107
doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraem er, Slide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors: Name Company Address Phone email Bruce Kraemer Marvell 5488 Marvell Ln Santa Clara, CA 95054 +1-321-427- 4098 bkraemer@ marvell .com

Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

Embed Size (px)

Citation preview

Page 1: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

April 2013

Bruce Kraem

er, Marvel

l

Slide 1

WG11 Opening Report Snapshots April 2013

Date: 20 – April -2013Authors:

Name Company Address Phone email Bruce Kraemer Marvell 5488 Marvell Ln

Santa Clara, CA 95054

+1-321-427-4098

[email protected]

Page 2: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

Beijing Meeting

Agenda 11-13-0393r0

Snapshots 11-13-0394r0

Supplementary 11-13-0395r0

April 2013

Bruce Kraem

er, Marvel

l

Slide 2

Page 3: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

802.11 March Meeting Documents• Agenda 11-13-0166r1• Snapshots 11-13-0167r0• Supplementary 11-13-0168r0• Adrian’s Vice Chair report 11-13-0096r2• IEEE Web account 11-13-0250r0• Jon’s Vice Chair report 11-13-0187r0• Treasury report 11-13-0186r0• Publicity report 11-13-0091r0• Newcomers material 11-13-0049r1

April 2013

Bruce Kraem

er (Marve

ll)

Slide 3

Page 4: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

April 2013

Bruce Kraem

er, Marvel

l

Slide 4

PAR Expiration/Renewal ScheduleProject PAR Expiration Date

AF 31-DEC-2013AH 31-DEC-2014AI 31-DEC-2014AC 31-DEC-2014AJ 31-DEC-2016AK 31-DEC-2016AQ 31-DEC-2016

https://development.standards.ieee.org/pub/active-pars?n=22&o=1a0a2a3d

Page 5: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

April 2013

Bruce Kraem

er, Marvel

l

Slide 5

Page 6: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

Type of Groups

April 2013

Bruce Kraem

er, Marvel

l

Slide 6

Type of Group Description

WG Working Group

TG Task Group

SG Study Group

SC Standing Committee

Page 7: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

April 2013

Bruce Kraem

er, Marvel

l

Slide 7

802.11 Appointments

• WG Secretary – Stephen McCann• Treasurer – Jon Rosdahl• Publicity – Stephen McCann• ANA Authority – Adrian Stephens• WG Technical Editors – Adrian Stephens, Peter Ecclesine

Monday Agenda Item 4.1.2

Page 8: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

GroupsApril 2013

Bruce Kraem

er (Marve

ll)

Slide 8

Type Group Description Chair

WG WG11 The IEEE 802.11 Working Group Bruce Kraemer

TG MC Maintenance – Revision “mc” Dorothy StanleyTG AC Very High Throughput (<6 GHz bands) Osama Aboul-Magd

TG AD Very High Throughput (60 GHz) Eldad PerahiaTG AF Operation in TV Whitespace bands Richard Kennedy

TG AH Operation in 900 MHz bands Dave Halasz TG AI Fast Initial Link Setup Hiroshi ManoTG AJ China 60 GHz Xiaoming PengTG PAQ Pre-association Discovery Stephen McCannTG AK General Link Donald EastlakeSC WNG Wireless Next Generation Clint ChaplinSC ARC Architecture Mark HamiltonSC JTC1 ISO/IEC/JTC1/SC6 shadow committee Andrew MylesSC REG Regulatory Richard KennedySC SG HEW – High Efficiency WLAN Laurent Cariou pro-tem

Page 9: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

April 2013

Bruce Kraem

er (Marve

ll)

Slide 9

WG11 Task & Study Group Officers – March 2013Cat Group Chair Vice Chair Technical Editor Secretary

WG WG11 Bruce Kraemer Jon RosdahlAdrian Stephens

Adrian Stephens Peter Ecclesine

Stephen McCann

TG MC Dorothy Stanley Mark Hamilton, Jon Rosdahl Adrian Stephens Jon Rosdahl

TG AC Osama Aboul-Magd Menzo Wentink, Joonsuk Kim

Robert Stacey David Yang

TG AD Eldad Perahia James Yee Carlos Cordeiro -OPEN-

TG AF Richard Kennedy Peter Ecclesine, Zhou Lan Peter Ecclesine Zhou Lan

TG AH Dave Halasz Yongho Seok Minyoung Park Li Chia CHOO

TG AI Hiroshi Mano Marc Emmelmann,Gabor Bajko

Lee ArmstrongPing Fang

Hitoshi Morioka

TG AJ Xiaoming Peng Eldad Perahia, Haiming Wang NYRQ HAO Peng

TG AK Donald Eastlake NYRQ NYRQ ZHUANG Yan

TG AQ Stephen McCann Yunsong YANG Dan Gal Sue Hares

SC WNG Clint Chaplin Jim Lansford

SC ARC Mark Hamilton David Bagby

SC JTC1 Andrew Myles

SC REG Richard Kennedy

SG HEW Laurent Cariou

NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open NEW

Page 10: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

April 2013

Adrian Stephe

ns, Intel

Corporation

Slide 10

Teleconferences

Group Dates Start Time Duration TGmc Fridays, April 5 to April 26 10:00 ET 2 hoursTGai Tuesdays, March 26 to May 21 10:00 ET 1 HourTGah Wed May 8th 10:00 ET 

 1 Hour

TGac  May 23May 9, May 30

10:00 ET20:00 ET

2 Hours2 Hours

TGaf Tuesdays to July 30 21:00 ET 2 Hours TGak Monday April 8, 22; May 6 17:00 ET 1 HourTGaq April 22nd 10:00 ET 1 HourTGaj April 18th 19:00 ET 1 hour

REG SC Thursdays to July 29 12:30 ET 1.5 Hours

Page 11: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

April 2013

Bruce Kraem

er, Marvel

l

Slide 11

Page 12: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

March 2013

Adrian Stephe

ns, Intel

Corporation

Slide 12

Current Membership Status

Data as of 2013-03-01

Definitions: Aspirant: a member who has attended 1 qualifying meetingPotential Voter: a member who has attended 2 qualifying meetings and will become a voter at the start of the next plenary they attend

Status NumberAspirant 86

Potential Voter 44Voter 325

Page 13: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Slide 13

IEEE 802.11 Standards Pipeline

PHY

SponsorBallot

MAC

Study groups

PublishedStandard

WG Letter Ballot

802.11 -2012

802.11aaVideo Transport

802.11acVHT 5GHz

TG without Approved draft

Discussion Topics

PublishedAmendment

802.11afTVWS

Smart Grid802.11ai

FILS

802.11 ahWNG

April 2013

Slide 13

802.11aeQoS Mgt Frames

Bruce Kraem

er, Marvel

l

802.11adVHT 60 GHz

PAD802.11AQ

802.11aj

802.11-2015

GLK802.11AK

Page 14: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

IEEE 802.11 Revisions

802.11kRRM

802.11rFast Roam

a 54 Mbps5GHz

b11 Mbps2.4GHz

dIntl roaming

802.11VNetwork

Management

802.11sMesh

802.11uWIEN

802.11YContention

BasedProtocol

802.11nHigh

Throughput(>100 Mbps)

