DAYS LEFT: -4TOTAL SHUTDOWN DAYS : 36
TURN AROUND RAS LAFFAN OLEFINS COMPANY FEB / MAR 2015
CLIENT: RAS LAFFAN OLEFINS COMPANY [RLOC]
PROJECT: 8503
DESCON PROGRESS MONITORING REPORT
Thursday, March 12, 2015
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 1 of 31
> HSE STATISTICS
> OVERALL PROGRESS CURVE
> MAJOR HIGHLIGHTS / CONCERNS
> ISBL AND OSBL PROGRESS CURVE
> PROJECT (TWR's) PROGRESS CURVE
> EXCHANGER PROGRESS CURVE
> OTHER EQUIPMENT PROGRESS CURVE
> CUT & REWELD) PROGRESS CURVE
> CONTROL VALVE PROGRESS CURVE
> E&I PROGRESS CURVE
> CRITICAL SYSTEMS / CRITICAL PATH OF TURN AROUND PROGRESS CURVE
O STEAM/ CONDENSATE
O CGC
O COOLING WATER / SEA WATER
O DRYER
O QUENCH TOWER
> EQUIPEMT TYPE WISE PROGRESS
> JOB TYPE WISE PROGRESS
> MANPOWER AND EQUIPMENT STATUS
> ATTACHMENT ‐ 1 [SYSTEM HANDOVER STATUS]
INDEX
DAILY TURN AROUND PROGRESS REPORTTURNAROUND WORKS
RLOC‐TA‐2015
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 2 of 31
40
.
1-Fe
b
2-Fe
b
3-Fe
b
4-Fe
b
5-Fe
b
6-Fe
b
7-Fe
b
8-Fe
b
9-Fe
b
10-F
eb
11-F
eb
12-F
eb
13-F
eb
14-F
eb
15-F
eb
16-F
eb
17-F
eb
18-F
eb
19-F
eb
20-F
eb
21-F
eb
22-F
eb
23-F
eb
24-F
eb
25-F
eb
26-F
eb
27-F
eb
28-F
eb
1-M
ar
2-M
ar
3-M
ar
4-M
ar
5-M
ar
6-M
ar
7-M
ar
8-M
ar
9-M
ar
10-M
ar
11-M
ar
12-M
ar
13-M
ar
14-M
ar
15-M
ar
16-M
ar
17-M
ar
18-M
ar
0.47% 0.21% 0.17% 0.16% 0.13% 0.46% 1.73% 3.06% 4.77% 5.18% 5.00% 5.37% 5.85% 6.60% 6.45% 6.54% 6.41% 5.90% 5.10% 4.88% 4.55% 3.86% 3.20% 2.55% 1.65% 1.46% 1.19% 0.79% 1.01% 0.42% 0.25% 0.11% 0.07% 0.08% 0.08% 0.03% 0.02% 0.01% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.47% 0.04% 0.17% 0.56% 0.24% 0.84% 0.76% 0.67% 1.75% 1.78% 1.65% 1.65% 2.78% 3.21% 3.88% 5.12% 5.02% 5.44% 5.11% 5.17% 6.33% 5.97% 3.78% 5.08% 3.79% 1.49% 1.81% 1.30% 2.39% 1.78% 1.61% 1.95% 1.85% 2.52% 1.25% 0.66% 0.35% 2.00% 0.12% 0.10%
4.68% 4.88% 5.05% 5.22% 5.35% 5.81% 7.54% 10.61% 15.38% 20.55% 25.56% 30.92% 36.78% 43.38% 49.83% 56.37% 62.78% 68.68% 73.78% 78.67% 83.22% 87.08% 90.28% 92.82% 94.47% 95.93% 97.12% 97.91% 98.92% 99.34% 99.58% 99.70% 99.76% 99.84% 99.92% 99.95% 99.97% 99.99% 99.99% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
4.86% 4.90% 5.07% 5.63% 5.87% 6.71% 7.47% 8.14% 9.89% 11.66% 13.31% 14.96% 17.74% 20.95% 24.83% 29.96% 34.97% 40.41% 45.52% 50.69% 57.01% 62.98% 66.76% 71.84% 75.63% 77.12% 78.93% 80.24% 82.63% 84.41% 86.02% 87.97% 89.82% 92.35% 93.59% 94.25% 94.60% 96.60% 96.72% 96.82%
RAS LAFFAN OLEFINS COMPANY [RLOC]TURN AROUND RAS LAFFAN OLEFINS COMPANY FEB / MAR 2015
PROGRESS REPORTThursday, March 12, 2015
DATES
Daily Plan
Daily Actual
Cum Plan
Cum Actual
96.82% -3.18%
MONTH Feb-15
TODAY
Mar-15
1,271,302 1,595
6,888 5
OVERALL PROGRESSOVERALL PLANNED ACTUAL VARIANCE OVERALL PLANNED ACTUAL VARIANCE
Near Misses: (Reported) - 13 No. of confine space entries
0.00% 0.10% 0.10% TODATE 100.00%
CUT OFF TIME: 06:00 am REPORT DATE :
SHUTDOWN DAY: REPORT SUBMISSION :
12-Mar-15
13-Mar-15
HSE STATISTICS TODAY TODATE TODATE
40
TODAY
-
No. of LTI's: - - No of Tools Box Talks:
No. of First Aid Cases: - 4 Man-hours Without LTI:
0.47%
0.21% 0.17% 0.16% 0.13%
0.46%
1.73%
3.06%
4.77%
5.18%5.00%
5.37%
5.85%
6.60%6.45% 6.54%
6.41%
5.90%
5.10%4.88%
4.55%
3.86%
3.20%
2.55%
1.65%1.46%
1.19%
0.79%1.01%
0.42%0.25%
0.11% 0.07% 0.08% 0.08% 0.03% 0.02% 0.01% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.47% 0.04% 0.17%
0.56%
0.24%
0.84% 0.76% 0.67%
1.75% 1.78%1.65% 1.65%
2.78%
3.21%
3.88%
5.12%5.02%
5.44%
5.11% 5.17%
6.33%
5.97%
3.78%
5.08%
3.79%
1.49%
1.81%
1.30%
2.39%
1.78%1.61%
1.95% 1.85%
2.52%
1.25%
0.66%
0.35%
2.00%
0.12% 0.10%0%
20%
40%
60%
80%
100%
0%
1%
2%
3%
4%
5%
6%
7%
1-Fe
b
2-Fe
b
3-Fe
b
4-Fe
b
5-Fe
b
6-Fe
b
7-Fe
b
8-Fe
b
9-Fe
b
10-F
eb
11-F
eb
12-F
eb
13-F
eb
14-F
eb
15-F
eb
16-F
eb
17-F
eb
18-F
eb
19-F
eb
20-F
eb
21-F
eb
22-F
eb
23-F
eb
24-F
eb
25-F
eb
26-F
eb
27-F
eb
28-F
eb
1-M
ar
2-M
ar
3-M
ar
4-M
ar
5-M
ar
6-M
ar
7-M
ar
8-M
ar
9-M
ar
10-M
ar
11-M
ar
12-M
ar
13-M
ar
14-M
ar
15-M
ar
16-M
ar
17-M
ar
18-M
ar
TOD
AT
E %
TO
DA
Y
%
96.82%3.18%
RAS LAFFAN OLEFINS COMPANY [RLOC]TURN AROUND RAS LAFFAN OLEFINS COMPANY FEB / MAR 2015
PROGRESS REPORTThursday, March 12, 2015
1
2
1 1.03% of project progress is hold due to RLOC. e.g De-blinding of furnaces, Loop Test.
