Upload
minhtien-le
View
90
Download
6
Embed Size (px)
Citation preview
DO
NG
AH
CO
NS
TR
UC
TIO
N
www.dongah.co.kr
Aim HighFly Higher
CHALLENGE
PASSION
INNOVATION
HEAD OFFICE
T E L
F A X
Address
Kukdong Building 9th Fl., 60-1 Chungmuro 3-ga, Chung-gu, Seoul
(82)-3709-2114
(82)-3709-3801
BUSAN FACTORY
T E L
370-37 Shinpyoung-dong, Saha-gu, Busan
(851)-207-3760~7
CHEONAN FACTORY
T E L
Cheonheung Industrial Complex, 315-4 Cheonheung-ri, Seonggeo-eup, Cheonan-gun, Chungnam
(841)-560-6500
CHEONGJU FACTORY
T E L
Sangbal-ri, Nami-myeon, Cheongwon-gun, Chungbuk
(843)-231-5060~7
CHANGWON FACTORY
T E L
91-92 Daewon-dong, Changwon-si, Gyeongnam
(855)-273-2111~4
PROFILE_ 01
MESSAGE FROM THE CHAIRMAN_ 02
PRESIDENT & CEO’S MESSAGE_ 04
HISTORY_ 06
CHALLENGE_ 08
PASSION_ 10
INNOVATION_ 12
BUSINESS LINE_ 14
CIVIL ENGINEERING_ 16
PLANT _ 28
ARCHITECTURE_ 36
ENVIRONMENT_ 42
INTERNATIONAL _ 46
TECHNOLOGY CENTER & FACTORY_ 52
TECHNOLOGY CENTER_ 54
FACTORY_ 56
C O N T E N T S The 21st century already has seen significant changes in the global construction
industry. The traditional demographics and differentiators are no longer. The
Middle East, China and India are the new centers of the global construction
market. Consolidation has created fewer and larger global construction
companies. Currency fluctuations and shortages of labor and material are
putting added pressure on contractors.
Dong Ah Construction, since its establishment in 1945, has demonstrated great
ability in the domestic and international construction market. The company
began with major civil engineering projects in constructing dams, harbors,
highways, land reclamation projects and landfills. Later activities expanded to
include projects such as thermal and nuclear power plants. Dong Ah was a
significant force in the expansion of the Korean economy and did much to
improve the lives of the Korean people through social and urban projects.
Water/waste projects and other environmental construction helped to broaden
Dong Ah’s market. The success of its domestic operations provided the impetus
for expansion overseas and led to execution of major overseas civil construction
projects in the Middle East and Africa, particularly in Saudi Arabia and Libya.
Dong Ah also did major projects in S.E. Asia. The company looks with renewed
confidence to the 21st century with strong corporate core values and a clear
vision of our mission.
PROFILE
PROFILE 01
MESSAGE FROM THE CHAIRMAN 03DONG AH CONSTRUCTION02
MESSAGE FROM THE CHAIRMAN
Today’s world is full of new construction challenges. Demand and competition require innovation and
commitment. The concern for the environment requires that sustainability be an integral part of our performance.
Dong Ah Construction is “aiming high” in our commitment to be a global partner that can meet any challenge. Our
domestic operations will provide the solid base so essential to support international projects. The business
systems, construction technology, safety programs and the corporate core values of quality and training must be
firmly established, maintained and improved to ensure consistency and credibility globally.
Dong Ah Construction is now a member of The Prime Group. We are a leading developer in Korea and continue to
be active in planning, financing, engineering and construction. The Prime Group is involved in a wide range of
commercial and retail projects as well as technology / IT developments and urban improvement schemes.
Saman Engineering has also been added to the Prime Group. It is one of the leading Korean engineering firms and
we see lots of synergy with Dong Ah.
Prime and Dong Ah Construction are ready to “Aim High” with a commitment to “Fly Higher”. We will not rest on
our current success. We will strive for customer satisfaction and we will continue to improve on our core
competencies. Our national work ethic and emphasis on technical excellence will add value for our global
customers. Our staff is proud to be part of Dong Ah. As Chairman, I commit to use these personal assets to
provide lasting customer satisfaction.
