2.9
Brechfa Forest ConnectionDevelopment Consent Order Application - Reference EN020016
Deviation Plans
December 2015
WARNING: DRAWING MAY BE REDUCED. DO NOT SCALE.
OVERHEAD LINE CENTRE LINE
Stay above ground
Stay below ground
LATERAL LoD
BURIED DEPTH
LoD
GROUND
OUT OF
PLAN VIEW
ANGLE S POLE-
ON LINE VIEW
ANGLE S POLE-
12.9m
45° *
required dependant on design checks
A 30°-60° can be acheived where
* Design based on a 45° stay angle.
Vertical maximum: 2m
Lateral maximum: 5m
Limit of Deviation
Buried Depth Range: N/A all set at 2.1m
Pole Height Range: 12 - 15m
Single Pole Structure:
Radius maximum: 5m
Limit of Deviation
Buried Depth Range: N/A all set at 2.1m
Pole Height Range: 12 - 15m
Single Pole Structure:
N/A
APPLICATION No.
SCALE
ISSUE
TITLE:
ISSUE DATE COMMENTS CHK'D APP'DDRAWN
CAD
A1
No.
ORIGINATOR DRAWING
COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF WESTERN POWER DISTRIBUTION
KEY
Notes
DRAWING No.
PROJECT
JH GSA-
A
23-13571-114 EN020016
15/WPD/108
SHEET 1 OF 4
DEC 2015 FIRST ISSUE
(REGULATION 5(2)(o))
POLE ANGLE STRUCTURE
DEVIATION PLAN FOR SINGLE
ORDER
(BRECHFA FOREST CONNECTION)
WESTERN POWER DISTRIBUTION
(REGULATION 5(2)(o))
DEVIATION PLAN FOR SINGLE POLE ANGLE STRUCTURE
WESTERN POWER DISTRIBUTION (BRECHFA FOREST CONNECTION) ORDER
unaffected depending on local ground conditions
lateral movement but the lengths would remain
located. Stay positions would be affected by any
distance and position the pole centre could be
The dashed grey line indicates the maximum
LIMIT of DEVIATION of POLE:
1.8
m
15
m
12.9
m2.1
m
LIMIT of DEVIATION of STAY
5.0m5.0m
5.0m5.0m
5.0m
12.9m
5.0
m
5.0m
5.0
m5.0
m
WARNING: DRAWING MAY BE REDUCED. DO NOT SCALE.
45°*
OVERHEAD LINE CENTRE LINE
Stay above ground
Stay below ground
BURIED DEPTH
LoD
GROUND
OUT OF
5m LATERAL AND 5m ON LINE
THE MAXIMUM LIMIT OF DEVIATION IS
LoD NOTES:
OHL ENTRY TO TERM
SECTION VIEW
TERMINAL H 4 POLE-
PLAN VIEW
TERMINAL H 4 POLE-
15° 15°
lateral pull.
positioned at an additional 15° to counteract
conductor tension. A further two stays are
incoming OHL line to conductors to counteract
Terminal structures are back stayed at 5° from
STAY ORIENTATION:
required dependant on design checks
A 30°-60° can be acheived where
* Design based on a 45° stay angle.
Vertical maximum: 2m
Lateral maximum: 5m
Limit of Deviation
Buried Depth Range: N/A all set at 2.1m
Pole Height Range: N/A all15m
4 Pole Structure:
Radius maximum: 5m
Limit of Deviation
Buried Depth Range: N/A all set at 2.1m
Pole Height Range: N/A all15m
4 Pole Structure:
LIMIT of DEVIATION of STAYS
unaffected depending on local ground conditions
lateral movement but the lengths would remain
located. Stay positions would be affected by any
distance and position the pole centre could be
The dashed grey line indicates the maximum
LIMIT of DEVIATION of POLE:
APPLICATION No.
SCALE
ISSUE
TITLE:
ISSUE DATE COMMENTS CHK'D APP'DDRAWN
CAD
A1
No.
ORIGINATOR DRAWING
KEY
Notes
DRAWING No.
PROJECT
JH GSA-
COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF WESTERN POWER DISTRIBUTION
SHEET 2 OF 4 A
N/A15/WPD/108
23-13571-114 EN020016
FIRST ISSUEDEC 2015
(REGULATION 5(2)(o))
DEVIATION PLAN FOR TERMINAL H 4 POLE STRUCTURE
WESTERN POWER DISTRIBUTION (BRECHFA FOREST CONNECTION) ORDER
(REGULATION 5(2)(o))
H 4 POLE ANGLE STRUCTURE
DEVIATION PLAN FOR TERMINAL
ORDER
(BRECHFA FOREST CONNECTION)
WESTERN POWER DISTRIBUTION15.0
m
5.0m5.0m
5.0m
12.9
m2.1
m
12.1m
5.0
m5.0
m
1.8
m
12.9
m
12.9
m
5.0m
5.0
m
5.0m
5.0m5.0m
WARNING: DRAWING MAY BE REDUCED. DO NOT SCALE.
