'J j t 1 ENVrKQN i JUN 2 9 1972 1 1 Docket Non+ 50-27 . and 50-323 Mr. Frederick T. Sanrls Vice President nnd General Counsel Pncific Gas and Electric Company 77 Beale Street San Francisco, California 94106 Dear Mr, Searlst DISTRIBUTION: AEC PDR Local PDR J. R. McVherter, ORNL E. G. Struxness, ORNL M. Malsch, OGC L. BE Warner, EP-2, L L. L. Kintner, PHR-2, L Licensing Asst,, PWR-2, R. L. Hade, EP-2, L R. C, DeYoung, ADPHR's, D. R, Muller, ADEP, L H. Denton, ADSS, L G. K. Dicker, EP-2, L A, Giambusso, DDRP> L RO (3) RP Rdg. File EP-2 Rdgo File This letter will confirm the June 19, 20 nnd 22 site visit and meeting related to our environmental review of the Diablo Canyon Nuclear Power Station. I na enclosing a proposed agenda and detailed list of topics to guide the discussions during this meeting. Dr. Louis BE Hernar of the Directorate of Licensing is the Pro)act Mnnager responsible for preparation of the environmental statement8 nnd will represent the regulatory staff at this meeting. Accompanying him will be sevex'al members of the Onk Ridge National Laboratory (ORNL) vho ax'e providing technical support in our environmental revievc The ORNL team lender will be Mr, Jack McHhartar Please feel free to contact Drc h'orner at 301/973-7588 if additional information pertaining to the site visit is required. Sincerely, Original signed bp Daniel R. Muller Daniel, R. Muller, Assistant Director inr Envix'onmentnl Pro)acts Directorate oi Licensing. Enclosures! Agenda nnd Suggested Topics 'Pertaining to Diablo Canyon Nuclenr Station See the attached for concurrences OFFICE Is SURIIAME > DATE Is Form hEC-318 (Rcv. 9-33) hECM 0240 V, S, OOVERNMENT PRRrrlNO OPPICR l SQSO 0 h05 SSS

Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING

'J

jt

1

ENVrKQNi

JUN 2 9 1972

1

1

Docket Non+ 50-27 .

and 50-323

Mr. Frederick T. SanrlsVice President nnd General CounselPncific Gas and Electric Company77 Beale StreetSan Francisco, California 94106

Dear Mr, Searlst

DISTRIBUTION:AEC PDRLocal PDRJ. R. McVherter, ORNL

E. G. Struxness, ORNL

M. Malsch, OGC

L. BE Warner, EP-2, LL. L. Kintner, PHR-2, LLicensing Asst,, PWR-2,R. L. Hade, EP-2, LR. C, DeYoung, ADPHR's,D. R, Muller, ADEP, LH. Denton, ADSS, LG. K. Dicker, EP-2, LA, Giambusso, DDRP> LRO (3)RP Rdg. FileEP-2 Rdgo File

This letter will confirm the June 19, 20 nnd 22 site visit andmeeting related to our environmental review of the Diablo CanyonNuclear Power Station.

I na enclosing a proposed agenda and detailed list of topics toguide the discussions during this meeting.

Dr. Louis BE Hernar of the Directorate of Licensing is the Pro)actMnnager responsible for preparation of the environmental statement8 nndwill represent the regulatory staff at this meeting. Accompanyinghim willbe sevex'al members of the Onk Ridge National Laboratory (ORNL)vho ax'e providing technical support in our environmental revievc TheORNL team lender willbe Mr, Jack McHhartar Please feel free tocontact Drc h'orner at 301/973-7588 if additional information pertainingto the site visit is required.

Sincerely,

Original signed bpDaniel R. Muller

Daniel, R. Muller, Assistant Directorinr Envix'onmentnl Pro)acts

Directorate oi Licensing.

Enclosures!Agenda nnd Suggested Topics'Pertaining to Diablo CanyonNuclenr Station

See the attached for concurrences

OFFICE Is

SURIIAME >

DATE Is

Form hEC-318 (Rcv. 9-33) hECM 0240 V, S, OOVERNMENT PRRrrlNO OPPICR l SQSO 0 h05 SSS

Page 2: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING

n1

/ »~ 1 '«"p)

; >'077>Z«(X'«! "„1V.