MAN POWER STATUS
CONCERNS:-
MAJOR HIGHLIGHTS:-
473 jobs shut down works 100% completed.
De-blinding in progress
0
114
0
61
35
178
1422
100
120
75
28 22
45
9 6
122
165
84
34
0
20
40
60
80
100
120
140
160
180
200
PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL PLAN ACTUAL
DAY NIGHT DAY NIGHT DAY NIGHT DAY NIGHT DAY NIGHT
RLOC SUPPLY SUBCO DIRECT INDIRECT DESCON TOTAL
.
1-Fe
b
2-Fe
b
3-Fe
b
4-Fe
b
5-Fe
b
6-Fe
b
7-Fe
b
8-Fe
b
9-Fe
b
10-F
eb
11-F
eb
12-F
eb
13-F
eb
14-F
eb
15-F
eb
16-F
eb
17-F
eb
18-F
eb
19-F
eb
20-F
eb
21-F
eb
22-F
eb
23-F
eb
24-F
eb
25-F
eb
26-F
eb
27-F
eb
28-F
eb
1-M
ar
2-M
ar
3-M
ar
4-M
ar
5-M
ar
6-M
ar
7-M
ar
8-M
ar
9-M
ar
10-M
ar
11-M
ar
12-M
ar
13-M
ar
14-M
ar
15-M
ar
16-M
ar
17-M
ar
18-M
ar
0.50% 0.21% 0.17% 0.17% 0.14% 0.58% 2.21% 4.00% 5.74% 6.21% 5.72% 5.68% 5.84% 5.95% 5.59% 5.76% 5.72% 5.29% 4.67% 4.73% 4.42% 4.02% 3.16% 2.40% 1.54% 1.41% 1.03% 0.66% 0.99% 0.26% 0.16% 0.11% 0.07% 0.05% 0.04% 0.03% 0.02% 0.02% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.50% 0.02% 0.24% 0.70% 0.24% 1.02% 0.81% 0.79% 2.13% 2.92% 2.04% 1.06% 1.44% 4.05% 4.44% 6.18% 5.21% 6.02% 4.55% 5.64% 5.30% 6.15% 4.17% 4.11% 3.77% 1.17% 1.95% 1.48% 2.06% 1.64% 1.75% 1.36% 2.13% 1.93% 1.35% 0.65% 0.46% 0.77% 0.14% 0.00%
5.22% 5.44% 5.61% 5.78% 5.92% 6.50% 8.71% 12.71% 18.45% 24.65% 30.38% 36.06% 41.90% 47.85% 53.44% 59.20% 64.92% 70.21% 74.88% 79.61% 84.03% 88.05% 91.21% 93.61% 95.14% 96.55% 97.58% 98.23% 99.22% 99.48% 99.65% 99.76% 99.83% 99.88% 99.91% 99.94% 99.97% 99.98% 99.99% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
4.95% 4.98% 5.21% 5.91% 6.15% 7.16% 7.97% 8.76% 10.89% 13.81% 15.85% 16.90% 18.35% 22.39% 26.83% 33.01% 38.22% 44.24% 48.80% 54.44% 59.74% 65.89% 70.06% 74.17% 77.94% 79.11% 81.06% 82.54% 84.61% 86.25% 88.00% 89.36% 91.48% 93.41% 94.76% 95.41% 95.87% 96.63% 96.78% 96.78%
DATES
Daily Plan
Daily Actual
Cum Plan
Cum Actual
96.78% -3.22%
MONTH Feb-15 Mar-15
TODAY 0.00% 0.00% 0.00% TODATE 100.00%
ISBL PROGRESS CURVE:-OVERALL PLANNED ACTUAL VARIANCE OVERALL PLANNED ACTUAL VARIANCE
0.50%
0.21% 0.17% 0.17% 0.14%
0.58%
2.21%
4.00%
5.74%
6.21%
5.72% 5.68%
5.84%5.95%
5.59%
5.76% 5.72%
5.29%
4.67%4.73%
4.42%
4.02%
3.16%
2.40%
1.54%1.41%
1.03%
0.66%
0.99%
0.26%0.16% 0.11% 0.07% 0.05% 0.04% 0.03% 0.02% 0.02% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.50%
0.02%
0.24%
0.70%
0.24%
1.02%
0.81% 0.79%
2.13%
2.92%
2.04%
1.06%
1.44%
4.05%
4.44%
6.18%
5.21%
6.02%
4.55%
5.64%
5.30%
6.15%
4.17% 4.11%
3.77%
1.17%
1.95%
1.48%
2.06%
1.64%1.75%
1.36%
2.13%
1.93%
1.35%
0.65%
0.46%
0.77%
0.14%
0.00%0%
20%
40%
60%
80%
100%
0%
1%
2%
3%
4%
5%
6%
7%
1-Fe
b
2-Fe
b
3-Fe
b
4-Fe
b
5-Fe
b
6-Fe
b
7-Fe
b
8-Fe
b
9-Fe
b
10-F
eb
11-F
eb
12-F
eb
13-F
eb
14-F
eb
15-F
eb
16-F
eb
17-F
eb
18-F
eb
19-F
eb
20-F
eb
21-F
eb
22-F
eb
23-F
eb
24-F
eb
25-F
eb
26-F
eb
27-F
eb
28-F
eb
1-M
ar
2-M
ar
3-M
ar
4-M
ar
5-M
ar
6-M
ar
7-M
ar
8-M
ar
9-M
ar
10-M
ar
11-M
ar
12-M
ar
13-M
ar
14-M
ar
15-M
ar
16-M
ar
17-M
ar
18-M
ar
TOD
AT
E %
TO
DA
Y
%
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 5 of 31
.
