Diyarbakır Batman Siirt Development Project IFAD Loan No 718 TR 2010 PROGRESS REPORT (01.01.2010 30.06.2010) T.R. MINISTRY OF AGRICULTURE AND RURAL AFFAIRS

Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

Diyarbakır Batman Siirt

Development Project

IFAD Loan No 718 –TR

2010

PROGRESS REPORT

(01.01.2010 – 30.06.2010)

T.R.

MINISTRY OF AGRICULTURE AND RURAL AFFAIRS

Page 2: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

2

Contents ………………………………………………………………………………………2

Abbreviations ........................................................................... Error! Bookmark not defined.

Project Area ........................................................................ …5Error! Bookmark not defined.

1. General Information about the Project ................................................................................ 6

1.1Project Area ....................................................................................................................... 6

1.2Project Target Group ......................................................................................................... 7

1.3 Objectives of the Project ................................................................................................... 7

1.4 Components of the Project ............................................................................................... 7

1.4.1 Component A – Village Improvement Program ........................................................ 8

1.4.2 Component B – Rural Economic Growth .................................................................. 8

1.4.3 Component C – Capacity Building for Employment ................................................. 9

2. ACTIVITIES REALIZED IN FIRST SIX MONTHS OF 2010 BY COMPONENTS ...... 9

2.1 Component A – Village Improvement Program .................................................................. 9

2.1.1 Farmers’ Education and Training .................................................................................. 9

Table .1. Farmer Training Activities in 2010 ....................................................................... 10

Table.2. List of Office Furniture and technical equipment for Farmer Training Center in

Batman…11

Table.3.Demonstration Activities for 2010……………………………………………………..12

Table.4. Procurement of Tools and Equipment for Demonstration Activities………………12

2.1.2 Infrastructure Investments for Village Improvement………………………………14

2.1.3 Expenditures for Village Improvement Component ……………………………….14

Table.5. Expenditures for Village Improvement Component…………………………………….14

2.2 Component B – Rural Economic Growth .......................................................................... 14

2.2.1 Strategic Investment Plans and Grant Program ......................................................... 14

Table.6. Contributory Grant Disbursements for Individual Project Applications…………15

Table.7. Contibutory Grant Disbursements for Economic Investment Project

Applications….15

Table.8. Total Paid Contributory Grant Amount(USD) …………………………………16

2.2.2 Expenditures for Rural Economic Growth Component …………………………….16

2.3 Component C – Capacity Building for Employment ......................................................... 16

3. PROJECT COORDINATION AND MANAGEMENT................................................... 16

Table.9. Staff List of Project Management Unit Employed in Center and Project Provinces 17

Table.10. Expenditures of Project Coordination and Management Component…………….18

3.1 Audit of Treasury ............................................................................................................ 18

Page 3: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

3

4. Financial Situation of the Project ......................................................................................... 19

4.1.Project Finance, Cost and Expenditures ......................................................................... 19

Table.11. Finance Resource and Investment Amount of the Project…………………………….19

Table.12. Expenditures by Loan Categories and financiers ……………………………………20

Table.13. Expenditures by Project components……………………………………………………20

Table.14. Summary of Expenditures by Components and loan categories for 2010…………21

Table.15. Summary of Expenditures by Components and Financiers for 2010………………..22

ATTACHMENT 1: Implementation Schedule of the Project Activities in accordance with

AWP&B of 2010…………………………………………………………………………….23

Page 4: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

4

ABBREVIATIONS AND ACRONYMS

APA Accountant/Procurement Assistant

AWPB Annual Work Plan and Budget

CWC Civil Works Consultant

DBSKP Diyarbakir Batman Siirt Development Project

DDES Demand-Driven Extension Specialist

EU European Union

FPO Finance/Procurement Officer

GDAPD General Directorate of Agricultural Production and Development

GDOS General Directorate of Organization and Support (MARA)

GVI Guidelines for Village Infrastructure

GICGC Guidelines for Implementation of the Contributory Grant Co-financing

IFAD International Fund for Agricultural Development

MARA Ministry of Agriculture and Rural Affairs

MIS Management Information System

NRDS National Rural Development Strategy

PA Program Administrator

APC Area Project Coordinator

PDA Provincial Director (ate) of Agriculture

PSE Provincial Site Engineer

PIM Project Implementation Manual

CPMU/MARA Central Project Management Unit/MARA

PRPR Program for Rural Poverty Reduction

PSA Program Support Associate (UNDP/CO)

BDS Business Development Specialist

VCM Value Chain Management

VCMS Value Chain Management Specialist

SEDP Sivas-Erzincan Development Project

SIP Strategic Investment Program

SPA Special Provincial Administration

SPO State Planning Organization

UNDP/CO United Nations Development Program

UNDP/CO/CO UNDP/CO Country Office (Ankara)

VDP Village Development Planning

BDS Business Development Specialist

MES Monitoring and Evaluation Specialist

Page 5: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

5

Project Area

Siirt Diyarbakır

Batman

Ankara

Page 6: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

6

1. General Information about the Project

1. Project has been implemented by Ministry of Agriculture and Rural Affairs, General

Directorate of Agricultural Production and Development. UNDP will support program

management in terms of helping for fund flow contracts, programming, accountancy and

provision of goods and services and also will provide 752.000 USD financing for the first 5

years during project implementation.

