Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Capitol Professional’s Academy
DIPLOMA IN MEP BUILDING CONSTRUCTION ENGINEERING
2016
DIPLOMA IN ELECTRICAL BUILDING CONSTRUCTION ENGINEERING Todays World is in the hands of construction industries,that hold’s together for a better
substantial journey.Construction as an industry comprises six to nine percent of the gross
domestic product of developed countries. In this fast moving construction nature , most of our
companies are hiring for trained professionals around the globe than non trained
professionals. Around 40% of the total project value belongs to MEP department that’s brings
an importance of this course.
Diploma in MEP Building Construction Engineering covers the full design and analysis of
Mechanical Building Services (HVAC, Plumbing and Fire Fighting sectors) and Electrical
Building Services. This course comprises entire process in construction industry starting from
design, drafting, Estimation, procurement and site training.. The major design softwares used
are Carrier HAP, Mc Quay Duct Sizer, RELux ,CGLux , ANIXTER, BUSBAR etc and Estimation
softwares like PLANSWIFT. We have been conducting training on custom made HVAC,
Electrical, Plumbing and Fire fighting site labs and site visit also. We also provide tailor made
training for specific areas of technology
Module 1- INTRODUCTION TO ELECTRICAL FUNDAMENTALS
Module 2- WIRING AND CABLE MANAGEMENT SYSTEMS
Module 3- LIGHTING MANAGEMENT SYSTEM
Module 4- POWER DISTRIBUTION SYSTEM
Module 5- EARTHING & LIGTINING PROTECTION SYSTEM, TRANSFORMERS &
GENERATORS (HT)
Module 6- ELECTRICAL DESIGN CALCULATIONS
Module 7- ELECTRICAL SYSTEM DRAUGHTING (CAD)
Module 8- INTRODUCTION TO HVAC
Module 9- HVAC DESIGN & DRAFTING
Module 10- INTRODUCTION OF PLUMBING
Module 11- PLUMBING DESIGN & DRAFTING
Module 12- FIRE FIGHTING DESIGN, DRAFTING
Module 13 - MEP ESTMATION & PROCUREMENT
Module 14- PROJECT MANAGEMENT
Module 15- SITE TRAINING
TECHNOLOGY PARTNERS
DETAILED SYLLABUS
INTRODUCTION TO ELECTRICAL FUNDAMENTALS MODULE:1 a) ELECTRICITY - DEFINITION, UNITS, & SYMBOLS b) BASICS & IMPORTANCE OF ELECTRICITY c) ELECTRICAL CODES & STANDARDS. d) GENERATION, TRANSMISSION & DISTRIBUTION SYSTEM e) INTRODUCTION TO ELECTRIC MOTOR, DRIVES, STARTERS ETC.
WIRING AND CABLE MANAGEMENT SYSTEMS MODULE: 2 a) RULES & REGULATIONS. b) TYPES & SELECTION OF WIRING SYSTEMS c) APPLICATIONS AND SELECTION OF SWITCHES & SOCKETS. d) APPLICATIONS AND SELECTION OF WIRES AND CABLES. e) STANDARD HEIGHTS OF MOUNTING ACCESSORIES. f) LOAD SCHEDULE & LOAD BALANCING. g) SELECTION OF MCB DISTRIBUTION BOARDS h) LIGHTING POWER CIRCUIT WIRING DIAGRAM i) CONDUIT LAYOUT DIAGRAM
LIGHTING MANAGEMENT SYSTEM MODULE: 3 a) LIGHTING SCHEMES. b) LIGHTING LOAD ESTIMATION AND DESIGNING OF LIGHTING PANEL. c) TYPES AND APPLICATION OF LUMINARIES. d) LIGHTING DESIGNING OF AUDITORIUMS AND THEATERS e) LIGHTING DESIGNING FOR INTERIOR DECORATION AND LANDSCAPE.
f) EMERGENCY LIGHTING SYSTEM. POWER DISTRIBUTION SYSTEM MODULE: 4
a) TYPES & SELECTION OF CIRCUIT BREAKERS. b) IMPORTANCE & APPLICATION OF VCB, ACB, MCCB & MCB c) RESIDUAL CURRENT DEVICES d) ISOLATORS AND SDF (SWITCH DISCONNECTING FUSE) e) CAPACITORS, RESISTOR AND REACTORS. f) SELECTION OF AMF (AUTOMATIC MAIN FAILURE) & APFC (AUTOMATIC POWER FACTOR
CORRECTION) PANEL g) UNDER GROUND CABLE TYPE & SELECTION. h) LT PANEL BOARD DESIGN. i) COORDINATION WITH HVAC, PLUMBING, FIREFIGHTING, MECHANICAL SYSTEMS LIKE
CHILLERS, j) AHU, FCU, WATER AND DRAINAGE PUMPS, FIREFIGHTING PUMPS ETC. k) SWITCHGEARS-TYPES AND SELECTION.
l) UPS & INVERTERS. EARTHING & LIGTINING PROTECTION SYSTEM MODULE: 5
a) EARTHING SYSTEMS (TYPES METHOD AND INSTALLATION). b) LIGHTNING PROTECTION SYSTEMS.