802.11WManagement

Frame Security

802.11zTDLS

802.11pWAVE

802.11 -1999

PHY

MAC

802.11-2012

802.11-2007

802.11aaVideo Transport

802.11aeQoS Mgt Frames

802.11ah<1GHz

802.11acVHT

6Gbps @ 5GHz

802.11aiFILS

802.11adVHT

6Gbps @ 60GHz

802.11afTV Whitespace

802.11-2003

g54 Mbps2.4GHz

eQoS

iSecurity

hDFS & TPC

jJP bands

f Inter AP

April 2013

Bruce Kraem

er, Marvel

l

802.11akGlobalLink

802.11aj40 & 60 GHz

802.11aqService Discovery

Slide 14

Page 15: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

April 2013

Bruce Kraem

er, Marvel

l

Slide 15

Page 16: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Slide 16

802.11 WG Editor’s Meeting (March 2013)

Date: 2013-03-10

Name Affiliation Address Phone email Peter Ecclesine Cisco Systems 170 W. Tasman Dr.,

MS SJ-14-4, San Jose, CA 95134-1706

+1-408-527-0815 [email protected]

Authors:

Adrian Stephe

ns, Intel

Corporation

from slide 1/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)

March 2013

Page 17: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Slide 17

Volunteer Editor Contacts• TGmc – Adrian Stephens – [email protected]• TGac – Robert Stacey – [email protected] • TGaf – Peter Ecclesine – [email protected] • TGah – Minyoung Park – [email protected]• TGai – Lee Armstrong– [email protected], Ping FANG [email protected]• TGaq – Dan Gal – [email protected]

• Editors Emeritus:– TGaa – Alex Ashley – [email protected]– TGad – Carlos Cordeiro – [email protected] – TGae – Henry Ptasinski – [email protected]

Adrian Stephe

ns, Intel

Corporation

March 2013

from slide 2/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)

Page 18: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

802.11 Style Guide• See 11-09-1034-07-0000-wg11-style-guide.doc

– We updated 802.11 WG Style Guide based on 2012 IEEE Standards Style Manual and consistency changes in final publication of the 802.11 standard

• Editor’s responsibility includes checking the 2012 IEEE Standards Style Manual when creating or updating drafts. https://development.standards.ieee.org/myproject/Public/mytools/draft/styleman.pdf

• Submissions with draft text should conform to both the WG11 Style Guide and IEEE Standards Style Manual

• Note that the Style Guide evolves with our practice

Slide 18 Adrian Stephe

ns, Intel

Corporation

from slide 3/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)

March 2013

Page 19: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Slide 19

Editor Amendment Ordering

Amendment Number Task Group REVCOM Date802.11-2011 Amendment 1 TGae Mar 2012

802.11-2011 Amendment 2 TGaa Jun 2012

802.11-2011 Amendment 3 TGad Oct 2012

802.11-2011 Amendment 4 TGac Feb 2014

802.11-2011 Amendment 5 TGaf Jun 2014

802.11-2011 Amendment 6 TGah Jan 2016

802.11-2011 Amendment 7 TGai Feb 2015

• Data as of Mar 2013• See http://grouper.ieee.org/groups/802/11/Reports/802.11_Timelines.htm

Amendment numbering is editorial! No need to make ballot comments on these dynamic numbers!

Adrian Stephe

ns, Intel

Corporation

from slide 4/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)

March 2013

Page 20: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

Most current

doc shaded green.

TG Published or Draft Baseline DocumentsSource MEC

Style Guide Editor

Snapshot Date

Publishe

d

ac af ah ai mc aj aq

ac Y 5.0 Frame 10.0

Yes 2012 Robert Stacey 19-Mar

af Y 5.0 3.0 Frame 10.0

No 2012 Peter Ecclesine 21-Mar

ah Y 3.0 2.0 0.0 Frame10.0

No 2012 Minyoung Park 13-Nov

ai Y 4.0 2.2 0.0 0.4 Frame 9.0

No 2012 Lee ArmstrongPing FANG

19-Mar

mc Y 1.2 Frame 10.0

No 2012 Adrian Stephens 19-Mar

aj Y

aq Y

Changes from last report shown in red.

Slide 20

Draft Development Snapshot

Slide 20 Adrian Stephe

ns, Intel

Corporation

March 2013

from slide 5/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)

Page 21: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

MIB style, Visio and Frame practices

• I’m going to suggest going forward we use a single style with appropriately set tabs,  and use leading Tabs to distinguish the syntax and description parts. (Adrian Stephens Feb 9, 2010)

•  Keep embedded figures using visio as long as possible– Near the end of sponsor ballot,  turn these all into .wmf (windows meta

file) format files (you can do this from visio using “save as”).   Keep separate files for the .vsd source and the .wmf file that is linked to from frame.

• Frame templates for 11aa, 11ac, 11af • Text version of MIB is available (2012, ae2012, aa2012,

ad2012)

Adrian Stephe

ns, Intel

Corporation

Slide 21from slide 6/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)

March 2013

Page 22: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephe

ns, Intel

Corporation

Slide 22

March 2013 PublicityDate: 2013-03-21

Name Company Address Phone email

Stephen McCann Research in Motion (RIM) UK Ltd

200 Bath Road, Slough, Berkshire, SL1 3XE, UK

+44 1753 667099 [email protected]

Authors:

from slide 1/2 of 11-13/0386r0 by Stephen McCann, RIM

March 2013

Page 23: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephe

ns, Intel

Corporation

Slide 23

• HEW Press Release– Draft press release regarding the creation of a new

High Efficiency WLAN (HEW) study group, based on the WNG SC presentations from Tuesday evening.

• Draft• https://

mentor.ieee.org/802.11/dcn/13/11-13-0385-02-0000-high-efficiency-wlan-press-release.doc

from slide 2/2 of 11-13/0386r0 by Stephen McCann, RIM

March 2013

Page 24: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephens, Intel CorporationSlide 24

Wireless Next Generation (WNG) ReportDate: 2013-03-22

Authors:

Name Company Address Phone email

Jim Lansford CSR Technology 100 Stirrup Cir, Florissant, Colorado 80816

+1-719-286-9277 [email protected]

from slide 1/4 of 11-13/0355r0 by Jim Lansford, Vice-chair (CSR Technology)

March 2013

Page 25: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephens, Intel CorporationSlide 25

• Presentations at March 2013 meeting– Agenda:

https://mentor.ieee.org/802.11/dcn/13/11-13-0340-02-0wng-agenda-for-march-2013.ppt

• Tuesday AM1 session– https://mentor.ieee.org/802.11/dcn/13/11-13-0323-02-00ai-tgai-experimental-test-report-o

f-fils.pptx – Hiroshi MANO

– https://mentor.ieee.org/802.11/dcn/13/11-13-0314-00-0wng-on-future-enhancements-to-802-11-technology.pptx - Juho PIRSKANEN

