Balanced beam

M M

Page 3: Dove Las

Closure pour

Page 4: Dove Las

Procedure

Page 5: Dove Las

Field of application

ÅÅÅ

Page 6: Dove Las

Field of application

ÅÅÅ

Page 7: Dove Las

Pierhead: Fixing to the pier

Page 8: Dove Las

Pierhead: Solutions

Å

ÅÅÅÅÅ

Traveller ÅUsing the traveller

ÅÅÅÅ

Page 9: Dove Las

Pierhead: Girders through box-outs in the pier

Page 10: Dove Las

Pierhead: Girders through box-outs in the pier

Page 11: Dove Las

Post tension ï for construction time

Page 12: Dove Las

Post tension ï for final state

After final stage (continuousness pre-stressing): Positive bending moment, continuous beam

Page 13: Dove Las

Post-tensioning systems ï position in different cross sections and projects

Page 14: Dove Las

Post-tensioning systems: example DSI MA

Page 15: Dove Las

Post-tensioning systems: Equipment Hydraulic jack

DSI:

Page 16: Dove Las

Overview

Page 17: Dove Las

Overview: CFT Traveller

Page 18: Dove Las

Overview: Longitudinal frames and rails

Page 19: Dove Las

Overview: Cross beams, platforms, cantilever brackets

Page 20: Dove Las

Overview: Bottom slab formwork (bottom grid)

Page 21: Dove Las

Overview: Exterior formwork

Page 22: Dove Las

Overview: Interior formwork

Page 23: Dove Las

Overview

Å

Å

Å

Page 24: Dove Las
Page 25: Dove Las

Adjusting the width

Page 26: Dove Las

Number of longitudinal frames

Å

1 2 3 4

Page 27: Dove Las

Competitors: adjusting the width is a problem!

Å

Å

Å

Page 28: Dove Las

Inner formwork: Reduction of height

D

Page 29: Dove Las

Inner formwork: Blisters!

Page 30: Dove Las

Safety: Platforms

Page 31: Dove Las

Principle of the mechanism

Page 32: Dove Las

Longitudinal slope is severely hazardous!

Danger of falling down!

Page 33: Dove Las

Longitudinal slope is severely hazardous!

ÅÅ

ÅÅ

Page 34: Dove Las

Longitudinal slope is dangerous!

Page 35: Dove Las

S L I D I N G B E A R I N G: Reliable protection against slopes

Å

Å

Å

Å

Page 36: Dove Las

Operating instructions, CE-certification

Page 37: Dove Las

Safe pre-assembly on a safe assembly area

Page 38: Dove Las

Positioning of launching rails

Page 39: Dove Las

Positioning of longitudinal trusses

Assembly: Longitudinal trusses

Page 40: Dove Las

Lifting cross-beams

Page 41: Dove Las

Lifting cantilever-arm brackets

Page 42: Dove Las

Cantilever arm formwork

Page 43: Dove Las

Outside web-formwork

Page 44: Dove Las

Bottom grid

Page 45: Dove Las

Inside formwork

Page 46: Dove Las
Page 47: Dove Las

Description of an possible ĂWeekly cycleñ

Sunday: - Hardening of casted segments

Page 48: Dove Las

SO 204 ï Most pres Labe ï Litomerice (Czech Republic)

Å

Å

Page 49: Dove Las

SO 206 ï Most pres Vltavu ï Prague (Czech Republic)

Å

Page 50: Dove Las

SO 206 ï Most pres Vltavu ï Prague (Czech Republic)

ÅCross section A

ÅCross section B

Page 51: Dove Las

SO 206 ï Most pres Vltavu ï Prague (Czech Republic)

ÅCross section A : single box ÅCross section B: double box

Å

Page 52: Dove Las

SO 206 ï Most pres Vltavu ï Prague (Czech Republic)

ÅCross section A : single box ÅCross section B: double box ÅCross-walls, blisters, etc.

Å

Page 53: Dove Las

SO 206 ï Most pres Vltavu ï Prague (Czech Republic)

ÅCross section A : single box ÅCross section B: double box ÅCross-walls, blisters, etc. ÅDoka ready-to-use service

Å

Page 54: Dove Las

Viaducto de Teror Cantilever superstructure ï Gran Canaria (Spain)

ÅStay-cable bridge (extra-dosed bridge) ÅInclined webs with blister box-outs

Page 55: Dove Las

Viaducto de Teror Cantilever superstructure ï Gran Canaria (Spain)

ÅStay-cable bridge (extra-dosed bridge) ÅInclined webs with blister box-outs

ÅTelescopic mechanism for widening up the bottom formós width

Page 56: Dove Las

Viaducto de Teror Cantilever superstructure ï Gran Canaria (Spain)

Å

Å

Å

Å

Page 57: Dove Las

Viaducto de Teror Cantilever superstructure ï Gran Canaria (Spain)

ÅStay-cable bridge (extra-dosed bridge) ÅInclined webs with blister box-outs ÅTelescopic mechanism for widening up the bottom formós width ÅNarrow cross section height, very shallow interior

Å

Page 58: Dove Las

V5 Pagador ï Gran Canaria (Spain)

ÅPierhead ÅWith newly developed pierhead solution

Page 59: Dove Las

V5 Pagador ï Gran Canaria (Spain)

ÅPierhead ÅWith newly developed pierhead solution ÅLongitudinal slope 8%

Page 60: Dove Las

V5 Pagador ï Gran Canaria (Spain)

ÅPierhead ÅWith newly developed pierhead solution ÅLongitudinal slope 8% Å2 Cantilever Forming Travellers

Page 61: Dove Las

M43 ï Tisza Hid (Hungary)

ÅComposite bridge with webs made of trapezoidal plates

Page 62: Dove Las

M43 ï Tisza Hid (Hungary)

ÅComposite bridge with webs made of trapezoidal plates Å4 longitudinal frames ÅĂgateñ lifting in the steel parts

Page 63: Dove Las

M43 ï Tisza Hid (Hungary)

ÅComposite bridge with webs made of trapezoidal plates Å4 longitudinal frames ÅĂgateñ lifting in the steel parts

Page 64: Dove Las

Donaubrücke Traismauer (Austria, River Danube)

Å

Å

Å

Å

Page 65: Dove Las

Donaubrücke Traismauer (Austria, River Danube)

Page 66: Dove Las

Speedway Bridge Nitra (Slovakia)

Å3 pairs of Doka Cantilever Forming Travellers