7/27/2019 Digsilent Evento Bifasico Rural
http://slidepdf.com/reader/full/digsilent-evento-bifasico-rural 1/1
100 1000 10000[pri.A]0,01
0,1
1
10
100
1000
[s]
100 1000
24,90 kV
69,00 kVTerminal\Cub_1\RURAL SEPSA DDI069\Cub_2\B300
DDI069\Cub_2\B301 Transformer Damage Curve
RURAL SEPSAIEC Norm. Inv.Ipset: 0,20 sec.ATpset: 0,05
RURAL SEPSAIpset: 0,60 sec.ATset: 0,00 s
B301IEC Inv.Ipset: 4,70 sec.ATpset: 0,10
B300IEC Inv.Ipset: 6,25 sec.ATpset: 0,20
Transformer Damage CurveSrat: 7,50 MVAuk: 7,58 %Ipeak: 12,00/0,10 s
I =1703,918 pri.A
0.366 s
0.865 s
I =1475,636 pri.A
0.000 s
SELECTIVIDAD DE PRTOECCIONES EVENTO BIFASICO RURAL
΄ INCORPORACION DEL TRANSFORMADOR T - 3 "WEG" SUBESTACION DON DIEGO
Date: 04/09/2013
Annex: 11
D I g S I L E N T