• Tuesday PM3 (evening) session– https://mentor.ieee.org/802.11/dcn/13/11-13-0313-00-0wng-usage-models-for-next-genera

tion-wi-fi.pptx - Osama ABOUL-MAGD

– https://mentor.ieee.org/802.11/dcn/13/11-13-0343-00-0wng-operator-oriented-wi-fi.pptx – LIU Dapeng

– https://mentor.ieee.org/802.11/dcn/13/11-13-0309-00-0wng-next-gen-wlan.pptx – Ron PORAT

– https://mentor.ieee.org/802.11/dcn/13/11-13-0287-03-0wng-beyond-802-11ac-a-very-high-capacity-wlan.pptx - Yasuhiko INOUE

– https://mentor.ieee.org/802.11/dcn/13/11-13-0331-05-0wng-high-efficiency-wifi.ppt – Laurent CARIOU

– https://mentor.ieee.org/802.11/dcn/13/11-13-0339-10-0wng-high-efficiency-wlan-straw-poll.ppt - Laurent CARIOU from slide 3/4 of 11-13/0355r0 by Jim Lansford, Vice-chair (CSR Technology)

March 2013

Page 26: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

• Straw poll during PM3 to indicate support for creation of a “High Efficiency WLAN” study group– Vote was (Y/N/A): 128/1/27

• Attendance– AM1: ~126– PM3: ~165

• Minutes– https://mentor.ieee.org/802.11/dcn/13/11-13-0352-00-0wng-wng-meeting

-minutes-orlando-mar2013.doc

• Plans for May 2013– One 2-hour session

Adrian Stephens, Intel CorporationSlide 26from slide 4/4 of 11-13/0355r0 by Jim Lansford, Vice-chair (CSR Technology)

March 2013

Page 27: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephens, Intel CorporationSlide 27

ARC Report Date: 2013-03-20

Name Affiliations Address Phone email Mark Hamilton Spectralink 1765 W 121st Ave,

Westminster, CO, 80234

720-872-7445 [email protected]

Authors:

from slide 1/5 of 11-13/0366r0 by Mark Hamilton, Spectralink, Corp.

March 2013

Page 28: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephens, Intel CorporationSlide 28

Work Completed• IETF/802 coordination

– Reviewed RFC 4441 update. Trying to balance between redundant with CBPs versus enough information here.

– Still open for comments – please get comments to Dorothy Stanley– Also, Operations Area working group has gotten submissions on

CAPWAP, and will be considering.• Brief update on General Links (GLK SC) and 802.1

bridging discussions– Most presentations will be in Thursday AM1 joint session– Looks like changes are needed in 802.1AC, which will need a PAR

• 802 Overview and Architecture Draft 1.6 sponsor ballot– Ballot deadline extended to Mar 22. Some comments addressed this

week, more on telecons. – Reviewed 802.11 section (Annex B.2) and comments submitted.

Noted that PLCP/PMD split is being removed from 802.11, so need to describe potential changes in our architecture pictures

from slide 3/5 of 11-13/0366r0 by Mark Hamilton, Spectralink, Corp.

March 2013

Page 29: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephens, Intel CorporationSlide 29

Work Completed (cont)• Architecture of APs/DS/Portals, and 802.1 concepts

– Reviewed submission: https://mentor.ieee.org/802.11/dcn/13/11-13-0115-03-0arc-considerations-on-ap-architectural-models.doc

– Agreed 802.11 Figure 5-1 (MAC data plane architecture) has issues and confusing parts. Started work toward a proposed replacement.

– Need to get clarification on all (architectural) interface points within 802.11 specification – all MAC-SAPs (are there more than one?), etc.

Minutes are in 11-13/0367r0

Teleconferences:– None expected, if needed, will schedule with 10 days notice

• Distribution concepts:• https://

mentor.ieee.org/802.11/dcn/13/11-13-0427-00-00ak-intro-to-distribution-service-concepts.docx

from slide 4/5 of 11-13/0366r0 by Mark Hamilton, Spectralink, Corp.

March 2013

Page 30: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephens, Intel CorporationSlide 30

March 2013 Goals

• One meeting slot planned:– Continue discussion on architectural model for AP

(and DS and Portal) and where MAC-SAP interface(s) appear, and how this relates to the 802.1 concepts

– 802 O&A sponsor ballot, as appropriate– IETF/802 RFC 4441, as appropriate

from slide 5/5 of 11-13/0366r0 by Mark Hamilton, Spectralink, Corp.

March 2013

Page 31: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephe

ns, Intel

Corporation

Slide 31

IEEE 802 JTC1 SC report Date: 2013-3-22

Name Company email

Andrew Myles Cisco [email protected]

Authors:

from slide 1/15 of 11-13/0383r0 by Andrew Myles, Cisco

March 2013

Page 32: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephens, Intel Corporation

JTC1 SC focused on reporting on status updates & preparing for next SC6 meeting

• Reviewed latest liaisons to SC6– 802.11ac D5.0 liaised– Responses to comments on 802.11-2012 liaised

• Reviewed status of PSDO activity– Pre-ballots in SC6 on 802.1X & 802.1AE passed

• 5 month ballot delayed until comments resolved• 11-13-336r5 on 802.1X, 11-13- 337r4 on 802.1AE will be considered

by EC– Pre-ballots in SC6 on 802.11aa/ad/ae are still open

• Close on 7 April– 802.3 WG will submit 802.3-2012 under PSDO– 802.1 WG will submit 802.1AS, 802.1AB, 802.1AR under PSDO

Slide 32from slide 3/15 of 11-13/0383r0 by Andrew Myles, Cisco

March 2013

Page 33: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephens, Intel Corporation

JTC1 SC focused on reporting on status updates & preparing for next SC6 meeting

• Reviewed status of various China NB proposals in SC6– No known changes to status for :

• WAPI• TEPA-AC • TLSec• TAAA

– IETF are now tracking TISec and may send representative to next SC6 meeting

– Nufront will present on EUHT and coexistence with 802.11 in March in Hawaii; possibly in SC?

Slide 33from slide 4/15 of 11-13/0383r0 by Andrew Myles, Cisco

March 2013

Page 34: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephens, Intel Corporation

JTC1 SC focused on reporting on status updates & preparing for next SC6 meeting

• Prepared for next SC6 meeting in June in Korea– Reviewed agenda– Empowered Bruce Kraemer as HoD– Completed contribution process for SC6 NBs to “participate” in

development & maintenance of 802 standards• 11-13-1454r8 will be will be considered by EC • Also discussed in 802.1 WG & 802.3 WG

– Discussed a Swiss NB “explanatory report” on the SC6 resolutions from Graz• Further discussion and any action will occur in Hawaii

– Discussed a response to Swiss NB comparison of 802.1X and TEPA-AC• Will be completed in Hawaii

Slide 34from slide 5/15 of 11-13/0383r0 by Andrew Myles, Cisco

March 2013

Page 35: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephens, Intel Corporation