1-Fe
b
2-Fe
b
3-Fe
b
4-Fe
b
5-Fe
b
6-Fe
b
7-Fe
b
8-Fe
b
9-Fe
b
10-F
eb
11-F
eb
12-F
eb
13-F
eb
14-F
eb
15-F
eb
16-F
eb
17-F
eb
18-F
eb
19-F
eb
20-F
eb
21-F
eb
22-F
eb
23-F
eb
24-F
eb
25-F
eb
26-F
eb
27-F
eb
28-F
eb
1-M
ar
2-M
ar
3-M
ar
4-M
ar
5-M
ar
6-M
ar
7-M
ar
8-M
ar
9-M
ar
10-M
ar
11-M
ar
12-M
ar
13-M
ar
14-M
ar
15-M
ar
16-M
ar
17-M
ar
18-M
ar
0.37% 0.18% 0.17% 0.14% 0.12% 0.11% 0.19% 0.10% 1.70% 1.90% 2.71% 4.37% 5.90% 8.69% 9.20% 9.00% 8.58% 7.84% 6.50% 5.38% 4.95% 3.38% 3.31% 3.01% 2.00% 1.62% 1.71% 1.20% 1.09% 0.91% 0.51% 0.12% 0.07% 0.16% 0.20% 0.04% 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.37% 0.02% 0.24% 0.70% 0.24% 1.02% 0.81% 0.79% 2.13% 2.92% 2.04% 1.06% 1.44% 4.05% 4.44% 7.09% 4.39% 3.59% 6.86% 3.68% 9.57% 5.38% 2.55% 8.15% 3.87% 2.51% 1.67% 0.74% 3.44% 2.22% 1.19% 3.82% 0.99% 4.43% 0.92% 0.69% 0.00% 5.89% 0.06% 0.00%
2.94% 3.11% 3.28% 3.42% 3.54% 3.65% 3.84% 3.94% 5.64% 7.54% 10.25% 14.62% 20.51% 29.20% 38.40% 47.41% 55.98% 63.82% 70.32% 75.69% 80.64% 84.02% 87.33% 90.35% 92.35% 93.96% 95.67% 96.87% 97.97% 98.88% 99.38% 99.50% 99.57% 99.73% 99.94% 99.98% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
4.45% 4.56% 4.56% 4.79% 5.04% 5.27% 5.85% 6.09% 6.36% 6.47% 6.84% 7.25% 8.58% 10.70% 13.18% 20.27% 24.66% 28.25% 35.11% 38.78% 48.35% 53.74% 56.29% 64.44% 68.31% 70.81% 72.48% 73.23% 76.67% 78.89% 80.07% 83.89% 84.89% 89.32% 90.24% 90.94% 90.94% 96.83% 96.89% 96.89%
Daily Plan
Daily Actual
Cum Plan
Cum Actual
MONTH Feb-15 Mar-15
DATES
ACTUAL VARIANCETODAY 0.00% 0.00% 0.00% TODATE 100.00% 96.89% -3.11%
OVERALL PLANNED ACTUAL VARIANCE OVERALL PLANNEDOSBL PROGRESS CURVE:-
0.37%0.18% 0.17% 0.14% 0.12% 0.11% 0.19% 0.10%
1.70%1.90%
2.71%
4.37%
5.90%
8.69%
9.20%9.00%
8.58%
7.84%
6.50%
5.38%
4.95%
3.38% 3.31%
3.01%
2.00%
1.62% 1.71%
1.20%1.09%
0.91%
0.51%
0.12% 0.07% 0.16% 0.20%0.04% 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.37%0.02%
0.24%
0.70%
0.24%
1.02%0.81% 0.79%
2.13%
2.92%
2.04%
1.06%
1.44%
4.05%
4.44%
7.09%
4.39%
3.59%
6.86%
3.68%
9.57%
5.38%
2.55%
8.15%
3.87%
2.51%
1.67%
0.74%
3.44%
2.22%
1.19%
3.82%
0.99%
4.43%
0.92%0.69%
0.00%
5.89%
0.06% 0.00%0%
20%
40%
60%
80%
100%
0%
2%
4%
6%
8%
10%
12%
1-Fe
b
2-Fe
b
3-Fe
b
4-Fe
b
5-Fe
b
6-Fe
b
7-Fe
b
8-Fe
b
9-Fe
b
10-F
eb
11-F
eb
12-F
eb
13-F
eb
14-F
eb
15-F
eb
16-F
eb
17-F
eb
18-F
eb
19-F
eb
20-F
eb
21-F
eb
22-F
eb
23-F
eb
24-F
eb
25-F
eb
26-F
eb
27-F
eb
28-F
eb
1-M
ar
2-M
ar
3-M
ar
4-M
ar
5-M
ar
6-M
ar
7-M
ar
8-M
ar
9-M
ar
10-M
ar
11-M
ar
12-M
ar
13-M
ar
14-M
ar
15-M
ar
16-M
ar
17-M
ar
18-M
ar
TOD
AT
E %
TO
DA
Y
%
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 6 of 31
.
1-Fe
b
2-Fe
b
3-Fe
b
4-Fe
b
5-Fe
b
6-Fe
b
7-Fe
b
8-Fe
b
9-Fe
b
10-F
eb
11-F
eb
12-F
eb
13-F
eb
14-F
eb
15-F
eb
16-F
eb
17-F
eb
18-F
eb
19-F
eb
20-F
eb
21-F
eb
22-F
eb
23-F
eb
24-F
eb
25-F
eb
26-F
eb
27-F
eb
28-F
eb
1-M
ar
2-M
ar
3-M
ar
4-M
ar
5-M
ar
6-M
ar
7-M
ar
8-M
ar
9-M
ar
10-M
ar
11-M
ar
12-M
ar
13-M
ar
14-M
ar
15-M
ar
16-M
ar
17-M
ar
18-M
ar
0.34% 0.49% 0.49% 0.48% 0.43% 0.66% 1.46% 2.59% 3.53% 3.94% 3.64% 4.03% 3.89% 4.53% 4.26% 4.77% 4.10% 4.85% 4.80% 6.00% 5.71% 5.36% 4.64% 2.99% 1.82% 1.38% 1.46% 0.96% 0.71% 0.48% 0.34% 0.24% 0.16% 0.13% 0.08% 0.04% 0.03% 0.02% 0.02% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.34% 0.00% 0.00% 1.87% 0.77% 2.07% 1.79% 0.63% 1.03% 0.59% 0.53% 0.40% 0.28% 2.12% 2.80% 7.05% 4.43% 5.17% 4.81% 1.42% 1.86% 4.04% 2.49% 1.64% 3.48% 0.95% 0.86% 1.84% 2.86% 2.07% 2.72% 1.52% 3.71% 7.13% 2.59% 1.26% 0.05% 0.65% 0.27% 0.00%
14.49% 14.98% 15.47% 15.95% 16.39% 17.05% 18.50% 21.09% 24.62% 28.56% 32.20% 36.24% 40.12% 44.65% 48.91% 53.67% 57.77% 62.62% 67.42% 73.42% 79.13% 84.49% 89.13% 92.12% 93.94% 95.32% 96.79% 97.74% 98.45% 98.93% 99.27% 99.51% 99.68% 99.80% 99.88% 99.92% 99.95% 99.97% 99.99% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