Prime will continually strive towards the actualization of the best value
for our customers.
Jong Heon Paek, Chairman
MESSAGE FROM THE CEO 05DONG AH CONSTRUCTION04
PRESIDENT & CEO’S MESSAGE
The history of Dong Ah is filled with accomplishments in the domestic and international construction market.
Dong Ah was an acknowledged leader of the economic development in Korea through significant projects in civil
engineering and plant facilities. We also gained trust and reputation in the Middle East particularly in Libya, Saudi
Arabia and UAE. Our performance on the Great Man Made River in Libya captured the imagination of the World. In
extremely difficult conditions, our quality was outstanding and the huge pipeline had no leakage problems.
Similarly, in Saudi Arabia, Dong Ah accomplished every performance milestone on the expansion of the national
telecommunication system.
We construct the future
A historic new chapter is opening for Dong Ah with our merger with Prime Group. Once again we will be a driving
force to maintain and improve Korea’s economic position domestically. We will be innovative and capitalize on the
synergies with Prime. Dong Ah will launch a new initiative to regain our positon as a global construction company.
We will be leaders in creativity
Dong Ah will continue to rely on our core staff. Turnover is low and retention is high because respect and in-house
training are stressed. Communication is essential to a global company. Information is open and consistent. We
embrace the need for cultural diversity and we have foreign employees and consultants. Relationships with other
global companies and specialty groups add further competencies. We create and nurture a creative and lively
business culture.
Dong Ah is ready to assume the responsibility and obligations to be a leader in building a sustainable and bright
infrastructure for mankind.
Aiming High
as a global E&C Contractor
Sun Gu Kim, President & CEO
1980 Complete Gori Nuclear Power Plant No. 1 & No. 2
1980 Complete Incheon Landfill Development
1981 Complete Wolseong Nuclear Power Plant No. 1
1983 Receive Phase I construction of the Libya Great Manmade
River Project (project size of $3.8 billion)
1985 Establish Institute of Technology
1986 Complete construction of Saudi Arabia TEP ($1.27 billion)
1989 Complete Wolseong Nuclear Power Plant No. 1 & No. 2
1945 Establish Cheongnam Construction Company
1957 Relocate Head Office to Seoul
1971 Complete 3 sections of Seoul Subway’s Line No. 1
1971 Begin construction of Gori Nuclear Power Plant
No. 1 & No. 2
1978 Begin construction of Wolseong Nuclear Power Plant No. 1
1978 Begin Saudi Arabia’s TEP construction
1978 Complete Wonhyo Bridge with company capital
1979 Complete Al-Jaw mountain road construction
in Saudi Arabia
1990 Receive Phase II construction of the Libya Great Manmade
River Project (project size of $6.1 billion)
1990 Complete International Broadcasting Center
1991 Obtain ASME NA and NPT certificate
1991 Complete Phase I of the Libya Great Manmade River Project
1991 Complete construction of Juam Multipurpose Dam
1993 Complete the War Memorial of Korea in Yongsan
1993 Complete Biological & Radiological Protection
Facility-14 (MCPS)
1994 Obtain ISO 9001 Quality Certification
1995 Complete Muju Hydraulic Power Plant No. 1 & No. 2
1995 Complete Posco Economic Center
1995 Obtain ISO14001 Environmental Certification
1996 Formal Inauguration of Phase II of the Libya Great
Manmade River Project
1996 Awarded First Prize in the Architectural Division from
the IFWPCA (International Federation of Asia and Western
Pacific Contractors’ Associations), Posco Center
1997 Obtain KEPIC, MN, SN, EN Certificate
1997 Complete Seoul City Museum
1998 Settle agreement on Phase III of the Libya Great
Manmade River Project (project size of $ 5.1 billion)
1998 Complete Uljin Nuclear Power Plant No. 3
1998 First Korean company to enter Japanese public
construction market
1999 Complete Uljin Nuclear Power Plant No. 4