JTC1 SC have plans for May 13 in Hawaii focused on preparations for SC6 meeting

• Review status of liaisons to SC6• Review status of pre-ballots/ballots in SC6

– 802.11aa/ad/ae, 802.1X/AE/AS/AB/AR, 802.3

• Prepare for SC6 meeting in June– Review final agenda– Consider response to Swiss NB “explanatory report”– Complete response comparison of 802.1X &TEPA-AC– Update table of status of IEEE 802 contributed ISO/IEC

documents– Develop status information about 802.1/3/11 for SC6– Liaise with IETF on TISec

• Possibly host Nufront presentation on EUHTSlide 35

from slide 6/15 of 11-13/0383r0 by Andrew Myles, Cisco

March 2013

Page 36: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

Motions for EC

Adrian Stephe

ns, Intel

Corporation

Slide 36from slide 7/15 of 11-13/0383r0 by Andrew Myles, Cisco

March 2013

Page 37: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

The SC recommends empowerment of the IEEE 802 HoD to the next SC6 meeting

• Motion from IEEE 802 JTC1 SC – The IEEE 802 JTC1 SC recommends that Bruce Kraemer be

appointed as HoD of the IEEE 802 delegation to the SC6 meeting in June 2013 and be authorised to:• Appoint the IEEE 802 delegation• Approve any necessary submissions• Call any necessary preparation teleconferences

– Result: 8/0/1• Abstain was Bruce Kraemer

Adrian Stephens,

Intel Corporation

Slide 37from slide 8/15 of 11-13/0383r0 by Mar 2013

March 2013

Page 38: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

The SC recommends empowerment of the IEEE 802 HoD to the next SC6 meeting

• Motion for consideration by IEEE 802 EC– The IEEE 802 SC appoints Bruce Kraemer as HoD of the IEEE

802 delegation to the SC6 meeting in June 2013 and authorises Mr Kraemer to:• Appoint the IEEE 802 delegation• Approve any necessary submissions• Call any necessary preparation teleconferences

– Moved:– Seconded:– Result:

Adrian Stephens,

Intel Corporation

Slide 38from slide 9/15 of 11-13/0383r0 by Mar 2013

March 2013

Page 39: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

The SC recommends a response to SC6’s requests for collaboration

• Motion from IEEE 802 JTC1 SC – The IEEE 802 JTC1 SC recommends that 11-13-1454r8 be

approved as a response to the ISO/IEC JTC1/SC6 requests that IEEE 802:• Establish a mechanism that allows SC6 NBs to contribute to the

revision process in IEEE 802.1/3/11• Exchange information with SC6 about new work items that are within

the scope of SC6 and the respective IEEE 802 WG for information and potential coordination

– Result: 9/0/0

Adrian Stephens,

Intel Corporation

Slide 39from slide 10/15 of 11-13/0383r0 by Mar 2013

March 2013

Page 40: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

The SC recommends a response to SC6’s requests for collaboration

• Motion for consideration by IEEE 802 EC – The IEEE 802 EC approves 11-13-1454r8 as a response to the

ISO/IEC JTC1/SC6 requests that IEEE 802:• Establish a mechanism that allows SC6 NBs to contribute to the

revision process in IEEE 802.1/3/11• Exchange information with SC6 about new work items that are within

the scope of SC6 and the respective IEEE 802 WG for information and potential coordination

– Moved:– Seconded:– Result:

Adrian Stephens,

Intel Corporation

Slide 40from slide 11/15 of 11-13/0383r0 by Mar 2013

March 2013

Page 41: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

The SC recommends approving the responses related to the 802.1X pre-ballot

• Motion from IEEE 802 JTC1 SC – The IEEE 802 JTC1 SC recommends that the responses in

11-13-336r5 to the comments from the China NB in the pre-ballot in ISO/IEC JTC1/SC6 on IEEE 802.1X under the PSDO process be approved and liaised to ISO/IEC JTC1/SC6

– Result: 9/0/0

Adrian Stephens,

Intel Corporation

Slide 41from slide 12/15 of 11-13/0383r0 by Mar 2013

March 2013

Page 42: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

The SC recommends approving the responses related to the 802.1X pre-ballot

• Motion for consideration by IEEE 802 EC – The IEEE 802 EC approves the responses in 11-13-336r5 to the

comments from the China NB in the pre-ballot in ISO/IEC JTC1/SC6 on IEEE 802.1X approves their liaising to ISO/IEC JTC1/SC6

– Moved:– Seconded:– Result:

Adrian Stephens,

Intel Corporation

Slide 42from slide 13/15 of 11-13/0383r0 by Mar 2013

March 2013

Page 43: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

The SC recommends approving the responses related to the 802.1AE pre-ballot

• Motion from IEEE 802 JTC1 SC – The IEEE 802 JTC1 SC recommends that the responses in

11-13-337r4 to the comments from the China NB in the pre-ballot in ISO/IEC JTC1/SC6 on IEEE 802.1AE under the PSDO process be approved and liaised to ISO/IEC JTC1/SC6

– Result: 9/0/0

Slide 43from slide 14/15 of 11-13/0383r0 by Mar 2013

March 2013

Page 44: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

The SC recommends approving the responses related to the 802.1AE pre-ballot

• Motion for consideration by IEEE 802 EC – The IEEE 802 EC approves the responses in 11-13-337r4 to the

comments from the China NB in the pre-ballot in ISO/IEC JTC1/SC6 on IEEE 802.1AE approves their liaising to ISO/IEC JTC1/SC6

– Moved:– Seconded:– Result:

Slide 44from slide 15/15 of 11-13/0383r0 by Mar 2013

March 2013

Page 45: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephe

ns, Intel

Corporation

Slide 45

IEEE 802.11 Regulatory SCOrlando Report

Date: 2013-03-22

Name Affiliations Address Phone email Rich Kennedy Research In

Motion 7305 Napier Trail Austin, TX 78729

+1-972-207-3554 [email protected]

Authors:

from slide 1/6 of 11-13/0369r0 by Rich Kennedy, BlackBerry

March 2013

Page 46: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

Agenda

• The regulatory summaries• Action items and issues• WP5A liaison from IEEE 802 on 5 GHz • The NPRM FCC 13-22• Transmit beamforming antenna gain presentations• Adjourn

Adrian Stephe

ns, Intel

Corporation

Slide 46from slide 3/6 of 11-13/0369r0 by Rich Kennedy, BlackBerry

March 2013

Page 47: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

Accomplishments• Approved Vancouver meeting and teleconference minutes• Heard regulatory update summaries for North America, the

EU and Asia• Approved a liaison to ITU-R WP5A on expansion of the 5

GHz spectrum• Heard two presentations on transmit beamforming antenna

gain (relating to a TCB test document for multiple antennas)• Developed and approved a framework document for the

development of Comments for NPRM FCC 13-22 (proceeding 13-49)

• Planned for teleconferences– Thursdays, at 12:30ET for 90 minutes (starting April 4th)