14.72% 14.72% 14.72% 16.59% 17.36% 19.43% 21.23% 21.86% 22.88% 23.48% 24.01% 24.41% 24.69% 26.81% 29.61% 36.66% 41.09% 46.26% 51.07% 52.50% 54.35% 58.39% 60.88% 62.52% 66.00% 66.95% 67.81% 69.66% 72.52% 74.59% 77.31% 78.83% 82.54% 89.67% 92.26% 93.52% 93.57% 94.22% 94.49% 94.49%
Daily Plan
Daily Actual
Cum Plan
Cum Actual
MONTH Feb-15 Mar-15
DATES
ACTUAL VARIANCETODAY 0.01% 0.00% -0.01% TODATE 100.00% 94.49% -5.51%
OVERALL PLANNED ACTUAL VARIANCE OVERALL PLANNEDPROJECTS (TWR's) PROGRESS CURVE:-
0.34%0.49% 0.49% 0.48% 0.43%
0.66%
1.46%
2.59%
3.53%
3.94%
3.64%
4.03%3.89%
4.53%
4.26%
4.77%
4.10%
4.85% 4.80%
6.00%
5.71%
5.36%
4.64%
2.99%
1.82%
1.38%1.46%
0.96%
0.71%
0.48%0.34%
0.24%0.16% 0.13% 0.08% 0.04% 0.03% 0.02% 0.02% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.34% 0.00% 0.00%
1.87%
0.77%
2.07%
1.79%
0.63%
1.03%
0.59% 0.53%0.40%
0.28%
2.12%
2.80%
7.05%
4.43%
5.17%
4.81%
1.42%
1.86%
4.04%
2.49%
1.64%
3.48%
0.95%0.86%
1.84%
2.86%
2.07%
2.72%
1.52%
3.71%
7.13%
2.59%
1.26%
0.05%
0.65%
0.27%
0.00%0%
20%
40%
60%
80%
100%
0%
1%
2%
3%
4%
5%
6%
7%
8%
1-Fe
b
2-Fe
b
3-Fe
b
4-Fe
b
5-Fe
b
6-Fe
b
7-Fe
b
8-Fe
b
9-Fe
b
10-F
eb
11-F
eb
12-F
eb
13-F
eb
14-F
eb
15-F
eb
16-F
eb
17-F
eb
18-F
eb
19-F
eb
20-F
eb
21-F
eb
22-F
eb
23-F
eb
24-F
eb
25-F
eb
26-F
eb
27-F
eb
28-F
eb
1-M
ar
2-M
ar
3-M
ar
4-M
ar
5-M
ar
6-M
ar
7-M
ar
8-M
ar
9-M
ar
10-M
ar
11-M
ar
12-M
ar
13-M
ar
14-M
ar
15-M
ar
16-M
ar
17-M
ar
18-M
ar
TOD
AT
E %
TO
DA
Y
%
.
1-Fe
b
2-Fe
b
3-Fe
b
4-Fe
b
5-Fe
b
6-Fe
b
7-Fe
b
8-Fe
b
9-Fe
b
10-F
eb
11-F
eb
12-F
eb
13-F
eb
14-F
eb
15-F
eb
16-F
eb
17-F
eb
18-F
eb
19-F
eb
20-F
eb
21-F
eb
22-F
eb
23-F
eb
24-F
eb
25-F
eb
26-F
eb
27-F
eb
28-F
eb
1-M
ar
2-M
ar
3-M
ar
4-M
ar
5-M
ar
6-M
ar
7-M
ar
8-M
ar
9-M
ar
10-M
ar
11-M
ar
12-M
ar
13-M
ar
14-M
ar
15-M
ar
16-M
ar
17-M
ar
18-M
ar
0.15% 0.02% 0.00% 0.00% 0.00% 0.49% 1.38% 2.49% 4.81% 5.01% 5.99% 6.35% 7.68% 7.36% 7.75% 7.66% 7.96% 6.85% 5.97% 5.10% 4.74% 3.20% 2.13% 1.48% 1.43% 1.37% 0.81% 0.77% 0.52% 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.58% 0.09% 0.46% 0.01% 0.00% 0.67% 0.14% 0.35% 0.63% 1.61% 0.81% 0.53% 1.20% 4.64% 4.38% 6.50% 8.50% 9.20% 3.90% 9.19% 10.98% 11.86% 7.33% 5.42% 2.43% 0.48% 0.77% 0.58% 0.50% 0.34% 0.68% 0.74% 1.91% 0.28% 0.26% 0.38% 0.48% 0.27% 0.00% 0.00%
0.62% 0.64% 0.64% 0.64% 0.64% 1.13% 2.51% 5.00% 9.82% 14.83% 20.81% 27.16% 34.84% 42.20% 49.95% 57.61% 65.57% 72.42% 78.39% 83.50% 88.23% 91.44% 93.57% 95.05% 96.47% 97.84% 98.65% 99.42% 99.94% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
0.58% 0.67% 1.13% 1.14% 1.14% 1.81% 1.95% 2.30% 2.93% 4.54% 5.35% 5.88% 7.08% 11.73% 16.11% 22.61% 31.11% 40.32% 44.22% 53.41% 64.39% 76.25% 83.58% 89.00% 91.43% 91.91% 92.67% 93.25% 93.75% 94.09% 94.77% 95.50% 97.42% 97.69% 97.95% 98.34% 98.82% 99.08% 99.08% 99.08%
Daily Plan
Daily Actual
Cum Plan
Cum Actual
MONTH Feb-15 Mar-15
DATES
ACTUAL VARIANCETODAY 0.00% 0.00% 0.00% TODATE 100.00% 99.08% -0.92%
OVERALL PLANNED ACTUAL VARIANCE OVERALL PLANNED
EXCHANGER PROGRESS CURVE:-
0.15% 0.02% 0.00% 0.00% 0.00%
0.49%
1.38%
2.49%
4.81%5.01%
5.99%6.35%
7.68%7.36%
7.75% 7.66%7.96%
6.85%
5.97%
5.10%4.74%
3.20%
2.13%
1.48% 1.43% 1.37%
0.81% 0.77%0.52%
0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.58% 0.09%0.46%
0.01%
0.00%
0.67%
0.14%0.35%
0.63%
1.61%
0.81%0.53%
1.20%
4.64%4.38%
6.50%
8.50%
9.20%
3.90%
9.19%
10.98%
11.86%
7.33%
5.42%
2.43%
0.48%0.77%
0.58% 0.50% 0.34%0.68% 0.74%
1.91%
0.28% 0.26% 0.38% 0.48%0.27%
0.00% 0.00%0%
20%
40%
60%
80%
100%
0%
2%
4%
6%
8%
10%
12%
14%
1-Fe
b
2-Fe
b
3-Fe
b
4-Fe
b
5-Fe
b
6-Fe
b
7-Fe
b
8-Fe
b
9-Fe
b
10-F
eb
11-F
eb
12-F
eb
13-F
eb
14-F
eb
15-F
eb
16-F
eb
17-F
eb
18-F
eb
19-F
eb
20-F
eb
21-F
eb
22-F
eb
23-F
eb
24-F
eb
25-F
eb
26-F
eb
27-F
eb
28-F
eb
1-M
ar
2-M
ar
3-M
ar
4-M
ar
5-M
ar
6-M
ar
7-M
ar
8-M
ar
9-M
ar
10-M
ar
11-M
ar
12-M
ar
13-M
ar
14-M
ar
15-M
ar
16-M
ar
17-M
ar
18-M
ar
TOD
AT
E %
TO
DA
Y %
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 8 of 31
.