TRANSFORMERS & GENERATORS (HT) a) TYPES AND SELECTIONS.
b) INSTALLATION - RULES AND REGULATIONS. c) PARALLEL OPERATION OF TRANSFORMERS AND GENERATORS. d) INTERNAL CONNECTIONS & TESTING.
ELECTRICAL DESIGN CALCULATIONS MODULE: 6 a) CALCULATING THE TOTAL POWER REQUIREMENTS b) CIRCUIT BREAKER SELECTION & DESIGN CALCULATIONS.. c) RCBO/ELCB SELECTION & DESIGN CALCULATIONS.. d) BRANCH & MAIN FEEDER CABLE SIZING, SELECTION & CALCULATION. e) DETERMINING CABLE TRAYS AND TRENCHES. f) BUSBAR SELECTION AND DESIGN. g) EARTHING CABLE SELECTION AND DESIGN. h) TOTAL CONNECTED LOAD & MAXIMUM DEMAND CALCULATION BASED ON DIVERSITY
FACTOR. i) LOAD DISTRIBUTION SCHEDULE & LOAD BALANCING CALCULATIONS. j) TRANSFORMER SELECTION & DESIGN CALCULATIONS. k) GENERATOR SELECTION & DESIGN CALCULATIONS. l) CAPACITOR BANK SELECTION. m) UPS SELECTION & DESIGN CALCULATIONS. n) BATTERY SELECTION & DESIGN CALCULATION. o) VOLTAGE DROP CALCULATIONS. p) FAULT LEVEL CALCULATIONS. q) PREPARATION OF SCHEMATIC DIAGRAM (ONE LINE DIAGRAM) - RESIDENTIAL, HIGH RISE, r) COMMERCIAL AND INDUSTRIAL BUILDINGS. s) INTRODUCTION TO STRUCTURAL t) INTRODUCTION TO HVAC & SEWAGE TREATMENT PLANT
ELECTRICAL SYSTEM DRAUGHTING (CAD) MODULE: 7 a) BASICS OF ELECTRICAL CAD.
b) PREPARATION OF LIGHTING, POWER, COMMUNICATION AND EARTHING LAYOUT. c) PREPARATION OF SCHEMATIC DIAGRAMS. d) PHYSICAL LAYOUT OF TRANSFORMERS, GENERATORS & PANEL BOARDS. e) PREPARATION OF GENERAL INSTALLATIONS AND SECTIONS f) SCHEMATIC DRAWINGS
INTRODUCTION TO HVAC MODULE:8 a)SCOPE OF HVAC IN CONSTRUCTION INDUSTRY b)HEATING, VENTILATION, AIR CONDITIONING, REFRIGERATION c)TYPES OF HEAT TRANSFER, REFRIGERATION CYCLES, d)TYPES OF COMPRESSORS, CONDENSORS, EXPANSION VALVE, EVAPORATORS e)TYPES OF REFRIGERANTS f)TYPES OF AIR CONDITIONING SYSTEMS LIKE LOCAL COOLING SYSTEMS (WINDOW A/C, SPLIT A/C, MULTI SPLIT LIKE DUCTABLE A/C, PACKAGE UNITS, VRF/VRV) AND CENTRALISED AIR CONDITIONING LIKE AIR COOLED AND WATER COOLED SYSTEMS. g)STUDY OF AHU, FAHU, CHILLER PRIMARY AND SECONDARY PUMPS, TYPES OF VALVES,CHILLER PIPING, AIR OUTLETS ETC h)STUDY OF DUCTS, TYPES OF DUCTS, INSULATION, HANGERS AND SUPPORTS ETC i)INTRODUCTION TO VENTILATION SYSYTEMS, FANS ETC j)STUDY ON PSYCHOMETRIC CHARTS
HVAC DESIGNING MODULE :9 a) LOAD CALCULATION USING E20 MANUAL CALCULATION b) VENTILATION AND INFILTRATION LOAD CALCULATION c) PARKING, KITCHEN, TOILET VENTILATION DESIGN d) DUCT SIZING METHODS USING EQUAL FRICTION METHODS, VELOCITY REDUCTION METHODS e) HEAT LOAD CALCULATION USING HOURLY ANALYSIS PROGRAMME (HAP). b)CALCULATION OF DUCT SIZES USING Mc QUAY DUCT SIZER, CHILLED WATER PIPE SIZE USING Mc QUAY PIPE SIZER, AIR TERMINAL SELECTION BY BETA SOFTWARE. c)PUMP HEAD CALCULATION AND ESP CALCULATION USING DUCTULATOR SOFTWARE. d)AIR TERMINAL SELECTION e)SELECTION OF MATERIALS OF DUCTS f)PRIMARY AND SECONDARY PUMP SELECTION g)SELECTION OF CHILLERS, AHU ETC h)AHU , FCU CLASSIFICATION AND SELECTION i)PACKAGE UNIT AND DX UNIT SELECTION