Adrian Stephe

ns, Intel

Corporation

Slide 47from slide 4/6 of 11-13/0369r0 by Rich Kennedy, BlackBerry

March 2013

Page 48: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

References• NPRM FCC 12-118• NPRM FCC 12-148• NPRM FCC 13-22• FCC request for comment on WRC-15• FCC authorization of TVWS databases nationwide• Early draft of EN301 598 (v0.0.16)• Technical feasibility of IMT in the bands above 6 GHz• RECOMMENDATION ITU-R F.1763• RECOMMENDATION ITU-R M.1651• WP5A liaison re M.1651• IEEE 802.11 liaison to ITU-R WP5A on expansion of the 5 GHz band• Industry outline for NPRM FCC 13-22 response• NPRM FCC 13-22 Dissected• FCC 13-22 Comment Framework• Transmit Beamforming Antenna Gain• Beamfoming Array Gain to Intended and Unintended Users

Slide 48 Adrian Stephe

ns, Intel

Corporation

from slide 6/6 of 11-13/0369r0 by Rich Kennedy, BlackBerry

March 2013

Page 49: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephe

ns, Intel

Corporation

Slide 49

IEEE 802.11mc Report forMarch 2013Date: 2013-03-21

Name Affiliations Address Phone email Dorothy Stanley

Aruba Networks 1322 Crossman Ave Sunnyvale, CA 94089

+1 630-363-1389

[email protected]

Authors:

from slide 1/6 of 11-13/0384r0 by Dorothy Stanley (Aruba Networks)

March 2013

Page 50: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

Status: comment resolution

• Continued processing comments received in the recent Initial Letter Ballot– 801 comments (713 LB, 88 remaining 2012 Call for comments)– Approved resolutions to approximately 350 comments

Adrian Stephe

ns, Intel

Corporation

Slide 50from slide 3/6 of 11-13/0384r0 by Dorothy Stanley (Aruba Networks)

March 2013

Page 51: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephe

ns, Intel

Corporation

Slide 51Slide 51

TGmc Plan of Record• 20 July 2012 – 12 Sept 2012 – Call for Comment/Input• 29-30 Aug 2012 – NesCom, SASB PAR Approval• Sept 2012 – Begin to process input • Sept 2012 – 11aa, 11ae integration• Jan – First WG Letter ballot - without 11ad• Dec 2012 – March/May 2013 – 11ad integration – May/July ballot

on D2.0• Dec 2013 – March 2014 – 11ac integration• Feb 2014 – Mandatory Draft Review• Feb-March 2014 – Form Sponsor Pool (45 days) • April/May 2014 – Initial Sponsor Ballot • TBD – integration of additional completed amendments (e.g. 11af)• Nov 2014 – WG/EC Final Approval• March 2015 – RevCom/SASB Approval

from slide 4/6 of 11-13/0384r0 by Dorothy Stanley (Aruba Networks)

March 2013

Page 52: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

Next Steps

• Continued Comment Resolution• Recirculation Letter ballot (expect July)

Adrian Stephe

ns, Intel

Corporation

Slide 52from slide 6/6 of 11-13/0384r0 by Dorothy Stanley (Aruba Networks)

March 2013

Page 53: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephe

ns, Intel

Corporation

Slide 53

TGac March 2013 ReportDate: 2013-03-20

Name Affiliations Address Phone email Osama Aboul-Magd Huawei Technologies 303 Terry Fox Drive,

Kanata, ONT, K2K-3J1 613-287-1405 Osama.aboulmagd@huaw

ei.com

Authors:

from slide 1/6 of 11-13/0358r1 by Osama Aboul-Magd (Huawei Technologies)

March 2013

Page 54: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

Work Completed • Approved resolutions to comments received on draft

D5.0 (LB 191).– Comment spreadsheet is available at:

https://mentor.ieee.org/802.11/dcn/13/11-13-0199-03-00ac-lb191-comments-tgac-d5-0.xls

• A motion passed to start a 15-day recirculation ballot on draft D5.0.

• Reviewed and approved the report to the IEEE 802 EC requesting conditional approval for Sponsor ballot.– https://mentor.ieee.org/802.11/dcn/13/11-13-0320-01-00ac-p8

02-11ac-report-to-ec-on-conditional-approval-to-go-to-sponsor-ballot.pptx Adrian

Stephens,

Intel Corpor

ation

Slide 54from slide 3/6 of 11-13/0358r1 by Osama Aboul-Magd (Huawei Technologies)

March 2013

Page 55: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

Next Ad Hoc Meeting

• None scheduled for May 2013.• A motion passed to authorize an ad hoc meeting in July

2013, somewhere in Europe.

Adrian Stephe

ns, Intel

Corporation

Slide 55from slide 4/6 of 11-13/0358r1 by Osama Aboul-Magd (Huawei Technologies)

March 2013

Page 56: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephe

ns, Intel

Corporation

Slide 56

May 2013 Goals

• Start working on Sponsor Ballot comment resolution

from slide 5/6 of 11-13/0358r1 by Osama Aboul-Magd (Huawei Technologies)

March 2013

Page 57: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephe

ns, Intel

Corporation

Slide 57

TGaf March Report

Date: 2013-03-22

Name Affiliations Address Phone email Rich Kennedy BlackBerry 7305 Napier Trail

Austin, TX 78729 +1-972-207-3554 rikennedy@blackberr

y.com

Peter Ecclesine Cisco 170 W. Tasman Dr., San Jose, CA, 95134

+1-408-527-0815 [email protected]

Authors:

from slide 1/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry

March 2013

Page 58: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

Plan for the Week• Approve meeting and teleconference minutes• Regulatory update• Review the results of LB192• Review of the progress since January• Editorial review; spreadsheet 11-12/1017r35• Review and Approve all comment resolution submissions• Update the draft and comment resolution spreadsheet with

approved changes, and request a recirculation letter ballot• Plan for May meeting and teleconferences

Adrian Stephe

ns, Intel

Corporation

Slide 58from slide 3/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry

March 2013

Page 59: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

TGaf Accomplishments • Reviewed the comment spreadsheet and resolved

all of the remaining comments from LB192• Requested the Editor to prepare D4.0 and the

asked WG to start a recirculation letter ballot• Planned for May meeting, and weekly

teleconferences– Tuesdays at 21:00 ET for 2 hours

Adrian Stephe

ns, Intel

Corporation

Slide 59from slide 4/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry

March 2013

Page 60: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

Plan for May

• Approve Orlando and Teleconference minutes• Review and resolve comments from the

recirculation letter ballot on Draft 4.0• Ask the WG for a recirculation letter ballot• Prepare PAR extension request• Plan for July and Teleconferences, and begin the

process of starting the first TGaf Sponsor ballot

Adrian Stephe

ns, Intel

Corporation

Slide 60from slide 5/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry

March 2013

Page 61: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephe

ns, Intel

Corporation

Slide 61

TGaf Timeline – Affirmed March 2013

• Initial Working Group Letter Ballot: January 2011• Second Working Group Letter Ballot: July 2012• Recirculation Letter Ballot: January 2013• Form Sponsor Ballot Pool: June 2013• Initial Sponsor Ballot: July 2013• Recirculate Sponsor Ballot: November 2013• Final WG/EC Approval: March 2014• RevCom/Standards Board Approval: June 2014

from slide 6/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry

March 2013

Page 62: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

Motion• Having approved comment resolutions for all of the

comments received from LB192 on TGaf D3.0 as contained in document 11-12/1017r37

• Instruct the editor to prepare Draft 4.0 incorporating these resolutions and,

• Approve a 15 day Working Group Recirculation Ballot, asking the question “Should P802.11af D3.0 be forwarded to Sponsor Ballot?”

