyburgh STATE AY ZIP: 99999-9990 PHONE NO: ( 999 ) 999 - 9990 X 99999 FAX NO: (999) 999-9999E-MAIL ADDRESS: ABCDEFG

TYPE: ADMINISTRATIVE TECHNICAL DATA SUBMITTALORIGINAL PARAGRAPH NUMBER(S) AND TEXT:

ERR 127-1 (1993)

3.11.2.3.6 All piping/fitting welds in systems with pressures greater than or equal to 500 Psig or which containflammable/combustible gases shall be 100% visually and radiographically inspected. All piping/fitting welds insystems with pressures less than 500 Psig shall be inspected IAW ANSI B31.3 (341.4.1). The accept/reject criteriashall be IAW ANSI B31.3, table K341.3.2 or Table 341.3.2 as applicable.

SUGGESTED PARAGRAPH NUMBERS AND TEXT:

All piping and fitting butt-welds shall be 100% visually examined and radiographed. Accept/reject criteria shall bein accordance with ASME B31.3, Table 341.3.2A.

RATIONALE FOR CHANGE:

Clarification

4 5 / 3 0 S W / S E U S E O N L Y B E L O W T H I S L I N E45/30 SW/SE COMMENTS:

Incorporated with Modification: All piping and fitting butt-welds used to fabricate hazardous pressure systems shallbe 100 percent visually and radiographically inspected. Accept/reject criteria shall be in accordance withANSI/ASME B31.3, Table 341.3.2A or Table K341.3.2A for pressure systems equal to or greater than 6000 psi.

DISPOSITION:

APPROVED APPROVED WITH COMMENTS DISAPPROVED

DATE: 99 Month 9999

TRACKING NUMBER: ABCD-E-FG-HI

3-2

Downloaded from http://www.everyspec.com

Page 66: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

127-1 NONCOMPLIANCE REQUEST

PROGRAM: RANGE USER: POC NAME: DATE:

ADDRESS: CITY: STATE ZIP: PHONE NO: ( ) - X FAX NO:

TYPE : DEVIATION MEETS INTENT CERTIFICATION WAIVER

EFFECTIVITY REQUESTED: LIFE OF PROGRAM LIMITED TO:

CLASS: PUBLIC SAFETY LAUNCH AREA SAFETY LAUNCH COMPLEX SAFETY

NONCOMPLIANCE REQUIREMENT SOURCE: 1972 AFETR 127-1 1985 WSMCR 127-1 1984 ESMCR 127-1 1989 WSMCR 127-1 1993 ERR 127-1 1993 WRR 127-1 1995 EWR 127-1 EWR 127-1 CHANGE NOTICE NO.

REQUIREMENT PARAGRAPH NUMBER(S) AND TEXT:

RATIONALE FOR NONCOMPLIANCE REQUEST:

HAZARD MITIGATION:

GET WELL PLAN:

4 5 / 3 0 S W / S E U S E O N L Y B E L O W T H I S L I N E45/30 SW/SE COMMENTS:

45 SW/SE SIGNATURE 30 SW/SE SIGNATURE

DISPOSITION: APPROVED APPROVED W/COMMENTS DISAPPROVED

DATE:

TRACKING NO:

3-3

Downloaded from http://www.everyspec.com

Page 67: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

127-1 NONCOMPLIANCE REQUEST

PROGRAM: NeuSat PayloadRANGE USER: Satellite MakerPOC NAME: May DuppDATE: 99 Month 9999

ADDRESS: P. O. Box 1234, QZ X9-9999CITY: Anywhere STATE AN ZIP: 0000-0000 PHONE NO: ( 000 ) 000 - 0000 X FAX NO: ( 000) 000-0000

TYPE : DEVIATION MEETS INTENT CERTIFICATION WAIVER

EFFECTIVITY REQUESTED: LIFE OF PROGRAM LIMITED TO: NeuSat mission only

CLASS: PUBLIC SAFETY LAUNCH AREA SAFETY LAUNCH COMPLEX SAFETY

NONCOMPLIANCE REQUIREMENT SOURCE: 1972 AFETR 127-1 1985 WSMCR 127-1 1984 ESMCR 127-1 1989 WSMCR 127-1 1993 ERR 127-1 1993 WRR 127-1 1995 EWR 127-1 EWR 127-1 CHANGE NOTICE NO.