45°
OVERHEAD LINE CENTRE LINE
Stay above ground
Stay below ground
BURIED DEPTH
LoD
GROUND
OUT OF
5.0m5.0m
14.9
m2.1
m
17.0
m
17.0m
APPLICATION No.
SCALE
ISSUE
TITLE:
ISSUE DATE COMMENTS CHK'D APP'DDRAWN
CAD
A1
No.
ORIGINATOR DRAWING
COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF WESTERN POWER DISTRIBUTION
KEY
Notes
DRAWING No.
PROJECT
JH GSA-
15/WPD/108
SHEET 3 OF 4
EN02001623-13571-114
A
N/A
FIRST ISSUEDEC 2015
LIMIT of DEVIATION of STAY
required dependant on design checks
A 30°-60° can be acheived where
* Design based on a 45° stay angle.
Vertical maximum: 2m
Lateral maximum: 5m
Limit of Deviation
Buried Depth Range: N/A all set at 2.1m
Pole Height Range: 12 - 17m
Twin Pole Structure:
ON LINE VIEW
ANGLE TWIN POLE-
Radius maximum: 5m
Limit of Deviation
Buried Depth Range: N/A all set at 2.1m
Pole Height Range: 12 - 17m
Twin Pole Structure:
PLAN VIEW
ANGLE TWIN POLE-
(REGULATION 5(2)(o))
POLE ANGLE STRUCTURE
DEVIATION PLAN FOR TWIN
ORDER
(BRECHFA FOREST CONNECTION)
WESTERN POWER DISTRIBUTION
(REGULATION 5(2)(o))
DEVIATION PLAN FOR TWIN POLE ANGLE STRUCTURE
WESTERN POWER DISTRIBUTION (BRECHFA FOREST CONNECTION) ORDER
unaffected depending on local groundconditions
lateral movement but the lengths would remain
located. Stay positions would be affected by any
distance and position the pole centre could be
The dashed grey line indicates the maximum
LIMIT of DEVIATION of POLE:
5.0
m
1.8
m
5.0m5.0m 5.0m5.0m
17.0m
14.9m
2.1m
5.0
m5.0
m
5.0m
CABLE PLASTIC COVERS
WARNING TAPE
BACKFILL & REINSTATEMENT
TO HAUC GUIDELINES
132kV SINGLE CIRCUIT
SECTION A-A
160160
75
150
100
150
110mm O/D DUCT
EARTH TAPE (IF REQUIRED)
CBS BACKFILL TO
ENA TS 97-1
1200mm Cu
XLPE CABLE
100 O/D DUCT FOR
FIBRE OPTIC CABLE
160/150 PVC DUCTS
CLASS 1 750N CRUSH
STRENGTH
COVER REQUIREMENTS
FOOTWAY/VERGE = 800mm
CARRIAGEWAY = 900mm
AGRICULTURAL = 1225mm
75
630
110100
16.00 m
4.50m5.00m
0.63m
0.90m
0.60m
5.00m
LIMIT OF DEVIATION INCLUDING TYPICAL CROSS SECTION OF
UNDERGROUND CABLES AND DIMENSIONS OF WORKING AREAS
Fence
1.50m
Fence
0.60
2.00 2.00
LIMIT OF DEVIATION
HAUL ROADSUBSOIL
PROPOSED 132kV OPEN CUT
TRENCH ROUTE AREA
TOPSOIL
GROUND LEVEL
TYPICAL 16.00 METRES EASEMENT WIDTHAND LIMIT OF DEVIATION FOR ALL WORKS
APPLICATION No.
SCALE
ISSUE
TITLE:
ISSUE DATE COMMENTS CHK'D APP'DDRAWN
As Shown
ORIGINATOR DRAWINGNo.
COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF WESTERN POWER DISTRIBUTION
PROJECTDRAWING No.
RB ASA
A
15.12.15 CONNECTION
TMPRD-A1-007 EN020016
15/WPD/108
SHEET 4 OF 4
LIMIT OF DEVIATION INCLUDINGTYPICAL CROSS SECTION OF
UNDERGROUND CABLES AND DIMENSIONS
OF WORKING AREAS
A3
CAD
Notes
1.All dimensions are in millimetres unless otherwise stated.
2.Dimensional information should not be obtained from this drawing (do not
scale).
3.Dimensions and depths are indicative only and will vary according to
installation and site conditions.
4.Proposed general arrangement based on WPD requirements.
5.Trench arrangement and dimensions to be confirmed during detail design
stages.
6.Minimum depth to top of cables to be 900mm in general installation, except in
agricultural land where the minimum is 1000mm.
7.Construction swathe width may vary according to site conditions.
WESTERN POWER DISTRIBUTION (BRECHFA FOREST CONNECTION) ORDER
DESIGN DRAWINGS
(REGULATION 5(2)(o))
2m1m01m
1:50 Metric