2. Project has been included in 2006 investment program by 22.11.2006 dated and

2006/87 numbered decision of Higher Planning Council. “Loan Agreement” has been signed

on 5 March 2007 between the financing institution IFAD and Undersecretariat of Treasury

on behalf of GoT and adopted by the Cabinet on 14 May 2007.

3. Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

out in accordance with IFAD rules. In this context, Semi-annual Progress Report for the first

part of 2010 has been prepared in accordance with section 4.02 of Loan Agreement (Loan No.

718 TR).

4. “Grant Agreement” has been signed on 19 June 2007 between the Treasury and

UNDP.

5. “Service Agreement” has been signed on 6 September 2007 between our Ministry,

Ministry of Foreign Affairs and UNDP.

6. Project has been come into force on 19 December 2007 after fulfilling necessary

conditions and closing date as 30 June 2013 and completion date as 31 December 2012 have

been determined by IFAD.

1.1 Project Area

7. Project area, namely Diyarbakır, Batman and Siirt Provinces of South-eastern Anatolia

constitutes a part of the eastern Anatolian plateau, lying some 100 km north of the Syria and

Iraq borders.

8. The climate is harsh with severely cold winters and hot dry summers. Rainfall ranges

from about 200-700 mm. At Diyarbakır the average January temperature at nights is -24°C

and maximum temperature in July and August can reach 46°C. The growing season is short.

Total agricultural land of three provinces in the Project area is 994,869 ha, forest area is

473,376 ha and pasture land is 451,764 ha. Total land is 2,430,362 ha. The most important

potential natural resource in the Project provinces in GAP region is water potential of

watershed of Euphrates and Tigris Rivers. Also, natural resources such as petroleum, copper,

marble seam with colored streak, forest, pastures and culture and tourism resources exist in

the region. Rich and high quality marble reserves in Diyarbakır are attractive considered

commercially.

Page 7: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

7

1.2 . Project Target Group

9. Primary target groups would be poorer rural men, women and youth population living

in the project provinces. Secondary target groups would be new or established rural

businesses identified as sustainably profitable and having economic advantage.

10. On the basis of 2006 Agriculture Master Plans for Diyarbakır, Batman and Siirt and

bearing in mind the spatial distribution of poverty, ‘Village Improvement Program’

component of the Project’s proposed component would be targeted mainly to

upland/mountainous medium/low potential zones and the ‘Rural Economic Growth’

component would be targeted mainly to lowland, higher potential zones.

1.3 Objectives of the Project

11. Main objective of the Project is to improve economic and social status of the poor

people living in rural areas in accordance with Turkey’s national rural development strategies,

plans and programs.

12. Project’s primary objectives are to;

(a) Improve the quality of life and economic efficiencies of agricultural enterprises

being poor due to current production and employment patterns in poor rural

villages in the Project area,

(b) Develop both on- and off-farm income sources and establish new businesses

through developing Supply Chain Management and increase employment

through the establishment of new and expansion of existing profitable

businesses,

(c) Optimize employability of members of the target groups through enhancement

of individual and organizational skills necessary to achieve the first two

objectives.

1.4 Projenin Bileşenleri

13. Investment activities of the project are implemented under three components;

(a) Village Improvement Program,

(b) Rural Economic Growth and

(c) Capacity Building for Employment.

14. On the other hand, in addition to these components, (d) Project Coordination and

Management Components is designed for smooth and effective implementation of the Project

and realization of planning and budget control activities as forth component.

Page 8: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

8

1.4.1 Component A – Village Improvement Program

15. Selected economic and social investments will be supported under this component to

improve the living standards of poor villages. This component comprises three sub-

components:

(a) Awareness raising,

(b) Farmer Education and Training,

(c) Infrastructure Investments for Village Improvement.

16. Sub-Component: Awareness Raising; activities for raising awareness of rural

population about existing financial and social development support types and resources that

are necessary for determining investment opportunities at village level and facilitating these

kinds of investments.

17. Aim of Sub-Component: Farmer education is to increase sustainable productivity

level in subsistence and semi-subsistence farming systems in poor villages suffering from

resource squeeze.

18. Under sub-component Infrastructure Investments for Village improvement

Improvement in village’s financial and social infrastructure at low levels will be supported

under sub-component infrastructure for village improvement.