REQUIREMENT PARAGRAPH NUMBER(S) AND TEXT:

3.1.7.8.7 Batteries shall be sealed and have provisions for pressure relief to keep pressure 50 percent below the yieldpoint of the battery housing, unless the case has a 4:1 safety factor with respect to worst case pressure buildup. Thepurpose of this requirement is to protect personnel from the effects of a possible battery housing rupture, including flyingdebris and hazardous materials.

RATIONALE FOR NONCOMPLIANCE REQUEST:

This waiver is requested because the user believes that he meets the intent of the Range Safety requirement. By test, thebatteries exceed the 4:1 burst safety factor requirement and thus should not require pressure relief.

HAZARD MITIGATION:

N/A

GET WELL PLAN:

Future battery casings will comply with the required 4:1 safety factor by design.

4 5 / 3 0 S W / S E U S E O N L Y B E L O W T H I S L I N E45/30 SW/SE COMMENTS:

None

45 SW/SE SIGNATUREOriginal Signed

30 SW/SE SIGNATURE

DISPOSITION: APPROVED APPROVED W/COMMENTS DISAPPROVED

DATE: 99 Month 9999

TRACKING NO: ABCDEF-G-HI-JK

3-4

Downloaded from http://www.everyspec.com

Page 68: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

127-1 TAILORING REQUEST

PROGRAM: RANGE USER: POC NAME: DATE:

ADDRESS: CITY: STATE ZIP: PHONE NO: ( ) - X FAX NO:

EWR 127-1 1995 ERR 127-1 1993 WRR 127-1 1993 OTHER:TYPE: ADDITION CHANGE DELETIONORIGINAL PARAGRAPH NUMBER(S) AND TEXT:

TAILORED PARAGRAPH NUMBER(S) AND TEXT:

RATIONALE FOR TAILORING REQUEST:

45/30 SW/SE COMMENTS:

DISPOSITION: SIGNATURE AND DATE: (as applicable) APPROVED 45 SW/SE APPROVED W/ COMMENTS 30 SW/SE DISAPPROVED RANGE USER

RANGE USERTRACKING NUMBER:

3-5

Downloaded from http://www.everyspec.com

Page 69: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

127-1 TAILORING REQUEST

PROGRAM: Solid Rocket ExampleRANGE USER: Solid Rocket Example MakerPOC NAME: Joe RocketDATE: 15 July 1995

ADDRESS: 1234 Any StreetCITY: Anytown STATE AY ZIP: 99999PHONE NO: (999 ) 999-9999 X 9999FAX NO: (999) 999-9999

EWR 127-1 1995 ERR 127-1 1993 WRR 127-1 1993 OTHER:TYPE: ADDITION CHANGE DELETIONORIGINAL PARAGRAPH NUMBER(S) AND TEXT:

1. 3.5.2 c. An ENABLE control switch and status for all solid rocket motor arming devices

2. 3.5.2 d. Launch vehicle liquid propulsion system inhibits and propellant tank pressure status (psig)

3. 3.5.2 h. HOLDFIRE (stop launch sequencer) control switch and status active through T-0 seconds

TAILORED PARAGRAPH NUMBER(S) AND TEXT:

1. 3.5.2 c An ENABLE control switch and status for al solid rocket motor arming devices and solid rocket motorbreakup system

2. 3.5.2 d Delete

3. 3.5.2 h HOLDFIRE (stop launch sequencer) control switch and status active through T-2

RATIONALE FOR TAILORING REQUEST:

1. The solid rocket motor breakup system is a category A ordnance system that is not part of the FTS. Inadvertentactuation may cause injury and death.

2. The Solid Rocket Example Program does not have a liquid propulsion system or propellant tanks

3. At T-2 seconds, the ignition sequence begins by squibbing the ignition battery; it is very difficult and morehazardous to throw a hold fire after this point than to continue with launch. Furthermore, the reaction time fromspotting a hold condition at T-2 seconds to throwing the hold fire is grater than the 2 seconds available to do so.

45/30 SW/SE COMMENTS:

1. None

2. None

3. Since the ignition sequence really begins at Y-2 seconds, then T-2 seconds is effectively T-0 for the purposes ofthis requirement. The intent of the requirement is met with equivalent safety.

DISPOSITION: SIGNATURE AND DATE: (as applicable) APPROVED 45 SW/SE Original Signed APPROVED W/ COMMENTS 30 SW/SE DISAPPROVED RANGE USER

RANGE USERTRACKING NUMBER:

3-6

Downloaded from http://www.everyspec.com

Page 70: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 71: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

APPENDIXES

Downloaded from http://www.everyspec.com

Page 72: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Appendixes

Appendix ARANGE SAFETY DIRECTORY

A-1

45th Space Wing

“For a current staff directory,please contact 45th Space Wing Safety Officeat(321) 494- 2114.”