1999 Complete Dangjin Thermal Power Plant No. 1 & No. 2
2001 Complete Malaysia Bakun Tunnel
2001 Complete Dangjin Thermal Power Plant No. 3 & No. 4
2001 First Korean company to complete steel frame tall
apartment, Dong Ah SoleCity in Yongin, Guseong
2001 Complete eight-lane extension work of Namhae Highway
(from Naeseo to Nangjung)
2001 Complete Phase II superstructure construction of first
container terminal at Gwangyang Port & 9 other
construction works
2002 Complete construction of Gayang Bridge
2002 Complete Biological & Radiological Protection
Facility-13 (MCPS)
2003 Complete eight-lane extension work of Kyoungbu
Highway (from Naeseo to Nangjung)
2004 Complete Hai Van Pass Tunnel construction in Vietnam
2004 Complete Young Hung Thermal Power Plant No. 1 & No. 2
2004 Complete four-lane extension work of Donghae Highway
(from Donghae to Jumunjin)
2005 Complete Woljin Nuclear Power Plant No. 5 & No. 6
2005 Complete extension work of Incheon Port’s floodgates (10KT)
2006 Complete four-lane extension work of National Highway
No. 5 (from Hyeon-dong to Naeseo)
2007 Complete Cheonggsong Hydraulic Power Plant
No. 1 & No. 2
2007 Complete expansion work of Masan / Changwon Sewage
Treatment Plant
HISTORY
HISTORY 07DONG AH CONSTRUCTION06
1945~ 1980~ 1990~ 2000~
CHALLENGETo take on challenges that overcome limits indeveloping the world’s land and infrastructurewhile protecting and preserving the environment.The Egyptian pyramids, the Great Wall of China,the Roman Colosseum,
Bulguksa Buddhist Temple of the Shilla Dynasty, and other wonders of
the world are the masterpieces of construction technology. Libya’s
Great Manmade River Project which firmly established Dong Ah
Construction’s reputation on the global stage is a historical site which
will prove to be a great asset to mankind even after thousands of years.
PASSIONTo transform the dreams of clients intoreality with a commitment toperformance, quality and safety.Nothing is impossible when it comes to the creation of value
for customers. The dedication and desire to satisfy the needs
of every customer are derived from the commitment to
excellence and thinking from the point of view of the
customer.
INNOVATIONTo lead the future of global construction throughtechnological innovation.Innovation is a key word in Dong Ah’s corporate language. It conveys
the corporate commitment to constantly and consistently look for
improvements in everything that carries the company’s name.Our
past brings tradition and pride while the present allows us to
demonstrate our values and performance. It is the future that will
differentiate Dong Ah by adding value to every client through our
“least total cost” approach that ensures sustainable projects.
The structure of Dong Ah Construction seeks to maximize the synergistic
benefits of five business lines. These are Civil Engineering, Architecture, Plant,
Environment, and International. Major investment is being made in ongoing
research and development to enhance quality and develop new technology, while
stable raw material supplies are ensured through factories in three places,
including Cheonan, in accordance with the specialty and technological changes
being made in the world market. Our vision is to minimize the negative impacts
of external factors through comprehensive planning for all resources.
BUSINESS LINESDong Ah Construction is rising as a leader in global E&C
Contractor, growing with its base founded on specialty
and technological skills.
( )
( )
BUSINESS LINE 15DONG AH CONSTRUCTION14
Civil engineering
Cheonan Changwon Busan Cheongju
Architecture Plant Environment International
FACTORY
CONSTRUCTION
Steel structures, Industrial machines Bolts, Nuts Concrete PC Panel, PC BOX
CIVIL ENGINEERINGLAND DEVELOPMENT_18 I ROAD_20 I BRIDGE_22 I PORT_24 I TUNNEL & SUBWAY_26
Better roads make a better world. Through Dong Ah
Construction’s many civil engineering projects, a continuing
contribution will be made to infrastructure and economic
development.