1-Fe
b
2-Fe
b
3-Fe
b
4-Fe
b
5-Fe
b
6-Fe
b
7-Fe
b
8-Fe
b
9-Fe
b
10-F
eb
11-F
eb
12-F
eb
13-F
eb
14-F
eb
15-F
eb
16-F
eb
17-F
eb
18-F
eb
19-F
eb
20-F
eb
21-F
eb
22-F
eb
23-F
eb
24-F
eb
25-F
eb
26-F
eb
27-F
eb
28-F
eb
1-M
ar
2-M
ar
3-M
ar
4-M
ar
5-M
ar
6-M
ar
7-M
ar
8-M
ar
9-M
ar
10-M
ar
11-M
ar
12-M
ar
13-M
ar
14-M
ar
15-M
ar
16-M
ar
17-M
ar
18-M
ar
0.35% 0.15% 0.10% 0.10% 0.04% 0.47% 3.37% 4.38% 5.69% 5.53% 3.80% 4.61% 4.75% 5.78% 4.93% 5.52% 7.06% 6.40% 5.17% 4.08% 3.51% 3.68% 3.62% 2.92% 1.85% 2.05% 1.67% 1.42% 3.24% 1.22% 0.68% 0.17% 0.08% 0.17% 0.22% 0.05% 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1.41% 0.02% 0.11% 0.07% 0.14% 0.37% 0.62% 0.66% 1.36% 2.66% 3.99% 1.13% 1.00% 7.64% 2.15% 5.06% 3.01% 4.85% 4.55% 6.41% 6.42% 4.22% 3.67% 9.88% 2.08% 1.77% 4.79% 0.74% 3.23% 2.27% 1.64% 3.92% 1.60% 1.06% 1.55% 0.58% 0.92% 0.00% 0.00% 0.10%
1.48% 1.64% 1.74% 1.84% 1.88% 2.35% 5.71% 10.10% 15.79% 21.33% 25.12% 29.73% 34.48% 40.26% 45.19% 50.71% 57.77% 64.17% 69.34% 73.42% 76.94% 80.61% 84.23% 87.16% 89.01% 91.05% 92.72% 94.14% 97.38% 98.60% 99.28% 99.45% 99.53% 99.69% 99.91% 99.97% 99.99% 99.99% 99.99% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
1.41% 1.43% 1.54% 1.61% 1.75% 2.11% 2.73% 3.39% 4.75% 7.41% 11.40% 12.53% 13.53% 21.17% 23.32% 28.38% 31.39% 36.24% 40.80% 47.20% 53.63% 57.84% 61.52% 71.40% 73.48% 75.25% 80.04% 80.78% 84.01% 86.28% 87.92% 91.84% 93.44% 94.50% 96.04% 96.62% 97.53% 97.53% 97.53% 97.63%
Daily Plan
Daily Actual
Cum Plan
Cum Actual
MONTH Feb-15 Mar-15
DATES
ACTUAL VARIANCETODAY 0.00% 0.10% 0.10% TODATE 100.00% 97.63% -2.37%
OVERALL PLANNED ACTUAL VARIANCE OVERALL PLANNED
OTHER EQPT PROGRESS CURVE:-
0.35%
0.15% 0.10% 0.10% 0.04%
0.47%
3.37%
4.38%
5.69%5.53%
3.80%
4.61%4.75%
5.78%
4.93%
5.52%
7.06%
6.40%
5.17%
4.08%
3.51%3.68% 3.62%
2.92%
1.85%
2.05%
1.67%
1.42%
3.24%
1.22%
0.68%
0.17%0.08%
0.17% 0.22%0.05% 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1.41%
0.02% 0.11% 0.07%
0.14%
0.37%
0.62% 0.66%
1.36%
2.66%
3.99%
1.13%1.00%
7.64%
2.15%
5.06%
3.01%
4.85%
4.55%
6.41% 6.42%
4.22%
3.67%
9.88%
2.08%
1.77%
4.79%
0.74%
3.23%
2.27%
1.64%
3.92%
1.60%
1.06%
1.55%
0.58%
0.92%
0.00% 0.00%0.10%
0%
20%
40%
60%
80%
100%
0%
2%
4%
6%
8%
10%
12%
1-Fe
b
2-Fe
b
3-Fe
b
4-Fe
b
5-Fe
b
6-Fe
b
7-Fe
b
8-Fe
b
9-Fe
b
10-F
eb
11-F
eb
12-F
eb
13-F
eb
14-F
eb
15-F
eb
16-F
eb
17-F
eb
18-F
eb
19-F
eb
20-F
eb
21-F
eb
22-F
eb
23-F
eb
24-F
eb
25-F
eb
26-F
eb
27-F
eb
28-F
eb
1-M
ar
2-M
ar
3-M
ar
4-M
ar
5-M
ar
6-M
ar
7-M
ar
8-M
ar
9-M
ar
10-M
ar
11-M
ar
12-M
ar
13-M
ar
14-M
ar
15-M
ar
16-M
ar
17-M
ar
18-M
ar
TOD
AT
E %
TO
DA
Y %
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 9 of 31
.