Downloaded from http://www.everyspec.com

Page 73: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Appendixes

Appendix ARANGE SAFETY DIRECTORY

A-2

30th Space Wing

“For a current staff directory,please contact 45th Space Wing Safety Officeat(321) 494- 2114.”

Downloaded from http://www.everyspec.com

Page 74: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Appendixes

Appendix BNASA/KSC APPROVED PLASTIC FILM LIST

B-1

The NASA/KSC approved film list is attached. Group I materials are approved for all KSC FlightHardware Processing Facilities. The use of plastic films in this group does not require any additionalNASA/KSC Safety approval. Materials listed in Group II, Sub-Group A, Sub-Group B, and Sub-Group Crequire NASA/KSC Safety approval prior to their use.

Questions regarding Safety approval for use of Group II materials should be directed to the FlightHardware Safety Engineering Branch (RT-SOE-1) at (407) 867-4945. Questions on specific plasticmaterials, the pass/fail testing criteria, and all other questions on the plastic film list should be directed toMr. Robert Frankfort (DM-MSL-24) at (407) 867-4619.

Legend:

Brandname - Material nameManufacturer - ManufacturerFLAM - Flammability RatingESD30 - 30% Electrostatic RatingESD45 - 45% RH Electrostatic RatingMMH - Monomethyl Hydrazine ResistanceN2H4 - Hydrazine ResistanceN2O4 - Nitrogen Tetroxide ResistanceTEST NO. - Test Report NumberOPTIC - Optical CharacteristicsP - PassF - FailOP - OpaqueTL - TranslucentTP - Transparent But TintedCL - ClearTHK - Thickness (in.)

The list of materials presented below is based on testing conducted using the methods described in MTB-402-85.

These lists were developed to provide the test results on plastic films that have been submitted for safetyevaluation. It must be emphasized that these results are applicable only for the particular thickness shown.Some color variations have also been known to affect test results and these were identified whereapplicable.

It should be noted that clean-room operational requirements were not taken into consideration. Therefore,if such an application is anticipated, the User must ensure that the plastic film chosen meets the facilityclean-room requirements.

Downloaded from http://www.everyspec.com

Page 75: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Appendixes

Appendix BNASA/KSC APPROVED PLASTIC FILM LIST

B-2

GROUP I

The plastic films listed below are approved for use in all KSC Flight Hardware processing facilities. Theapproval is based on meeting the basic acceptance criteria for flammability, electrostatic properties, andhypergolic ignition and breakthrough resistance.

BRANDNAME MANUFACTURER FLAM ESDO30 ESD45 MMH N2H4 N204

TEST NO. OPTIC THK

AN-22SAP-T-VU Curtain, Anti-StaticChemfab DF 1471, 10 MILLectrolite Duotone, Blue/BlackAN-4CChemfab DF 1471, 2.5 MILAN-40Herculite 80, WhiteSeries 24, 02403Series 24, 02405AN-18Series 24, 02410Series 24, 02406AN-19AN-110AN-100Chemfilm DF-1471-SB, 2 MILChemfilm DF-1471-SB, 4 MILNMD-FR, N048PA-1-NYFRAS-P-212Lectrolite Duotone, Green/BlackHerculite 80, Yellow

Orcon Corp.Frommelt Industries

Chemfab

Herculite Products

Orcon Corp.Chemfab

Orcon Corp.Herculite ProductsT&F Div of CHP Ind.T&F Div of CHP Ind.Orcon Corp.T&F Div of CHP Ind.T&F Div of CHP Ind.Orcon Corp.Orcon Corp.Orcon Corp.Chemfab