CIVIL ENGINEERING 17DONG AH CONSTRUCTION16
Wonhyo Bridge
Creating greater value and prosperityfrom the land
Daeho Tide Embankment
Ansan Housing Development
Janseong Dam in Janseong-gun, Jeonnam
Juam Multipurpose Dam in Suncheon-si, Jeonnam
LAND DEVELOPMENT 19DONG AH CONSTRUCTION18
LAND DEVELOPMENT
Dong Ah Construction performs a crucial role in laying the foundation
of economic prosperity through comprehensive urban and rural development. Dong Ah has a
significant track record in the effective development of reclamation projects, tide
embankment construction, multipurpose dams, and landfill projects. These have brought
incredible development in the agricultural and manufacturing industries. Dong Ah has also
executed many housing site development projects in major cities, land readjustment projects,
and industrial complexes.
CIVIL ENGINEERING LAND DEVELOPMENT I ROAD I BRIDGE I PORT I TUNNEL & SUBWAY
ROAD 21DONG AH CONSTRUCTION20
ROAD CIVIL ENGINEERING LAND DEVELOPMENT I ROAD I BRIDGE I PORT I TUNNEL & SUBWAY
Incheon International Airport Highway
Donghae Highway
Al-Jaw Mountain Road in Saudi Arabia
National Highway No. 5 (Masan, Hyeondong IC)
The infrastructure to realize economic dreams
Beginning with the construction of the Kyoungbu Highway that is well
known as the cornerstone of the nation’s economic development, Donh Ah has been a major
player in the development of the national highway network. Projects completed by Dong Ah
cross the Korean Peninsula in every direction. Notably, Dong Ah was able to greatly
contribute to the development of the nation’s key transporation modes by being nominated
as a participating company in the New Seoul Airport Highway construction. This became, an
emblem of the 21st century Korea.
BRIDGE 23DONG AH CONSTRUCTION22
CIVIL ENGINEERING LAND DEVELOPMENT I ROAD I BRIDGE I PORT I TUNNEL & SUBWAY
BRIDGE
Wonhyo Bridge
Cheongpyeong-Kyongchun Train Line-Jo Jong River Bridge No. 1
Sinjeong Bridge
Donghae Highway-Namdae River Bridge
Spanning vast bodies of water, symbolsof civilization’s progress
The Wonhyo Bridge was designed as the longest continuous PSC BOX
bridge where the Dywidag method was first applied in Korea. It covers a vast length of 100
meters in the shape of an arch exhibiting unity and symmetry. This very aesthetic solution
brought great recognition to Dong Ah. The abilty to blend innovative and pleasing design
solutions with technical advanced construction methods made Dong Ah a leader in the bridge
market sector. This is demonstrated in Korea through the major bridges of the Hangang
River and the first suspension bridge, or the Gwangan Bridge in Busan.
PORT 25DONG AH CONSTRUCTION24
CIVIL ENGINEERING LAND DEVELOPMENT I ROAD I BRIDGE I PORT I TUNNEL & SUBWAY
PORT
Incheon Port’s Floodgates
Busan Port’s 8th Wharf
Quadima Port in Saudi Arabia
Gwangyang Port Container Terminal
Combining yesterday’s experience withtomorrow’s technology
Port construction has long been an integral part of Dong Ah’s civil
works portfolio. The company’s involvement in marine works has been a feature of the
domestic success. From this record of successful accomplishment Dong Ah began to
undertake port and harbor work internationally. A noteworthy project was the construction of
the floodgate and wharf which connects the inner and outer harbor at the Incheon Port
Integrated Facility Construction Project, where tides reach a maximum height difference of
10 meters. In Busan, Korea’s largest international port, the 7th and 8th Wharf was constructed.
TUNNEL & SUBWAY 27DONG AH CONSTRUCTION26
CIVIL ENGINEERING LAND DEVELOPMENT I ROAD I BRIDGE I PORT I TUNNEL & SUBWAY
TUNNEL & SUBWAY
Seoul Subway Line No. 4
Transfer operation of Daegu Railway Line
Underground Shopping Center at Uijeongbu Station
Ssaljae Tunnel in Masan, Kyoungnam
Namsan Tunnel No. 2 in Seoul
Guduk Tunnel in Busan
The triumph of construction over allobstacles
Dong Ah Construction has acquired substantial experience and
technology in the field of tunnel construction in various highway and rail projects. Subway
construction connecting Seoul and Bundang, and in Gwangju, and Busan were successfully
completed. Also the Seoul Subway Line No. 5 construction was completed in a difficult work
site in the heart of the city. Recognition has also been given to Dong Ah for outstanding
execution skills in subway connection construction and circular structures.
