12 Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

Embed Size (px)

Citation preview

Page 1: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

12

Division 12AlexanderCatawbaClevelandGastonIredellLincoln

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Page 2: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

IREDELL

GASTON

CLEVELAND

LINCOLN

CATAWBA

ALEXANDER

74

70

21

64

321

321

64

21

77

40

85

40

90

274

115

127

279

901

150

73182

27

273

216

10

226

3

16

18

10115

150

Statesville

Gastonia

Hickory

Newton

Mooresville

Lincolnton

MountHolly

KingsMountain

Shelby

Belmont

AV-5755

B-4405

B-5150

B-5847

B-5549

B-5844

B-5848B-5849

B-5843

B-5142

B-5859

B-5846

K-4908

U-5817

U-5778

U-5800U-2567 I-5713

R-5712

I-5000

U-5777

U-5780

U-5801

R-5711

I-5716

EB-5771EB-5768

U-5510

U-5819U-5775

R-5710

EB-5706

R-3833C

U-5799

R-5100

I-4928

U-5779

EB-5713

EB-5746

EB-5752

EB-5745

EB-5750

U-3633

EB-5751 EB-5701

U-5816

R-2522

U-2523B

I-5804

R-2707F

R-2707BR-2707AB

R-2307B

R-3603A

U-2530A

U-3608

U-5821

R-3100B

I-5805

R-3100A

R-5113

I-5772

R-5721A

R-2707C

I-5813

I-5773

R-5713

R-2307A

I-5719

I-5717

EB-5767

EB-5748

EB-5769

EB-5749

EB-5772I-5837

EB-5743

EB-5702

DRAFT STIPFY 2015-2025STI ProjectsDIVISION 12

0 6.5 133.25Miles

BRIDGES FUNDED THROUGH STI

STATEWIDE AVIATION

REGIONAL AVIATION

DIVISION AVIATION

DIVISION FERRYREGIONAL RAILDIVISION RAILREGIONAL TRANSITDIVISION TRANSITSAFETYTRANSITION *TRANSITION *INTERSTATE MAINTENANCESTATEWIDE HIGHWAYREGIONAL HIGHWAYDIVISON HIGHWAYDIVISION BIKE/PEDESTRIANINTERSTATE ROUTEUS ROUTENC ROUTESECONDARY ROADMUNICIPAL BOUNDARIESMILITARY BASENCDOT DIVISION BOUNDARYCOUNTY BOUNDARYWATER FEATURES

* Note: Reflects 108 of the Major Transition ProjectsNote: FY 2015 projects represent major projects not

let as of November 2014

Page 3: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

COUNTY

FUTURE YEARS

F

NHPB - National Highway Performance Program (Bridge)NHPIM - National Highway Performance Program (Interstate Maintenance)O - OthersRR - Rail-Highway SafetyS (M) - State MatchSRTS - Safe Routes to School

FLPI - Federal Lands Program (Indian Reservation Roads) STP - Surface Transportation ProgramHFB - Highway Fund Bridge Replacement Program STPDA - Surface Transportation Program - Direct AttributableHP - Federal-Aid High Priority STPEB - Surface Transportation Program, Enhancements (Bike)

STPON - Surface Transportation Program Bridge (On System Bridge)STPOFF -Surface Transportation Program (Off System Bridge) PE - Preliminary EngineeringT - State Highway Trust Funds

NHP - National Highway Performance Program TAP - Transportation Alternatives Program RG - Right of Way (GARVEE)

SW - StatewideTRN -Transition Project

S - StructureU - Utilities

I - ImplementationL - LandscapingM - MitigationO - OperationsP - Paving

WAKE

NUMBERLENGTH (MILES)

DIVISION 00

R-0000

IDROUTE/CITY

US or NC RoutesON NEW LOCATION. I - InterstateWITH A BYPASS OF HOMETOWN ROUTE/CITY

Project termini and a general

SW

M1500

A

NHP

4000

FUNDING CATEGORY (1)

used for each project phase.

FUNDING SOURCE (2)

U

B3000R

FY 2017

C

(3) WORK TYPE (ACTIVITY)

A - Acquisition

with proposed work type or activity beginning in the initial scheduled year. (Estimates are in thousand of

For other work types or activities see Work Type (Activity) box below.

dollars.)

of a project segment indicates (Cash-Flow Funding) COMMITMENTSFUTURE

SW CBSW

One or two letter

HIGHWAY PROGRAM

UNFUNDED

NC 3 TO SR 1003SR 1003 TO NC 96

ASW

UNFUNDED

20000CRC 5000C 5000 BC B

WIDEN TO A FOUR-LANE FACILITY

A

NC 00 R7.3 R25063,450I-40 TO NC 96 EAST OF HOMETOWN.

B

FY 2025 FY 2018

700

FY 2019

DEVELOPMENTAL PROGRAMSTATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2020FY 2015 FY 2016

M

TOTAL PROJECT

COST (THOU)

NHPNHP

FUN

DS

A

PRIOR YEARS COST

(THOU)

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

U 5000NHP

C10000

FY 2021

C

FY 2023 FY 2024

FY 2022

5000

9000

APD - Appalachian Development

NHPNHP

LOCATION / DESCRIPTION NHP

NHP

I-40 TO NC 3

Preliminary engineering, Right of Way, Mitigation, Utilities or Construction. break.

work description.

way, utility, mitigation and construction cost estimates

See Highway Funding Key

any project breaks.Category for the project andIdentifies the "STI" Funding

by funding category in current dollars. Cost may include one or more funding types. Multi-year funding

for an explanation of funding categories

Phases of implementation: ESTIMATED COST Preliminary engineering, right of

(1) FUNDING CATEGORY

PROJECT BREAKS

designation for project

LOCATION / DESCRIPTION

SR - Secondary Road

IDENTIFICATION NUMBER Assigned to each project at conception and remains with

BVarious - multiple routesNEW ROUTE or City

WORK TYPE (ACTIVITY) (3)

BOND (R) - Revenue Bond

HRRR - High Risk Rural Roads

L - LocalHSIP - Highway Safety Improvement Program

project until completion.

DIV - DivisionEX - Exempt

REG - RegionalHF - State Dollars (Non-STI)

F - Feasibility StudyCG - Construction (GARVEE)C - Construction

G - Grading and Structures

R - Right of Way

(2) FUNDING KEY FOR HIGHWAY FUNDING SOURCES

ER - Emergency Relief Funds

CMAQ - Congestion MitigationDP - Discretionary or Demonstration

FED - Federal Rail Funds

Page 4: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

R-3603 57800SR 1400 (CLONINGER MILL ROAD) - SR 1351 (1ST STREET NW) IN CATAWBA COUNTY TO US 64-NC 90 IN ALEXANDER COUNTY. UPGRADE TWO LANES AND PROVIDE SOME MULTI-LANE CURB AND GUTTER.

10.8 T 1000R A T 30400C A T 1000R B T 25400C B

A SR 1400 (CLONINGER MILL ROAD) TO SR 1156 (RICHEY ROAD).DIVB SR 1156 (RICHEY ROAD) TO US 64/NC 90.

ALEXANDERCATAWBA

NC 127

URBAN PROJECTS

PLANNING/DESIGN/LET BY DIVISION

U-5801 190INTERSECTION OF NC 16 AND US 64. INTERSECTION IMPROVEMENTS.REG

T C 190 ALEXANDER NC 16

U-5615 42525STP-DA IN THE GREATER HICKORY METROPOLITAN PLANNING ORGANIZATION (MPO) AREA.

DIV

STPDA 8100C C 2700 C 2700 C 2700 C 2700 C 2700 2700C2700C2700C C 2700 C 1350L 2025C C 675 C 675 C 675 C 675 C 675 675C675C675C C 675 C 675

ALEXANDERBURKECALDWELLCATAWBA

VARIOUS

FEDERAL BRIDGE PROJECTSB-4980 1540REPLACE BRIDGE NO. 291 OVER MIDDLE

LITTLE RIVER.

HF

HFB R 140 HFB C 1400

ALEXANDER SR 1348(OLD NC 90)

B-4405 1543 58REPLACE BRIDGE NO. 130 OVER ELK SHOALS CREEK.

DIV

STPOFF R 135 STPOFF C 1350

ALEXANDER SR 1605(PAUL PAYNE STOREROAD)

B-5391 625 150REPLACE BRIDGE NO. 139 OVER GLADE CREEK.

HF

HFB R 50 HFB C 425

ALEXANDER SR 1609(COUNTY HOMEROAD)

UNDER CONSTRUCTION

B-5110 727 727REPLACE BRIDGE NO. 129 OVER BIG BRANCH CREEK.

DIV

ALEXANDER SR 1626(DRUMBSTANDROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5112 18735 16735DIVISION 12 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4912 14330 14330ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 12 PROJECT MITIGATION.

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

12-7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 5: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5212 4445 4445DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

INTERSTATE PROJECTS

SCHEDULED FOR FEASIBILITY STUDY

FS-1512A NC 10 (EXIT 138) TO WEST OF US 21 (EXIT 151). WIDEN ROADWAY.

13CATAWBAIREDELL

I-40

COMPLETE - GARVEE BOND FUNDING $19.71 MILLION; CONSTRUCTION - PAYBACK FY 2008 - FY 2019

I-5003 38988 28178EXIT 119 IN BURKE COUNTY TO SR 1753 (MILE MARKER 146) IN IREDELL COUNTY. PAVEMENT REHABILITATION.

27

TRN

NHP 2162CG CG 2162 CG 2162 CG 2162 CG 2162 BURKECATAWBAIREDELL

I-40

I-5716 1160SR 1007 (LENOIR RHYNE BOULEVARD) INTERCHANGE. CONSTRUCT INTERCHANGE IMPROVEMENTS.SW

NHP R 160 NHP 1000C

CATAWBA I-40

RURAL PROJECTS

PLANNING/DESIGN IN PROGRESS

R-3100 58876 3406SR 1895 TO SR 1800 SOUTHEAST OF NEWTON. WIDEN TO FOUR LANES.

9.1 STP 8500R A STP 1600U A STP C 12050 A C 12050 A STP 4200R B STP 70U B STP C 8500 B C 8500 B

A SR 1895 (TOWER ROAD) TO SR 1814 (CALDWELL ROAD)DIVB SR 1814 (CALDWELL ROAD) TO SR 1801 (CLAREMONT ROAD)DIVC SR 1801 (CLAREMONT ROAD) TO SR 1800 (CALEB SETZER ROAD) - COMPLETE

CATAWBA NC 16

R-3603 57800SR 1400 (CLONINGER MILL ROAD) - SR 1351 (1ST STREET NW) IN CATAWBA COUNTY TO US 64-NC 90 IN ALEXANDER COUNTY. UPGRADE TWO LANES AND PROVIDE SOME MULTI-LANE CURB AND GUTTER.

10.8 T 1000R A T 30400C A T 1000R B T 25400C B

A SR 1400 (CLONINGER MILL ROAD) TO SR 1156 (RICHEY ROAD).DIVB SR 1156 (RICHEY ROAD) TO US 64/NC 90.

ALEXANDERCATAWBA

NC 127

PLANNING/DESIGN IN PROGRESS - COORDINATE WITH PROJECT I-5717

R-2307 204270 1920RELOCATED NC 16 (TIP PROJECT R-2206) TO I-77. WIDEN TO MULTI-LANES.

