33
Introducing the Next Wave! Diesel Operation Overview

Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Introducing the Next Wave!

Diesel Operation Overview

Page 2: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Overview

• Review Tsunami2 Diesel sound sets

• Set up sound roster and Dynamic Digital Exhaust (DDE)

• Highlight lesser-known functions in decoder

• Show how these functions relate to the prototype

Page 3: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Review Tsunami2 Diesel Sound Sets

• Tsunami2 diesel sound sets feature up to 9 prime movers per decoder.

• These decoders are divided by 4 major manufacturers: • EMD

• EMD-2

• GE

• ALCO

• Baldwin & Others

• Each diesel decoder has a common sound set of 44 airhorns, 14 bells (with a total of 50 ring rate options) dynamic brakes, independent and train brake sounds, fuel loading, cab chatter, and Fireman Ed sounds.

Page 4: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Review Tsunami2 Diesel Sound Sets

• EMD Prime Movers• 8-Cylinder 567 Non turbo, non transition notch (Ideal for small switchers- SW

& NW)

• 16-Cylinder 567 Non turbo, transition notch (Ideal for early F Units & Geeps)

• 567D Turbo (GP20, GP30, & GP35)

• Dual 567 (E Units)

• 645 Non turbo (GP38, GP38-2)

• 16-Cylinder 645 Turbo (F40, SD40, SD40-2, GP40)

• Dual 645 Turbo (DD-40AX)

• 16-Cylinder 710 Turbo (SD60, SD70 & SD90)

• 16-Cylinder 710 G3T2 (SD70 ACe)

Page 5: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Review Tsunami2 Diesel Sound Sets

• EMD-2 Prime Movers• 12-Cylinder 567 Non turbo, non transition notch (SW and NW switchers)

• 16-Cylinder 567C Non turbo, transition notch (early F Units & Geeps)

• 12-Cylinder 645E Non turbo (GP15, MP-15, SW-1000, SW1500)

• 12- Cylinder 645E Turbo (GP-39, GP-49)

• 16-Cylinder 645F Turbo (EMD 50-Series)

• 20-Cylinder 645E Turbo (EMD 45 Series)

• 12-Cylinder 710G Turbo (F59PHI)

• 16-Cylinder 710G (GP 60)

Page 6: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Review Tsunami2 Diesel Sound Sets

• GE Prime Movers• FDL12 (U-23 and other export models)• FDL16 (U-25, 28, 30B/C, 33B/C, 36B/C, Dash 7 &

Dash 8 series) • 7FDL16 (Dash 9 series, AC4400, Amtrak P40/42)• Dual FDL16 (U-50)• GEVO G12 (Evolution “ES” series)• GEVO G12T4 (Evolution “ES” Tier 4 series)• 44 Ton Center Cab Dual Caterpillar• GE Cummins (GE 70 Tonners, GE 45 tonners

and other small industrial switchers

Page 7: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Review Tsunami2 Diesel Sound Sets

• ALCO Prime Movers• ALCO 539 Turbo (HH series, DL series, S-2, S-4, S-12, RS-1 & RS-13)

• ALCO 539 Non Turbo ( S-1, S-3)

• ALCO 244 Turbo (PA, FA/B series, RS/C-2 & 3, RS/D-4 & 5)

• ALCO 251 i6 (S-5,S-6, S-13, RS-23 & exports)

• ALCO 251C v12 #1 (RS-11, RSD-12, RS-18 & FP-4 series)

• ALCO 251C v12 Super Charged (RS-32)

• ALCO 251C v12 #2 (C/M420 series)

• ALCO 251C v16 (C425, RS-27, RS-17 & C/M424 series)

• ALCO 251F v16 Super Charged (C/M636 series, C430 & C/M630 series)

Page 8: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Review Tsunami2 Diesel Sound Sets

• Baldwin and Other Prime Movers• Baldwin VO (VO-660 & VO-1000)• Baldwin 608NA (DS-4-4-1000, DR-6-4-2000 & DT-6-6-200)• Baldwin 608A (AS-16, AS-416, AS-616 & RF-16 “Sharks”) • Baldwin 606NA (DS-4-4-660, DS-4-4-750 & DRS-6-4-750)• Rio Grande Southern Galloping Goose (other motor cars)• Dual Whitcomb (also applicable to other small engine

industrial locomotives)• Fairbanks-Morse (H10-44, H12-44 & others)• UP “Turbine” GTEL (4-Versions) • NRE GenSet (1, 2, 3 GenSet Versions!)