1-Fe
b
2-Fe
b
3-Fe
b
4-Fe
b
5-Fe
b
6-Fe
b
7-Fe
b
8-Fe
b
9-Fe
b
10-F
eb
11-F
eb
12-F
eb
13-F
eb
14-F
eb
15-F
eb
16-F
eb
17-F
eb
18-F
eb
19-F
eb
20-F
eb
21-F
eb
22-F
eb
23-F
eb
24-F
eb
25-F
eb
26-F
eb
27-F
eb
28-F
eb
1-M
ar
2-M
ar
3-M
ar
4-M
ar
5-M
ar
6-M
ar
7-M
ar
8-M
ar
9-M
ar
10-M
ar
11-M
ar
12-M
ar
13-M
ar
14-M
ar
15-M
ar
16-M
ar
17-M
ar
18-M
ar
0.86% 0.19% 0.12% 0.10% 0.07% 0.04% 0.80% 2.03% 3.71% 4.01% 4.47% 4.49% 5.94% 7.49% 7.90% 7.96% 7.08% 6.49% 5.96% 6.02% 5.66% 3.86% 2.99% 3.48% 2.37% 1.89% 1.09% 0.40% 0.35% 0.20% 0.12% 0.10% 0.06% 0.06% 0.06% 0.06% 0.06% 0.03% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.86% 0.06% 0.23% 0.35% 0.01% 0.10% 0.32% 0.82% 4.95% 0.67% 1.56% 1.11% 1.84% 1.23% 6.11% 8.39% 5.48% 3.44% 7.06% 5.53% 8.13% 2.50% 2.10% 5.62% 7.76% 2.81% 0.00% 0.00% 1.38% 0.59% 0.19% 0.69% 0.28% 0.78% 0.80% 0.55% 0.10% 0.58% 0.06% 0.00%
2.25% 2.44% 2.56% 2.66% 2.72% 2.76% 3.56% 5.59% 9.30% 13.31% 17.79% 22.28% 28.22% 35.71% 43.61% 51.57% 58.65% 65.14% 71.10% 77.12% 82.78% 86.64% 89.63% 93.11% 95.48% 97.36% 98.46% 98.86% 99.21% 99.41% 99.53% 99.63% 99.69% 99.76% 99.82% 99.88% 99.94% 99.98% 99.98% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
2.42% 2.48% 2.72% 3.07% 3.07% 3.17% 3.50% 4.32% 9.26% 9.94% 11.49% 12.60% 14.43% 15.67% 21.78% 30.17% 35.64% 39.08% 46.14% 51.67% 59.80% 62.31% 64.40% 70.02% 77.78% 80.59% 80.59% 80.59% 81.96% 82.55% 82.74% 83.43% 83.70% 84.48% 85.28% 85.83% 85.92% 86.50% 86.56% 86.56%
Daily Plan
Daily Actual
Cum Plan
Cum Actual
MONTH Feb-15 Mar-15
DATES
ACTUAL VARIANCETODAY 0.00% 0.00% 0.00% TODATE 100.00% 86.56% -13.44%
OVERALL PLANNED ACTUAL VARIANCE OVERALL PLANNED
CUT & REWELD PROGRESS CURVE:-
0.86%
0.19% 0.12% 0.10% 0.07% 0.04%
0.80%
2.03%
3.71%
4.01%
4.47% 4.49%
5.94%
7.49%
7.90% 7.96%
7.08%
6.49%
5.96% 6.02%
5.66%
3.86%
2.99%
3.48%
2.37%
1.89%
1.09%
0.40% 0.35%0.20%
0.12% 0.10% 0.06% 0.06% 0.06% 0.06% 0.06% 0.03% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.86%
0.06%0.23%
0.35%
0.01%0.10%
0.32%
0.82%
4.95%
0.67%
1.56%
1.11%
1.84%
1.23%
6.11%
8.39%
5.48%
3.44%
7.06%
5.53%
8.13%
2.50%
2.10%
5.62%
7.76%
2.81%
0.00% 0.00%
1.38%
0.59%
0.19%
0.69%
0.28%
0.78% 0.80%
0.55%
0.10%
0.58%
0.06% 0.00%0%
20%
40%
60%
80%
100%
0%
1%
2%
3%
4%
5%
6%
7%
8%
9%
1-Fe
b
2-Fe
b
3-Fe
b
4-Fe
b
5-Fe
b
6-Fe
b
7-Fe
b
8-Fe
b
9-Fe
b
10-F
eb
11-F
eb
12-F
eb
13-F
eb
14-F
eb
15-F
eb
16-F
eb
17-F
eb
18-F
eb
19-F
eb
20-F
eb
21-F
eb
22-F
eb
23-F
eb
24-F
eb
25-F
eb
26-F
eb
27-F
eb
28-F
eb
1-M
ar
2-M
ar
3-M
ar
4-M
ar
5-M
ar
6-M
ar
7-M
ar
8-M
ar
9-M
ar
10-M
ar
11-M
ar
12-M
ar
13-M
ar
14-M
ar
15-M
ar
16-M
ar
17-M
ar
18-M
ar
TOD
AT
E %
TO
DA
Y %
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 10 of 31
.
1-Fe
b
2-Fe
b
3-Fe
b
4-Fe
b
5-Fe
b
6-Fe
b
7-Fe
b
8-Fe
b
9-Fe
b
10-F
eb
11-F
eb
12-F
eb
13-F
eb
14-F
eb
15-F
eb
16-F
eb
17-F
eb
18-F
eb
19-F
eb
20-F
eb
21-F
eb
22-F
eb
23-F
eb
24-F
eb
25-F
eb
26-F
eb
27-F
eb
28-F
eb
1-M
ar
2-M
ar
3-M
ar
4-M
ar
5-M
ar
6-M
ar
7-M
ar
8-M
ar
9-M
ar
10-M
ar
11-M
ar
12-M
ar
13-M
ar
14-M
ar
15-M
ar
16-M
ar
17-M
ar
18-M
ar
0.70% 0.00% 0.00% 0.00% 0.00% 1.15% 2.79% 5.41% 6.66% 8.82% 9.18% 10.84% 10.11% 11.29% 11.21% 9.10% 6.86% 4.29% 1.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.70% 0.00% 0.11% 0.44% 0.01% 0.69% 1.39% 1.49% 0.07% 12.45% 2.08% 0.63% 2.77% 1.69% 5.86% 2.47% 4.00% 4.76% 2.20% 2.07% 2.85% 4.35% 5.31% 3.97% 2.38% 2.94% 3.54% 4.81% 5.82% 4.22% 4.64% 2.47% 0.54% 0.94% 0.91% 0.45% 0.10% 0.36% 0.00% 0.00%
1.28% 1.28% 1.28% 1.28% 1.28% 2.43% 5.22% 10.63% 17.29% 26.11% 35.29% 46.13% 56.24% 67.53% 78.74% 87.84% 94.70% 98.99% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% #### #### #### #### ##### #### 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
2.36% 2.36% 2.47% 2.91% 2.92% 3.62% 5.01% 6.49% 6.57% 19.02% 21.10% 21.73% 24.50% 26.19% 32.04% 34.51% 38.51% 43.27% 45.47% 47.54% 50.39% 54.74% 60.05% 64.02% 66.40% 69.34% 72.88% 77.69% 83.50% #### #### #### #### 96.32% 97.22% 97.67% 97.78% 98.14% 98.14% 98.14%
Mar-15
CONTROL VALVE PROGRESS CURVE:-VARIANCE
-1.86%ACTUAL VARIANCE OVERALL PLANNEDOVERALL
Cum Plan
Cum Actual
MONTH
DATES
PLANNED
Daily Plan
Daily Actual
Feb-15
ACTUALTODAY 0.00% 0.00% 0.00% TODATE 100.00% 98.14%
0.70%
0.00% 0.00% 0.00% 0.00%
1.15%
2.79%
5.41%
6.66%
8.82%9.18%
10.84%
10.11%
11.29% 11.21%
9.10%
6.86%
4.29%
1.01%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.70% 0.00% 0.11%0.44%
0.01%
0.69%
1.39% 1.49%
0.07%
12.45%
2.08%
0.63%
2.77%
1.69%
5.86%
2.47%
4.00%
4.76%
2.20% 2.07%
2.85%
4.35%
5.31%
3.97%
2.38%
2.94%
3.54%
4.81%
5.82%
4.22%
4.64%
2.47%
0.54%
0.94% 0.91%
0.45%0.10%
0.36%0.00% 0.00%
0%
20%
40%
60%
80%
100%
0%
2%
4%
6%
8%
10%
12%
14%
1-Fe
b
2-Fe
b
3-Fe
b
4-Fe
b
5-Fe
b
6-Fe
b
7-Fe
b
8-Fe
b
9-Fe
b
10-
Feb
11-
Feb
12-
Feb
13-
Feb
14-
Feb
15-
Feb
16-
Feb
17-
Feb
18-
Feb
19-
Feb
20-
Feb
21-
Feb
22-
Feb
23-
Feb
24-
Feb
25-
Feb
26-
Feb
27-
Feb
28-
Feb
1-M
ar
2-M
ar
3-M
ar
4-M
ar
5-M
ar
6-M
ar
7-M
ar
8-M
ar
9-M
ar 10-
Mar 11-
Mar 12-
Mar 13-
Mar 14-
Mar 15-
Mar 16-
Mar 17-
Mar 18-
Mar
TOD
AT
E %
TO
DA
Y %
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 11 of 31
.