13.6 STP 15300R A R 15300 ASTP 650M A STP 67000C A STP R 8000 B STP U 5600 B STP C 22625 B C 22625 B 22625C B22625C B

A RELOCATED NC 16 (TIP PROJECT R-2206) TO SR 1902 (HARVEL ROAD)REGB SR 1902 (HARVEL ROAD) IN CATAWBA COUNTY TO I-77 IN IREDELL COUNTYREG

CATAWBAIREDELLLINCOLN

NC 150

R-5113 42900US 70 TO NC 10. WIDEN TO MULTI-LANES. 4.6

DIV

STP 5600R STP 700U STP 27450C C 9150

CATAWBA SR 1005 (STARTOWNROAD)

12-8 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 6: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS

PLANNING/DESIGN IN PROGRESS - INCLUDES B-4450

U-4700 440818 4090US 70 IN HICKORY TO US 64/NC 18/NC 90 IN LENOIR. WIDEN TO SIX LANES.

17.2 NHP R 50750 A R 50750 A NHP M 586 A NHP 17525C A17525C A9175C A C 17525 A HP 8350C A NHP 25400R B NHP 2372M B NHP 41800C B NHP 94400R C NHP 98400C C NHP R 420 CA NHP C 583 CA 583C CA584C CA

A US 70 IN HICKORY TO US 321ASWB US 321A TO SR 1108 (MISSION ROAD)C SR 1108 (MISSION ROAD) TO US 64/NC 18/NC 90 IN LENOIRCA SR 1160 (MOUNT HERMAN ROAD). UPGRADE INTERSECTION TO SUPERSTREET DESIGN. - WITHIN THE LIMITS OF U-4700 C.REG

BURKECALDWELLCATAWBA

US 321

U-5777 7051ST AVENUE SE TO 2ND AVENUE SE. ADD TURN LANES.

REG

T R 135 T 570C

CATAWBA NC 127

U-2530 22900WIDEN NC 127 TO MULTI-LANES, SR 1132 TO SR 1008. UPGRADE AND EXTEND SR 1213 (CURRENTLY NC 127), PROPOSED US 321-NC 127 INTERCHANGE TO NORTH OF SR 1182.

4.5 T 6700R A T 800U A T 15400C A

A SR 1132 (HUFFMAN FARM ROAD) TO SR 1008 (ZION CHURCH ROAD).REGB NORTH OF US 321-NC 127 INTERCHANGE TO NORTH OF SR 1182 - COMPLETE

CATAWBA NC 127

PLANNING/DESIGN BY DIVISION

U-5510 5300 750US 70 TO SR 1148 (STARTOWN ROAD). CONSTRUCT A THREE-LANE FACILITY IN HICKORY.

0.5

DIV

T R 1200 T U 150 T C 3200

CATAWBA SR 1468SWEETWATER ROADEXTENSION

U-5615 42525STP-DA IN THE GREATER HICKORY METROPOLITAN PLANNING ORGANIZATION (MPO) AREA.

DIV

STPDA 8100C C 2700 C 2700 C 2700 C 2700 C 2700 2700C2700C2700C C 2700 C 1350L 2025C C 675 C 675 C 675 C 675 C 675 675C675C675C C 675 C 675

ALEXANDERBURKECALDWELLCATAWBA

VARIOUS

FEDERAL BRIDGE PROJECTSB-5862 495REPLACE BRIDGE NO. 43 OVER HOP CREEK.

HF

HFB 45R HFB 450C

CATAWBA SR 1131(PITTSTOWN ROAD)

UNDER CONSTRUCTION

B-5101 1384 1384REPLACE BRIDGE NO. 83 OVER CLARK CREEK.

DIV

CATAWBA SR 1149(CONOVER-STARTOWN ROAD)

RIGHT OF WAY IN PROGRESS

B-5150 2242 792REPLACE BRIDGE NO. 34 OVER FALLING CREEK.

DIV

NHPB 1450C CATAWBA SR 1404(29TH AVENUE NE)

B-5847 4600REPLACE BRIDGE NO. 173 OVER I-40.

DIV

NHPB 200R NHPB C 4400

CATAWBA SR 1709(ROCK BARN ROAD)

B-5854 990REPLACE BRIDGE NO. 7 OVER LYLE CREEK.

HF

HFB 90R HFB 900C

CATAWBA SR 1712

12-9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 7: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

UNDER CONSTRUCTION

B-4061 1128 1128REPLACE BRIDGE NO. 90 OVER HAGAN CREEK.

DIV

CATAWBA SR 1727(BOGGS ROAD)

B-5852 1210REPLACE BRIDGE NO. 158 OVER NORTH FORK MOUNTAIN CREEK.

HF

HFB 110R HFB 1100C

CATAWBA SR 1817(JOE JOHNSONROAD)

UNDER CONSTRUCTION

B-4458 2145 2145REPLACE BRIDGE NO. 95 OVER SOUTH FORK CATAWBA RIVER.

DIV

CATAWBA SR 2019(ROCKY FORD ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5112 18735 16735DIVISION 12 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

B-5542 336 40PRESERVATION OF BUNKER HILL COVERED BRIDGE.

DIV

DP 237C L 59C

CATAWBA CLAREMOUNT

MUNICIPAL BRIDGE PROJECTS

PLANNING/DESIGN BY CITY OF HICKORY

B-5549 1176 176FALLING CREEK ROAD OVER FALLING CREEK. REPLACE BRIDGE NO. 327.

DIV

STPOFF 120R L 30R STPOFF 680C L 170C

CATAWBA HICKORY

MITIGATION PROJECTS

IN PROGRESS

EE-4912 14330 14330ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 12 PROJECT MITIGATION.

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

HAZARD ELIMINATION PROJECTS

UNDER CONSTRUCTION

SF-5112A 1047 1047NC 127, SR 1128 TO SR 1176. CONSTRUCT CONTINUOUS LEFT TURN LANE.

CATAWBA NC 127

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5212 4445 4445DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

CONGESTION MITIGATION PROJECTSC-5608 1602PROJECTS TO IMPROVE CONGESTION AND

AIR QUALITY IN THE HICKORY MPO AND UNIFOUR RPO.EX

CMAQ C 801 C 801 CATAWBA VARIOUS

12-10 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 8: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025CONGESTION MITIGATION PROJECTS

C-5195 644 24CONSTRUCT SIDEWALKS AT VARIOUS LOCATIONS IN CLAREMONT.

EX

CMAQ 496C L 124C

CATAWBA CLAREMONT

C-5196 269116TH. STREET (SANDY RIDGE ROAD) AT 29 TH. AVENUE NE AND 21 ST. AVENUE NE IN HICKORY. ADD TURN LANES AND MAKE SIGNAL IMPROVEMENTS.

EX

CMAQ 203R L 51R CMAQ 1950C L 487C

CATAWBA HICKORY

FUNDS FLEXED TO FTA

C-5131 WESTERN PIEDMONT REGIONAL TRANSIT AUTHORITY (WPRTA). PURCHASE HYBRID BUSES.EX

CATAWBA HICKORY

UNDER CONSTRUCTION

C-5129 2500 2500UPGRADE TRAFFIC SIGNAL SYSTEM IN HICKORY.EX

CATAWBA HICKORY

ENHANCEMENT (CALL PROJECTS)

UNDER CONSTRUCTION

E-4961 101 101SOUTH OF SR 1154 (RADIO STATION ROAD) TO NC 10 IN NEWTON. CONSTRUCT GREENWAY.

CATAWBA NEWTON

INTERSTATE PROJECTS

UNDER CONSTRUCTION

I-5503 3499 3499MILEPOST 8.4 IN CLEVELAND COUNTY TO MILEPOST 13.9 IN GASTON COUNTY. MILL, PATCH AND RESURFACE.

CLEVELANDGASTON

I-85

RURAL PROJECTSR-5713 3200US 74 BUSINESS TO NC 226. CONSTRUCT

ACCESS MANAGEMENT IMPROVEMENTS.6

REG

T R 100 T U 100 T 3000C

CLEVELAND US 74

PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY - IN PROGRESS.

R-4045 14682 382SR 1167 (WEST MAIN STREET) IN MOORESBORO TO PROPOSED SHELBY BYPASS (R-2707) UPGRADE TO FULL CONTROL OF ACCESS.

1 NHP 3000R NHP 11300C

CLEVELAND US 74

PLANNING/DESIGN IN PROGRESS

R-2707* 331881 116185FOUR LANE DIVIDED FREEWAY ON NEW LOCATION.

18.6 NHP 16339G B T 13000R C T 1900U C T M 7 C T G 19333 C G 19334 C G 19333 C T 5900R D T 650U D T 28000G D T 8900R E T 32800C E T P 15900 F T P 9250 G 9250P G T 15800P H

A WEST OF SR 1162 (PEACHTREE ROAD) TO EAST OF SR 1315 (PLATO LEE ROAD). RIGHT-OF-WAY ONLY. - COMPLETEAA WEST OF SR 1162 (PEACHTREE ROAD) TO EAST OF SR 1318 (KIMBRELL ROAD). GRADING, STRUCTURES, PAVING - UNDER CONSTRUCTIONAB EAST OF SR 1318 (KIMBRELL ROAD) TO EAST OF SR 1315 (PLATO LEE ROAD). GRADING AND STRUCTURES - UNDER CONSTRUCTIONTRNB EAST OF SR 1315 (PLATO LEE ROAD) TO EAST OF NC 226. GRADING AND STRUCTURES - UNDER CONSTRUCTIONTRNC EAST OF NC 226 TO WEST OF NC 150. GRADING AND STRUCTURESREGD WEST OF NC 150 TO EXISTING US 74 WEST OF SR 2238 (LONG BRANCH ROAD). GRADING AND STRUCTURESE US 74 WEST OF SR 2238 TO WEST OF SR 1001 (STONEY POINT ROAD). GRADING, STRUCTURES, PAVINGF EAST OF SR 1318 (KIMBRELL ROAD) TO EAST OF NC 226. PAVINGTRNG WEST OF NC 226 TO WEST OF NC 150. PAVINGREGH WEST OF NC 150 TO EXISTING US 74 WEST OF SR 2238 (LONG BRANCH ROAD). PAVING

CLEVELAND US 74 SHELBYBYPASS

12-11 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 9: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS

$300,000 FROM CITY OF SHELBY

U-5775 1860INTERSECTION OF US 74 BUSINESS (MARION STREET) AND NC 150 (CHERRYVILLE ROAD). REALIGN INTERSECTION.

REG

T R 360 T C 1200 L C 300

CLEVELAND US 74 BUSINESS(MARION STREET)

U-2567 13500NC 150 (DEKALB STREET) INTERSECTION. CONSTRUCT INTERCHANGE.

SW

T 2200R T 11300C

CLEVELAND US 74 (DIXON BLVD)

FEDERAL BRIDGE PROJECTSB-5855 1870REPLACE BRIDGE NO. 9 OVER SEABOARD

COAST LINE RALROAD.HF

HFB 170R HFB 1700C

CLEVELAND US 74 BUSINESS

B-5531 5170REPLACE BRIDGE NO. 76 OVER BUFFALO CREEK.

HF

HFB R 470 HFB C 4700

CLEVELAND NC 150

B-5849 1010REPLACE BRIDGE NO. 104 OVER ASHWORTH CREEK.