Page 9: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Set up sound selections, set operation CVs and calibrate Dynamic Digital Exhaust

Page 10: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Tsunami2 Sound Selection

Diesel: • Select Air horn - CV 120

• Select Bell - CV 122• (0-49, +128 to enable Grade-Crossing Logic bell)

• Select Prime Mover - CV 123• Pitch shift in CV 223 (V1.2)

• Select Air Compressor - CV 124

• Select air dryer or poppet valve CV 125 (V1.2)

• Select Coupler - CV 126

Page 11: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

CV 112- Sound Configuration 1

• Used to Select Sound Setup• E-Stop Prime mover reaction, idle or shutdown

• Low-Pressure Alarm Bell Enable

• Gen Select• Steam generator

• Aux diesel HEP

• True Idle Enable

Page 12: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

CV 114- Engine Exhaust Control

• Used to control the prime mover sound effects• Auto notching rate can be changed to allow for more or less speed steps per

prime mover notch.• It is recommended to set the auto notch rate to 15 for a smoother response of the

Dynamic Digital Exhaust.

• If auto notching rate is set to 0, manual notching is enabled and the RPM+/RPM- (default F5 & F6 keys) are used to control prime mover notch

• Prime Mover Interlock bit

• Auto-Start bit

• Dynamic Brake override bits• 4 modes of operation: no change to PM, EMD (idle), ALCO (N8), & SP (N4)

Page 13: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Calibrate Dynamic Digital Exhaust

• Run the model for at least 2 minutes before starting the process

• Set CV 32 = 2 to access the second index (location of the DDE CVs)

• On a flat, level track without any load behind the loco, perform the following steps:• With model at speed step 1, set CV 2.503 = 255

• Increase to speed step 25-30 (of 128)

• When model reaches that speed, set CV 2.504 = 255

• Adjust CV 2.512 to your liking to further tune the prime mover’s response to changes in load or grade. Set CV 2.512 = 32

Page 14: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

RPM+ & RPM-

• F5 (RPM+) is used to start the prime mover and increase the notch

• F6 (RPM-) is used to shut down the prime mover or decrease the notch

• Can be used with auto notching enabled and DDE to adjust the notch up or down as desired

• F10 Straight to Notch 8

• F19 Straight to Idle

• NEVER Lose control of loco speed!

Page 15: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Default Function Mapping

• F0= Headlight/Backup light• F1= Bell• F2= Airhorn• F3= Short airhorn• F4= Dynamic Brakes• F5= RPM+/Engine Startup• F6= RPM-/Engine Shutdown• F7= Dimmer• F8= Mute• F9= Grade-Crossing Signal• F10= Straight-to-eight• F11= Independent/Train Brake• F12= Brake Select/Train Line Charge • F13= Couple/uncouple• F14= Switching Mode

• F15= Handbrake • F16= HEP Mode• F17= Fuel Loading• F18= General Servicing• F19= Straight to Idle• F20= Steam Generator• F21= Sander Valve• F22= Cab Chatter• F23= “All Aboard”/Coach Doors• F24-27= FX3-FX6 Function

Outputs

Page 16: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Diesel Lights

• F0 turns on the headlight/back-up light.

• F24-27 are used to turn on the FX3-FX6 outputs.

• The default “Diesel Light” Hyperlight effect mimics the short duration necessary for the lamp to reach full brightness.

• Tsunami2 decoders feature over 25 selectable Hyperlight lighting effects including: Ditch lights, strobe light, Gyralight, Stratolight, rotary beacon, Mars light and many others.

Page 17: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Independent and Train Brakes• F11 activates the air brake features built into the decoder

• Tsunami2 supports both air brake systems found on a diesel locomotive

• Independent (Locomotive Brake) when function 12 is off

• Train (Automatic Brake) when function 12 is on

Train (Automatic) Brake

Independent (Locomotive) Brake

Page 18: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Independent & Train Brakes

• Independent brakes play sound of engine brake squeal

• Toggle between braking types using F12

• Turning on F12 will “charge the train line” causing the air compressor to turn on and the prime mover to elevate to Notch 3.

• Train brakes play the sound of an air reduction known as an application or set

• Both play unique sounds of a release when function 11 is turned off

• Brakes may be configured to affect speed of the train or simply play the sound effects

Page 19: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Relate to the Prototype: Use of Air Brakes

• Independent Brakes (Locomotive)• On the prototype, this is a “straight air” system. Positive pressure is used to

apply the brakes.

• More modern systems can be “MU-ed” together to allow for control of brakes on a multiple unit consist of diesel locomotives.

• Used when the brake pipe connection is not present to the rest of the train (i.e. switching, light engine moves, and to adjust slack)

• In your models: • Typically give stronger braking value in model to properly simulate this brake

• Sound effect will squeal when applied and play a bail off when released

• Should be first sound you hear released before you move your model

Page 20: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Relate to the Prototype: Use of Air Brakes

• Automatic Brakes (Train)• On the prototype, this is an “equalized” system. Positive air pressure is used

to hold the brakes off.

• Used when the brake pipe connection is coupled between the engine(s) and all the rest of the cars.

• Typically would be much slower and more gradual reduction in train speed than the independent brake

• In your models:• Sound will play the noise of air reduction when function key is turned on and a release

sound when the function key is off.

• Brake squeal would then come from the Tsunami SoundCar

Page 21: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Dynamic Brakes

• Dynamic braking is used to control the speed of trains when descending long grades.