Chemfab

National MetallizingSealed Air Corp.Herculite Products

Herculite Products

PP

P

P

PP

PPPPPPPPPPP

P

PPP

P

PP

P

P

PP

PPPPPPPPPPP

P

PPP

P

PP

P

P

PP

PPPPPPPPPPP

P

PPP

P

PP

P

P

PP

PPPPPPPPPPP

P

PPP

P

PP

P

P

PP

PPPPPPPPPPP

P

PPP

P

PP

P

P

PP

PPPPPPPPPPP

P

PPP

P

85-40285-402

85-402

85-402

85-40285-402

85-40285-40285-40285-40285-40285-40285-40289-36889-39989-399

89-724A

89-724A

91-421491-522592-4272

93-4774

OPTP

OP

OP

OPOP

OPOPOPOPOPOPOPOPCLOPOP

OP

TLTLOP

OP

0.0090.012

0.010

0.013

0.0050.002

0.0120.0230.0250.0050.0050.0100.0060.012.0005.00050.002

0.004

.0015

.00250.012

0.235

Downloaded from http://www.everyspec.com

Page 76: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Appendixes

Appendix BNASA/KSC APPROVED PLASTIC FILM LIST

B-3

NOTE: NASA/KSC APPROVAL MUST BE OBTAINED BEFORE ANY OF THE FOLLOWINGFILMS CAN BE USED.

GROUP II

SUB-GROUP A

The plastic films listed below passed the flammability and electrostatic discharge tests; however, thesematerials cannot be used in any area where hypergol fluid compatibility is a concern.

BRANDNAME MANUFACTURER FLAM ESDO30 ESD45 MMH N2H4 N204

TEST NO. OPTIC THK

1CC QUN-RAYOrcon AN-35Altair-0-200CR-3925, PTFE CoatedLLUMALLOY-HST100 Dunkote/DX-9089-20Met Polyester 100Altair 20Dunkote DX-8078-20LLUMALLOY HST-50%Herculite 10W, WhiteAN-120LLUMALLOY HSCNMD-FR, 100NPA1-NNMD-FR, 190NPA1-NNNMD-FR, N048PA-1-NNYRCAS 2450Herculite 10W, BlueRAS 2450

DunmoreOrcon Corp.Southwall Tech.T&F Div of CHR Ind.Courtaulds MartinDunmoreCourtaulds MartinSouthwell Tech.DunmoreMartin ProcessingHerculite ProductsOrcon Corp.Courtaulds MartinNational MetallizingNational MetallizingNational MetallizingRichmond TechnologyHerculite ProductsRichmond Technology

PPPPPPPPPPPPPPPPPPP

PPPPPPPPPPPPPPPPPPP

PPPPPPPPPPPPPPPPPPP

PPP

PP

P

PPPP

P

FPF

PF

P

PPPP

P

FFF

FF

F

FFFF

F

85-40285-40285-40285-40285-40285-40285-40285-40289-25489-25590-97591-410991-421591-491291-491291-530592-441592-524793-4624

TPOPCLOPTPTPTOTPTPTPOPCLTPTLTLTLTPOPTP

0.0010.0120.0020.0050.0010.0010.0010.0020.0010.0010.021.00050.0010.001.00170.002.00250.0120.003

Downloaded from http://www.everyspec.com

Page 77: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Appendixes

Appendix BNASA/KSC APPROVED PLASTIC FILM LIST

B-4

NOTE: NASA/KSC APPROVAL MUST BE OBTAINED BEFORE ANY OF THE FOLLOWING FILMS CAN BE USED.

GROUP II

SUB-GROUP B

The plastic films listed below are approved for use in relative humidities at or above 45%. These materialsare listed based on their poor performance or lack of data for the 30% RH test. The hypergol compatibilityof these materials, where there is a concern, needs to be taken into consideration.

BRANDNAME MANUFACTURER FLAM ESDO30 ESD45 MMH N2H4 N204

TEST NO. OPTIC THK

IPPLON WN 1500

IPPLON BW 900

RCAS 2400

AN-16Wrightlon AS-3000

Wrightlon 7000

IPFLON DP 1000

Met Polyester 50Wrightlon 8400

Wrightlon 7400

Black Tedlar, TZD 15SP9QMLFAS 300-AS/FR

RCAS 2450PIK-2151-9913

International Plastic ProductsInternational Plastic ProductsDixico, Inc. Richmond DivOrcon Corp.International Plastic ProductsInternational Plastic ProductsInternational Plastic ProductsCourtaulds MartinInternational Plastic ProductsInternational Plastic ProductsDuPontLaminated Film ProductsRichmond TechnologyABC Industries Inc.