DIV

STPOFF 50R STPOFF 960C

CLEVELAND SR 1002(NUMBER ONE SCHOOLROAD)

UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

B-4075 843 843REPLACE BRIDGE NO. 129 OVER GROG CREEK.

DIV

CLEVELAND SR 1184(MCKINNEY ROAD)

B-5856 770REPLACE BRIDGE NO. 351 OVER CREEK.

HF

HFB 70R HFB 700C

CLEVELAND SR 1207(McGRAW ROAD)

DIVISION PURCHASE ORDER CONTRACT (DPOC) - CONSTRUCTION UNDER 17BP.12.R.33

B-1135 108 108REPLACE BRIDGE NO. 139 OVER BEAVERDAM CREEK.

DIV

CLEVELAND SR 1314(ARTEE ROAD)

B-5861 640REPLACE BRIDGE NO. 229 OVER GRASSY BRANCH.

HF

HFB 60R HFB 580C

CLEVELAND SR 1504(SHUFORD LAKE ROAD)

B-5858 1210REPLACE BRIDGE NO. 392 OVER BUFFALO CREEK.

HF

HFB 110R HFB 1100C

CLEVELAND SR 1607(EASTRIDGE DRIVE)

B-5863 1210REPLACE BRIDGE NO. 165 OVER KNOB CREEK.

HF

HFB 110R HFB 1100C

CLEVELAND SR 1635(CASAR-BELWOODROAD)

B-5392 2740 100REPLACE BRIDGE NO. 201 OVER KNOB CREEK.

HF

HFB R 240 HFB C 2400

CLEVELAND SR 1641(BRACKETT ROAD)

B-5393 1530 100REPLACE BRIDGE NO. 192 OVER MAPLE CREEK.

HF

HFB R 130 HFB C 1300

CLEVELAND SR 1662(WILL DIXON ROAD)

B-5390 2275 100REPLACE BRIDGE NO. 31 OVER MUDDY FORK CREEK.

HF

HFB R 200 HFB C 1975

CLEVELAND SR 2002(TOBE BRIDGE ROAD)

B-5845 3080REPLACE BRIDGE NO. 25 OVER BUFFALO CREEK.

HF

HFB R 280 HFB 2800C

CLEVELAND SR 2033(OAK GROVE ROAD)

12-12 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 10: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

B-5848 3900REPLACE BRIDGE NO. 72 OVER BUFFALO CREEK.

DIV

STPOFF 200R STPOFF 3700C

CLEVELAND SR 2226(LAVENDAR ROAD)

B-5844 950REPLACE BRIDGE NO. 67 OVER BEASON CREEK.

DIV

STPOFF R 50 STPOFF 900C

CLEVELAND SR 2245(BETHLEHEM ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5112 18735 16735DIVISION 12 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4912 14330 14330ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 12 PROJECT MITIGATION.

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

HAZARD ELIMINATION PROJECTS

UNDER CONSTRUCTION

W-5320 265 265US 74 BYPASS AT US 74 BUSINESS (WESTERN INTERSECTION). REALIGN US 74 BUSINESS APPROACH AND IMPROVE CURVE SUPERELEVATION.

CLEVELAND US 74 BYPASS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5212 4445 4445DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

INTERSTATE PROJECTS

PROJECT COMPLETE - GARVEE BOND FUNDING $3.05 MILLION; PAYBACK FY 2007 - FY 2018

I-5007 6503 5167SOUTH FORK RIVER BRIDGE TO EXIT 27. PAVEMENT REHABILITATION.

3.1TRN

NHP 334CG CG 334 CG 334 CG 334 GASTON I-85

UNDER CONSTRUCTION

I-4928 9831 9831CONSTRUCT NEW I-85 NBL WEIGH STATION FROM SR 1302 (CROWDERS MOUNTAIN ROAD) TO SR 1307 (EDGEWOOD ROAD).TRN

GASTON I-85

PLANNING/DESIGN IN PROGRESS

I-5000 22100 1000I-85/US 321. GEOMETRIC SAFETY IMPROVEMENTS TO INTERCHANGE.

SW

NHP 4700R NHP 2600U NHP C 6900 C 6900

GASTON I-85

UNDER CONSTRUCTION

I-5503 3499 3499MILEPOST 8.4 IN CLEVELAND COUNTY TO MILEPOST 13.9 IN GASTON COUNTY. MILL, PATCH AND RESURFACE.

CLEVELANDGASTON

I-85

12-13 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 11: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025INTERSTATE PROJECTS

I-5719 255500US 321 TO NC 273. WIDEN TO EIGHT LANES. (COORDINATE WITH I-5713)

9.8

SW

NHP 18800R18800R NHP 2900U NHP 107500C C 53750 C 53750

GASTON I-85

I-5869 1700MAIN STREET IN LOWELL (EXIT 22) TO SAM WILSON ROAD (EXIT 29). DEPLOY INTELLIGENT TRANSPORTATION SYSTEM (ITS) IMPROVEMENTS ALONG CORRIDOR.

7.1

SW

NHP C 1700 GASTONMECKLENBURG

I-85

PLANNING/DESIGN BY DIVISION

I-5713 1160SR 2200 (COX ROAD) INTERCHANGE. CONSTRUCT INTERCHANGE IMPROVEMENTS. (COORDINATE WITH I-5719)SW

NHP R 160 NHP C 1000

GASTON I-85

URBAN PROJECTSU-3608 4715I-85 TO US 29/74. WIDEN TO MULTI-LANES. 0.3

DIV

T R 460 T U 55 T 4200C

GASTON NC 7

U-5800 465INTERSECTION OF NC 7/US 74 AND NC 7/US 29. CONSTRUCT NORTHBOUND THROUGH LANE AND INTERSECTION IMPROVEMENTS.REG

T R 90 T 375C

GASTON NC 7

U-5819 2350INTERSECTION OF NC 27 (WEST CHARLOTTE AVENUE) AND SR 2534 (HAWTHORNE STREET). CONSTRUCT INTERSECTION IMPROVEMENTS.DIV

T R 450 T 1900C

GASTON NC 27 (WESTCHARLOTTE AVENUE)

PLANNING/DESIGN IN PROGRESS

U-3633 21033 983TUCKASEEGEE ROAD (AT BEATTY DRIVE) TO HIGHLAND STREET (AT A & E DRIVE) IN MOUNT HOLLY. WIDEN TO FOUR-LANES DIVIDED.

1.3

REG

NHP 6300R NHP 1350U NHP C 6200 C 6200

GASTON NC 273 (SOUTH MAINSTREET)

U-5821 28130SR 2478 (TITMAN ROAD) TO SR 2435 (UNION-NEW HOPE ROAD). WIDEN TO 3-LANES.

3.8

DIV

T R 1100 T U 130 T 13450C13450C

GASTON NC 279 (NEWHOPE ROAD)

U-2523 14740NC 7 TO WEST OF NC 275 IN DALLAS. WIDEN TO MULTI-LANES.

3.6 T 3700R B T 440U B T 10600C B

A NC 7 (OZARK AVENUE) TO NORTH OF SR 2275 (ROBINSON-CLEMMER ROAD). - COMPLETEB NORTH OF SR 2275 (ROBINSON-CLEMMER ROAD) TO WEST OF NC 275 IN DALLAS.REG

GASTON NC 279

PLANNING/ENVIRONMENTAL DOCUMENT TO BE COMPLETED UNDER PROJECT U-2523B

U-5778 2325INTERSECTION OF NC 279 (LOWER DALLAS HIGHWAY) AND NC 275 (DALLAS STANLEY HIGHWAY). INTERSECTION IMPROVEMENTSREG

T 450R T 1875C

GASTON NC 279 (LOWERDALLAS HIGHWAY)

FEDERAL BRIDGE PROJECTSB-5857 10890REPLACE BRIDGE NO. 82 OVER SOUTH

FORK CATAWBA RIVER.

HF

HFB 990R HFB C 9900

GASTON US 29US 74

B-5926 6380REPLACE BRIDGE NO. 22 OVER DUKE POWER FEEDER CANAL.

HF

HFB 580R HFB 5800C

GASTON NC 273

DIVISION PURCHASE ORDER CONTRACT (DPOC) - CONSTRUCTION UNDER 17BP.12.R.36

BK-5120 19 19REPLACE BRIDGE NO. 170 OVER CREEK.DIV

GASTON SR 1802

12-14 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 12: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

B-4981 1467 37REPLACE BRIDGE NO. 172 OVER HOYLE'S CREEK.

HF

HFB R 130 HFB C 1300

GASTON SR 1819(ALEXIS ROAD)

UNDER CONSTRUCTION

B-4118 1035 1035REPLACE BRIDGE NO. 200 OVER STANLEY CREEK.

DIV

GASTON SR 1905(BLACKSNAKE ROAD)

B-5535 1375REPLACE BRIDGE NO. 198 OVER JOHNSTON CREEK.

HF

HFB R 125 HFB C 1250

GASTON SR 1909(KILLIAN ROAD)

B-4751 933 108REPLACE BRIDGE NO. 203 OVER STANLEY CREEK.

HF

HFB 100R HFB C 725

GASTON SR 1935(WILLOW SIDE DRIVE)

UNDER CONSTRUCTION

B-4752 5672 5672REPLACE BRIDGE NO. 6 OVER SOUTH FORK CATAWBA RIVER.

DIV

GASTON SR 2014(NORTH MAIN STREET)

UNDER CONSTRUCTION

B-4753 1304 1304REPLACE BRIDGE NO. 15 OVER DUHART'S CREEK.

DIV

GASTON SR 2439(LOWELL BETHESDAROAD)

B-5851 1210REPLACE BRIDGE NO. 19 OVER CATAWBA CREEK.

HF

HFB 110R HFB 1100C

GASTON SR 3217(BRADFORD HEIGHTSROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5112 18735 16735DIVISION 12 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

MUNICIPAL BRIDGE PROJECTS

UNDER CONSTRUCTION BY BESSEMER CITY - MUNICIPAL BRIDGE

B-4575 2667 2667REPLACE BRIDGE NO. 165 OVER MICKLEY AVENUE OVER NORFOLK SOUTHERN RAILROAD.DIV

GASTON BESSEMER CITY

MITIGATION PROJECTS

IN PROGRESS

EE-4912 14330 14330ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 12 PROJECT MITIGATION.

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

12-15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 13: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025HAZARD ELIMINATION PROJECTS

RIGHT OF WAY IN PROGRESS

W-5311 2100 200US 321 AT SR 2416 (ROBINSON ROAD), AND US 321 JUST NORTH OF SR 2416. REPLACE OVERHEAD RAILROAD BRIDGE TO ALLOW FOR CONSTRUCTION OF TWO-LANE, TWO-WAY ROAD FOR SR 2416, CONSTRUCT RIGHT TURN LANE FOR US 321 NORTHBOUND APPROACH AND CONSTRUCT TWO LIMITED MOVEMENT CROSSOVERS, AND REVISE EXISTING FLASHER.

SW

HSIP 1900C GASTON US 321

UNDER CONSTRUCTION

SF-4912H 105 105NC 279, SR 1602 (ASHEBROOK PARK ROAD) TO SR 1630 (DICK BEAM ROAD) AND NC 274, NORTH OF SR 1443 (DAMERON ROAD) TO SOUTH OF SR 1405 (RAMSEUR ROAD). INSTALL RUMBLE STRIPS AND PAVEMENT MARKINGS.