PLANT NUCLER POWER PLANT_30 I THERMAL & HYDRAULIC POWER PLANT_32 I INDUSTRIAL PLANT_34
PLANT BUSINESS 29DONG AH CONSTRUCTION28
POSCO Museum in Pohang
Since the construction of Korea’s first nuclear power plant,
Dong Ah Construction’s cutting-edge technologies have been
leading the way in industrial facilities of all types.
NUCLER POWER PLANT 31DONG AH CONSTRUCTION30
PLANT NUCLER POWER PLANT I THERMAL & HYDRAULIC POWER PLANT I INDUSTRIAL PLANT
NUCLER POWERPLANT
Gori Nuclear Power Plant
Wolseong Nuclear Power Plant
Uljin Power Plant No. 3 & No. 4
Uljin Power Plant No. 1 through No. 6
Industry-leading power plantconstruction capabilities
Dong Ah Construction opened a new era by constructing Korea’s first
nuclear power plant in 1971. Dong Ah Construction began with the Gori Nuclear Power Plant
No. 1 and No. 2 and continued in successfully executing the building of the Wolseong Nuclear
Power Plant, Uljin Nuclear Power Plant No. 1 and No. 2, and the Uljin Nuclear Power Plant
No. 3, 4, 5, & 6, which represent the standard Korean nuclear power plant. Dong Ah
Construction further gained global recognition for its nuclear power plant building technology
by participating in the KEDO’s North Korea reactor project.
THERMAL & HYDRAULIC POWER PLANT 33DONG AH CONSTRUCTION32
PLANT NUCLER POWER PLANT I THERMAL & HYDRAULIC POWER PLANT I INDUSTRIAL PLANT
THERMAL& HYDRAULICPOWER PLANT
Seocheon Thermal Power Plant
Dangjin Thermal Power Plant
Cheongsong Hydraulic Power Plant
Cheongsong Hydraulic Power Plant
(Basement)
Youngheung Thermal Power Plant
Seamless integration of cutting-edgeconstruction technologies
Dong Ah has always been regarded as a market leader in this sector.
Completed plants can be seen all around Korea including the Yeosu, Wangsimni, Yeongdong,
Seocheon, and Dangjin Thermal Power Plants No.1, 2, 3, and 4 and the Youngheong Thermal
Power Plant No. 1 & 2. Eco-friendly clean power plants such as the Cheongpyeong, Muju,
Cheongsong Hydraulic Power Plant, and the Ilsan Power Plant complex have all displayed
Dong Ah’s outstanding technology and execution skills.
INDUSTRIAL PLANT 35DONG AH CONSTRUCTION34
PLANT NUCLER POWER PLANT I THERMAL & HYDRAULIC POWER PLANT I INDUSTRIAL PLANT
INDUSTRIAL PLANT
Ulsan Petrochemical Complex
Gwangyang Iron Mill
Gwangyang Cold Rolling Mill
Pohang Iron and Steel
Singapyeong Transmission Line(T/L)
Steel Tower
Lasting monuments of plant-buildingprowess
Dong Ah Construction contributed to the strengthening of Korea’s
economy by constructing the Ulsan oil refinery, Korean fertilizer factory, Namhae Chemical
high-strength chemical plant and heavy industries, and the Pohang and Gwangyang iron and
steel plant
ARCHITECTURE BUILDING_38 I HOUSING_40
ARCHITECTURE 37DONG AH CONSTRUCTION36
POSCO Center
Dong Ah has considerable in-house capabilities in a broad
range of architectural services. Most projects are conventional
design-bid-build but we are able to respond to design/build
opportunities in the market place.