1.4.2 Component B – Rural Economic Growth

19. Measures for diversifying rural income resources and increasing employment in

project provinces are under this component. This component comprises three sub-

components:

(a) Rural Supply Chain Management,

(b) Contributory Grants,

(c) P/DDA Staff Capacity Building.

20. Investment needs and opportunities determined by rural supply chain management

will form a basis for investments to be supported by the project.

21. Grant resources will be used for in- and off-field investments under “Strategic

Investment Plan” to be prepared in project provinces under sub-component contributory

grants.

22. It is targeted to develop institutional capacity by improving information and skills of

technical staff in provincial and district directorate on Strategic Investment Plan under sub-

component P/DDA staff capacity building.

Page 9: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

9

1.4.3 Component C – Capacity Building for Employment

23. This component seeks to enhance capacity of project’s target group in a way to

improve employment opportunities in local economies.

2. ACTIVITIES REALIZED IN THE FIRST HALF OF 2010 BY

COMPONENTS

2.1 Component A – Village Improvement Program

2.1.1 Farmers’ Education and Training

24. Under the Farmers’ Education and Training sub-component, a budget of 559.000 USD

has been allocated for 2010 and activities under this sub-component have been planned in

accordance with regional needs and needs determined on the basis of Strategic Investment

Plans.

25. Staff of Diyarbakir Provincial Directorate of Agriculture and County Directorate of

Agriculture has been sent to SUTAS Karacabey Training Center in Bursa to provide training

on cattle breeding. Aim of this training is to provide more information about cattle breeding

for farmers and staff and therefore to ensure that staff can provide true technical and practical

information to the farmers.

26. Training tour to SUTAS Karacabey Training Center was organized to provide applied

training on cattle breeding to farmers from Diyarbakir and Batman Provinces. Aim of this

training to ensure farmers to realize production by being more conscious and aware of

technologic needs about “Cattle Breeding”.

27. Under the training activities, applied training on “Fruit Growing” at Atatürk

Horticulture Research Institute where trainings are provided on Fruit Growing in Yalova was

provided to farmers between 14/06/2010 and 16/06/2010.

28. Training on “Pistachio Grafting and Production” at Pistachio Research Institute in

Antep was provided to farmers interested in pistachio growing in Siirt between 07.06.2010

and 10.06.2010.

29. Regional Final of Knowledge Contest between Female Farmers was realized in

Diyarbakir on 14.04.2010 in order to contribute to agricultural training of female farmers by

ensuring their competition and organization support was provided to this program under the

Project.

30. 75 producers have been provided by training on “High Wired Fence System Pruning”

and “Pruning of Old Vines” in Batman on 24-25 February 2010.

Page 10: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

10

31. Organization support was provided for introduction of Siirt Zivzik Pomegranate and

Siirt Pistachio in Antalya ANFAŞ Agriculture Fair.

32. Activities under the farmers’ education and training realized in the first half of 2010

are indicated in Table 1.

Table.1. Farmer Training Activities in 2010

33. During IFAD mission between 6-18 September 2009 it was decided to arrange a

Farmer Training Center in order to realize Farmer Education and Training in Batman

Province, to this end rehabilitation was realized in the existing building by Provincial

Directorate and Center was put into practice after procurement of IT Equipment for furniture

and technical accessories under the Project. Procured materials are listed in Table 2.

Table.2.List of Office Furniture and Technical Equipment for Farmer Training Center in

Batman

Number of Participants

Subject of the Training Unit Diyarbakir Batman Siirt Female Male Total

Training on Dairy (Farmer) Number 2 1 - - 82 82

Training on Dairy (Technical Staff) Number 1 - - 3 19 22

Pruning and Grafting of Fruit Trees Number 2 - - 45 45

Pruning of Vines Number - 1 - - 75 75

Pistachio Growing and Grafting Number - - 1 - 30 30

Contest between Female Farmers Number 1 - - 50 - 50

TOTAL 6 1 1 53 176 229

Technical Equipment (number)

No Item Diyarbakir Batman Siirt Total

1 Laptop - 1 - 1

2 Desktop Computer - 3 - 3

3 Antivirus Program - 2 - 2

4 Projection Tool - 1 - 1

5 Hanging Tool for Projection - 1 - 1

6 42” LCD TV - 1 - 1

7 Cinema System - 1 - 1

8 ADSL Modem - 1 - 1

Page 11: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

11

9 Wireless Network Adaptor - 3 - 3

10 Multi-functional laser printer - 1 - 1

11 Projection Screen - 1 - 1

12 Security system - 1 - 1

TOTAL - 12 12

Office Furniture (number)