GASTON NC 279NC 274

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5212 4445 4445DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

CONGESTION MITIGATION PROJECTS

RIGHT OF WAY IN PROGRESS

C-4934 4158 1114NC 279 (NEW HOPE ROAD), BURTONWOOD DRIVE TO SR 2466 (GARRISON BOULEVARD) IN GASTONIA. ADD TURN LANE.

0.53

EX

CMAQ 2283C L 761C

GASTON NC 279 (NEW HOPEROAD)

C-5606 2908PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE GASTON MPO.EX

CMAQ C 1454 C 1454 GASTON VARIOUS

C-5505 1300RAIL TRAIL, WOODLAWN AVENUE TO BELMONT ABBEY COLLEGE AND DOWNTOWN. CONVERT ABANDONED NCDOT RAILROAD LINE TO A PEDESTRIAN TRAIL.

EX

CMAQ 1040C L 260C

GASTON BELMONT

IN PROGRESS

C-5536 500 500MECKLENBURG COUNTY AIR QUALITY -GRADE (GRANTS TO REPLACE AGING DIESEL ENGINS). REPLACE, REPOWER OR RETROFIT AGING DIESEL VEHICLES AND EQUIPMENT.

EX

CABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANUNION

CHARLOTTE

C-5563 150FLEET VEHICLE CONVERSIONS (RETROFIT) TO LPG BI-FUEL.

EX

CMAQ 120I L 30I

GASTON CRAMERTON

C-5508 237DALLAS-HIGH SHOALS ROAD (OLD US 321), DALLAS CHERRYVILLE HIGHWAY TO PARK ROAD AND EAST ON PARK ROAD TO SAM RHYME COURT. CONSTRUCT SIDEWALKS.

EX

CMAQ 190C L 47C

GASTON DALLAS

IN PROGRESS

C-5510 500 500MECKLENBURG COUNTY AIR QUALITY -GRADE (GRANTS TO REPLACE AGING DIESEL ENGINS). REPLACE, REPOWER OR RETROFIT AGING DIESEL VEHICLES AND EQUIPMENT.

EX

GASTON GASTONCOUNTY

12-16 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 14: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025CONGESTION MITIGATION PROJECTS

C-5562 333 50BIKE AND PEDESTRIAN IMPROVEMENTS BETWEEN DOWNTOWN AND LINEBERGER PARK.EX

CMAQ 225C L 58C

GASTON GASTONIA

C-5186 123GASTONIA CCTV CAMERAS. INSTALL 6 CCTV CAMERAS TO THE EXISTING COMPURIZED TRAFFIC SIGNAL SYSTEM ON I-85 AT NC 7 (OZARK AVENUE); US 29/US 74 AT FRANKLIN SQUARE II; NC 279 (NEW HOPE ROAD) AT OZARK AVENUE; US 321 (CHESTER STREET) AT TULIP DRIVE-BULB AVENUE; NC 274 (BESSEMER CITY ROAD) AT NC 275 (DALLAS-BESSEMER CITY ROAD AND US 274 (UNION ROAD) AT SR 1255 (HUDSON BOULEVARD).

EX

CMAQ 98C L 25C

GASTON GASTONIA

C-5566 240GPS AUTHOMATIC VEHICLE LOCATOR PROGRAM FOR FLEET VEHICLES.

EX

CMAQ 128I I 64 L 32I I 16

GASTON GASTONIA

UNDER CONSTRUCTION

C-5148 395 395SIDEWALKS ALONG MOUNTAIN STREET IN CHERRYVILLE.EX

GASTON MOUNTAIN STREET

INTERSTATE PROJECTS

SCHEDULED FOR FEASIBILITY STUDY

FS-1512A NC 10 (EXIT 138) TO WEST OF US 21 (EXIT 151). WIDEN ROADWAY.

13CATAWBAIREDELL

I-40

I-5320 2800MILE MARKER 146 TO MILE MARKER 151. PAVEMENT REHABILITATION.

5SW

NHPIM 2800C IREDELL I-40

I-5805 6400SR 2167 (WARD ROAD) TO DAVIE COUNTY LINE. PAVEMENT REHABILITATION.

4SW

NHPIM C 6400 IREDELL I-40

I-5804 2500SR 1639 (MEACHAM ROAD) TO 0.3 MILE EAST OF US 21. PAVEMENT REHABILITATION.

3SW

NHPIM C 2500 IREDELL I-40

GARVEE BOND FUNDING $10 MILLION; CONSTRUCTION - PAYBACK FY 2012 - FY 2023

I-3819 310936 132618STATESVILLE, MODIFICATION OF I-40/I-77 INTERCHANGE AREA.

NHP 1097CG A CG 1097 A CG 1097 A CG 1097 A CG 1097 A CG 1097 A 1097CG A1097CG A1097CG A NHP 100R B NHP 245M B NHP 168100C B

A INITIAL I-40/I-77 INTERCHANGE IMPROVEMENTS - UNDER CONSTRUCTIONTRNB FINAL I-40/I-77 INTERCHANGE IMPROVEMENTS

IREDELL I-40/I-77

I-5772 102501.4 MILES EAST OF I-77 TO SR 2167 (WARD ROAD). PAVEMENT REHABILITATION.

4.6SW

NHPIM C 10250 IREDELL I-40

COMPLETE - GARVEE BOND FUNDING $19.71 MILLION; CONSTRUCTION - PAYBACK FY 2008 - FY 2019

I-5003 38988 28178EXIT 119 IN BURKE COUNTY TO SR 1753 (MILE MARKER 146) IN IREDELL COUNTY. PAVEMENT REHABILITATION.

27

TRN

NHP 2162CG CG 2162 CG 2162 CG 2162 CG 2162 BURKECATAWBAIREDELL

I-40

PROJECT COMPLETE - GARVEE BOND FUNDING $9.76 MILLION; PAYBACK FY 2007 - FY 2018

I-4723 15329 11049MECKLENBURG COUNTY LINE TO EXIT 45. MILL AND RESURFACE.

15.1TRN

NHP 1070CG CG 1070 CG 1070 CG 1070 IREDELL I-77

12-17 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 15: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025INTERSTATE PROJECTS

PLANNING/DESIGN IN PROGRESS - FUNDING FOR I-4750 AA INCLUDED IN I-5405

I-4750 503839 5248SR 5544 (WEST CATAWBA AVENUE - EXIT 28) TO I-40. WIDEN AND RECONSTRUCT ROADWAY.

23 NHP 10500R AB NHP 675U AB NHP 133000C AB NHP 11700R B NHP 16M B NHP 105200C B NHP 17500R C NHP 220000C C

AA SR 5544 (WEST CATAWBA AVENUE - EXIT 28) TO NC 150 (EXIT 36). CONSTRUCT HIGH OCCUPANCY/TOLL (HOT) LANES.AB SR 5544 (WEST CATAWBA AVENUE - EXIT 28) TO NC 150 (EXIT 36). CONSTRUCT ONE ADDITIONAL LANE IN EACH DIRECTION.B NC 150 (EXIT 36) TO NC 115/US 21 (EXIT 42)C NC 115/US 21 (EXIT 42) TO I-40

IREDELLMECKLENBURG

I-77

COMPLETE - GARVEE BOND FUNDING $4 MILLION; CONSTRUCTION - PAYBACK FY 2009-2020

I-5106 6476 3842MILE MARKER 57.83 TO MILE POST 61.74. PAVEMENT REHABILITATION.

3.9TRN

NHP 439CG CG 439 CG 439 CG 439 CG 439 CG 439 IREDELL I-77

UNDER CONSTRUCTION

I-5606 10077 10077EXIT 45 TO EXIT 54, EXCLUDING PROJECT AREA FOR I-3819 A. PAVEMENT REHABILITATION.

9IREDELL I-77

COORDINATE WITH PROJECT R-2307

I-5717 11100NC 150 INTERCHANGE. CONSTRUCT INTERCHANGE IMPROVEMENTS.

SW

NHP R 900 NHP 5100C5100C

IREDELL I-77

I-5773 41002 MILES NORTH OF SR 1001 (OSWALT AMITY ROAD) TO 0.3 MILE NORTH OF SR 2321 (EAST BROAD STREET). PAVEMENT REHABILITATION.

5.5SW

NHPIM C 4100 IREDELL I-77

I-5813 19000.3 MILE NORTH OF SR 2321 (EAST BROAD STREET) TO SR 1892 (JENNINGS ROAD). PAVEMENT REHABILITATION.

5.2SW

NHPIM C 1900 IREDELL I-77

INCLUDES FUNDING FOR I-3311 C AND I-4750 AA - "O" FUNDING IS PUBLIC PRIVATE PARTNERSHIP (PPP) FUNDING CONSISTING OF $216 M TIFIA BONDS, $100 M PRIVATE ACTIVITY BONDS, AND $234 M PRIVATE EQUITY

I-5405 644656 6456I-277 (BROOKSHIRE FREEWAY) TO WEST CATAWBA AVENUE (EXIT 28). CONSTRUCT HIGH OCCUPANCY TOLL (HOT) LANES AND CONVERT EXISTING HIGH OCCUPANCY VEHICLE (HOV) LANES TO HIGH OCCUPANCY TOLL (HOT) LANES.

17

TRN

NHP 2000R CMAQ 13000C NHP 73200C O 550000C

IREDELLMECKLENBURG

I-77

RURAL PROJECTSR-2522 15550CEDAR AVENUE IN TROUTMAN TO SR 1336

IN BARIUM SPRINGS. WIDEN TO MULTI-LANES.

1.6

REG

T 7100R T 850U T C 7600

IREDELL US 21 - NC 115

PLANNING AND DESIGN BY DIVISION

R-5711 1500INTERSECTION OF US 21 AND SR 2375 (HOUSTON ROAD)/SR 1312 (FLOWER HOUSE ROAD). REALIGN AND SIGNALIZE.

REG

T R 250 T U 250 T C 500 500C

IREDELL US 21

PLANNING/DESIGN IN PROGRESS - COORDINATE WITH PROJECT I-5717

R-2307 204270 1920RELOCATED NC 16 (TIP PROJECT R-2206) TO I-77. WIDEN TO MULTI-LANES.

13.6 STP 15300R A R 15300 ASTP 650M A STP 67000C A STP R 8000 B STP U 5600 B STP C 22625 B C 22625 B 22625C B22625C B

A RELOCATED NC 16 (TIP PROJECT R-2206) TO SR 1902 (HARVEL ROAD)REGB SR 1902 (HARVEL ROAD) IN CATAWBA COUNTY TO I-77 IN IREDELL COUNTYREG

CATAWBAIREDELLLINCOLN

NC 150

12-18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 16: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

$890,000 CONTRIBUTION FROM TOWN OF MOORESVILLE

R-3833 126699 117652SR 1177 (CHUCKWOOD ROAD) TO US 21. WIDEN TO MULTI-LANES WITH INTERCHANGE AT I-77.