•  Moved by Rich Kennedy on behalf of Tgaf

• Ballot closed Wednesday April 18, 2013- Passed

Adrian Stephe

ns, Intel

Corporation

Slide 62from slide 8/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry

March 2013

Page 63: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephe

ns, Intel

Corporation

Slide 63

IEEE 802.11ah Report forMarch 2013

Date: 2013-3-20

Name Affiliations Address Phone email David Halasz Self 330-283-2715 [email protected]

Authors:

from slide 1/5 of 11-13/0359r0 by David Halasz

March 2013

Page 64: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

Activity in TGah

• Work continued on specification framework– Update to the spec framework adopted– 11-11-1137-14-00ah-specification-framework-for-tgah.docx

• Timeline move out two months– Draft text not available beyond 12/1257. Hence internal task group

letter ballot move out to May of 2013.

Adrian Stephe

ns, Intel

Corporation

Slide 64from slide 2/5 of 11-13/0359r0 by David Halasz

March 2013

Page 65: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

Going forward

• Wrap up on specification framework• Move forward with draft text.• Start internal task group letter ballot

Adrian Stephe

ns, Intel

Corporation

Slide 65from slide 3/5 of 11-13/0359r0 by David Halasz

March 2013

Page 66: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

Timeline – Move out two months

• Current– Internal Task Group Ballot : May 2013– Initial Letter Ballot : September 2013– Initial Sponsor Ballot : March 2015– EC Approval : January 2016– Revcom Approval : March 2016

Adrian Stephe

ns, Intel

Corporation

Slide 66from slide 5/5 of 11-13/0359r0 by David Halasz

March 2013

Page 67: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

IEEE 802.11TGaiReport

Date: 2013-3-21

Authors:

Name Company Address Phone email

Hiroshi MANO AlliedtelesisR&D center,K.K.

8F TOC2 Bldg. 7-21-11 Nishi-Gotanda, Shinagawa-ku, Tokyo 141-0031 JAPAN

+81-3-5719-7630 [email protected]

March 2013

Slide 67 Adrian Stephe

ns, Intel

Corporation

from slide 1/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)

Page 68: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

IEEE 802.11 FILS TGai – Orland March 2013

• Goals for the Meeting:– Approve minutes of past meeting and teleconference– Comment resolution to volunteer review comments– Approve final technical contribution – Move to forward TGai call for comment – Joint meeting with TGaq– Approve Timeline– Approve Teleconference schedule– Approve Plan for May

March 2013

Slide 68 Adrian Stephe

ns, Intel

Corporation

from slide 3/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)

Page 69: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

Accomplishments TGai 1/2

• Review and approve January 2013 Vancouver Session Minutes– https://mentor.ieee.org/802.11/dcn/13/11-13-0182-01-00ai-

january-2013-vancouver-session-minutes.doc

• Review and approve January-March Teleconference Minutes – https://mentor.ieee.org/802.11/dcn/13/11-13-0191-04-00ai-

january-march-teleconference-minutes.doc

March 2013

Slide 69 Adrian Stephe

ns, Intel

Corporation

from slide 4/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)

Page 70: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

Accomplishments TGai 2/2

• 8 regular slots and 1 Joint adhoc with TGaq were held.• Experimental-test-report-of-FILS was reported on

adhoc.• 63 unsolved open technical before this session.• All comments were resolved.• 21 Technical motions ( 20 passed/ 1 failed)• Instructed editor to prepare draft 0.5 and

incorporating these resolutions and, approve 20 day peer review starting on/or after April 8th , 2013 to assist with producing an improved draft for working LB.

March 2013

Slide 70 Adrian Stephe

ns, Intel

Corporation

from slide 5/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)

Page 71: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

Work Completed

• Task Group documents reviewed: – Usage model, 12/1245r2, Jiamin Chen

• Submissions– 13/292r0, Backward compatibility of 11aj with 11ad, Carlos

Cordeiro– 13/0177r1, Proposal of RoF Extension Link Backhaul for

Category 4, Hiroyo Ogawa

Adrian Stephe

ns, Intel

Corporation

Slide 71

March 2013

from slide 2/4 of 11-13/0380r0 by Eldad Perahia, Intel Corporation

March 2013

Page 72: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

Goals for April

• Target to approve TG Usage model, Functional Requirement, Evaluation Methodology, Selection Procedure baseline document

• Continue to develop channel model for 45GHz

Adrian Stephe

ns, Intel

Corporation

Slide 72

March 2013

from slide 3/4 of 11-13/0380r0 by Eldad Perahia, Intel Corporation

March 2013

Page 73: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephens, Intel CorporationSlide 73

TGak March Report• Date: 2013-03-21

Authors:

Name Address Affiliations Phone Email

Donald EastlakeHuawei

Technologies

155 Beaver Street, Milford, MA 01757 USA

+1-508-333-2270 [email protected]

from slide 1/5 of 11-13/0374r0 by Donald Eastlake, Huawei

March 2013

Page 74: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephens, Intel CorporationSlide 74

TGak Report

• Accomplishments• Received and discussed 4 submissions (see list next

page)• Met jointly with 802.1 Thursday morning.• The minutes of this TGak meeting will be in 11-13/375

and an annotated agenda is in 11-13/0273r5.

• Teleconferences• TGak voted to hold 1 hour teleconferences on

Mondays, April 8th, April 22nd, and May 6th, at 5pm Eastern US time joint with 802.1Qbz.

from slide 3/5 of 11-13/0374r0 by Donald Eastlake, Huawei

March 2013

Page 75: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephens, Intel CorporationSlide 75

TGak Report• Presentations

• 11-13/0183r0, “Proposal of Preliminary Functional Requirements for 802.1Qbz-802.11ak”, Mitsuru Iwaoka (Yokogawa Electric Co.)