1 Refrigerator - 1 - 1

2 Oven - 1 - 1

3 Aspirator - 1 - 1

4 Water cooler - 1 - 1

5 Air Condition for Saloon - 1 - 1

6 Machine for Tea - 1 - 1

7 Meeting Table - 1 - 1

8 Sofa - 9 - 1

9 Arm Chair - 1 - 1

10 Chair - 24 - 24

11 Platform - 1 - 1

12 Blackboard - 1 - 1

13 Table - 1 - 1

14 Chair - 24 -

24

15 Chair for Computer - 3 - 3

16 Two Seating Armchair - 1 - 1

17 Single Chair - 2 -

2

18 Coffee Table - 6 - 6

19 Bookshelf-Cloakroom - 1 -

1

20 Table for Computer - 3 - 3

21 Cupboard - 1 -

1

22 Pedestal Ashtray - 6 - 6

TOTAL - 96 - 96

Page 12: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

12

34. Under demonstrations, pomegranate, apple, almond, walnut orchards were established

in order to develop and promote fruit growing and viticulture in Diyarbakir, Batman and Siirt.

Realized demonstration activities are indicated in Table 2.

Table.3. Demonstration Activities in 2010

Table.4. Procurement of Tools and Equipment for Demonstration Activities

35. Procurement of tools and equipments stated in AWP&B has not been realized in the

first half of 2010 for three Project provinces and preparations have been continuing.

Activity Unit

Programmed

(According to

AWP&B)

2010

Realized

2010

Realized

(%)

Distribution of Realized

Demonstration Activities to

Provinces

Diyarbakir Batman Siirt

Establishment Pomegranate

Orchard Da 5 5

100 5

Establishment of Semi-dwarf

Apple Orchard Da 95 95

100 15 50 30

Adaptation of Culture system

in new vineyards Da 10 10

100 10

Establishment of Almond

Orchard Da 60 60

100 30 30

Establishment of Walnut

Orchard Da 5 5

100 5

Rehabilitation of Barns number 2

Procurement of Tools and Equipment for 2010 (GENERAL)

Type Planned (AWP&B) Realized

Diyarbakir Batman Siirt Total Diyarbakir Batman Siirt

Auger (for Sapling) 10 1 6 17 - - -

Stubble Drill 1 1 - - -

Almond Cracker 2 2 - - -

Stone Collecting machine 1 1 - - -

Garden Tractor and its Equipments 1 1 - - -

Total 12 3 7 22

Page 13: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

13

2.1.2 Infrastructure Investments for Village Improvement

36. Periodic field visits for controlling system performances in all villages where Sewage

Systems were completed in 2008-2009 have been realized. Water samples have been taken

from Natural Treatment Facilities and quality analysis has been realized.

37. Taking over works had been done for works completed in 2008 with site investigations.

After conducting necessary controls, sewage networks in Diyarbakir have been transferred to

Special Provincial Administration. Taking over works have been continuing in Batman and

Siirt.

38. Project design biddings have been realized and projects have been submitted to the

administration in relation to following small works planned to be realized in Diyarbakir,

Batman and Siirt Provinces in 2010 under DBSDP;

Diyarbakır / Ergani County / Alitaş Village Şengalek Hamlet HİS Pond Project,

Diyarbakır / Çermik County / Artuk Village Closed System Irrigation Canal Project,

Diyarbakır / Merkez County / Ekinci Village HİS Pond Project,

Diyarbakır / Merkez County / Baroğlu Village HİS Pond Project,

Diyarbakır / Eğil County / Gürünlü Village Water Tank (HİS) Project,

Diyarbakır / Çermik County / Karakaya Village Closed System Irrigation Canal Project,

Diyarbakır / Kulp County / İslamköy Closed System Irrigation Canal Project,

Diyarbakır / Hani / Center / Anıl Village, Gürbüz Town and Kırım Hamlet Closed System

Irrigation Canal Project,

Batman/ Kozluk County / Tosunpınar Village Closed System Irrigation Canal Project,

Siirt /Kurtalan County / Saipbeyli Village Çıpçıpok location Small Sized Irrigation Pond

Project,

Siirt /Kurtalan County / Uluköy HİS Pond Project,

Preparations for bidding for implementation of irrigation canal and HIS pond project have

been continuing.

39. Construction of drinking water tank, catchment and transfer has been completed and its

provisional acceptance was realized on 01.06.2010.

40. Geological feasibility studies for stream bed rehabilitation in Diyarbakir Center Güleçoba

Village have been completed and we are now in the stage of bid advertisement.

Page 14: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

14

41. Meetings with special provincial administrations for realization of field roads in 2011

have been held and now we are at stage of agreement. Resource has been proposed for

necessary arrangements in budget proposal of 2011 in order to make payments from domestic

resource.