P

P

P

PP

P

P

PP

P

PP

PP

F

F

F

FF

F

F

FF

F

F

F

P

P

P

PP

P

P

PP

P

PP

PP

P

P

P

PP

P

P

PP

P

P

PP

P

P

P

PP

P

P

PP

P

P

PP

F

F

F

PF

F

F

FF

F

P

FP

85-402

85-402

85-402

85-40285-402

85-402

85-402

85-40285-402

85-402

85-40289-206

92-426892-5239

CL

CL

CL

OPCL

TP

TP

OPTP

TP

OPCL

TPOP

0.002

0.002

0.002

0.0090.002

0.002

0.002

0.0010.002

0.002

.00160.002

.00150.022

Downloaded from http://www.everyspec.com

Page 78: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Appendixes

Appendix BNASA/KSC APPROVED PLASTIC FILM LIST

B-5

NOTE: NASA/KSC APPROVAL MUST BE OBTAINED BEFORE ANY OF THE FOLLOWINGFILMS CAN BE USED.

GROUP II

SUB-GROUP C

The plastic films listed below are not permitted where electrostatic buildup/discharge are required to beminimal. These materials are listed based on their poor performance or lack of data for the 45% RH test.The hypergol compatibility of these materials, where there is a concern, needs to be taken intoconsideration.

BRANDNAME MANUFACTURER FLAM ESDO30 ESD45 MMH N2H4 N204

TEST NO. OPTIC THK

KAPTON LCL 1074CF K-798Chemfab Prem., 20 MILSARAN 18LSUNDURA 1000CAPRAN 980Chemfab Prem., 10 MILChemfab TCK 1589Chemfab TCK, 6 MILKN-80CRP NylonMet Polyester 200ACLAR 33CDUN-KOTE 200Wrightlon 4000A

ACLAR 23AChemfab TCK, 10 MILBALTARON 2007CAPRAN 512Chemfab TCK 1590Griffolyn NylonChemfab 100LFSC 120-AS/FR

FEP LS610:0500Ena Antistat Nylon, BlueAnti-Static NylonProguard PG1100ARO5083LL100H-35%LT302HERCULITE 10W, YellowHERCULITE 20, White

DuPontChemfabChemfabDow ChemicalFacile TechnologiesAllied PlasticsChemfabChemfabChemfabOrcon Corp.Clean Room ProductsCourtaulds MartinAllied PlasticsDunmoreInternational Plastic ProductsAllied PlasticsChemfabGeneral Tire & RubberAllied PlasticsChemfabReef IndustriesChemfabLaminated Film ProductsDuPontBaystatMaine Poly Corp.ContecDunmoreCourtaulds MartinClean Room ProductsHerculite ProductsHerculite Products

PPPPPPPPPPPPPPP

PPPPPPPP

PPPPPPPPP

FFFFFFFFFFF

F

F

FFFFFF

F

F

F

FFPFFF

FFFF

FFF

FFFFFF

F

FFFF

FFF

P

PPPPPPPPP

PPP

PPPPPP

PP

P

P

F

PPPPPFPFP

PPP

PPPPPF

PP

P

P

P

FPFFF

FPF

PFP

PFPF

P

PF

F

P

85-40285-40285-40285-40285-40285-40285-40285-40285-40285-40285-40285-40285-40285-40285-402

85-40285-40285-40285-40285-40285-40285-40289-207

89-22889-38089-63490-52999-446791-446791-473392-524793-4775

TPTLTLCLTLCLTLTPOPTPCLOPCLCLTP

CLTLTPTPTPTLOPTL

CLTPCLTPTLTPCLOPOP

0.0020.0050.0190.0020.0100.0020.0100.0190.0080.0040.0020.0020.002.00150.001

0.0050.0130.0050.0020.0250.0070.005.0025

0.0100.0020.0010.0020.0010.0010.0020.0110.014

Downloaded from http://www.everyspec.com

Page 79: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Appendixes

Appendix C45 SW/SES AUTHORIZED ORDNANCE TEST EQUIPMENT

C-1

Attached is a list of all ordnance test equipment authorized for use on the 45 SW Eastern Range in supportof active programs as of this date. 45 SW/SES approval has been established by a separate approvalletter. It should be noted that the ordnance to be tested with this equipment is electric explosive devices(EEDs) of either the heater bridge wire (HBW) or explosive bridge wire (EBW) types.

The ordnance test equipment most commonly used on the 45 SW Eastern Range is the Alinco IgniterCircuit Tester. All models of this tester that include the letter “G” (i.e., Model 101.5BFG) are acceptablefor use on the 45 SW Eastern Range and are listed without serial number identification. All other modelsare acceptable for use only after verification of the “G” modification (current limiting resistor isolation andhelipot rewiring) and are identified by serial number.

This listing will be kept current by inputs from Program Senior Safety Supervisors. The consolidated up-to-date listing will be maintained by the Pad Safety Explosives Safety Section. Further revisions of thislisting will be distributed whenever the extent of changes warrant.

