OPERATIONS: Exceeding Design Capacity
Mill operating at over 1,800 tpd in Q2 2010, 20% above design capacity (1,500 tpd) one year after commercial production
Q2 2010 cash costs per pound of zinc US$0.05/lb. Now in the lowest 5% of zinc producers worldwide
Strong Balance sheet - $170 million assets, $27 million long-term debt, $29 million cash
Mine operating pro� t of $14.9 million in Q2 2010
ZIN
C C
OPPE
R S
ILVER
GO
LD LEA
D
www.farallonmining.com Neil MacRaeInvestor Relations Manager
604-638-2160 / [email protected]
TSX:FAN
Mexico City
Acapulco
Puerto Vallarta
G-9 Mine
MEXICO
Manzanillo
A LOW-COST ZINC MINING COMPANY WITH ORGANIC
GROWTH UPSIDE
G-9 Mine - A Platform for Growth
0
500
1000
1500
2000
Q1/09 Q2/09 Q3/09 Q4/09 Q1/10 Q2/10
Design Capacity
(Tonnes / Day)
1,180 1,260 1,275
1,550
Declared Commercial Production - April 2009
1,6911,816
0
10
20
30
40
50
60
70
80
90
100
G9
Min
e Q
2 20
10
G9
Min
e Q
1 20
10
G9
Min
e 20
09
2010 Zinc C1 Cost Curve
0 10 20 30 40 50 60 70 80 90 100
Cost
(US
c/lb
pai
d zi
nc)
Cumulative Percentage of Production
© Copyright Brook Hunt - A Wood Mackenzie Company, 2010
Ant
amin
a
Red
Dog
Cent
ury
G-9 Cost - $0.05/lb zinc
↑
El Largo
La Lucha
G-9
Reforma
El Rey Naranjo
Abajo Zone
San Raphael Fault
Immediate Target:Stratigraphic Horizon200m Deeper ThanExisting Deposits
EXPLORATION: Excellent Potential for Continued Drilling Success
Exceptional Recent Drill Results
Share Information (As at August 24, 2010):
Shares Out: 473 M Share Price: C$0.365
Market Cap: C$172 M 52 Week Hi-Lo: C$0.65-C$0.305
Average Vol: 463k
Highly Prospective Target Horizon
MANAGEMENT: A Strong Track Record of Delivering Results
* Mineral resources that are not mineral reserves do not have demonstrated economic viability. A 5% Zn cuto� was used for December 2007 preliminary assessment; detailed engineering studies will determine the best cuto� . Quali� ed Person: David Gaunt, P.Geo., and Qingping Deng, CPG, of Behre Dolbear & Company (USA), Inc. Feb 2008.
Built a blind, green� eld discovery into the G-9 Mine in under 4 years
Raised over $275 Million in � nancing to construct the G-9 Mine without a feasibility study
Successfully made transition from an exploration play to an operating mining company while retaining 100% ownership for Farallon shareholders
Strong operations track record obtained with mill operating 20% above design capacity only one year after announcing commercial production.
Large Land Package for Further Discoveries
Exploration activity orientated towards the potential for further zinc discoveries
High grade gold zones announced with inferred resource of 225,000 tonnes of 8.6 g/t of gold
1000m
1100m
1050m
1550m
1350m
1300m
1250m
1450m
1400m
1200m
950m
900m
1500m
San Raphael Fault
1150m
850m
Legend
Massive Sulphide
Argillite, Siltstone
Felsic Flow
Chert
Thrust Fault
Normal Fault
Sectional graph through El Largo and Abajo
North Zone G-9
Abajo Zone
Abajo Horizon
El Largo
Drill Hole Width (m) Au g/t Ag g/t Zn % Cu % Pb % UG-09-120UG-09-120
UG-09-060AUG-09-061
10.204.98
13.4215.00
1.251.64
19.672.28
7383
1,700266
27.7336.09
4.5721.57
2.412.900.352.01
0.971.134.041.05
Target Area
Management Dick Whittington President & CEO Greg McCunn CFO