P("< ".)::A5N'" Pr. «~>.i

.«j PQ XAq'Z')()»'.«J«P«A g H«I I»f»««i&DR ~ »> ~ 8

Dl)') rialEt',R-'i:(,XOZZZ.«",.8 ..i,

J ~ 2-'«~Pi, ('ZZZOtr~'.lJ,R-J~~«'l ~ «laeA ~r(keZZ«~;i'» l

I c~ Li eei)Z'»'i "Ie "'ii«ZQ«' aZZQAYQ(1 ~ '„)

.I,'JH(it<,w'«LJZ)Y .:;J, 8RQA, ao9.,o((

,'S««<(i((, n~~ZZdr «XA

(E).~b!f 'Sl)

.OLi'%Z,SI 2-'H

«I 1« ~ ~

II ~

I I»

I I

yd bonsai" ioni>ilQieliuM .8 lsinsG

Page 3: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING

c-

Docket 'Nos. 50-275,and 50-323

Hr. Frederick T. SearlsVice President and General CounselPacific Gas nnd Electric Company77 Beale StreetSan Francisco, California 94106

Dear Hro

Senrls.'ISTRIBUTION:

AEC PDRLocal PDRJ. R. HcWherter, ORNL

E. G, Struxness, ORNL

H. Halsch, OGC

L. B. Werner, EP-2, L.. L. L. Kintner, PWR»2, L

Licensing Asst., PWR-2, LR+ L. Wade, EP-2, LRd C. DeYoung, ADPW.'s, LDRHuller, ADEP,PH. Denton, ADSS,,LG. K. Dickeyd+EP-2, LA. Giambus/o,DXDRP, LRO (3)RP Rd Fi,leEP-2 g. File

This letter will confirm the Juno 19, 2 nnd 22 site visit andmeeting related to our environmental viev of the Diablo CanyonNuclear Power Stat1on.

I am enclosing n proposed agenda nd detailed list of topics toguide the discussions during th s meet1ng.

Dr. Louis B. Warner of the nv +cot-~Directorate of Licensing, the Pro)ect Hnnager responsible"for prepnrat1on of the e ironmental statemont9 and will representtho regulatory staff at his meeting, Accompanying h1m will besovoral members of the Onk Ridge National Laboratory (ORNL) whoare providing techni 1 support in our environmental reviewsThe ORNL team londo vill be Hr,- Jack HcWhertor. Please feelfree to contact D Worner at 301/973-7588 if additionnl infor«mation pertninin to the site visit is requiredi

Sincorely9

Daniel R+ Huller, AssistantDirector'or

Environmental Pro)octoDirectorate of Licensi'ng

nclosuras:genda and Suggested Topics

Pertaining to Diablo CanyonNuclear Station

g 2;L

~er: peb6/7/72

OFFICE P

SURNAME W

DATE >form hEC-3 IS (Rcv. 943) hEChf 0240

GKDicker6/ /72

EP-2:L

DBlRQer:ADE6/ /72

V, 3. GOVERNhrEN'F PRrNl'rN0 'OFFICE c rdro 0» ddd ddd

Page 4: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING

-0lsd <Z»g )I TP>Q

.'it)'i l):<65lG'i Xsqc:g

JVXiO,mdv~~~NzlI!...i . 4gf'a(» e -a~~uxsa .') ..i

~:e,a.',»x~»; .t*.

J eR-'i;l,masm";t' e~-~i'c>'<'1~eD»»iX ..S "i

, 2-~l',4'5, .amah»»»iwov~,i,i»,,",-HM,,6b»,~,3 .:i

, ."<';o(v.,",,n~s '.". V, -a, 'UGtC, WaJ fSrl'"if"»

J ,8~A ,~op»»iq.i'I,"-'V,~~9~1«.;i .:)

4, '!.'IQZG,n"~uzi...~.P*') .4(8) t>P

.~cfhi . »,'»4 'Nei'L i .~b'» 6-'l-

'I

I'

)I,I (

~'~d

l

I -II 11 )41

C

)I)

11

C

I X

I)

I6

I

I

I )I " I

~ il

I

D

CX )I

tl

I',I If ~

I , I

1

I

I

I

I II

4

I

I- ~

f

gag (g ",

'I

9."BlA:XOL k»)c-,'i(".

Rrk

I

w~~Ao k(."."!0Fr 4»Ld

p I

f)'19c» o g.'f» f/15»5'J,iRrArK0

tl f,

Page 5: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING

PROPOSED, AGENDA FOR SITE VISIT TODIABLO CANYON NUCLEAR STATION.