• The traction motors are changed to generators which impart resistive force on the wheels, slowing the train.

• The electricity generated during the braking process is dissipated though large grids on the locomotive roof cooled by multiple fans.

• Tsunami2 decoders feature a multi stage dynamic braking effect with an additional brake rate option to add more realism to operations.

Page 22: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Dynamic Brakes

• When cresting a grade on your model railroad, press the F4 key once to move into the “low” dynamic brake notch. This will play the dynamic brake sound effect and maintain train speed.

• As more braking effort is required, press the F4 key again to enable the braking rate as set in CV 116 and the “high” dynamic brake notch.

• Like the prototype, Tsunami2 dynamic brake only slow down the train and will not stop the model. As the model slows to speed step 8 (of 128) you will hear the dynamic brake sound effect return to the “low” notch and speed will be held.

• If dynamic braking effort is no longer required, press the F4 key a fourth time to turn off the dynamic brakes.

Page 23: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Passenger Operation• HEP is used to provide power to passenger cars for lighting, HVAC, and

other appliances.• F16 starts the warning bell then raises the prime mover to N8 (EMD, ALCO,

Baldwin & Others) or N6 (GE).• The diesel engine turns a HEP generator at a constant RPM hence the need

to increase engine RPMs.• F20 Enables Steam Generator or Aux HEP ‘Pup Motor’

Page 24: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

General Service

• Fireman Ed! Performs various tasks around the loco

• F17- Fueling the loco

• F18 Triggers general service• Cab door

• Wrenches

• Pneumatic Lubricators

• AC unit, cab chatter, toilet flush and more!

Page 25: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Automatic Sound Effects

• Air compressor

• Radiator fans• Operates based on loco use

• Poppet valve or air drier• CV 200 used to control the rate

• “Clickety-Clack”• Rail joints sound effect

Page 26: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Relate to the prototype: Dynamic Digital Exhaust

• Starting & Running on flat track examples

• Engine demand is based on tonnage. Therefore, it may be in run 8 and loud, but only going 15-20mph when hooked to a long cut of cars

• Engine maybe going 70 mph with light passenger train and bouncing between run 2 and 3 depending on slight variations in grade

Page 27: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

How to Start a Diesel Locomotive

• Turn on Headlight (F0)

• Blow proper whistle (horn) signal (F2/F3)

• Throw Reverser forward (Direction/F5/F6)

• Turn on bell (F1)

• Open sander valve (F21)

• Gently open throttle to pull out coupler slack (Throttle Knob to SS1)

• Release independent/train brake (F11)

• Adjust throttle to pull slack based on tonnage (DDE, F5/F6)

• Close Sander valve (F21)

• Open throttle to get moving up to speed (Throttle Knob)

Page 28: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

How to Stop a Diesel Locomotive

• Blow proper whistle (horn) signal (F2/F3)

• Reduce throttle (Throttle Knob to SS1)

• Turn on bell (F1)

• Open sander valve (F21)

• Gently apply (feather) brakes on and off to stop (F11)

• Close Sander valve (F21)

• Couple to the train (F13)

Page 29: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Relate to the prototype:

• Operational Tips

• Add some momentum for more realistic acceleration and deceleration

• When tied onto train, activate F12 to ‘charge the trainline’ and set proper sounds for handling a train• When coupled with SoundCar, creates a great operational scenario!

• Adding in sound operation helps slow down the op session, do more in less space

• Set F# keys to match you and your operator’s tastes, or to match DCC throttles in use for best enjoyment and ease of operation

Page 30: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Conclusion

• Understanding diesel locos is key to Tsunami2 development

• Running trains can be more than just adjusting the throttle knob

• Using the loco(s) more like the prototype makes operating sessions more interactive and more fun!

Page 31: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Floobydust

• YouTube channel filled with tips on SoundTraxx products

• Steam and Diesel User’s Guide very helpful

• Other tips at the all new SoundTraxx.com

• Next Webinar- Subscribe to Newsletter for Updates

Page 32: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Want to learn More? Explore these Links:• Tsunami2 Manuals

• Manuals Page: www.soundtraxx.com/reference/manuals/

• Past Webinars & Presentations• https://soundtraxx.com/reference/webinar

• SoundTraxx Newsletter Sign Up • Customer Newsletter: https://soundtraxx.com/newsletter

• Retailers contact [email protected] to sign up for our Retailer Newsletter

• SoundTraxx Social Media • Facebook: https://www.facebook.com/SoundTraxxDCC/

• YouTube: https://www.youtube.com/user/SoundTraxxVideos

• Twitter: https://twitter.com/SoundtraxxCO

• Instagram: https://www.instagram.com/soundtraxxdcc/

Page 33: Diesel Operation Overview · •With model at speed step 1, set CV 2.503 = 255 •Increase to speed step 25-30 (of 128) •When model reaches that speed, set CV 2.504 = 255 •Adjust

Questions?