Construction Phase
Consultant
Project Management Team refer also to Consultant or Site Consultant
They do Site Supervision-surveillance or official Site Inspection
Preside Construction Meeting
Decide and Govern the Construction Project
Construction Phase
Project Manager
Each Trade or Each Contractor has a
Project Manager, as he is the team
leader or the chief superior, accountable
to the whole project of their scope of
work.
Construction Phase
Project Manager
Each Trade or Each Contractor has a
Project Manager, as he is the team
leader or the chief superior, accountable
to the whole project of their scope of
work.
Whenever they send letter it is his name is
under it.
Construction Phase
Project Manager Responsibilities
Ensure that all projects are delivered on-time, within scope and within budget
Ensure resource availability and allocation
Develop a detailed project plan to track progress
Use appropriate verification techniques to manage changes in project scope, schedule and costs
Measure project performance using appropriate systems, tools and techniques
Report and escalate to management as needed
Manage the relationship with the client and all stakeholders
Perform risk management to minimize project risks
Establish and maintain relationships with third parties/vendors
Create and maintain comprehensive project documentation
Construction Phase
Site Engineer
Site Engineer is responsible to implement
what is in the approved drawing, he must
capable to understand Drawing and how it
will be implemented in site during
installation period. He deals with the
foreman, worker, supplier (for product
information and delivery date). He then
report to his Project Manager to discuss
status of the project progress etc.
Construction Phase
Site Engineer - Key tasks of the job include: managing parts of construction projects
overseeing building work
undertaking surveys
setting out sites and organising facilities
checking technical designs and drawings to ensure that they are followed correctly
supervising contracted staff
ensuring projects meet agreed specifications, budgets or timescales
liaising with clients, subcontractors and other professional staff, especially quantity surveyors and the overall project manager
providing technical advice and solving problems on site
preparing site reports and filling in other paperwork
liaising with quantity surveyors about the ordering and negotiating the price of materials
ensuring that health and safety and sustainability policies and legislation are adhered to
Construction Phase
QC Engineer
To check and ensure that the work done is as per Project Specification, Method Statement and as per approved shop drawings. Also to ensure that all approved and Inspected materials are used.
To raise NCR and initiate corrective action if the work done is not as per Specification, Method Statement or as per approved shop drawing.
Make internal inspection and after verifying the work done, raise Inspection for client/consultant Inspection.
Construction Phase
Foreman
A foreman typically occupies the first supervisory tier, ranking above workers but below managers. The jobtitle is most often found in the construction, manufacturing and repair industries. Exact dutiesdepend on the industry involved, the employer and theforeman's training or experience
Construction Phase
Labor
Construction labor- has a great role in construction, they are the doer
and the one who implement work at site, both quality and progress
depend on their skill
Construction Phase
Consultant
Consultants are the experts in their field, and are paid to give their opinion. Working in a variety of different fields, consultants spend their time learning everything
Management consultants help organisationsto solve issues, create value, maximisegrowth and improve business performance. They use their business skills to provide objective advice and expertise and help an organisation to develop any specialist skills that it may be lacking.
Construction Phase
Consultant
Review and Approve Shop Drawing
Respond to Contractor, Client
Respond Construction Document such as RFI, Letters etc.
Evaluate actual Site condition for client report or billing purpose
Resolve any related issue to construction
Raise Non Conformance Report
Attend Inspection for Approval
Consultant Capabilities Can recommend termination manpower or contract
Evaluate addition and deduction as per Change Order○ By Non Conformance Report
○ From RFI confirmation action
Other management strategy that will working environment on site
Construction Phase
Tools
Tools is another factor, If you have enough man power in site but
without tools is inefficient
Common Issue with Tool shortage
1. Safety Tools
2. Shortage of Common Tools
3. Electrical Provision
4. Lifting Tools like crane, fork lift etc/
5. Mismanagement of tools
6. Misusage of tools
Construction Phase
MachineMachine is like a tools that is very much necessary. It is one difficult challenge to improvise
machine in a limited space
MEP work sometimes require sufficient sufficient fabrication area where they could also be
prone for damage. Sometimes special Method Statement is neccesary to guide the
work
Construction Phase
Share of WorkAnother complicated issue
in the site is share of work, imagine if all workers working on the same are. Project Manager shall be very tactical on how they will manage to place their worker. Eventhough it is hard to avoid such issue.