BYDIRECTORATE OF LICENSING

JUNE 19, 20 AND 22, 1972

June 22:

June 19, 20! Visit to site with emphasis on: impact of constructionintake and discharge systems, transmission system, sitecharacteristics and ecology.

Discussion with Pacific Gas and Electric Company atSan Francisco, California.

Io Site

II~ Cooling System

III'cological Effects

IV. Radiological Considerations

V. Chemical Discharges

VI, Cost-Benefi.t

VII. Alternatives to Nuclear Power Generation

VIII. Nonitoring Programs

Those expected to attend:

ORNL

Louis Uerner, Pro)ect Hanager 'ack Nc!~herter, Team Leader.Harry Arnold, Cost/BenefitJ. Tom Kitchings, EcologyGeorge Kerr, Health PhysicsL. Farrar, Site DescriptionThomas Berg, Liquid EffluentsGeorge Parker, Gaseous Effluents

Page 6: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING
Page 7: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING

PROPOSED TOPICS FOR DISCUSSION

DIABLO CANYON SITE VISIT

Page 8: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING
Page 9: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING

A. Fresh Mater Hydrology

1. Ground and surface water movement in the general area of the

plant site.

B. Marine Hydrology

1. Detailed description of all currents in the area that could

affect the plant, as a function of month.

2. Shoreline and bottom contours near the plant site.t

3. Vertical temperature profiles in the water near the plant site.

4. Chemical composition of sea water at the plant site.

5. Salinity profiles in the vicinity of the plant.

6. Evaluation of results of any measurements made for estimating:

a. the equilibrium surface temperature, and

b. mean longitudinal diffusion coefficient.

C. Me te orology

1. Meteorological information - .monthly averages, and extremesII

observed over a period of time for:

Page 10: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING

~ CI

Page 11: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING

a. rain fall

b. gross solar radiation

c. dewpoint

d. mean wind velocity and direction (wind rose or the data for

a wind rose)

e. frequency and duration 'of very calm conditions.

D. Topography

l. Obstructions, natural or man made, near the plant which affect

the plant in any way. This includes obstructions to wind flow

as well as water flow.

E. Geographical

l. Identification and location of all property owned by the appli-

cant within one mile of the plant.

2. I'dentification and location of all'public building and recre-

ational facilities within five miles of the plant.I

Page 12: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING
Page 13: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING

II'OOLING SYSTEM

A. Intake

1. The number and capacity of pumps.

2. Detailed drawings of intake structure, e.g., cross-sectional

area open to flow, materials of construction, screen details-

traveling or stationary, physical arrangement, etc.

3. Cross-sections and lengths, and any other pertinent details

of canals or channels associated with cooling water intake structures.

4. Detailed description of the opening to the water source, e.g.,

a skimmer wall.

5. Maximum water velocity graph from intake opening through

sys tern to final dis charge.

6. Method for disposal of trash from screens.

B. Condenser System

1. Details of pipe lines to the condensers, i.e., diameters,

length, materials, etc. (also. from condenser) .

2. Description of the condensers; num>er and sizes of tubes,

materials, fabrication technique, and corrective action

planned for leaks.

Page 14: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING
Page 15: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING

3. Condenser cooling water flow rates and inlet and outlet

temperatures. If these are variables, include details of dif-

ferent operating conditions. Time-temperature details of

water flow through cooling system from intake opening to

out fall.

C. Discharge S tructure

1. Design details of the discharge structure, sizes, shapes and

dimensions of openings, and materials of construction. Exact

location of discharge relative to plant and receiving water

body.

2. Depth of discharge. If this varies, description of the

conditions under which it varies.

3. Discharge velocity and orientation, and variations if any.

D. Condenser Cooling Mater

Details of water treatment planned, i.e., heat and chemicals.

Concentration and addition schedule for all chemicals (generic

names) added to the water.

E. Cooling Mater Discharge

Results and description of analytic and/or physical model studies

made on the heated water discharge from the condensers into the

receiving water body.

Page 16: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING
Page 17: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING

III. ECOLOGICAL EFFECTS

A. Terres trial

l. Identification of the terrestrial flora and fauna present in

the area, including abundance, habitat preference,'nd how

they willbe affected by plant construction and operation.

Particular attention should be paid to the species in the

Los Padres National Forest and to any endangered species in

the area. (i.e., Horro Bay Kangaroo Rat and California\

condor) .

2. Characterization of the land types to be crossed by transmis-

sion lines. Projected uses of land in the rights-of-way.

'ethods used to control erosion in the disturbed areas.