5.9 STP R 5200 C STP M 147 C STP 2810C C L 890C C

A SR 1177 (CHUCKWOOD ROAD) TO SR 1109 (CENTRE CHURCH ROAD) - COMPLETEB SR 1109 (CENTRE CHURCH ROAD) TO I-77 - COMPLETEC I-77 TO US 21DIV

IREDELL SR 1100BRAWLEY SCHOOLROAD

COORDINATE WITH U-5817

R-5100 24400I-77 TO NC 150. WIDEN TO MULTI-LANES. 3.2

DIV

T R 3000 T U 1100 T 10150C10150C

IREDELL SR 1109(WILLIAMSON ROAD)

PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY - PLANNING BY TOWN OF MOORESVILLE

R-4757 250 250RELOCATION OF ROADWAY IN MOORESVILLE.

IREDELL SR 1206ALCOVE ROAD

URBAN PROJECTSU-5799 16700SR 1933 TO FORT DOBBS ROAD. WIDEN TO

MULTI-LANES AND REALIGN OFFSET INTERSECTIONS OF SR 1922 AND SR 2171.

0.8

REG

T 3200R T 400U T 13100C

IREDELL US 21

U-5779 13700SR 1645 (OLD WILKESBORO ROAD) TO HARTNESS ROAD. WIDEN TO MULTI LANES.

0.9

REG

T R 1250 1250R T U 150 150U T 10900C

IREDELL NC 115

U-5780 930INTERSECTION OF NC 150 AND SR 2399 (WIGGINS ROAD). REALIGN INTERSECTION.

REG

T R 180 T 750C

IREDELL NC 150

COORDINATE WITH R-5100

U-5817 6100EXTEND SR 1246 (FAIRVIEW ROAD) OVER I-77 TO CONNECT WITH SR 1206 (ALCOVE ROAD).

0.1

DIV

T R 1100 T U 200 T 4800C

IREDELL SR 1246 (FAIRVIEWROAD)

U-5816 9600US 21 (CHARLOTTE HIGHWAY) TO SR 1474 (BLUEFIELD ROAD). WIDEN TO THREE-LANES WITH OVERPASS OVER I-77.

1.5

DIV

T R 1500 T U 1000 T 7100C

IREDELL SR 1305 (OATES ROAD- MIDNIGHT LANE)

U-4744 182675STP-DA IN MECKLENBURG-UNION METROPOLITAN PLANNING ORGANIZATION (MUMPO).

DIV

STPDA 11300C C 13605 C 9235 C 14000 C 14000 14000C14000C28000C C 14000 C 14000L 2825C C 3401 C 2309 C 3500 C 3500 3500C3500C7000C C 3500 C 3500

IREDELLMECKLENBURGUNION

VARIOUS

FEDERAL BRIDGE PROJECTSB-4982 3540 240REPLACE BRIDGE NO. 38 OVER THIRD

CREEK.HF

HFB R 300 HFB C 3000

IREDELL US 21/NC 115

B-4766 2856 106REPLACE BRIDGE NO. 69 OVER ROCKY CREEK.

HF

HFB R 250 HFB C 2500

IREDELL NC 115

B-5142 3350 200REPLACE BRIDGE NO. 57 OVER CORNELIUS CREEK.

DIV

STPOFF 300R STPOFF C 2850

IREDELL SR 1302(CORNELIUS ROAD)

12-19 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 17: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

B-5860 440REPLACE BRIDGE NO. 77 OVER THIRD CREEK.

HF

HFB 40R HFB 400C

IREDELL SR 1338(WALLACE SPRINGSROAD)

B-5394 2475REPLACE BRIDGE NO. 279 OVER SOUTH HUNTING CREEK.

HF

HFB R 225 HFB 2250C

IREDELL SR 1832(EAGLE MILLS ROAD)

B-5846 4300REPLACE BRIDGE NO. 189 OVER SOUTH YADKIN RIVER.

DIV

STPOFF 200R STPOFF 2050C2050C

IREDELL SR 1892(JENNINGS ROAD)

B-5859 1160REPLACE BRIDGE NO. 179 OVER CREEK.

DIV

STPOFF R 60 STPOFF C 1100

IREDELL SR 1930(FORT DOBBS ROAD)

B-4767 1485REPLACE BRIDGE NO. 14 OVER WEATHERS CREEK.

HF

HFB R 135 HFB C 1350

IREDELL SR 2382(BRAWLEY ROAD)

B-5843 210REPLACE BRIDGE NO. 20 OVER CREEK.

DIV

STPOFF R 10 STPOFF 200C

IREDELL SR 2402(HOOVER ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5112 18735 16735DIVISION 12 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4912 14330 14330ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 12 PROJECT MITIGATION.

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5212 4445 4445DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

CONGESTION MITIGATION PROJECTSC-5201 2250NC 115 IN MOORESVILLE, MECKLENBURG

COUNTY LINE TO NORMAN AVENUE. CONSTRUCT FOUR FOOT BIKE LANES ALONG BOTH SIDES.

EX

CMAQ C 1800 L C 450

IREDELL NC 115

UNDER CONSTRUCTION

C-5132 611 611NC 150-TALBERT ROAD IN MOORESVILLE. INTERSECTION IMPROVEMENT.EX

IREDELL NC 150

12-20 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 18: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025CONGESTION MITIGATION PROJECTS

IN PROGRESS

C-5536 500 500MECKLENBURG COUNTY AIR QUALITY -GRADE (GRANTS TO REPLACE AGING DIESEL ENGINS). REPLACE, REPOWER OR RETROFIT AGING DIESEL VEHICLES AND EQUIPMENT.

EX

CABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANUNION

CHARLOTTE

IN PROGRESS

C-5530 207 207MECKLENBURG COUNTY AIR QUALITY -GRADE (GRANTS TO REPLACE AGING DIESEL ENGINS). REPLACE, REPOWER OR RETROFIT AGING DIESEL VEHICLES AND EQUIPMENT.

EXIREDELL IREDELL COUNTY

C-5531 429KISTLER FARM-BRIARCLIFF-BELLINGHAM-WHITE OAK SIDEWALK NETWORK IN MOORESVILLE. CONSTRUCT SIDEWALKS IN VARIOUS LOCATIONS.

EX

CMAQ C 343 L C 86

IREDELL MOORESVILLE

C-5529 1346 114INTERSECTION OF NC 115 AND FAITH ROAD-CAMPUS LANE IN MOORESVILLE. REALIGN FAITH ROAD TO TIE INTO EXISTING NC 115/CAMPUS LANE INTERSECTION AND CONSTRUCT DEDICATED TURN LANES ON FAITH ROAD AND CAMPUS LANE APPROACHES TO THE INTERSECTION.

EX

CMAQ R 32 L R 11 CMAQ C 892 L C 297

IREDELL MOORESVILLE

C-5528 350INTERSECTION OF NC 150 AND TALBERT ROAD IN MOORESVILLE. CONSTRUCT RIGHT TURN LANE ON SOUTHBOUND APPROACH.

EX

CMAQ C 280 L C 70

IREDELL MOORESVILLE

C-5200 1295 74NC 115 AND NC 150 IN MOORESVILLE. CONSTRUCT SOUTHBOUND NC 115 RIGHT TURN LANE AT NC 150 AND WESTBOUND NC 150 SHARED THROUGH-RIGHT LANE AT NC 115.EX

CMAQ R 92 L R 29 CMAQ C 836 L C 264

IREDELL MOORESVILLE

UNDER CONSTRUCTION

C-5153 799 799MAGNOLIA AVENUE-FIELDSTONE NEIGHBORHOOD IN MOORESVILLE. CONSTRUCT SIDEWALK NETWORK.EX

IREDELL MOORESVILLE

ROADSIDE ENVIRONMENTAL PROJECTS (REST AREA)

RIGHT OF WAY IN PROGRESS

K-4908 18350 1250I-77, NEW REST AREA PAIR ON NEW LOCATION TO REPLACE TWO EXISTING PAIRS. ONE IN IREDELL COUNTY (LAKE NORMAN) AND THE OTHER AT THE IREDELL-YADKIN COUNTY LINE. TO IMPROVE SPACING AND REDUCE MAINTENANCE COST.

TRN

NHP 8550C C 8550 IREDELL I-77

RURAL PROJECTSR-5712 930INTERSECTION OF NC 16 BUSINESS AND SR

1439 (UNITY CHURCH ROAD)/SR 1387 (TRIANGLE CIRCLE). ADD TURN LANES.REG

T R 180 T 750C

LINCOLN NC 16 BUSINESS

PLANNING/ENVIRONMENTAL DOCUMENT TO BE COMPLETED UNDER PROJECT R-5721

R-5710 930INTERSECTION OF NC 73 AND NC 16 BUSINESS. INTERSECTION IMPROVEMENTS.

REG

T 180R T 750C

LINCOLN NC 73

12-21 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 19: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

R-5721 64430NC 16 BUSINESS IN LINCOLN COUNTY TO SR 5544 (WEST CATAWBA AVENUE) IN MECKLENBURG COUNTY. WIDEN TO MULTI-LANES.

9.1 T 5500R A T 2600U A T 18100C A C 9050 A C 9050 AT 3600R B T 430U B T C 16100 B

A NC 16 BUSINESS TO VANCE ROAD EXTENSION/BEATTIES FORD ROAD.REGB VANCE ROAD EXTENSION/BEATTIES FORD ROAD TO SR 5544 (WEST CATAWBA AVENUE).REG

LINCOLNMECKLENBURG

NC 73

PLANNING/DESIGN IN PROGRESS - COORDINATE WITH PROJECT I-5717

R-2307 204270 1920RELOCATED NC 16 (TIP PROJECT R-2206) TO I-77. WIDEN TO MULTI-LANES.

13.6 STP 15300R A R 15300 ASTP 650M A STP 67000C A STP R 8000 B STP U 5600 B STP C 22625 B C 22625 B 22625C B22625C B

A RELOCATED NC 16 (TIP PROJECT R-2206) TO SR 1902 (HARVEL ROAD)REGB SR 1902 (HARVEL ROAD) IN CATAWBA COUNTY TO I-77 IN IREDELL COUNTYREG

CATAWBAIREDELLLINCOLN

NC 150

FEDERAL BRIDGE PROJECTSB-5850 1980REPLACE BRIDGE NO. 44 OVER RELIEF.

HF

HFB 180R HFB 1800C

LINCOLN NC 150

B-4571 3856 6REPLACE BRIDGE NO. 7 OVER INDIAN CREEK.

HF

HFB R 350 HFB C 3500

LINCOLN NC 182

UNDER CONSTRUCTION

B-4176 3231 3231REPLACE BRIDGE NO. 118 OVER CLARK CREEK.

DIV

LINCOLN SR 1008(NORTH GROVE STREET)

B-5853 2420REPLACE BRIDGE NO. 71 OVER INDIAN CREEK.

HF

HFB 220R HFB 2200C

LINCOLN SR 1168(JOHNSTOWN ROAD)

UNDER CONSTRUCTION

B-5155 1122 1122REPLACE BRIDGE NO. 37 OVER HOYLE CREEK.

DIV

LINCOLN SR 1314(LOW BRIDGE/WILLSCHRONCE)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5112 18735 16735DIVISION 12 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4912 14330 14330ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 12 PROJECT MITIGATION.

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

HAZARD ELIMINATION PROJECTS

UNDER CONSTRUCTION

W-4712 2980 2980EAST OF NC 150 TO SR 1354. WIDEN TO PROVIDE CONTINUOUS LEFT TURN LANE.