HVAC DRAFTING a)INTRODUCTION TO DRAFTING USING AUTOCAD b)STUDY AND PREPARATION OF SHOP DRAWINGS, BUILDERS WORK DRAWING c)STUDY AND PREPARATION OF VENTILATION DRAWINGS, RISER DRAWINGS ETC d)DETAIL STUDY OF CO-ORDINATION DRAWINGS, SECTIONAL DRAWINGS e)CHILLED WATER PIPE DRAWING
INTRODUCTION TO PLUMBING MODULE: 10 a)STUDY OF WATER SUPPLY SYSTEM LIKE COLD WATER SUPPLY ,HOT WATER SUPPLY AND WATER SUPPLY MATERIALS. b)STUDY OF DRAINAGE SYSTEM LIKE WASTE PIPE, SOIL PIPE, VENT PIPE,RAIN WATER PIPE AND DRAINAGE PIPE MATERIALS ETC. c)STUDY OF PIPE FITTINGS, SANITARY FIXTURE, JOINING METHODS, VALVES, SUPPORTS ETC. d)STUDY OF SANITARY AND VENTING SYSTEM LIKE TWO PIPE SYSTEM, ONE PIPE SYSTEM, VENT SYSTEM
PLUMBING DESIGN & DRAFTING MODULE: 11 a)REQUIREMENTS OF WATER SUPPLY b)ESTIMATE TOTAL WATER DEMAND c)WATER STORAGE AND PLUMBING CALCULATION d)PIPE SIZING USING Mc QUAY PIPE SIZER e)PUMP HEAD CALCULATION f)INTRODUCTION TO DRAFTING USING AUTOCAD,STUDY AND PREPARATION OF SHOP DRAWINGS, BUILDERS WORK DRAWING RISER DRAWINGS, SCHEMATIC DRAWINGS ETC
h)DETAIL STUDY OF CO-ORDINATION DRAWINGS, SECTIONAL DRAWINGS i)ENLARGE FLOOR PLAN OF TOILET, KITCHEN, PUMP ROOM ETC
FIRE FIGHTING MODULE: 12 a)INTRODUCTION TO FIRE FIGHTING. b)CLASSIFICATION OF FIRE (DESCRIPTION) c) FIRE EXTINGUISHER TYPES- USING PROCEDURE and GENERAL MAINTENANCE d) FIRE PROTECTION SYSTEMS 1)ACTIVE 2)PASSIVE e)FIRE SUPRESSION & DETECTION SYSTEMS 1. Sprinklers – Type, Selection & Designing
COURSE DURATION
2. Detectors – Type, Selection & Detection f)FIRE HOSE CABINET & FIRE HYDRANT SELECTION g)PIPE SELECTION & SIZING h)CONCEPT OF WET RISER & DRY RISER i)DESIGN OF OVERHEAD & UNDER GROUND FIRE TANK SIZING j)FIRE PUMPS (MAIN PUMP, JOCKEY PUMP & DIESEL PUMP) CLASSIFICATION, TYPES & SELECTION. k)DESIGN OF FIRE PROTECTION SCHEMATIC LAYOUTS l)FM 200 SYSTEM DESIGN (WATER LESS FIRE PROTECTION SYSTEMS) m)FIRE ALARM SYSTEM DESIGNING
ESTIMATION MODULE:13 a)ESTIMATION OF TWO PROJECTS MANUALY AND USING PLANSWIFT SOFTWARE b)CLEAR STUDY OF TENDER DOCUMENTS LIKE SPECIFICATION, BOQ, DRAWINGS c)TAKING QUANTITY OF LIGHTING,POWER,ELV,CABLES, AIR OUTLETS, PIPES , PUMPS, INSULATIONS, SUPPORTS, VALVES, GAUGES, FANS, AIR CONDITIONING EQUIPMENTS , WATER SUPPLY PIPES, DRAINAGE PIPES, VALVES, FITTINGS, MANHOLES , FIRE FIGHTING PUMPS, SPRINKLERS ETC d)PREPARING BOQ FROM QUOTATIONS ETC
PROCUREMENT a)PREPARATION OF MATERIAL SUBMITTALS, SHOP DRAWING SUBMITTALS, TYPES OF APPROVALS b)PREPARATION OF PURCHASE ORDER, LETTER OF INTENT, LETTER OF CREDIT ETC
PROJECT MANAGEMENT MODULE: 14 SITE TRAINING MODULE: 15
a)TRAINING FOR STUDENTS IN CUSTOM MADE HVAC, PLUMBING, ELECTRICAL SITE LABS. b)ON GOING SITE VISIT
FULL TIME
DURATION: 6 MONTHS
QUALIFICATION:MTECH/BTECH /DIPLOMA
PART TIME
DURATION:8 MONTHS
QUALIFICATION:MTECH/BTECH/DIPLOMA
TECHNOLOGY PARTNERS
Capitol Professional’s Academy
Address1, Address2