BUILDING 39DONG AH CONSTRUCTION38
ARCHITECTURE BUILDING I HOUSING
BUILDING
War Memorial of Korea in Yongsan
Seoul City Museum
World Cup Stadium in Daejun
International Broadcasting Center (IBC) & KBS Broadcasting Center
Creative solutions for people and spaceDong Ah Construction built the KBS and MBC broadcasting center, and
the International Broadcasting Center. These facilities were the heart of the entire
communications network for the 1988 Summer Olympics. Dong Ah received many accolades
for its outstanding construction skills in the construction of these broadcasting centers. Dong
Ah has constructed many cutting-edge intelligent buildings, and museums, including the
Korea Cancer Center Hospital, Seoul Station, and Dongdae-gu Station. These buildings have
become landmarks in Seoul and have made a real contribution to the physical impact of the
skyline and general urban environment.
HOUSING 41DONG AH CONSTRUCTION40
ARCHITECTURE BUILDING I HOUSING
HOUSING
Yongin Guseong Dong Ah Apartments
Santa Elena private residences in San Francisco, USA
Sindang-dong Redevelopment Zone No. 3
Construction of Steel Structures
New concepts in livingDong Ah Construction has been the leader in the new wave of better
housing for Korean. The goal was to build houses that responded to the needs for improved
facilities, updated communications and better use of space. This began with the Dong Ah
SoleCity apartments, which was Korea’s first steel structure, and has been supplying better
homes in Seoul as well as in cities across the nation. Dong Ah Construction has been deeply
involved in the development of Seoul’s satellite districts and has been the leading company in
the development, and reconstruction of villas and luxury housing. These construction skills
that were developed in the domestic market have enabled Dong Ah to compete and win
several major housing programs internationally.
ENVIRONMENT ENVIRONMENT PROJECT_44
ENVIRONMENTAL BUSINESS 43DONG AH CONSTRUCTION42
“The value of nature never changes.” Dong Ah Construction
has a strong corporate commitment to preserve the
environment through participation in “green” solutions for
plant and facilities.
ENVIRONMENT PROJECT 45DONG AH CONSTRUCTION44
ENVIRONMENTAL BUSINESS ENVIRONMENT PROJECT
ENVIRONMENTPROJECTS
Gayang Sewage Treatment Plant
Gayang Sewage Treatment Plant Construction
Juam Dam Large Water Excavation (TBM Method)
Anyang River Sewage Treatment Plant
“Technologies to protect the globalenvironment in the 21st century”
Dong Ah Construction has been actively pursuing projects in this sector,
particularly sewage and water pollution purification plants. We have advanced skills in
environmental technology, as demonstrated in the Juam Dam channel large water
construction, the Gayang Sewage Treatment Plant, Changwon Sewage Treatment Plant,
Masan Sewage Management Facility, Ilsan Dumping Site, Incheon Waste Water Treatment
Plant, Anyang Sewage Treatment Plant, Pohang Sewage Treatment Plant, and Kimpo and
Pohang Landfill project. Once again these skills that were developed domestically have
enabled Dong Ah to export technology and skills internationally.
INTERNATIONAL GMR PROJECT_48 I TELECOMMUNICATIONS_50
Libya’s Great Man-Made River Project
OVERSEAS 47DONG AH CONSTRUCTION46
Combining civil engineering, plant and architectural
capabilities under one roof, Dong Ah Construction is “aiming
high” for an exciting future. Our successful participation in
Libya’s Great Manmade River Project earned Dong Ah
Construction worldwide respect and recognition for
outstanding technological capabilities.
GMR PROJECT 49DONG AH CONSTRUCTION48
INTERNATIONAL GMR PROJECT I TELECOMMUNICATIONS
GMR PROJECT
Ajdabiya Resevoir
Air view of Libya’s Great Manmade River Construction
Coating Shop, a Pipe Production Construction
Libya Great Manmade River Project’s Main Resevoir
A 20th century miracle of human endeavorDong Ah Construction was awarded Libya’s Great Manmade River
Project, the largest project in the world, and produced a record zero rate of leakage,
successfully completing the historic project by supplying 2 million ton per day of water to
Libya’s two major cities of Benghazi and Sirt. The huge project set various records in the
history of world civil engineering such as manpower materials, and equipment utilized in the
construction. In 1983, these records were recorded in the Encyclopedia Britannica Yearbook
as GMR was acknowledged as the world’s best public work project.