Downloaded from http://www.everyspec.com

Page 80: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Appendixes

Appendix C45 SW/SES AUTHORIZED ORDNANCE TEST EQUIPMENT

C-2

MANUFACTURER MODEL SERIAL NO. (if applicable)Alinco Test Sets 101-5A

101-5AF101-5AFM101-5BF101-5BFG101-5BFMG101-5CFG101-5CRG

3369826131, 3996, RCA #26124, RCA #29288RCA #25517AL011, 10354, 13273, 33899, 26624, 25632, 261168546, 9839, 9840

Alinco Igniter Circuit Tester 101-5A1101-5BPG

8480181C, 12135A10920, 10921, 11129

Bridge Wire Continuity Test Con-sole,P/N 5645976 (C59813) inc. HP8510Network Analyzer SystemCimron Digital Voltmeter 6653ACircuit Resolver Y-2349608 03.05Delta Ordnance Test System (DOTS)EBW Test Set Dwg. #2715171 TS-121A 004.08EBW Test Set P/N 2715171 (C-06216)ETI (DuPont) Blasters Multimeter 101A 4203, 3777General Electric Ordnance Circuit TestUnits

IC NT5641ICNA2269

001002

John Fluke Digital Multimeter 8012A8012B8060A

N3080088

Meggar Testers 1862C1863

373374

Ordnance Test Sets P/N 80-801FM0000 17, 18Ordnance Test Controls 01Simpson Multimeter 463 N/ASpace Electronics Igniter Circuit Tester 101-5AF, 101-5AL, 101-

5R2-3, 101-HP, 101-HJ101-5HJ/HJR101-5HJ S9024, S9093

Test Set Safety General Purpose(Volt/Ohms) Type CT582/3(NATO Ref: #6624-99-014-9531)TRW OICU G333389 1 and 2U.K. Safety Ohmmeter Type 5875Valhalla Digital Igniter Tester 4314A

4314AB4314AN4314B4314KB

001, 002, 00313-119

N/AN/a

Downloaded from http://www.everyspec.com

Page 81: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Appendixes

Appendix DEASTERN RANGE ORDNANCE TEST CONSOLE DESCRIPTION

D-1

INTRODUCTION

Two ordnance test converters are located in the Electro-Mechanical Test (EMT) facility on Cape CanaveralAir Station (CCAS) in Fuel Storage Area #2. Specific equipment includes the following:

a. Datel digital meters, models DM-3100X and DM-3102A, respectively.

b. Valhalla Igniter Tester - The primary feature of an Igniter Tester is fail-safe current limiting (5milliamps) to prevent accidental firing of an ordnance under test.

c. C. P. Claire mercury-wetted relays - These relays were selected for their very low contact resist-ance. This low resistance must be repeatable on subsequent relay closures. The replacement C. P. Clairemercury-wetted relays using a high-pressure closure.

EQUIPMENT DESCRIPTION

An ordnance test console (OTC) is used to obtain low resistance measurements and isolation resistancemeasurements of ordnance devices used on various launch vehicles, payloads, and the Space Shuttle.These readings are used to verify the functionality safety of the ordnance device before installation on thevehicle. Figure 1 shows a simplified block diagram of the major functional areas of an OTC.

The ordnance under test is placed inside the Test Chamber using an ordnance unique cable with a connectorcompatible to the Test Chamber. Twenty-four test lines from the Test Chamber to the OTC are configuredto the “+” and “-” buss by selecting the proper Line Select Switch via the Line Selector Relay Bank.

The Test Equipment Selector Switch then places the desired test equipment (Valhalla Digital Igniter Tester,High Current Test Circuit, or external equipment) across the buss. The Safe and Arm Operate Controlsinitiate the Safe or Arm features of those types of ordnance. The Digital Stopwatch will time the Safe andArm or Arm to Safe action.

Downloaded from http://www.everyspec.com

Page 82: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Range User Handbook Appendixes

Appendix DEASTERN RANGE ORDNANCE TEST CONSOLE DESCRIPTION

D-2

Downloaded from http://www.everyspec.com

Page 83: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com

Page 84: Downloaded from 45 CES/CEF - 45th Civil Engineer Squadron, Fire Protection 45 SEOO - 45th Space Wing, Mission Flight Control 45 SW/MIS - 45th Space Wing, Office of Infor-mation Management

Downloaded from http://www.everyspec.com