2.1.3. Expenditures for Village Improvement Component

42. Expenditures for Village Improvement Component is indicated in Table 5.

Table.5. Expenditures for Village Improvement Component

EXPENDITURES

FINANCE RESOURCE (USD)

TOTAL IFAD

DOMESTIC RESOURCE

BENEFICIARY UNDP

GRANT

Civil works 67,121.76 67,121.76

Procurement of Equipment and Material

17,553.92 17,553.92

Farmers Training and Studies

212,523.41 212,523.41

National Workshops 26,503.62 26,503.62

Technical Assistance 151,050.00 9,658.21 160,708.21

TOTAL 448,249.09 0.00 0.00 36,161.83 484,410.92

2.2 Component B – Rural Economic Growth

2.2.1 Strategic Investment Plans and Grant Program

43. Project applications were received in 2009 under the rural economic growth grant

program component, “Strategic Investment Plans” for Diyarbakır Province Dairy and Fruit

(grape, almond, and apple) Sectors, Batman Province Dairy and Viniculture Sectors, Siirt

Province Zivzik Pomegranate and implementation and payment activities have been initiated

at the field level in relation to the approved grants.

44. In order to support development of Viticulture in Batman, grant was advertised on

04.05.2010 again. Application period was completed on 11.06. 2010 and evaluation of bids by

PMU have been continuing.

45. Grant advertisement were realized on 08.06.2010 in Diyarbakir to support and extend

establishment of Almond Orchard under Strategic Investment Plan for Fruit Growing and

milk collection under Strategic Investment Plan for Dairy. Deadline for application is

08.07.2010.

Page 15: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

15

46. Information Meeting about “Grant Program in Diyarbakir” was held on 15.06.2010 by

PMU in Diyarbakir Provincial Directorate of Agriculture with the participation of county

directors.

47. Strategic Investment Plant for Sheep Breeding in Siirt has been prepared.

48. Below table indicates the financial situation of individual and economic grant project

applications applied in 2009 in Diyarbakir, Batman and Siirt and approved by the end of June

2010. Contributory grant disbursements belonging to individual project applications are

indicated in Table 6. Contributory grant disbursements belonging to economic investment

projects are indicated in Table 7.

Table.6. Contributory Grant Disbursements for Individual Project Applications

DİY

AR

BA

KIR

Sector

Number of

Investments of

which

Disbursement was

Realized

Amount of

Disbursed Grant

(TL)

Fruit Growing 10 139,848.75

Viticulture 12 162,436.10

TOTAL 24 302,284.85

BA

TM

AN

Viticulture 12 235,233.09

Dairy 3 53,245.00

TOTAL 15 288,478.09

Sİİ

RT

Zivzik Pomegranate

Growing 25 105,336.75

GENERAL TOTAL 64 696,099.69

Page 16: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

16

Tablo.7. Contributory Grant Disbursements for Economic Investment Project Applications D

İYA

RB

AK

IR

Sector

Number of

Investments of

which

Disbursement was

Realized

Amount of

Disbursed Grant

(TL)

Viticulture 1 32,553.50

Dairy 4 155,520.60

TOTAL 5 188.074.10

49. As understood from the data indicated in Table.6. and Table.7., Total Contributory Grant

disbursed for individual and economic applications by the end of June 2010 is 884,173.79

TL.

2.2.2. Expenditures for Rural Economic Growth Component

50. Total Contributory Grant disbursed for individual and economic applications is indicated

in Table 8 below as USD.

Table.8. Total Disbursed Contributory Grant (USD)

EXPENDITURES

FINANCE RESOURCE (USD)

TOTAL IFAD

DOMESTIC RESOURCE

BENEFICIARY UNDP GRANT

Contributory Grants

579,219.23 745,091.18 1,324,310.41

TOTAL 579,219.23 0.00 745,091.18 0.00 1,324,310.41

2.3 Component C – Capacity Building for Employment

51. Studies for determining needed employment areas for vocational training and training

subjects about these areas have been continuing.

3. PROJECT COORDINATION AND MANAGEMENT

52. Project is being managed by “Central Project Unit” established within General Directorate

of Agriculture Production and Development (GDAPD) of Ministry of Agriculture and Rural

Affairs and “Project Management Units” established within Provincial Directorates of

Agriculture in Diyarbakıt, Batman and Siirt Provinces. List of staff of Project Management

Units at center and Project provinces is indicated in Table 6.

Page 17: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

17

Tablo.9. List of Staff of Project Management Units at center and Project Provinces

* Processes for selection of a regional administration for the project have been continuing.

Institution Name-Surname Duty Unit

MA

RA

GD

AP

D

Ahmet Savaş İNTİŞAH Department Head Department of Risk Management

and Projects

Dr. Şule ÖZEVREN Section Director Department of Risk Management

and Projects

Ali Çağlar ÇELİKCAN Agriculture Engineer

(Cent. Proj. Man. Unit)

Department of Risk Management

and Projects

Mustafa Fuat BUZ Agriculture Engineer

(Cent. Proj. Man. Unit)

Department of Risk Management

and Projects

Meltem BAŞOL Agriculture Engineer

(Cent. Proj. Man. Unit)

Department of Risk Management

and Projects

UNDP Burak ELDEM Project Administrator

DİY

AR

BA

KIR

(Cen

tra

l P

roje

ct O

ffic

e)