TELECOMMUNICATIONS 51DONG AH CONSTRUCTION50
INTERNATIONAL GMR PROJECT I TELECOMMUNICATIONS
TELE-COMMUNICATIONS
Communication line exterior
Expansion work of automated telephones in Saudi Arabia
Interior of the communication line construction’s communication facility
First ever in a century of world-classconstruction history
The reputation of Dong Ah Construction climbed to new heights as a
global enterprise with the construction of the Saudi Arabia TEP (Telephone Expansion
Project). The TEP project required the laying of cables all across Saudi Arabia. This required
extensive knowledge of telecommunications construction and significant resources. This was
a massive construction project with a total cost of USD 1.27 billion.
Dong Ah Construction continually develops better technologies to bring added
value to its customers. The investment in The Technology Center is yet another
indication of our corporate goals and vision. To rely on experience and current
methods is to risk extinction in today’s world, Dong Ah will continue to invest in
The Technolgy Center to ensure that its staffs are well trained and at the leading
edge of technology.
TECHNOLOGYCENTER & FACTORY“Reaching new heights for the future construction business”
TECHNOLOGY CENTER & FACTORY 53DONG AH CONSTRUCTION52
TECHNOLOGY CENTER 55DONG AH CONSTRUCTION54
TECHNOLOGY CENTER & FACTORY TECHNOLOGY CENTER
TECHNOLOGY CENTER
~ ASME (AMERICAN SOCIETY OF MECHANICAL ENGINEERS) :
NA, NPT, NS Certification Obtained (1991. 1) - Institute : ASME
~ KEPIC (KOREA ELECTRIC POWER INDUSTRY CODE) :
MN, EN, SN Certification Obtained (1997. 8)- Institution : KEPIC
CERTIFICATES (SINCE 1991)
Obtain ISO 9001 (Quality Management) Certification (1994. 5) - Institute :
TUV KOREA LTD.
Obtain ISO 14001 (Environment Management) Certification (1995. 12)
- Institute : TUV KOREA LTD.
Top-ranked capabilities throughtechnological competitiveness
Dong Ah Construction ensures competitiveness with technology
development that satisfies the desires of customers. Specialists in each area pursue the
development of new technology and construction methods to raise competitiveness of the
company. Training and research are highly stressed to gain global certification.
FACTORY 57DONG AH CONSTRUCTION56
FACTORYCheonan
Factory
Changwon
Factory
Busan
Factory
Cheongju
FactoryCHEONAN FACTORY
Manufactures various steel structuressuch as bridges, architectural steelbridges, and nuclear steel frames, aswell as leases construction equipment.
CHANGWON FACTORY
Produces high tensile boltsand bolts and nuts used inheavy machinery.
BUSAN FACTORY
Produces piles, tunneling, hume pipes,and other secondary concrete productsand ready mixed concrete.
CHEONGJU FACTORY
Manufactures PC Panels, PC BOX, PCBEAM, PC Pipes, and PCC Pipes.
Automated plant systems for the highest qualityAs Korea’s first steel structure manufacturer, it manufactures and erects various types of steel
structures including steel bridges, steel buildings, and cranes. Dong Ah also leases the 750 ton
Ringer Crane and other special equipments.
Changwon Factory produces high tensile bolts used in connecting steel structures and track bolts
used in assembling track chains in heavy machinery, which are supplied domestically and
exported to the United States as well as the global market.
Busan Factory produces high performance concrete pile, tunneling, and ready mixed concrete,
MCPS, and hume pipes, and is especially equipped with large pile and high performance concrete
producing facilities.
Cheongju Factory produces and installs PC Panel, PC BOX, PC BEAM, PC Pipe, PCC Pipe, for
construction and civil engineering. The PCC Pipe production performance capability was a huge
factor in the successful bid for the Libya Great Manmade River Project.
TECHNOLOGY CENTER & FACTORY FACTORY
NETWORK
DONG AH CONSTRUCTION58
DONG AH CONSTRUCTION
DEVELOPMENT & CONSTRUCTION
Prime Develop Co., Ltd.