• 11-13/185r1, “Problems to be solved by 802.11ak/802.1Qbz”, Donald Eastlake (Huawei Technologies)

• 11-13/221r2, “802.11 QoS Queue Architecture and Possible 802.1bz Bridge Model”, Philippe Klein (Broadcom)

• 11-13/0253r0, “Changes to 802.1Q required by 802.1Qbz”, Norm Finn (Cisco)

• https://mentor.ieee.org/802.11/dcn/13/11-13-0427-00-00ak-intro-to-distribution-service-concepts.docx Mark Hamilton, Spectralink

from slide 4/5 of 11-13/0374r0 by Donald Eastlake, Huawei

March 2013

Page 76: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephens, Intel CorporationSlide 76

TGak Report

• May Plans• Develop a firm list of Problems to be solved by

this effort.• Develop an architectural model for 802.11ak.• Receive and discuss technical presentations• Develop process and timeline for TGak

from slide 5/5 of 11-13/0374r0 by Donald Eastlake, Huawei

March 2013

Page 77: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephe

ns, Intel

Corporation

Slide 77

TGaq ReportDate: 2013-03-22

Name Company Address Phone email

Stephen McCann Research in Motion (RIM) UK Ltd

200 Bath Road, Slough, Berkshire, SL1 3XE, UK

+44 1753 667099 [email protected]

Authors:

from slide 1/3 of 11-13/0370r1 by Stephen McCann, RIM

March 2013

Page 78: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephe

ns, Intel

Corporation

Slide 78

• Summary– Use case

• 11-13-0125-04-00aq-use-case-analysis.docx• Use case collection now closed

– Requirements and terminology documents• 11-13-0299-00-00aq-draft-tgaq-terminology.docx

– Initial protocol design discussion• 11-13-0057-02-00aq-design-options.ppt

– Detailed scoping discussion– Teleconference : Monday 22nd April 10:00 ET

• Plans for May 2013– Initial technical presentations

from slide 3/3 of 11-13/0370r1 by Stephen McCann, RIM

March 2013

Page 79: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

March 2013

Adrian Stephens, Intel CorporationSlide 79

802.15 Liaison ReportDate: 2013-03-22

Name Affiliations Address Phone email Al Petrick Jones-Petrick

and Associates 12201 Treetop Ct. Orlando, Florida

+1-321-235-3269 [email protected]

Authors:

from slide 1/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

Page 80: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

March 2013

Slide 80

Abstract

Liaison report on 802.15 as presented to 802.11

Adrian Stephens, Intel Corporationfrom slide 2/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

Page 81: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

March 2013

Slide 81Slide 81

802.15.4kLow Energy Critical Infrastructure Monitoring

(LECIM)• Resolved Sponsor Ballot letter ballot comments• Issue recirculation Sponsor Ballot• Seek conditional approval by EC to forward RevCom

Adrian Stephens, Intel Corporationfrom slide 3/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

Page 82: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

March 2013

Slide 82Slide 82

802.15.4mTV White Space

• LB #87 passed with 88% of Approval in March 2013– Voting Results (Yes 83, No 11, Abstain 3)

• Resolved 551 Comments (Editorial 302, Technical & General 249)– Resolved all Technical, Editorial and General comments

• FSK, OFDM, NB-OFDM, Ranging, General PHY, and Coexistence Assurance

• 2 re-circulation letter ballots planned between March 2013 and May 2013

• Appointed BRC to resolved comments from re-circulation letter ballots

Adrian Stephens, Intel Corporationfrom slide 4/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

Page 83: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

March 2013

Slide 83Slide 83

802.15.4nChinese Medical Band

• Heard updated Proposals Presentations– O-QPSK– FSK– Ranging

• Reviewed and updated the TG4n web page• Will continue call for proposals

Adrian Stephens, Intel Corporationfrom slide 5/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

Page 84: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

March 2013

Slide 84Slide 84

802.15.4pPositive Train Control

• Continued to flush out combined contribution to reflect the technical proposals presented

• Completed Coexistence Document (15-13-0212-01)• Completed draft d1P802-15-4p_Draft_Standard.pdf• Issue WG letter ballot after close of March 2013

session

Adrian Stephens, Intel Corporationfrom slide 6/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

Page 85: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

March 2013

Slide 85Slide 85

802.15.4qUltra Low Power

• Second meeting as a Task Group• Began work on technical guidance and channel

modeling framework • Worked on applications • Released call for contributions to application, TGD

and channel modeling efforts• Heard FSK and PPM PHY related technical

presentations

Adrian Stephens, Intel Corporationfrom slide 7/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

Page 86: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

March 2013

Slide 86Slide 86

802.15.8 Peer Aware Communications

Adrian Stephens, Intel Corporationfrom slide 8/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

Page 87: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

March 2013

Slide 87Slide 87

802.15.9 Key Management Protocol

Adrian Stephens, Intel Corporationfrom slide 9/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

Page 88: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

March 2013

Slide 88Slide 88

Layer 2/Mesh Under Routing (L2R) SG• Completed Preliminary Draft PAR and 5c

• Preliminary Draft PAR - doc.#15-13-0231-00• Preliminary Draft 5c - doc. #15-13-0232-00

• Finalize PAR and 5c in May 2013

Adrian Stephens, Intel Corporationfrom slide 10/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

Page 89: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

March 2013

Slide 89Slide 89

Better Use of Spectrum Resources in WPANs (SRU) IG

• Heard and discussed two presentations– IG SRU will focus on Radio resource measurement and management

(RRMM) for drafting PAR and 5C in May 2013.

Adrian Stephens, Intel Corporationfrom slide 11/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

Page 90: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

March 2013

Slide 90Slide 90

THz IG• Heard 5 technical presentations

– MAC layer, Optical interconnects, Study Group formation, Propagation Aspects of Terahertz Outdoor Fixed Wireless Links.

• Update of the Technical Expectations Document (11/0745r7)• Discussed spinning-off a Study Group on “Beam switchable

wireless point-to-point 40/100 Gbps links”• Next meeting in July 2013

Adrian Stephens, Intel Corporationfrom slide 12/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

Page 91: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

March 2013

Slide 91Slide 91

WNG SC

• Review two (2) technical presentations– Launching a SG on THz by Thomas Kürner (15-

13-0139-01)– Review and Amendment of IEEE802.15.6 BAN

to Focus on Dependable Wireless BAN of Things by Prof Ryuji Kohno (15-12-0192-01)

Adrian Stephens, Intel Corporationfrom slide 13/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

Page 92: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

March 2013

Slide 92

Maintenance SC

• Reviewed document (doc 15-13-0194-01) “802.15.4 use by external SDOs”

• The IEEE 802.15 Work Group (WG) is in the process of considering a number of significant changes to the 802.15.4 standard, Low-Rate Wireless Personal Area Networks (LR-WPANs), and is soliciting input from all Standard Development Organizations (SDOs), businesses, and individuals that would be impacted by these changes.  The changes are described in his presentation and summarized here:

1. Using a Frame Type ID value as an extension to indicate following bits are new Frame types

2. Restructuring Information Element IDs to allow IDs to be assigned to external SDOs

3. Changing the order of the Information Element length and type fields.

Adrian Stephens, Intel Corporation

March 2013

Page 93: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

March 2013

Slide 93

References

• This document• All Documents

– https://mentor.ieee.org/802.15/documents• Current draft is in the members-only area

– http://www.ieee802.org/15 Members_Only_Area– 802.11 members log in using 802.11 username and password

Adrian Stephens, Intel Corporation

March 2013

Page 94: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephe

ns, Intel

Corporation

Slide 94

RR-TAG (802.18) to 802.11 Liaison Report

Date: 2013-03-22

Name Affiliations Address Phone email Rich Kennedy Research In

Motion 7305 Napier Trail Austin, TX 78729

+1-972-207-3554 [email protected]

Authors:

from slide 1/5 of 11-13/0376r0 by Rich Kennedy, BlackBerry

March 2013

Page 95: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephe

ns, Intel

Corporation

Slide 95

Abstract

This presentation is the liaison report from the RR-TAG for the March 2013 IEEE 802.11 Plenary in Orlando.

from slide 2/5 of 11-13/0376r0 by Rich Kennedy, BlackBerry

March 2013

Page 96: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephe

ns, Intel

Corporation

Slide 96

FCC Documents Reviewed and Approved by the RR-TAG

• There were no documents approved for submission to the FCC at this meeting.