Proper Hand Over has to be manage and be respected
Not only at site even in preparation of Drawing such as Coordination drawing, Reflected ceiling plan where massive cooperation, supports from superiors-pm, and harmonous work, respect are highly required.
Construction Phase
Scope of Work
Each Position has a specific scope of work,
however people has to be flexible especially if
the contractor company has a limited personel.
Both Manager and Subordinates has a clear
arrangement to avoid conflict, mistake, failure
and even fatal accident.
Construction Phase
Documentation – RFI (Request for
Information
Information from the client, designer, project
management has the authority to approve.
However everything has to be put on paper
in order to organize work. In all work
actually. RFI is not only doubts and
clarification. It is also to formalize any
decision in site to ensure everything is
traceable lead to proper management
Construction Phase
Documentation – Inspection Request
Inspection request is an informative document of any progress in site even delivery of Materials.
Composition of IR
1. IR Form
2. ITP Document -
3. Inspection Checklist
4. Approved Method Stated (optional)
5. Approved Shop Drawing
6. Detail drawing (if required)
7. Others
Note: All attachement are depend on the consultants requirement, there is no clear standard but commonly above are the common
Construction Phase
Documentation – Inspection Request
Sample of Inspection Request
Take note that Forms and Document shall be as per Quality
Management System Manual
Construction Phase
Documentation – Inspection Request
Component of IR Form
1. Inspection Date
2. Drawing No.
3. Work Title
4. People Involve PM, Site, QC, Surveyor
5. Revision number
6. Comment Section
7. Inspection Request Number
8. Others please specify
Construction Phase
Documentation –NCR Non Conformance Report
Other Site issue document
QAN-Quality
FON Field Observation Notice
QSO Quality Site Observation
NCN Non Compliance Notice
This is an offense ticket about wrong technicality in site. This has to be close btrework, rectification,
Construction Phase
Duct Installation1. Marking in site
2. Quantify as per site – Length and quantity of duct
Construction Phase
Duct Installation
3. All for offset will be fabricated later for
adjustment and alignment
Construction Phase
Typical Issue
Space Consumption
In Plant Room
Shaft
Ceiling Height
Roof
Redesign that cause reinstallation
Delay on Delivery of Material
Construction Phase
Solution on Issue during Construction Phase
1. Reliable Planning Schedule
2. Ensure that people are respecting the date given are sufficient
3. Good Project Management
- A good manager capable to associates it members and affiliate to the project goal.
- Expertise of Consultant to manage work
- Expertise of Site Engineer to control his Manpower and foreman to uphold good workmanship
- Excellent QC to present his document
- Cooperative Designer to help resolve the issue
4. Project Staff are complete to do the Job. There is QC, Site, Safety, Foreman, Document Controller etc. and ensure they function accordingly.
5, Method Statement, Installation detail from the Submittals and Other Site Procedures are strictly followed,
6. Proper Tools are being used
7. Compliance to Safety Requiement
Construction Phase
Closure of NCR
1. Set a Meeting
2. Carry out corrective action:
3. Inspection of corrective actionPREVENTIVE ACTIONS PROPOSED
Site Engineers have been instructed to check and see to it after shuttering of such item of works if it is safe, stable and prepared enough to cast the concrete in it in order to prevent such cited non-conformances to be happened again.
.
PREVENTIVE ACTIONS INITIATED: Foreman and Chargehand are deeply instructed by the site management to enforce thorough inspection within their respective areas of assignment so that there would not be any non-conformances to be noticed
QA/QC engineer are also making inspection for the their works pertaining to shuttering ensures that shutters are tightly supported with strut and strong enough to receive concrete, resist vibration and other factor that cause bulging of concrete.
Site engineer, who have the responsibility to verify and see to it that the work of his workmen are correct as per detailed drawing for carpentry or others.
If the inspection request is approved, the NCR is most likely to be closed. The closed NCR will
then go to document controller to log and update the revisions if it is in revision status. As a
QA/QC Engineer you will then update your own register of NCR.
Construction Phase
Snaglist or
A punch list is a document prepared near the end of a construction project listing work not conforming to contract specifications that the contractor must complete prior to final payment. The work may include incomplete or incorrect installations or incidental damage to existing finishes, material, and structures.
Construction Period
During Construction Period Contractor willreceive the Design Drawing, Specification andother related document and when the Budget andConstruction Cost is settle
Entity
1. Consultant – Site Supervisor
2. Designer – Guide and clarify Design
Others
3. Main Contractor
4. Supplier
5. Subcontractor