* Project Coordinator Project Management Unit

Murat BATURAY Civil Engineer Project Management Unit

Murat GÜNSEL Civil Engineer Project Management Unit

Yunus BİRCAN Business Development

Expert Project Management Unit

Cihad KAYHAN Procurement and

Finance Specialist Project Management Unit

Casim Can HİNDİOGLU Monitoring and

Evaluation Expert Project Management Unit

DİY

AR

BA

KIR

PR

OV

INC

IAL

DIR

EC

TO

RA

TE

OF

AG

RIC

UL

TU

RE

Sedat ILDIZ Section Director Project Management Unit

Yusuf YILMAZ Agriculture Engineer Project Management Unit

Muhterem Savaş KOÇ Agriculture Engineer Project Management Unit

BA

TM

AN

PR

OV

INC

IAL

DIR

EC

TO

RA

TE

OF

AG

RIC

UL

TU

RE

Yusuf ALP Section Director Project Management Unit

Yusuf ŞİMŞEK Agriculture Engineer Project Management Unit

Zeki EDİS Agriculture Engineer Project Management Unit

Mehmet Cengiz

ARSLANOĞLU Agriculture Engineer Project Management Unit

Yunus BİRCAN Business Development

Expert Project Management Unit

Sİİ

RT

PR

OV

INC

IAL

DIR

EC

TO

RA

TE

OF

AG

RIC

UL

TU

RE

M. Hakan DEMİRHAN Section Director Project Management Unit

Nezir EKİNCİ Agriculture Engineer Project Management Unit

Ali GÜNEŞ Agriculture Engineer Project Management Unit

Özgür Zeki ÖZOK Business Development

Expert Project Management Unit

Page 18: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

18

53. Casim Can HİNDİOĞLU took office on 01.04.2010 as Monitoring and Evaluation

Expert.

54. Özgür Zeki ÖZOK who worked in Siirt as Business Development Expert resigned on

03.05.2010.

55. Arif Mert ÖZTÜRK who worked in Diyarbakir as Business Development Expert resigned

on 09.07.2010 and processes for employing Business Development Experts for Batman and

Siirt Provinces have been initiated.

56. Yunus BİRCAN has been seconded as Business Development Expert both in Diyarbakir

and Batman temporarily until employing new Business Development Expert.

57. A training on Preparation and Evaluation of Investment Projects was held between 20 and

28 January 2010 in Diyarbakir, Batman and Siirt with participation of total 34 staff from

technical staff of provincial and county directorates and PMU staff.

3.1. Expenditures for Project Coordination and Management Component

58. Expenditures for Project Coordination and Management Component are indicated in

Table 10 below.

Table.10 Expenditures for Project Coordination and Management Component

EXPENDITURES

FINANCE RESOURCE

TOTAL IFAD

DOMESTIC RESOURCE

BENEFICIARY UNDP GRANT

Salaries and DSA of Project Staff

93,746.26 93,746.26

Operation and Maintenance

1,807.24 60,000.00 61,807.24

TOTAL 95,553.50 60,000.00 0.00 0.00 155,553.50

3.2 Audit of Treasury

59. Financial tables and project expenditures of Diyarbakir Batman Siirt Development Project

during the period between 01.01.2009–31.12.2009 have been audited for their compliance

with provisions of 718-TR numbered Loan Agreement. Views about the audit were stated in

the conclusion report. These views are as follows:

1- Fund resource and use table, Cumulative investment table, Withdrawal tables as State

of Expenditures and Special Account table indicates the financial situation in a right

was in accordance with accounting principles on the basis of cash collection and

payment.

2- GDAPD has acted in compliance with provisions of 718-TR numbered Loan

Agreement in terms of important points.

Page 19: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

19

3- There are sufficient documents kept for supporting demands from IFAD to meet

disbursements made for withdrawals about SOE and financing of these expenditures

are in compliance with 718-TR numbered Loan Agreement.

60. Developments about the recommendations of Treasury auditors that they submitted to the

Ministry as the result of audit are as follows;

1- A consultant to establish a Finance Management System that will establish

financial tables of the Project was employed by UNDP.

2- Estimated cost and method of the bidding will be stated in bidding documents in

accordance with recommendations.

3- Procurement plan will be prepared for 18 month for next years. Consolidated

financial tables about project accounts will be prepared by the Project Coordinator

and submitted to the Fund.

4. Financial Situation of the Project

4.1. Project Finance, Cost and Expenditures

61. Project is financed by Government of Turkish Republic, International Fund for

Agricultural Development (IFAD), United Nations Development Program (UNDP) and

Project Beneficiaries. Implementation period is 5 years and budget is approximately 37

million USD. Distribution of finance resources is indicated in Table 11.