1-Fe
b
2-Fe
b
3-Fe
b
4-Fe
b
5-Fe
b
6-Fe
b
7-Fe
b
8-Fe
b
9-Fe
b
10-F
eb
11-F
eb
12-F
eb
13-F
eb
14-F
eb
15-F
eb
16-F
eb
17-F
eb
18-F
eb
19-F
eb
20-F
eb
21-F
eb
22-F
eb
23-F
eb
24-F
eb
25-F
eb
26-F
eb
27-F
eb
28-F
eb
1-M
ar
2-M
ar
3-M
ar
4-M
ar
5-M
ar
6-M
ar
7-M
ar
8-M
ar
9-M
ar
10-M
ar
11-M
ar
12-M
ar
13-M
ar
14-M
ar
15-M
ar
16-M
ar
17-M
ar
18-M
ar
1.49% 0.67% 0.51% 0.00% 0.00% 0.00% 0.00% 0.82% 6.97% 0.60% 0.00% 0.54% 0.00% 0.00% 0.36% 0.00% 6.63% 1.58% 8.43% 7.05% 16.22% 24.39% 18.35% 4.11% 0.45% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1.49% 0.31% 0.00% 0.00% 0.00% 0.00% 0.67% 0.05% 0.00% 0.00% 0.00% 0.64% 0.00% 0.00% 8.70% 13.63% 0.41% 0.00% 9.04% 0.82% 0.76% 0.15% 0.00% 0.00% 3.82% 0.00% 0.00% 0.00% 16.34% 0.00% 22.94% 1.58% 0.00% 6.11% 0.00% 0.00% 2.46% 3.82% 0.00% 0.00%
2.31% 2.98% 3.49% 3.49% 3.49% 3.49% 3.49% 4.31% 11.28% 11.88% 11.88% 12.43% 12.43% 12.43% 12.79% 12.79% 19.42% 20.99% 29.42% 36.47% 52.69% 77.09% 95.44% 99.55% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
2.15% 2.46% 2.46% 2.46% 2.46% 2.46% 3.13% 3.18% 3.18% 3.18% 3.18% 3.82% 3.82% 3.82% 12.52% 26.15% 26.55% 26.55% 35.59% 36.41% 37.17% 37.32% 37.32% 37.32% 41.15% 41.15% 41.15% 41.15% 57.48% 57.48% 80.42% 82.00% 82.00% 88.11% 88.11% 88.11% 90.57% 94.39% 94.39% 94.39%
Daily Plan
Daily Actual
Cum Plan
Cum Actual
MONTH Feb-15 Mar-15
DATES
ACTUAL VARIANCETODAY 0.00% 0.00% 0.00% TODATE 100.00% 94.39% -5.61%
OVERALL PLANNED ACTUAL VARIANCE OVERALL PLANNED
E&I PROGRESS CURVE:-
1.49%
0.67% 0.51%0.00% 0.00% 0.00% 0.00%
0.82%
6.97%
0.60%0.00%
0.54%0.00% 0.00%
0.36%0.00%
6.63%
1.58%
8.43%
7.05%
16.22%
24.39%
18.35%
4.11%
0.45%0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1.49% 0.31%0.00% 0.00%
0.00% 0.00%
0.67%0.05% 0.00% 0.00% 0.00%
0.64%0.00% 0.00%
8.70%
13.63%
0.41%0.00%
9.04%
0.82% 0.76%0.15% 0.00% 0.00%
3.82%
0.00% 0.00% 0.00%
16.34%
0.00%
22.94%
1.58%
0.00%
6.11%
0.00% 0.00%
2.46%
3.82%
0.00% 0.00%0%
20%
40%
60%
80%
100%
0%
5%
10%
15%
20%
25%
30%
1-Fe
b
2-Fe
b
3-Fe
b
4-Fe
b
5-Fe
b
6-Fe
b
7-Fe
b
8-Fe
b
9-Fe
b
10-F
eb
11-F
eb
12-F
eb
13-F
eb
14-F
eb
15-F
eb
16-F
eb
17-F
eb
18-F
eb
19-F
eb
20-F
eb
21-F
eb
22-F
eb
23-F
eb
24-F
eb
25-F
eb
26-F
eb
27-F
eb
28-F
eb
1-M
ar
2-M
ar
3-M
ar
4-M
ar
5-M
ar
6-M
ar
7-M
ar
8-M
ar
9-M
ar
10-M
ar
11-M
ar
12-M
ar
13-M
ar
14-M
ar
15-M
ar
16-M
ar
17-M
ar
18-M
ar
TOD
AT
E %
TO
DA
Y %
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 12 of 31
TURN AROUND RAS LAFFAN OLEFINS COMPANY [RLOC] FEB / MAR 2015
CRITICAL SYSTEMS / CRITICAL PATH OF TURN AROUNDSTEAM/ CONDENSATE PROGRESS CURVE
MONTH February‐15 March‐15
DAYS 01‐Feb 02‐Feb 03‐Feb 04‐Feb 05‐Feb 06‐Feb 07‐Feb 08‐Feb 09‐Feb 10‐Feb 11‐Feb 12‐Feb 13‐Feb 14‐Feb 15‐Feb 16‐Feb 17‐Feb 18‐Feb 19‐Feb 20‐Feb 21‐Feb 22‐Feb 23‐Feb 24‐Feb 25‐Feb 26‐Feb 27‐Feb 28‐Feb 01‐Mar 02‐Mar 03‐Mar 04‐Mar 05‐Mar 06‐Mar 07‐Mar 08‐Mar 09‐Mar 10‐Mar 11‐Mar 12‐Mar 13‐Mar 14‐Mar 15‐Mar 16‐Mar 17‐Mar 18‐Mar
Daily Plan 0.73% 0.22% 0.16% 0.16% 0.13% 0.11% 0.06% 0.03% 0.03% 0.03% 0.03% 3.39% 6.62% 11.25% 13.24% 13.09% 11.76% 11.05% 7.70% 6.65% 5.24% 2.56% 0.47% 0.34% 0.28% 0.28% 0.70% 0.24% 0.12% 0.05% 0.04% 0.04% 0.04% 0.04% 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Daily Actul 0.73% 0.17% 0.01% 0.35% 0.18% 0.09% 0.23% 0.43% 0.28% 0.16% 0.68% 0.35% 0.39% 1.39% 6.66% 13.49% 7.18% 7.24% 8.98% 7.73% 10.36% 5.21% 3.52% 7.19% 4.12% 0.99% 1.09% 0.45% 1.11% 0.77% 1.38% 0.43% 0.20% 0.59% 0.70% 0.03% 0.00% 0.08% 0.00% 0.00%