LINCOLN NC 27

12-22 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 20: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5212 4445 4445DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

CONGESTION MITIGATION PROJECTS

IN PROGRESS

C-5536 500 500MECKLENBURG COUNTY AIR QUALITY -GRADE (GRANTS TO REPLACE AGING DIESEL ENGINS). REPLACE, REPOWER OR RETROFIT AGING DIESEL VEHICLES AND EQUIPMENT.

EX

CABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANUNION

CHARLOTTE

UNDER CONSTRUCTION

C-5149 287 287CLONINGER RAIL TRAIL EXTENSION IN LINCOLNTON.EX

LINCOLN LINCOLNTON

C-5532 582GENERAL BOULEVARD-MAIN STREET PEDESTRIAN IMPROVEMENTS IN LINCOLNTON. CONSTRUCT HIGH VISIBILITY CROSSWALKS, PEDESTRIAN REFUGE ISLANDS AND INSTALL COUNTDOWN TIMERS.

EX

CMAQ 70PE L 18PE CMAQ R 20 L R 5 CMAQ C 375 L C 94

LINCOLN LINCOLNTON

12-23 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 21: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

COUNTY ID

FUTURE YEARS

F

RR - Rail-Highway SafetyRTAP - Rural Transit Assistance ProgramS - State I - ImpementationS (M) - State Match O - OperationsSMAP - Operating Assistance and State Maintenance Oc - OPS Funded CapitalSRTS - Safe Routes to School PE - Preliminary EngineeringSTAT - State PL - Planning / DesignSTHSR - Stimulus High Speed Rail R - Right-of-WaySTPDA - Surface Transportation Program - Direct AttributableSTPE - Surface Transportation Program, EnhancementsSTPEB - Surface Transportation Program, Enhancements (Bike)T - State Highway Trust FundsT2001 - State Rail FundsTAP - Transportation Alternatives ProgramTIGER DISC - TIGER Discretionary Grants

HP - Federal-Aid High PriorityJARC - Job Assistance and Reverse Commute (3037)

(1) FUNDING CATEGORY

DURHAM AREA

SR - Secondary Road

TRANSIT PARTNERROUTE / CITY /

NUMBER

TA-4738

LOCATION / DESCRIPTION

PASSENGER AMENITIES - BUS STOP TRANSIT AUTHORITY

DIV

SHELTERS, BENCHES, SHOP EQUIPMENTSPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.

CP

BUS STOP SHELTER AND BENCHES LOCATED AT HOLLOWAY STREET

ESTIMATED COST Preliminary engineering, right of

C10000

dollars.)

of a project segment indicates (Cash-Flow Funding)Mitigation, Utilities or Construction.

way, utility, mitigation and construction cost estimates

(2) FUNDING SOURCES KEY

O - OtherL - Local

initial scheduled year. (Estimates are in thousand of

For other work types or activities see Work Type (Activity) box below.

work description. CPProject termini and a general

conception and remains with

9000

PROJECT BREAKS

CP

Various - multiple routes

A

5000

FY 2022

C

CP 3000CP

BCP 5000 B

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FY 2023 FY 2024FY 2021

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2020

TOTAL PROJECT

COST (THOU)

FUZFUZ

FUN

DS

A

PRIOR YEARS COST

(THOU)

ACP 700

FY 2015 FY 2016

4000CP

FY 2025

5000

BB

CP CP 5000B

UNFUNDED

NON HIGHWAY PROGRAM

ADIV

FY 2017 FY 2018

BSHOP EQUIPMENT, SPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.

WORK TYPE (ACTIVITY) (3)Phases of implementation:

DIV C

20000

COMMITMENTSFUTURE

by funding category in current dollars. Cost may include one or more funding types. Multi-year funding

Preliminary engineering, Right of Way, UNFUNDED

BUS STOP SHELTER AND BENCHES LOCATED AT GREGSON AVENUE

with proposed work type or activity beginning in the

break.

One or two letter

CP

A

for an explanation of funding categories

FUNDING CATEGORY (1)

DIV

DIVISION 00

DEVELOPMENTAL PROGRAM

DURHAM

FY 2019

TRANSIT PARTNERROUTE / CITY /

NEW ROUTE or CityTRANSIT PARTNER

IDENTIFICATION NUMBER Assigned to each project at

US or NC RoutesI - Interstate

project until completion.

C - City

FEPD - Elderly and Persons with Disablity (5310)

FMOD - Fixed Guideway Modifications

designation for project

any project breaks.Category for the project and

LOCATION / DESCRIPTION

used for each project phase.

FUNDING SOURCE (2)

Identifies the "STI" Funding

See Highway Funding Key

FSPR - State Planning and Research

FNF - New Freedom ProgramFNS - New Starts - Capital (5309)

FMPL - Metropolitan Planning (5303)

FED - Federal Rail Funds

FLAP - Federal Lands Access Program

FUZ - Urbanized Area Formula Program (5307)

CMAQ - Congestion Mitigation

FF - Federal Ferry

FNU - Non Urbanized Area Formula Program (5311)

(3) WORK TYPE (ACTIVITY)

C - ConstructionAD - Administrative

CP - Capital

A - AcquisitionHF - State Dollars (Non-STI)REG - RegionalSW - Statewide

DIV - Division

DP - Discretionary or DemonstrationFBUS - Capital Program - Bus Earmark (5309)

Page 22: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

NON HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025BICYCLE AND PEDESTRIAN PROJECTS

U-5546 3575GREATER HICKORY MPO TRANSPORTATION ALTERNATIVES (TA) PROGRAM.

DIV

TAP 60R R 20 R 20 R 20 R 20 R 20 20R20R20R R 20 R 20L 15R R 5 R 5 R 5 R 5 R 5 5R5R5R R 5 R 5TAP 600C C 200 C 200 C 200 C 200 C 200 200C200C200C C 200 C 200L 150C C 50 C 50 C 50 C 50 C 50 50C50C50C C 50 C 50

ALEXANDERBURKECALDWELLCATAWBA

VARIOUS

PUBLIC TRANSPORTATION PROJECTSTA-6556 339CAPITAL

HF

FNU 271CP L 34CP S 34CP

ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TA-6501 908 402REPLACEMENT VAN

HF

FNU 46CP CP 138 CP 92 CP 46 CP 46 46CP46CP46CP ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TG-4774 738 238ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC

HF

FUZ 100CP CP 50 CP 50 CP 50 CP 50 CP 50 50CP50CP50CP ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TG-6159 392 192ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC

HF

FNU 40CP CP 20 CP 20 CP 20 CP 20 CP 20 20CP20CP20CP ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

see amendment #2 to 2012-2018 STIP apv'd by BOT in March 2012

TG-4774A 5925 925PREVENTIVE MAINTENANCE

HF

FUZ 1000Oc Oc 500 Oc 500 Oc 500 Oc 500 Oc 500 500Oc500Oc500Oc ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TG-6142A 121 43ROUTINE CAPITAL - SERVICE VEHICLE

HF

FNU CP 39 39CP ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

see amendment #2 to 2012-2018 STIP apv'd by BOT in March 2012

TG-4774B 1463 353OPERATING ASSISTANCE - ADA PARATRANSIT SERVICE

HF

FUZ 222Oc Oc 111 Oc 111 Oc 111 Oc 111 Oc 111 111Oc111Oc111Oc ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TK-5181 4976 1426ADMINISTRATION

HF

FNU 710O O 355 O 355 O 355 O 355 O 355 355O355O355O FNU

ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TM-6108 2638 798OPERATING ASSISTANCE - NON-URBAN

HF

JARC 368O O 184 O 184 O 184 O 184 O 184 184O184O184O ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

12-27 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 23: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

NON HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TA-6507 2934 634REPLACEMENT - LIGHT TRANSIT VEHICLE

HF

FNU 460CP CP 230 CP 230 CP 230 CP 230 CP 230 230CP230CP230CP ALEXANDERBURKECALDWELLCATAWBA

TRANSPORTATION ADMIN.

TA-4928 1086EXPANSION BUS

HF

FUZ 362CP CP 362 362CP ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TA-4929 812 164REPLACEMENT VAN

HF

FUZ 108CP CP 108 CP 108 108CP108CP108CP ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

see March 2012-2018 BOT approval

TA-4927 1434 157REPLACEMENT BUS

HF

FUZ 557CP CP 180 CP 180 CP 180 180CP ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TA-4928B 122EXPANSION - LIGHT TRANSIT VEHICLE - CMAQ APP#HU5

HF

CMAQ 122CP ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TN-6109 390 90OPERATING ASSISTANCE - SMALL-URBAN

HF

FNF 60O O 30 O 30 O 30 O 30 O 30 30O30O30O ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

see amendment #2 of 2012-2018 STIP BOT apvd March 2012

TO-4733 26830 6254OPERATING ASSISTANCE

HF

FUZ 4964O O 2796 O 2796 O 2796 O 1046 O 1046 1046O1000O1046O SMAP 408O O 204 O 204 O 204 O 204 O 204 204O204O204O

ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TO-6109 2586 626OPERATING ASSISTANCE

HF

FNU 392O O 196 O 196 O 196 O 196 O 196 196O196O196O ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TP-5106 553 157PLANNING ASSISTANCE - 5303

HF

FMPL 84CP CP 42 CP 42 CP 42 CP 42 CP 42 34CP34CP34CP ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTCOUNCILOF GOVERNMENTS

TP-4733A 2281 811PLANNING ASSISTANCE

HF

FUZ 420CP CP 210 CP 210 CP 210 CP 210 CP 210 ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

12-28 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 24: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

NON HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TP-4733B 681 331PLANNING ASSISTANCE

HF

FUZ 100CP CP 50 CP 50 CP 50 CP 50 CP 50 ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TQ-6503 137 33PREVENTIVE MAINTENANCE - PARATRANSIT

HF

FEPD 22Oc Oc 11 Oc 11 Oc 11 Oc 11 Oc 11 9Oc9Oc9Oc ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TQ-6507 792 207OPERATING ASSISTANCE - ELDERLY AND DISABLED PERSONS

HF

FEPD 138O O 69 O 69 O 69 O 69 O 69 34O34O34O ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TS-5128 279 107SAFETY & SECURITY

HF

FUZ 54CP CP 24 CP 24 CP 23 CP 23 CP 24 ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

AVIATION PROJECTSAV-5752 600LAND ACQUISITION AND OBSTRUCTION

REMOVAL.

DIV

T 540R O 60R

CATAWBA HICKORY REGIONALAIRPORT (HKY)

AV-5741 3844600 FEET EXTENSION OF RUNWAY 6 - PHASE I AND II.

DIV

T C 3460 O C 384

CATAWBA HICKORY REGIONALAIRPORT (HKY)

BICYCLE AND PEDESTRIAN PROJECTSU-5546 3575GREATER HICKORY MPO TRANSPORTATION

ALTERNATIVES (TA) PROGRAM.

DIV

TAP 60R R 20 R 20 R 20 R 20 R 20 20R20R20R R 20 R 20L 15R R 5 R 5 R 5 R 5 R 5 5R5R5R R 5 R 5TAP 600C C 200 C 200 C 200 C 200 C 200 200C200C200C C 200 C 200L 150C C 50 C 50 C 50 C 50 C 50 50C50C50C C 50 C 50

ALEXANDERBURKECALDWELLCATAWBA

VARIOUS

EB-5752 1966ROCK BARN ROAD TO I-40. DECREASE ROADWAY FROM 4-LANES TO 2-LANES AND ADD LANDSCAPED MEDIAN AND BICYCLE LANES.