Herbicides, if any, which willbe used to control

vegetation.

B. Aquatic

l. Identification of the principal species of fish eggs, larvae,

and juveniles and other organisms susceptible to entrainmentI

in condenser cooling.

2. Exposure of entrained organisms to elevated temperature.

3. Fate of any fish which pass through the traveling screens.

Page 18: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING
Page 19: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING

4. Consideration of replacement of fish, both adult and larvae,

killed via plant operation,

5. Additional information on the extent of abalone reduction

as indicated on pages 41 and 42 of the Environmental Report.

Page 20: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING
Page 21: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING

IV. RADIOLOGICAL CONSIDERATIONS

1. Permanent population distribution within a 50-mile radius

of the station according to the 1970 census. Data are needed

for (a) sectors of 22.5'ith directions of %1, NN/, N,

NNE, NE, ENE, E, ESE, SE, and SSE and (b) distance increments

of 0 1 y 1 10 y 10 20 y 20 30 > 30 40 p and 40-50 miles

2. Estimated transient population distribution in the same

form as requested in Question 1.

3. Location of any permanent residences within about 6.5 miles of

the station, especially the closest residences (in any

direction and in the dominant wind directions) to the station.

4. Location (on a map) of population centers, recreational areas,

grazing and farming areas about the site, especially the

closest dairy herds and truck farms (in any direction and in

the dominant wind directions) to the station. Dis tinction

between major grazing areas for dairy herds separate from the

major grazing areas for beef herds.

5. Location (on a map) of major fishing areas along the coast

within a 50-mile radius of the station. Estimates of the

harvest of fish and other seafoods from these areas.

Page 22: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING
Page 23: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING

6. Estimates of the average yearly concentrations of liquid

effluents released by the station in fishing areas off the

coast near the station and in recreational areas on the coast

near the station.

Page 24: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING
Page 25: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING

V. CHEMICAL DIS CHARGES

A. Source, composition, quantities, pathways through plant and

concentrations at point of release to environments .

1. Cooling water treatment chemicals.

2. Corrosion products.

3. Sanitary system additives.

4. Cleaning and laundry compounds.

5. Steam system additives.

6. Oil, grease, organics.

7. Insoluble materials; suspended material.

8. Solid wastes.

B. Interaction with environment.

1. Reaction with sea water.

2. Other effects.

C. Chemicals and estimated quantities associated with the alternate

cooling systems described in the Environmental Report Supplement.

Page 26: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING
Page 27: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING

10—

VX ~ COST-BENEFIT

A. Transmission Lines

l. Important alternatives rejected in selection of present rights-

of-way.

2. Acreage and cost per mile of single and double lines; acreage

diverted from other uses.

B. S tation

1. Factors leading to rejection of alternate sites.

2. Land costs.

3. Cons truction schedule highlights.

C. Costs and Need for Power

1. Last ten years PG&E system capacity, peak load demand, and

predicted peak load demand.

2. Future eight-year predicted peak load demand and total system

capaci ty.

3. Estimated system reserve margin 1974-78 without Diablo Canyon

Units 1 and 2.

Page 28: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING

v

Page 29: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING

4. Total capacity of and reserve capacity of Western Systems

. Coordinating Council membership in 1974-75.

5. Cost of replacement power over plant life.

6. Cost of nuclear fuel and alternate fossil costs over 30 years.

7. Estimated interest rate (after tax cost of capital)

for comparing alternatives.

D. Benefits

l. Expected tax contribution of Diablo Canyon Units 1 and 2

to San Luis Obispo County.

2. Estimated increase in population which would be necessary

to match this increase in tax base.

3. Sociological, economic, and industrial changes which may be

expected as result of Diablo Canyon Units 1 and 2.

Page 30: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING
Page 31: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING

— l2-

VII. ALTERNATIVES TO NUCLEAR P5i'ER GENERATION

A. Geothermal

1. Sources of pawer, reserves, commercial availability of steam

2. Generation costs

3. Development schedules, normal and accelerated

Page 32: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING
Page 33: Diablo Canyon, Units 1 and 2 - Letter Confirming June 19, 20 and … · 2017. 7. 31. · PROPOSED, AGENDA FOR SITE VISIT TO DIABLO CANYON NUCLEAR STATION. BY DIRECTORATE OF LICENSING

4~

I~ .

13—

UIII, MONITORING PROGRAYiS

A. Radiological Monitoring Plan

B. Ecological Monitoring Plan