DOM Main Board Rev 3/Rev 4 Status December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory

DOM Main Board Rev 3/Rev 4 Status

  • Upload
    linh

  • View
    54

  • Download
    5

Embed Size (px)

DESCRIPTION

DOM Main Board Rev 3/Rev 4 Status. December 2, 2003 Gerald Przybylski Lawrence Berkeley National Laboratory. Major Rev 3 Goals. Booting to –50°C, or colder Memory Interface Layout PMT Waveform, and Clamping Ringing, Clamping, Baseline Bounce Component Substitutions. Deferred: - PowerPoint PPT Presentation

Citation preview

DOM Main BoardRev 3/Rev 4

Status

December 2, 2003Gerald Przybylski

Lawrence Berkeley National Laboratory

Major Rev 3 Goals

• Booting to –50°C, or colder• Memory Interface Layout• PMT Waveform, and Clamping• Ringing, Clamping, Baseline Bounce• Component Substitutions

Deferred:

-- Front-End Pulser -- Local Coincidence

We’re On Track

Rev 3 First Items (4)• Boot at -70°C, measured by on-board sensor:

from Flash and Configuration Memory• Memory test OK at -50°C, at 40 MHz, long term...• Good PMT waveforms. Good clamping.• Perfect MB – to – Delay board fit• Power Under 3W (at CPU @ 80MHz & Memory @ 40MHz)

• 2 boards: -60°C, 160 MHz CPU, 125 MHz Mem• RAP at -60°C

Rev 3 Problems• PC Fab House Testing Failure

Shorts on Top Layer: 2 pcs. 4 shorts

• Two New Schematic Errors (Mentor/EDIF)

• Loading/Bill-of-Materials errors• Two Footprint errors (QFP-100, Oscillator)

• Minor, but Unsightly Quirks in Front-End Pulser Waveform - product/brand dependency discovered

Rev 4 Changes

• Component Value Changes -- optimization -- schematic corrections

• Power Supply Load Balancing (One trace, one resistor)

• On-Board LED Pulser Power (Several parts)

• Component Substitutions for Reliability,- A few; mainly inductors… 99% finalized- Availability issues

• Front End Pulser Corrections• Layout Design Rule Optimizations

Open Issues• Chevette vs. Buick vs. Cadillac quality PCBs (Class 1, 2, 3)

• Verification (Qualtest) Split between LBNL and UWe.g. Thermal Cycling: How many? What range?e.g. Vibration Testing: What acceleration? Where?e.g. Humidity: Will UW measure RH at -40°C? at -70°C?? in purged and sealed DOM…(VPH2O 0.002mm Hg@-70°C vs. 0.1mm Hg@-40°C vs. 24mm Hg@25°C)>> No problem, says RI…<<Design for EMS, when mature (what measure of maturity?)

Late Breaking News

• Receiving & Testing 12 More Rev 3 Boards- 6 Evenstar boards, 6 Data Circuits boards- Looking good so far; Many loading changes in batch

• Rev 4 Schematic Updates In Progress - 30% of schematic pages to date- Few additional Components.- Detailed List; Configuration Control

Rev 4 schedule Ongoing test stand parallel development (STF)

-- To be available 1/23 -- Move to room 50a-6105 11/21Modification Review/approval of Spreadsheet and File III11/25 Design rules Review 12/15 - 12/19 “line-by-line” Reviews 12/24 - 1/6 Fab 1/7 - 1/20 Assembly 1/23 - 2/19 Acceptance Testing at LBNL (STF based) 2/20 First 20 cards to UW 2/23 - 5/21 integration at UW, verification testing at UW and

LBNL

The End

Changes Spreadsheet