Table.11. Finance Resource and Investment Cost of Project

Finance Resource Amount ( million USD)

Domestic Reource 4,454

External Resource (IFAD

Loan)

24,104

UNDP Grant 0,752

Beneficiary Contribution 7,607

Total 36,919

Page 20: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

20

Table.12. Expenditures by Loan Categories and Financiers

Table.13. Expenditures by Project Components

DBSDP, EXPENDITURES BY PROJECT COMPONENTS BY 30 JUNE 2010 ( USD )

PROJECT COMPONENTS

FINANCE RESOURCE

TOTAL IFAD

DOMESTIC

RESOURCE BENEFICIARY UNDP GRANT

Village Improvement Program 448.249,10 26.503,62 474.752,71

Rural Economic Growth 579.219,23 745.091,18 1.324.310,41

Capacity Building for Employment 0,00

Project Coordination and Management 95.553,50 60.000,00 9.658,21 165.211,71

TOTAL 1.123.021,82 60.000,00 745.091,18 36.161,83 1.964.274,83

DBSDP, EXPENDITURES BY LOAN CATEGORIES BY 30 JUNE2010 ( USD )

LOAN CATEGORİES

FINANCE RESOURCE

TOTAL IFAD

DOMESTIC

RESOURCE BENEFICIARY UNDP GRANT

I. Works 67.121,76 67.121,76

II. Equipment and Material 17.553,92 17.553,92

III.(a) Trainings 212.523,41 212.523,41

III.(b) National Workshops 26.503,62 26.503,62

IV. Technical Assistance 151.050,00 9.658,21 160.708,21

V. Contributory Grants 579.219,23 745.091,18 1.324.310,41

VI. (a) Salaries and DSA 93.746,26 93.746,26

VI. (b) Operation and Maintenance 1.807,24 60.000,00 61.807,24

VI. (c) Implementation Support 0,00 0,00

TOTAL 1.123.021,82 60.000,00 745.091,18 36.161,83 1.964.274,83

Page 21: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

21

Table.14. Summary of Expenditures by Components and Loan Categories for 2010

Categories

Village

Improvement

Program

Rural

Economic

Growth

Capacity

Building for

Employment

Project

Organization

and

Management

Total

I. Civil Works (CW) 1.300,00 1.300,00

II. Equipment and Material (EM) 25,00 60,00 85,00

III. Trainings, Workshops and Studies (TWS)

i) Trainings and Studies (TS) 450,00 66,00 516,00

ii) National Workshops (NW) 5,00 5,00

IV. Technical Assistance (TA) 316,00 20,00 336,00

V. Contributory Grants (CG) 4.036,00 4.036,00

VI. Recurrent Costs (RC)

i) Project Staff Salaries and Allowances

(PSSA) 202,00 202,00

ii) Operation and Maintenance (O&M) 5,00 5,00

iii) Implementation Support (IS) 173,00 173,00

iv) MARA/PDA Staff Salaries, fuel, VAT,

etc. 685,00 685,00

v) Vehicles (Pick-up x 3, Midibus x 1 ) 100,00 100,00

Total 2.091,00 4.056,00 66,00 1.230,00 7.443,00

Page 22: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

22

Table.15. Summary of Expenditures by Components and Financiers for 2010

Expenditure Categories Total

IFAD

Duties/

Gov. Budget UNDP Beneficiaries Taxes

I. Investment Costs

A. Civil Works 1.300,00 1.300,00

B. Equipment and Material 85,00 85,00

C. Trainings, Workshops and Studies 521,00 521,00

D. Technical Assistance 336,00 100,00 236,00

E. Contributory Grants 8.072,00 4.036,00 4.036,00

Total Investment Costs 10.314,00 6.042,00 0,00 0,00 236,00 4.036,00

II. Recurrent Costs

A. UNDP/CO Administration Support 45,00 45,00

B. UNDP/CO Administration Fee 128,00 128,00

C. Project Staff Salaries and Allowances 202,00 202,00

D. MARA/PDA Staff Salaries, fuel, VAT,

etc. 685,00 685,00

E. Operation and Maintenance 5,00 5,00

F. Vehicles(Pick-up x 3, Midibus x 1 ) 100,00 100,00

Total Recurrent Costs 1.165,00 380,00 0,00 785,00 0,00 0,00

Total COSTS 11.479,00 6.422,00 0,00 785,00 236,00 4.036,00

Page 23: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

23

ATTACHMENT 1: IMPLEMENTATION SCHEDULE OF THE PROJECT ACTIVITIES IN ACCORDANCE

WITH AWP&B OF 2010

Component A: Village Improvement Program

USD Activities J F M A M J J A S O N D Details/Steps

A 1. Awareness Raising 25.000,00

Prioritisation of Districts and

Selection of Villages

60 villages are targeted for 2008.

(20 villages for each province, including

the already selected for sewer construction

and small works)

It is merged with A2 sub-component.

BDSs and DDESs participate to the

visits.