5.5

DIV

TAP 245PE L 61PE TAP C 1328 L C 332

CATAWBA 1ST STREET

EB-5750 96009TH STREET NW TO 7TH AVENUE NE IN HICKORY. CONSTRUCT GREENWAY WITH PARK NODES AND BRIDGE SPANNING NC 127.

1.2

DIV

TAP 7680C L 1920C

CATAWBA MAIN AVENUEGREENWAY

PUBLIC TRANSPORTATION PROJECTSTQ-6175 500OPERATING ASSISTANCE - PURCHASE OF

SERVICE

HF

FEPD 400CP L 50CP S 50CP

CATAWBA CATAWBA COUNTY DEPTSOCIAL SERVICES

TQ-6808 150CAPITAL PURCHASE OF SERVICE

HF

FEPD CP 120 L CP 30

CATAWBA CATAWBA COUNTY DEPTSOCIAL SERVICES

12-29 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 25: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

NON HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TI-6101 8823 2512INTERCITY BUS - BOONE TO CHARLOTTE

HF

FNU 1543O O 596 O 596 O 596 O 596 O 596 596O596O596O CALDWELLCATAWBALINCOLNMECKLENBURGWATAUGA

COACH AMERICA

TA-6501 908 402REPLACEMENT VAN

HF

FNU 46CP CP 138 CP 92 CP 46 CP 46 46CP46CP46CP ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TA-6556 339CAPITAL

HF

FNU 271CP L 34CP S 34CP

ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TG-4774 738 238ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC

HF

FUZ 100CP CP 50 CP 50 CP 50 CP 50 CP 50 50CP50CP50CP ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TG-6159 392 192ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC

HF

FNU 40CP CP 20 CP 20 CP 20 CP 20 CP 20 20CP20CP20CP ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

see amendment #2 to 2012-2018 STIP apv'd by BOT in March 2012

TG-4774A 5925 925PREVENTIVE MAINTENANCE

HF

FUZ 1000Oc Oc 500 Oc 500 Oc 500 Oc 500 Oc 500 500Oc500Oc500Oc ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TG-6142A 121 43ROUTINE CAPITAL - SERVICE VEHICLE

HF

FNU CP 39 39CP ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

see amendment #2 to 2012-2018 STIP apv'd by BOT in March 2012

TG-4774B 1463 353OPERATING ASSISTANCE - ADA PARATRANSIT SERVICE

HF

FUZ 222Oc Oc 111 Oc 111 Oc 111 Oc 111 Oc 111 111Oc111Oc111Oc ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TK-5181 4976 1426ADMINISTRATION

HF

FNU 710O O 355 O 355 O 355 O 355 O 355 355O355O355O FNU

ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TM-6108 2638 798OPERATING ASSISTANCE - NON-URBAN

HF

JARC 368O O 184 O 184 O 184 O 184 O 184 184O184O184O ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

12-30 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 26: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

NON HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TA-6549 162CAPITAL - REPLACEMENT VEHICLES

HF

FEPD 130CP L 16CP S 16CP

CATAWBA THE MENTAL HEALTH FUND

TA-6507 2934 634REPLACEMENT - LIGHT TRANSIT VEHICLE

HF

FNU 460CP CP 230 CP 230 CP 230 CP 230 CP 230 230CP230CP230CP ALEXANDERBURKECALDWELLCATAWBA

TRANSPORTATION ADMIN.

see March 2012-2018 BOT approval

TA-4927 1434 157REPLACEMENT BUS

HF

FUZ 557CP CP 180 CP 180 CP 180 180CP ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TA-4928 1086EXPANSION BUS

HF

FUZ 362CP CP 362 362CP ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TA-4929 812 164REPLACEMENT VAN

HF

FUZ 108CP CP 108 CP 108 108CP108CP108CP ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TA-4928B 122EXPANSION - LIGHT TRANSIT VEHICLE - CMAQ APP#HU5

HF

CMAQ 122CP ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TN-6109 390 90OPERATING ASSISTANCE - SMALL-URBAN

HF

FNF 60O O 30 O 30 O 30 O 30 O 30 30O30O30O ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TO-6109 2586 626OPERATING ASSISTANCE

HF

FNU 392O O 196 O 196 O 196 O 196 O 196 196O196O196O ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

see amendment #2 of 2012-2018 STIP BOT apvd March 2012

TO-4733 26830 6254OPERATING ASSISTANCE

HF

FUZ 4964O O 2796 O 2796 O 2796 O 1046 O 1046 1046O1000O1046O SMAP 408O O 204 O 204 O 204 O 204 O 204 204O204O204O

ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TP-5106 553 157PLANNING ASSISTANCE - 5303

HF

FMPL 84CP CP 42 CP 42 CP 42 CP 42 CP 42 34CP34CP34CP ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTCOUNCILOF GOVERNMENTS

12-31 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 27: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

NON HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TP-4733A 2281 811PLANNING ASSISTANCE

HF

FUZ 420CP CP 210 CP 210 CP 210 CP 210 CP 210 ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TP-4733B 681 331PLANNING ASSISTANCE

HF

FUZ 100CP CP 50 CP 50 CP 50 CP 50 CP 50 ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TQ-7003 22SECTION 5310 PROGRAM ADMINISTRATION

HF

FEPD AD 22 CATAWBA WESTERN PIEDMONTREGIONAL TRANSPORTATION

TQ-6503 137 33PREVENTIVE MAINTENANCE - PARATRANSIT

HF

FEPD 22Oc Oc 11 Oc 11 Oc 11 Oc 11 Oc 11 9Oc9Oc9Oc ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TQ-6507 792 207OPERATING ASSISTANCE - ELDERLY AND DISABLED PERSONS

HF

FEPD 138O O 69 O 69 O 69 O 69 O 69 34O34O34O ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

TS-5128 279 107SAFETY & SECURITY

HF

FUZ 54CP CP 24 CP 24 CP 23 CP 23 CP 24 ALEXANDERBURKECALDWELLCATAWBA

WESTERN PIEDMONTREGIONAL TRANSPORTATION

BICYCLE AND PEDESTRIAN PROJECTS

PROJECT TO BE ADMINISTERED BY CLEVELAND COUNTY - FEDERAL LANDS ACCESS PROGRAM (FLAP) PROJECT

EB-5546 620CONSTRUCT SEGMENT OF GATEWAY TRAIL FROM GALILEE CHURCH ROAD TO BETHLEHEM ROAD. FEDERAL AID NUMBER NC FLAP CLVND TRL(1)

3.1

EX

FLAP 496C L 124C

CLEVELAND CLEVELAND COUNTY

PUBLIC TRANSPORTATION PROJECTSTA-6538 452CAPITALHF

FNU 452CP CLEVELAND TRANSPORTATION ADMIN.

TA-6290 REPLACEMENT VANHF

CLEVELAND TRANSPORTATION ADMIN.

TK-6166 4165 1175ADMINISTRATION

HF

FNU 598O O 299 O 299 O 299 O 299 O 299 299O299O299O FNU

CLEVELAND TRANSPORTATION ADMIN.

BICYCLE AND PEDESTRIAN PROJECTSEB-5701 490SR 2200 (COX ROAD) TO CITY LIMITS.

CONSTRUCT MISSING SIDEWALK ON NORTH SIDE.

1.5

DIV

SRTS 45PE L 145R SRTS C 300

GASTON US 29/74 (EAST FRANKLINBOULEVARD)

EB-5749 200NC 273 (HIGHLAND STREET) TO EAST BANK OF CATAWBA RIVER. IMPLEMENT ROAD DIET TO ACCOMMODATE CONSTRUCTION OF ON-STREET BIKE FACILITIES.

1.1

DIV

TAP 160C L 40C

GASTONMECKLENBURG

NC 27 (EASTCHARLOTTE AVE)

EB-5746 610SR 2044 (TUCKASEEGE ROAD) TO ROSE STREET. CONSTRUCT SIDEWALKS ON BOTH SIDES OF ROAD.

1.3

DIV

TAP 488C L 122C

GASTON NC 273 (SOUTHMAIN STREET)

12-32 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 28: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

NON HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025BICYCLE AND PEDESTRIAN PROJECTS

EB-5772 592EAST 4TH AVENUE TO NC 7 (LONG AVENUE). ADD BIKE FACILITIES, IMPROVE SIDEWALKS, AND MAKE BIKE/PEDESTRIAN IMPROVEMENTS TO INTERSECTIONS.

0.6

DIV

TAP 62PE L 15PE TAP C 412 L C 103

GASTON NC 274/BROAD STREET

EB-5702 458US 29/74 (EAST FRANKLIN BOULEVARD) TO NC 7 (EAST OZARK AVENUE). CONSTRUCT MISSING SIDEWALK ON ONE SIDE OF ROAD.

1.3

DIV

SRTS PE 53 L R 55 SRTS C 350

GASTON NC 279 (NORTH NEWHOPE ROAD)

EB-5743 475SR 2200 (ARMSTRONG PARK ROAD) TO SR 1255 (EAST HUDSON BOULEVARD). CONSTRUCT MISSING SIDEWALKS ON BOTH SIDES OF ROAD, ADDRESS ADA COMPLIANCE OF EXISTING SIDEWALK, AND MAKE PEDESTRIAN IMPROVEMENTS TO INTERSECTIONS.

1.1

DIV

TAP 49PE L 12PE TAP 331C L 83C

GASTON NC 279 (SOUTHNEW HOPE ROAD)

EB-5745 330SR 1255 (HUDSON BOULEVARD) FROM SR 2200 (GASTON DAY SCHOOL ROAD) TO SR 2466 (REDBUD DRIVE). SR 2466 (REDBUD DRIVE) FROM SR 1255 (HUDSON BOULEVARD) TO NC 279 (SOUTH NEW HOPE ROAD). CONSTRUCT MISSING SIDEWALK ON ONE SIDE.

1.2

DIV

TAP 34PE L 8PE L 12R TAP 221C L 55C

GASTON SR 1255 (HUDSON BLVD)SR 2466 (REDBUD DR)

EB-5706 361I-85 TO COURT DRIVE. CONSTRUCT MISSING SIDEWALK ON BOTH SIDES.

0.6

DIV

SRTS PE 38 L R 73 SRTS C 250

GASTON SR 2200 (COX ROAD)

EB-5713 160CONSTRUCT PEDESTRIAN IMPROVEMENTS AT THE INTERSECTION OF WILKINSON BOULEVARD AND LAKEWOOD ROAD, WILKINSON BOULEVARD AND MARKET STREET, AND EIGHTH AVENUE AND MARKET STREET.

1

DIV

SRTS PE 21 SRTS C 139

GASTON VARIOUS

EB-5748 319SMITH STREET TO FERSTL AVENUE. CONSTRUCT SIDEWALK ON ONE SIDE.

0.3

DIV

TAP 34PE L 8PE TAP 222C L 55C

GASTON BEATY ROAD

EB-5531 30012TH STREET, CHADWICK COURT TO KAISER ROAD AND YELLOW JACKET LANE/BESS TOWN ROAD, 12TH STREET TO 14TH STREET (NC 274). CONSTRUCT SIDEWALKS.