• The RR-TAG expects to finalize and approve comments to the FCC 5 GHz U-NII Band Rules Revision NRPM at a teleconference meeting to be held on on Friday April 19th, at 1:00 PM ET.– Link to NPRM: 18-13/016r0

from slide 3/5 of 11-13/0376r0 by John Notor, Notor Research

March 2013

Page 97: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephe

ns, Intel

Corporation

Slide 97

ITU-R Documents from 802.16 and 802.11 REG SC

Reviewed and Approved by the RR-TAG

• The RR-TAG approved the following documents from 802.16 for EC review and submission to ITU-R WP 5D:– 18-13/034r1, Proposed LS to ITU-R WP 5D: Update toward Rec. ITU-R

M.1457-12 (Meeting X Notification) Link: 18-13/034r1– 18-13/035r1, Proposed Cont. to ITU-R WP 5D- Update of WirelessMAN-

Advanced RIT of Rec. ITU-R M.2012 (Meeting Y+2) Link: 18-13/035r2

• The RR-TAG approved the following document from the 802.11 Regulatory Standing Committee for EC review and submission as an IEEE 802 document to ITU-R WP 5A:– 18-13/038r3, IEEE 802 Input to WP5A on 5 GHz Link: 18-13/038r3

from slide 4/5 of 11-13/0376r0 by John Notor, Notor Research

March 2013

Page 98: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephe

ns, Intel

Corporation

Slide 98

Other Documents Reviewed and Approved by the RR-TAG

• The RR-TAG approved the following document from 802.16 for EC review and submission to IETF, copy to the FCC:– 18-13/036r0, Proposed Statement to IETF LMAP on IEEE P802.16.3

Activity Link: 18-13/036r0

• The RR-TAG approved the following document from 802.16 for EC review and submission to the Broadband Forum, copy to the FCC:– 18-13/037r1 Proposed statement to BBF: Response to liaison of 8 March on

Performance Measurements Architecture Link: 18-13/037r1

from slide 5/5 of 11-13/0376r0 by John Notor, Notor Research

March 2013

Page 99: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephe

ns, Intel

Corporation

Slide 99

Liaison Report for OmniRAN EC SGDate: 2013-03-22

Authors:

from slide 1/5 of 11-13/0357r0 by Michael Montemurro, Research in Motion

March 2013

Page 100: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephe

ns, Intel

Corporation

Slide 100

Key Activities• Currently focused on defining the problem statement

and scope, leading to the creation of a PAR and 5C.• Review of feedback from presentations to IETF, IEEE

802.1, and EC.• Review OmniRAN use case proposals• Discussion with IEEE 802.21 on the scope of OmniRAN

relative to the scope of IEEE 802.21• Liaison to 3GPP to obtain clarification on some

technical aspects of SAMOG (3GPP TS 23.402)• Request for PAR extension.

from slide 3/5 of 11-13/0357r0 by Michael Montemurro, Research in Motion

March 2013

Page 101: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephe

ns, Intel

Corporation

Slide 101

Objectives for May• Teleconferences: April 11th, May 2nd at 9am – details on

OmniRAN SG website• Incorporate proposed use cases into an OmniRAN use

case document• Develop PAR submission documents – Target PAR

submission on Jun 15

from slide 4/5 of 11-13/0357r0 by Michael Montemurro, Research in Motion

March 2013

Page 102: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission Adrian Stephe

ns, Intel

Corporation

Slide 102

References

• OmniRAN website– http://www.ieee802.org/OmniRANsg/

• Document repository for OmniRAN:– https://mentor.ieee.org/omniran/documents

• Link to March 2013 OmniRAN Agenda:– https://mentor.ieee.org/omniran/dcn/13/omniran-13-0014

-03-ecsg-march-2013-orlando-agenda.pptx

from slide 5/5 of 11-13/0357r0 by Michael Montemurro, Research in Motion

March 2013

Page 103: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

April 2013

Bruce Kraem

er, Marvel

l

Slide 103

Page 104: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

March 2013

Bruce Kraem

er (Marve

ll)

Slide 104

Year Inter meeting Period

Ballots Completed

WG Sponsor

2011/2012 Nov - Jan 1 6

2012 Jan - Mar 1 0

2012 Mar - May 0 2

2012 May - July 1 1

2012 July - Sept 1 1

2012 Sept - Nov 1

2012/2013 Nov - Jan 0 0

2013 Jan - Mar 3 + comments

2013 Mar - May 2 1

2013 May - July

2013 July - Sept

Recent Ballot History

Page 105: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

802.11 Ballot #194 was a 15 day Working Group technical recirculation Ballot asking the question "Should P802.11ac D5.0 be forwarded to Sponsor Ballot?".

Ballot Opening Date:    Wednesday March 20, 2013- 23:59 ETBallot Closing Date:   Thursday April 04, 2013 - 23:59 ET 

RESPONSES:

300 eligible people are in this ballot group.    252 affirmative votes 

  10 negative votes  

  10 abstention votes

2 negative vote without comments

===  

274 votes received = 91.3 % valid returns                                     =   3.7 % valid abstentions

   APPROVAL RATE:252  affirmative votes       =   96.2 % affirmative  10  total negative votes  =     3.8 % negative

Motion PASSES.

There were no comments received

April 2013

Bruce Kraem

er, Marvel

l

Slide 105

Page 106: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

IEEE 802.11 WG Letter Ballot #195 was a 15 day Working Group Technical recirculation Ballot asking the question "Should P802.11af D4.0 be forwarded to Sponsor Ballot?" The

Ballot Opening Date:   Thursday April 02, 2013 - 23:59 ETBallot Closing Date:   Friday April 17, 2013 - 23:59 ET 

RESULTS: 300 eligible people are in this ballot group.   211 affirmative votes   19 negative votes  

1 negative vote without comments

   7 abstention votes

===  238  votes received  =  79.3% valid returns                                  =   2.9% valid abstentions

   APPROVAL RATE:211  affirmative votes       =   91.7 % affirmative  19  valid negative votes  =     8.3 % negative

Motion Passes.

There were 86 comments received.

April 2013

Bruce Kraemer, MarvellSlide 106

Page 107: Doc.: IEEE 802.11-13/0394r0 Submission April 2013 Bruce Kraemer, MarvellSlide 1 WG11 Opening Report Snapshots April 2013 Date: 20 – April -2013 Authors:

doc.: IEEE 802.11-13/0394r0

Submission

• Sponsor ballot for 802.11ac• Opened April 05, 2013• Closes May 05, 2013

April 2013

Bruce Kraem

er, Marvel

l

Slide 107