Village meetings and need

assessment

Collect the necessary data for sub-

component A1 and A2.

Information already available is

collected by PAUs about selected

villages.

Project Handbook Publication

25.000,00

Publication of project handbook for more

detail about the aim of the project to the

stakeholders and villagers of the project

provinces

Information for the more detail for all

component of the project

Page 24: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

24

Component A: Village Improvement Program

USD Activities J F M A M J J A S O N D Details/Steps

A 2. Farmer’s Training and

Education 559.000,00

Development of training

equipment and materials

100.000,00

Based on the needs of the PDA’s and

villagers prepare training material

and purchase equipment.

Supported by TA

Publication of training materials 9.000,00 Printing training material.

Demonstration and farmer

training 450.000,00

Based on the master plans of

Provincial and PDA’s needed Prepared by the Project staff and PDA’s

A 3. Infrastructure for Village

Improvement 1.450.000,00

Civil Works Consultant (CWC) (If

required) 18.000,00

Recruited of a CWC full (full time

renewable)

CWC does daily supervision at the

construction sites and prepares designs

and specifications for small works to be

carried out in 2009

Travel allowance for CWC 2.000,00 Visits to DBSDP provinces are

required by MARA Travel expenses and DSE for CWC

Provincial Site Engineers (PSE) 60.000,00 Recruited of a PSE’s

PSE’s are responsible to planning,

controlling and reporting all

infrastructures in the project provinces

Selection of villages The CWC meet with related

institutions.

Preparation of pre-feasibility

studies and getting no objection

from IFAD

Measurement of lengths, estimated

costs, large target groups

(beneficiaries)

Feasibility studies will be done by the

CWC and PSE’s. CPMU/MARA is

responsible for obtaining no objection

from IFAD

Procurement of additional design 127.000,00

Contracting an Engineering

If specific design expertise is required for

Page 25: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

25

services for “Small Works” Consultant (if required) identified “small works”

Preparation for tendering

Preparation of tender documents for

a 1 or 2-years small works

construction programme in

accordance with UNDP/CO

procedures

Prepared by the CWC and UNDP/CO/CO

procurement specialists

Expression of Interest and

Invitation to Bidders Selection of construction company One Tender

Construction of Small Works 1.300.000,00 2009 construction program for small

works Contractor mobilization

Total Component A 2.091.000,00

Page 26: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

26

Component B: Rural Economic Growth

USD Activities J F M A M J J A S O N D Details/Steps

B 1. Rural Supply Chain

Management 4.056.000,00

MARA/PDA/PMU visit to modern

processors within turkey to study their respective value chains

20 000 Visit to modern processors within Turkey

to study value chain management

Organize the trip and conduct the

visit.

Conduct a Value Chain Analysis

(VCA) to identify sub-

sector/commodities with the

greatest rural economic impact

Conduct VACs for the most promising

sub-sectors in each Project province.

Select the most promising VC and

conduct VCA.

Training of methodology in

preparation of Business Plan.

Training of staff from the CPMU/MARA,

APC, PDA and BDSs.

Linking investors in need of debt

financing to a financial

institution.

Linking investors to financial institutions Assist to link investors to financial

institutions to obtain debt financing

Provide Contributory Grants to

individual investors within the

SIP with a viable BP.

4.036.000,00 Appraise CG applications and prepare the

MoU for disbursement of grants. Appraise and disburse CG.

Total Component B 4.056.000,00

Page 27: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

27

Component C: Capacity Building for Employment

USD Activities J F M A M J J A S O N D Details/Steps

Need assessment and labor

market analysis 66.000,00

Vocational Training

66.000,00

Preparation of training program in

accordance with regional needs

After the completing the analysis of

regional labour market survey;

planning the vocational training by

APC, PDA’s and stakeholders

Training needs assessment

To be undertaken under component B1

VCA.

An integral part of the provincial

VCA for 2010.

Analysis of regional labour

market

To be undertaken in conjunction with the

VCA.

To be carried out in conjunction with

the VCA.

Total Component C 66.000,00

Page 28: Diyarbakır Batman Siirt Development Project€¦ · Diyarbakır Batman Siirt Development Project ... Implementations of Diyarbakır, Batman, Siirt Development Project have been carried

28

Component D: Project Organization and Management

USD Activities J F M A M J J A S O N D Details/Steps

Recurrent Costs

Fees 10.000,00

Allowances 5.000,00 DSA

National Travel 5.000,00 Air Fees

Office Operation Costs 5.000,00

Translation Services 5.000,00

UNDP/CO Administration 173.000,00

UNDP/CO Fees 128.000,00

UNDP/CO/CO Administration 45.000,00

Government Contributions 785.000,00

Vehicles 100.000,00

Driver, Secretary, Fuel-oil, Insurance etc. 685.000,00

Sub-Total Recurrent Costs 973.000,00

Project Organization and Management TOTAL 1.230.000,00