10
Disk testing - status

Disk testing - status

  • Upload
    don

  • View
    29

  • Download
    0

Embed Size (px)

DESCRIPTION

Disk testing - status. Disk Test Setup. we use similar setup as the one used for sector tests, only simplified (no C6F14 cooling system, no source test, no thermo cycling) it is based on TPLL, TPCC, SURF board, ISEG HV (8 channels) running TurboDAQ & Ambush - PowerPoint PPT Presentation

Citation preview

Page 1: Disk testing - status

Disk testing - status

Page 2: Disk testing - status

Disk Test Setup

• we use similar setup as the one used for sector tests, only simplified (no C6F14 cooling system, no source test, no thermo cycling)

it is based on TPLL, TPCC, SURF board, ISEG HV (8 channels) running TurboDAQ & Ambush

• Power supplies are not GPIB controlled

• cable length of ~20ft (6m) does not cause any problem so far…

(TPCC-SURF board, LV, HV, USB)

• at this moment we test only 1 module on the sector but it could be

extended if more sophisticated cooling ensured (air flow fan-out)

Page 3: Disk testing - status

First sector (9017) mounted on the disk

Page 4: Disk testing - status

Air flow cooling – bottom view

Page 5: Disk testing - status

Testing – reduced set of sector tests

Following tests have been used (so far):

• SRAM digital scan

• DFIFO digital scan

• Column pair digital scan

• Threshold scan (HV=150V)

• Threshold scan (antikill mode)

• Crosstalk scan

We skipped HV I-V scan, source scan,…

We use module configuration files created at significantly lower temp (~16 degr.C) and our tests are done at temperature ~28 degr.C however doesn’t seem to be a problem

Page 6: Disk testing - status

NTC Temperature - Cooling of 1 powered module at the sector (no HV)

10

15

20

25

30

35

40

45

0 10 20 30 40 50 60Time [min]

Tem

p [d

egr.

C]

start-up (module configured)air flow 50ft3/h

flow reduced to 25ft3/h

valve closed

high current state after Th scan

IR1

IR2

Page 7: Disk testing - status

NTC= 29 degr.C

IR1 image – cooling applied (air flow ~50ft3/h)

Page 8: Disk testing - status

NTC= 35 degr.C

IR2 image – no cooling applied (valve closed)

Page 9: Disk testing - status

Disc ID: TOP modules 20212000019017

Note Category Test Group Units

A

T (ºC) 16.8 15.6 28.0 16.5 16.7 28.0 18.5 16.8 28.0I (uA) 26.3 11.7 0.0 14.7 23.0 0.0 0.7 0.7 0.0

NTC T (ºC) 20.0 18.7 28.0 19.7 19.1 28.0 23.6 19.5 28.0Digital bad pixel No. 0 0 0 0 0 0 0 0 0ANA_BAD No. 6 6 6 45 45 45 52 55 57DISC_BAD No. 0 0 0 0 0 0 0 0 0XTALK_BAD No. 1 0 0 2 2 2 0 0 5

Analog bad pixel No. 7 6 6 47 47 47 52 55 62TOTAL BAD PIXELS No. 7 6 6 47 47 47 52 55 62Average noise e 194 194 196 198 198 200 193 194 195Threshold dispersion e 68 63 58 73 82 59 64 66 60

Qual Data Summary of Disk Assembly: Electrical Test

M3

510217AMS

M2

511494AMS

M1

510558AMS

B

BURN/LOAD/DISKC

Module ID

BURN/LOAD/DISK

Module Type (AMS / IZM)

Sensor I_ leakage @ 150 V

Disc ID:BOTTOM modules 20212000019017

Note Category Test Group Units

A

T (ºC) 16.7 16.6 28.0 16.8 18.8 28.0 16.6 16.1 28.0I (uA) 0.2 0.3 0.0 0.6 0.6 3.7 15.7 11.7 0.0

NTC T (ºC) 21.0 20.0 28.0 21.5 21.7 28.0 23.6 19.0 28.0Digital bad pixel No. 0 0 0 1 1 1 0 0 0ANA_BAD No. 0 0 0 109 109 109 3 4 4DISC_BAD No. 0 0 0 0 0 0 0 0 0XTALK_BAD No. 0 0 0 0 0 0 6 6 6

Analog bad pixel No. 0 0 0 109 109 109 9 10 10TOTAL BAD PIXELS No. 0 0 0 110 110 110 9 10 10Average noise e 204 202 202 198 198 200 190 189 192Threshold dispersion e 98 99 94 84 93 78 83 87 85

511448

M6

AMS

M4

511355IZM

M5

510648AMS

B

BURN/LOAD/DISKC

Module ID

BURN/LOAD/DISK

Module Type (AMS / IZM)

Sensor I_ leakage @ 150 V

Test results of sector 9017 (top and bottom modules separately)

Page 10: Disk testing - status

Next steps

• air flow cooling seems to be sufficient way to keep modules at safe

temperature during testing however the cooling setup should be

improve to ensure operation without risk of module damage

• ISEG (HV PS) does not seem to be reliable – communication with

PC frequently hanging (fortunately HV stays ON), after restarting of

PC is needed…

• we have to check carefully HV current @150V (has not been done

due to ISEG problems)

• in principal, we are ready to move the setup to bldg.77 (clean room)