Design and Construction of a Mining Haul Road Dr Richard Yeo, Austroads & Max Wallis, Polymix Industries

Design and Construction of a Mining Haul Roadcmsfocus.net/cpanel/britmindo/images/xplod/editor/mining... · 2017-12-31 · Design and Construction of a Mining Haul Road Dr Richard

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Design and Construction of a Mining Haul Roadcmsfocus.net/cpanel/britmindo/images/xplod/editor/mining... · 2017-12-31 · Design and Construction of a Mining Haul Road Dr Richard

Design and Construction of a Mining Haul RoadDr Richard Yeo, Austroads & Max Wallis, Polymix Industries

Page 2: Design and Construction of a Mining Haul Roadcmsfocus.net/cpanel/britmindo/images/xplod/editor/mining... · 2017-12-31 · Design and Construction of a Mining Haul Road Dr Richard

Steve Runge

Max Wallis

Tom Wilmot

Ian Hentschke

Acknowledgement

Page 3: Design and Construction of a Mining Haul Roadcmsfocus.net/cpanel/britmindo/images/xplod/editor/mining... · 2017-12-31 · Design and Construction of a Mining Haul Road Dr Richard

Lady Loretta mine

51.5km haul road

13 million tonnes of minerals

8 year life

Page 4: Design and Construction of a Mining Haul Roadcmsfocus.net/cpanel/britmindo/images/xplod/editor/mining... · 2017-12-31 · Design and Construction of a Mining Haul Road Dr Richard

135 km from Mount Isa

Annual wet and dry seasons

Environment has a greater impact than traffic loading

Page 5: Design and Construction of a Mining Haul Roadcmsfocus.net/cpanel/britmindo/images/xplod/editor/mining... · 2017-12-31 · Design and Construction of a Mining Haul Road Dr Richard

Guide to Pavement Technology

Page 6: Design and Construction of a Mining Haul Roadcmsfocus.net/cpanel/britmindo/images/xplod/editor/mining... · 2017-12-31 · Design and Construction of a Mining Haul Road Dr Richard

Pavement design focused on mitigating the risk of saturation of the pavement and subgrade

Construction during dry season

Page 7: Design and Construction of a Mining Haul Roadcmsfocus.net/cpanel/britmindo/images/xplod/editor/mining... · 2017-12-31 · Design and Construction of a Mining Haul Road Dr Richard

Design Traffic

Design vehicle – quad road train

5 x 106 ESAs

Page 8: Design and Construction of a Mining Haul Roadcmsfocus.net/cpanel/britmindo/images/xplod/editor/mining... · 2017-12-31 · Design and Construction of a Mining Haul Road Dr Richard

• unbound ‘track’

• running surface directly on the natural subgrade or worn well below this

• alignment varied by creek crossings and areas of black soils

• uneconomic to build up above natural ground

• existing compacted materials adopted

• very high operating costs

Variable subgrade:

• laterite soils

• very reactive black soils

• weathered rock outcrops

Existing conditions

Page 9: Design and Construction of a Mining Haul Roadcmsfocus.net/cpanel/britmindo/images/xplod/editor/mining... · 2017-12-31 · Design and Construction of a Mining Haul Road Dr Richard

• flooding anticipated during the design period

• possible inundation for up to 2 to 3 days

• road closed during flood events

Pavement inundation

Page 10: Design and Construction of a Mining Haul Roadcmsfocus.net/cpanel/britmindo/images/xplod/editor/mining... · 2017-12-31 · Design and Construction of a Mining Haul Road Dr Richard

• design involved use of rock won within the road reserve rather than importing material

• criteria included Particle Size Distribution, Plasticity Index (PI), Hardness, Linear Shrinkage

Fit for purpose pavement materials

Page 11: Design and Construction of a Mining Haul Roadcmsfocus.net/cpanel/britmindo/images/xplod/editor/mining... · 2017-12-31 · Design and Construction of a Mining Haul Road Dr Richard

In situ stabilisation adopted:

• correct mechanical deficiencies (particle size distribution and/or plasticity)

• increase strength or bearing capacity while maintaining a flexible pavement

• reduce permeability and/or moisture sensitivity

• cost-effective new pavement

• use of non-standard gravels

• minimal maintenance

• ease of maintenance

Fit for purpose pavement materials

Page 12: Design and Construction of a Mining Haul Roadcmsfocus.net/cpanel/britmindo/images/xplod/editor/mining... · 2017-12-31 · Design and Construction of a Mining Haul Road Dr Richard

Dry powder polymer selected on the basis of:

• proven track record – TIPES approved

• enabled a more open grading curve suited to the local materials

• reduced capillary rise

• increased soaked CBR

• increased wet strength

• reduced permeability

• lower water required for compaction

In situ stabilisation

Page 13: Design and Construction of a Mining Haul Roadcmsfocus.net/cpanel/britmindo/images/xplod/editor/mining... · 2017-12-31 · Design and Construction of a Mining Haul Road Dr Richard

0

20

40

60

80

100

120

140CBR (%)

A B C D EPavement

material:Unsoaked 4 day soaked 4 day soaked - stabilised

Page 14: Design and Construction of a Mining Haul Roadcmsfocus.net/cpanel/britmindo/images/xplod/editor/mining... · 2017-12-31 · Design and Construction of a Mining Haul Road Dr Richard

Sprayed seal

Binder Shoulders l/m2 Inbound l/m2 Outbound l/m2 Aggregate

S4.5S 1.7 1.4 1.0 10 mm

S4.5S 1.9 1.7 1.4 20 mm

Prime: AMC00: 0.8 l/m2

Page 15: Design and Construction of a Mining Haul Roadcmsfocus.net/cpanel/britmindo/images/xplod/editor/mining... · 2017-12-31 · Design and Construction of a Mining Haul Road Dr Richard

Sprayed seal

Page 16: Design and Construction of a Mining Haul Roadcmsfocus.net/cpanel/britmindo/images/xplod/editor/mining... · 2017-12-31 · Design and Construction of a Mining Haul Road Dr Richard

In summary

• 51.5 km

• 510,000 t crushed base and subbase

• dry powder polymer in situ stabilisation

• $510,000 per km