TRN

STPEB 300C GASTON BESSEMER CITY

EB-5535 760LAKEWOOD PARK TRAIL, LAKEWOOD PARK TO US 29/US 74. CONSTRUCT 10 FEET WIDE TRAIL.TRN

STPEB 760C GASTON CRAMERTON

EB-5533 875POSTON PARK TO SOUTH FORK RIVER GREENWAY. CONSTRUCT TRAIL.TRN

STPEB 875C GASTON GASTONIA

EB-5534 410CATAWBA CREEK GREENWAY EXTENSION, FERGUSON PARK TO DOWNTOWN. CONSTRUCT GREENWAY.TRN

STPEB 410C GASTON GASTONIA

EB-5771 394MCARVER STREET; MOUNTAIN VIEW SREET; MCARVER STREET TO GAIL AVENUE; HENDERSON STREET; SOUTH YORK ROAD. CONSTRUCT SIDEWALK ON ONE SIDE.

0.4

DIV

TAP 40PE L 10PE L R 14 TAP C 264L C 66

GASTON HENDERSON STEET;MCARVER STREET;MOUNTAIN VIEW STREET

EB-5114 800MOUNT HOLLY RIVERFRONT GREENWAY. 1.7

TRN

STPEB 640C S(M) 160C

GASTON MOUNT HOLLY

12-33 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 29: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

NON HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025BICYCLE AND PEDESTRIAN PROJECTS

EB-5751 420SR 2278 (SOUTH MARIETTA STREET) TO SR 1131 (LINWOOD ROAD). CONSTRUCT BIKE FACILITIES AND MISSING SIDEWALK.

1.4

DIV

TAP 44PE L 11PE TAP C 292 L C 73

GASTON SECOND AVENUE

EB-5767 195SOUTH CHESTNUT STREET TO SOUTH BELVEDERE AVENUE. CONSTRUCT BIKE FACILITIES AND MISSING SIDEWALK.

0.3

DIV

TAP 20PE L 5PE L 6R TAP C 131 L C 33

GASTON SECOND AVENUE

EB-5768 336DIXON CIRCLE; HILLTOP DRIVE TO GARDNER STREET; HUDSON BOULEVARD. CONSTRUCT MISSING SIDEWALK ON ONE SIDE.

0.5

DIV

TAP 34PE L 8PE L 17R TAP C 222 L C 55

GASTON SOUTH MARIETTA STREET/HILLTOP DRIVE; GARDNERSTREET

EB-5769 242WEST AIRLINE AVENUE TO NORTH FIRESTONE STREET. CONSTRUCT SIDEWALK.

0.5

DIV

TAP 25PE L 6PE L R 6 TAP C 164L C 41

GASTON WEST WALNUTAVENUE

PUBLIC TRANSPORTATION PROJECTSTQ-6171 490MOBILITY MANAGEMENT

HF

FEPD 400CP L 40CP S 50CP

ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION

CENTRALINA COUNCIL OFGOVERNMENTS

TA-6113 815 353CAPITALHF

FNU 462CP GASTON GASTON COUNTY ACCESS

TK-6128 3272 933ADMINISTRATION

HF

FNU 467O O 234 O 234 O 234 O 234 O 234 234O234O234O FNU

GASTON GASTON COUNTY ACCESS

TA-5138 1225BUS REPLACEMENT (3 BUSES)

HF

FUZ 980CP L 123CP S 122CP

GASTON GASTONIA TRANSIT

TA-5137 20SUPERVISOR'S VEHICLE REPLACEMENT

HF

FUZ CP 16 L CP 2 S CP 2

GASTON GASTONIA TRANSIT

TA-5136 160ADA VAN REPLACEMENT (3 VANS)

HF

FUZ 128CP L 16CP S 16CP

GASTON GASTONIA TRANSIT

TA-4926 2984 500EXPANSION BUSHF

FUZ 1242CP CP 1242 GASTON GASTONIA TRANSIT

12-34 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 30: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

NON HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

see Amendment #1 to 2012-2018 STIP

TD-5253 750FACILITY - PARK & RIDE - GASTON MULTIMODAL TRANSPORTATION CENTERHF

CMAQ 750CP GASTON GASTONIA TRANSIT

TD-5254 750 250FACILITY - PARK & RIDE - GASTON EXP BETWEEN BELMONT AND CHARLOTTEHF

CMAQ 500CP GASTON GASTONIA TRANSIT

TD-5270 344GASTONIA TRANSIT

HF

FUZ 275CP L 69CP

GASTON GASTONIA TRANSIT

TG-5117 3751 708ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC

HF

FUZ 601CP CP 379 CP 383 CP 386 CP 390 CP 226 226CP226CP226CP GASTON GASTONIA TRANSIT

see amendment #2 2012-2018 STIP, March 2012 BOT apvd

TG-5117A 6375 700PREVENTIVE MAINTENANCEHF

FUZ 1125OC OC 505 OC 510 OC 515 OC 520 OC 625 625OC625OC625OC GASTON GASTONIA TRANSIT

see amendment #2 2012-2018 STIP, March 2012 BOT apvd

TG-5117B 6536 800ADA SERVICEHF

FUZ 754OC OC 383 OC 1084 OC 390 OC 625 OC 625 625OC625OC625OC GASTON GASTONIA TRANSIT

TO-5142 16673 3428OPERATING ASSISTANCE

HF

FUZ 2078O O 1055 O 1065 O 1076 L 2078O O 1055 O 1065 O 1076 SMAP 537O O 272 O 275 O 278 O 267 O 267 267O267O267O

GASTON GASTONIA TRANSIT

added per FY 2011 allocations

TP-5115 336 56PLANNING ASSISTANCEHF

FMPL 56CP CP 28 CP 28 CP 28 CP 28 CP 28 28CP28CP28CP GASTON GASTONIA TRANSIT

TS-5110 242 38SAFETY & SECURITY - MIN. 1% SET ASIDEHF

FUZ 50CP CP 25 CP 26 CP 26 CP 25 CP 25 2CP5CP20CP GASTON GASTONIA TRANSIT

TD-4704C 1000FACILITY - PARK & RIDE - CATS X85 CITY OF BELMONT (CMAQ APP GA-11)

HF

CMAQ 1000CP GASTON CHARLOTTE AREATRANSIT SYSTEM

PASSENGER RAIL PROJECTSP-5200 8476 6976RAIL CORRIDOR BETWEEN GASTONIA AND

MOUNT HOLLY INCLUDING THE BELMONT SPUR. REACTIVATION OF RAIL CORRIDOR.

STPE 900C D STPE 240C EA T2001 60C EA STPE 240C EB T2001 60C EB

A CROSSING SIGNAL CONSTRUCTION - COMPLETEB CROSSING SIGN/PAVEMENT MARKING INSTALLATION - COMPLETEC RAIL TRACK CONSTRUCTION ENGINEERING OVERSIGHT - COMPLETED BELMONT SPURTRNEA THRIFT DEPOT RELOCATION - RIGHT OF WAY IN PROGRESSTRNEB THRIFT DEPOT STABILIZATIONTRN

GASTONMECKLENBURG

PIEDMONT ANDNORTHERNRAILROAD

BICYCLE AND PEDESTRIAN PROJECTSU-5544 19500CHARLOTTE REGIONAL TRANSPORTATION

PLANNING ORGANIZATION (CRTPO) TRANSPORTATION ALTERNATIVES (TA) PROGRAM.

DIV

TAP 300R R 100 R 100 R 100 R 100 R 100 100R100R100R R 100 R 100L 75R R 25 R 25 R 25 R 25 R 25 25R25R25R R 25 R 25TAP 3300C C 1100 C 1100 C 1100 C 1100 C 1100 1100C1100C1100C C 1100 C 1100L 825C C 275 C 275 C 275 C 275 C 275 275C275C275C C 275 C 275

IREDELLMECKLENBURGUNION

VARIOUS

EB-5530 480OLD MOUNTAIN ROAD, NORTH MAIN STREET TO SOUTH IREDELL HIGH SCHOOL IN TROUTMAN. CONSTRUCT SIDEWALK ON SOUTH SIDE OF ROAD.

TRN

STPEB 480C IREDELL TROUTMAN

EB-5532 430SR 2551 (OLD MURDOCK ROAD) TO SR 2335 (MOOSE CLUB ROAD). CONSTRUCT 10 FEET WIDE GREEWAY.TRN

STPEB 430C IREDELL TROUTMAN

12-35 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 31: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

NON HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TQ-6171 490MOBILITY MANAGEMENT

HF

FEPD 400CP L 40CP S 50CP

ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION

CENTRALINA COUNCIL OFGOVERNMENTS

TA-6528 207CAPITAL

HF

FEPD 165CP L 21CP S 21CP

IREDELL IREDELL COUNTY

TA-6128 730 244CAPITALHF

FNU 486CP IREDELL IREDELL COUNTY

TK-6136 1300 780ADMINISTRATIONHF

FNU 520AD IREDELL IREDELL COUNTY

TK-6179 3120 520ADMINISTRATIONHF

FNU 520O O 260 O 260 O 260 O 260 O 260 260O260O260O IREDELL IREDELL COUNTY

TM-6152 200OPERATING

HF

JARC 100O L 100O

IREDELL IREDELL COUNTY

TM-6134 350OPERATING ASSISTANCE

HF

JARC 175O L 175O

IREDELL IREDELL COUNTY

TQ-6795 200OPERATING

HF

FEPD 100O L 100O

IREDELL IREDELL COUNTY

TQ-6176 250OPERATING ASSISTANCE

HF

FEPD 125O L 125O

IREDELL IREDELL COUNTY

AVIATION PROJECTSAV-5755 176LAND ACQUISITION FOR RUNWAY 5

APPROACH.

DIV

T 158R O 18R

LINCOLN LINCOLNTON-LINCOLNCOUNTY AIRPORT (IPJ)

AV-5753 295OBSTRUCTION REMOVAL IN RUNWAY 5 APPROACH.

DIV

T 266R O 29R

LINCOLN LINCOLNTON-LINCOLNCOUNTY AIRPORT (IPJ)

PUBLIC TRANSPORTATION PROJECTSTQ-6171 490MOBILITY MANAGEMENT

HF

FEPD 400CP L 40CP S 50CP

ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION

CENTRALINA COUNCIL OFGOVERNMENTS

TI-6101 8823 2512INTERCITY BUS - BOONE TO CHARLOTTE

HF

FNU 1543O O 596 O 596 O 596 O 596 O 596 596O596O596O CALDWELLCATAWBALINCOLNMECKLENBURGWATAUGA

COACH AMERICA

12-36 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 32: Division 12 - NCDOT Division 12 Alexander Catawba Cleveland Gaston Iredell Lincoln STATE TRANSPORTATION IMPROVEMENT PROGRAM

NON HIGHWAY PROGRAMDIVISION 12

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TA-6112 658 308CAPITALHF

FNU 350CP LINCOLN LINCOLN COUNTY

TK-6141 3061 876ADMINISTRATION

HF

FNU 433O O 219 O 219 O 219 O 219 O 219 219O219O219O FNU

LINCOLN LINCOLN COUNTY

TQ-9004 50CAPITAL - PURCHASE OF SERVICE

HF

FEPD 40CP L 5CP S 5CP

LINCOLN LINCOLN SENIOR SERVICES

12-37 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project