37th~38th Flrs., Prime Center, 546-4 Guui-dong, Gwangjin-gu, Seoul
TEL 02-3424-0100 www.primedvp.com
Saman Corporation
Union Building, 1-20 Byeolyang-dong, Gwancheon, Gyeonggi-do
TEL 02-509-4600 www.samaneng.co.kr
DongAh Construction Industrial Co., Ltd.
Head Office: 9th Flr., Geukdong Bldg., 60-1 Chungmuro 3-ga,
Jung-gu, Seoul
TEL 02-3709-2114 www.DongAh.co.kr
Busan Plant: 370-37 Shinpyeong-dong, Saha-gu, Busan
TEL 051-207-3760~7
Cheonan Plant: Cheonheung Industrial Complex, 315-4 Cheonheung-ri,
Cheonan-gun, Cheungnam
TEL 041-560-6500
Cheongju Plant: Sangbal-ri, Nami-myeon, Cheongwon-gun, Chungbuk
TEL 043-231-5060~7
Changwon Bolt Plant: 91-92 Daewon-dong, Changwon, Gyeongnam
TEL 055-273-2111~4
Prime Industrial Co., Ltd.
13th Flr., Prime Center, 546-4 Guui-dong, Gwangjin-gu, Seoul
TEL 02-3424-3000 www.tm21.com
Korea Infra Development Co., Ltd.
18th Flr., Prime Center, 546-4 Guui-dong, Gwangjin-gu, Seoul
TEL 02-3424-1800 www.kidco.co.kr
Hallyu Wood Company. Ltd.
34th Flr., Prime Center, 546-4 Guui-dong, Gwangjin-gu, Seoul
TEL 02-3424-0276 www.h-wood.co.kr
Fuzzle Development Co.,Ltd.
34th Flr., Prime Center, 546-4 Guui-dong, Gwangjin-gu, Seoul
TEL 02-3424-5708
Youngnam Area Integrated Freight Terminal Co.,Ltd.
18th Flr., Prime Center, 546-4 Guui-dong, Gwangjin-gu, Seoul
TEL 02-3424-2000 www.kidco.co.kr
Gyeonggi Integrated Freight Terminal Co.,Ltd.
18th Flr., Prime Center, 546-4 Guui-dong, Gwangjin-gu, Seoul
TEL 02-3424-1800 www.kidco.co.kr
INFORMATION & TECHNOLOGY
Hansoft Inc.
20th~22th Flrs., Prime Center, 546-4 Guui-dong, Gwangjin-gu, Seoul
TEL 02-3424-3400 www.haansoft.com
Prime Information & Technology Co., Ltd.
7th Flr., Prime Center, 546-4 Guui-dong, Gwangjin-gu, Seoul
TEL 02-3424-0600 www.primeit.com
FINANCE & INVESTMENT
Prime Mutual Savings Bank
278-3 Nonhyeon-dong, Gangnam-gu, Seoul
TEL 02-3014-7000 www.primebanking.com
Prime Venture Capital Corporation
5th Flr., Prime Center, 546-4 Guui-dong, Gwangjin-gu, Seoul
TEL 02-3424-3700 www.prime-venture.co.kr
CULTURE & ENTERTAINMENT
YoungComm Co., Ltd.
29h Flr., Prime Center, 546-4 Guui-dong, Gwangjin-gu, Seoul
TEL 02-3424-2030 www.youngcomm.co.kr
Prime Entertainment Co. Ltd.
14th Flr., Prime Center, 546-4 Guui-dong, Gwangjin-gu, Seoul
TEL 02-3424-5200 www.primeenter.co.kr
Prime International Co., Ltd.
24th Flr., Prime Center, 546-4 Guui-dong, Gwangjin-gu, Seoul
TEL 02-3424-5463 www.kosney.co.kr
Croance Co., Ltd.
150-19 Gwangmyeong-dong, Gwangmyeong, Gyeonggi-do
TEL 02-2067-8114 www.croance.co.kr
Prime Broadcasting Co. Ltd.
10th Flr., Prime Center, 546-4 Guui-dong, Gwangjin-gu, Seoul
TEL 02-3424-3175 www.rtn.co.kr