Cum Plan 3.85% 4.07% 4.23% 4.39% 4.52% 4.63% 4.68% 4.71% 4.73% 4.76% 4.79% 8.18% 14.80% 26.05% 39.28% 52.38% 64.14% 75.19% 82.89% 89.54% 94.78% 97.34% 97.80% 98.14% 98.42% 98.70% 99.40% 99.64% 99.76% 99.82% 99.85% 99.89% 99.93% 99.97% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Cum Actual 4.17% 4.34% 4.35% 4.70% 4.88% 4.97% 5.20% 5.63% 5.91% 6.07% 6.75% 7.10% 7.48% 8.87% 15.53% 29.02% 36.20% 43.44% 52.42% 60.15% 70.51% 75.73% 79.24% 86.43% 90.55% 91.54% 92.63% 93.08% 94.19% 94.96% 96.33% 96.77% 96.97% 97.56% 98.25% 98.29% 98.29% 98.37% 98.37% 98.37%
0.73%
0.22% 0.16% 0.16% 0.13% 0.11% 0.06% 0.03% 0.03% 0.03% 0.03%
3.39%
6.62%
11.25%
13.24% 13.09%
11.76%
11.05%
7.70%
6.65%
5.24%
2.56%
0.47% 0.34% 0.28% 0.28%0.70%
0.24% 0.12% 0.05% 0.04% 0.04% 0.04% 0.04% 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%0.00%
20.00%
40.00%
60.00%
80.00%
100.00%
0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
14.00%
16.00%
01‐Feb
02‐Feb
03‐Feb
04‐Feb
05‐Feb
06‐Feb
07‐Feb
08‐Feb
09‐Feb
10‐Feb
11‐Feb
12‐Feb
13‐Feb
14‐Feb
15‐Feb
16‐Feb
17‐Feb
18‐Feb
19‐Feb
20‐Feb
21‐Feb
22‐Feb
23‐Feb
24‐Feb
25‐Feb
26‐Feb
27‐Feb
28‐Feb
01‐M
ar
02‐M
ar
03‐M
ar
04‐M
ar
05‐M
ar
06‐ M
ar
07‐M
a r
08‐M
ar
09‐M
ar
10‐M
ar
11‐M
ar
12‐M
ar
13‐M
ar
14‐M
ar
15‐M
ar
16‐M
ar
17‐M
ar
18‐M
ar
Daily Plan Daily Actul Cum Plan Cum Actual
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 13 of 31
MONTH February‐15 March‐15
DAYS 01‐Feb 02‐Feb 03‐Feb 04‐Feb 05‐Feb 06‐Feb 07‐Feb 08‐Feb 09‐Feb 10‐Feb 11‐Feb 12‐Feb 13‐Feb 14‐Feb 15‐Feb 16‐Feb 17‐Feb 18‐Feb 19‐Feb 20‐Feb 21‐Feb 22‐Feb 23‐Feb 24‐Feb 25‐Feb 26‐Feb 27‐Feb 28‐Feb 01‐Mar 02‐Mar 03‐Mar 04‐Mar 05‐Mar 06‐Mar 07‐Mar 08‐Mar 09‐Mar 10‐Mar 11‐Mar 12‐Mar 13‐Mar 14‐Mar 15‐Mar 16‐Mar 17‐Mar 18‐Mar
Daily Plan 0.64% 0.08% 0.06% 0.14% 0.04% 0.02% 4.92% 5.93% 6.22% 6.48% 4.39% 4.09% 3.14% 3.03% 2.88% 4.26% 6.10% 6.48% 5.87% 5.53% 4.48% 2.38% 1.82% 2.02% 1.84% 1.92% 1.82% 2.04% 4.05% 0.56% 0.29% 0.20% 0.12% 0.12% 0.12% 0.12% 0.09% 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Daily Actul 0.64% 0.06% 0.52% 0.04% 0.00% 0.44% 0.10% 0.34% 2.04% 2.94% 5.51% 1.64% 1.66% 3.04% 7.24% 2.70% 6.28% 8.83% 4.21% 5.82% 4.37% 7.07% 3.77% 2.91% 3.66% 0.38% 1.73% 2.65% 2.30% 1.33% 1.23% 4.53% 0.00% 0.00% 0.00% 0.00% 0.63% 1.10% 0.19% 0.00%
Cum Plan 6.30% 6.38% 6.44% 6.58% 6.62% 6.64% 11.56% 17.49% 23.71% 30.19% 34.58% 38.67% 41.81% 44.84% 47.72% 51.99% 58.09% 64.56% 70.44% 75.97% 80.45% 82.83% 84.65% 86.67% 88.51% 90.43% 92.25% 94.29% 98.34% 98.89% 99.19% 99.39% 99.51% 99.63% 99.75% 99.88% 99.96% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Cum Actual 5.28% 5.33% 5.85% 5.89% 5.90% 6.34% 6.44% 6.79% 8.82% 11.77% 17.28% 18.92% 20.57% 23.62% 30.86% 33.56% 39.84% 48.67% 52.87% 58.70% 63.07% 70.13% 73.91% 76.82% 80.48% 80.86% 82.59% 85.24% 87.54% 88.87% 90.10% 94.63% 94.63% 94.63% 94.63% 94.63% 95.26% 96.35% 96.55% 96.55%
TURN AROUND RAS LAFFAN OLEFINS COMPANY [RLOC] FEB / MAR 2015
CRITICAL SYSTEMS / CRITICAL PATH OF TURN AROUNDCGC PROGRESS CURVE
0.64%
0.08% 0.06% 0.14% 0.04% 0.02%
4.92%
5.93%6.22%
6.48%
4.39%
4.09%
3.14% 3.03%2.88%
4.26%
6.10%
6.48%
5.87%
5.53%
4.48%
2.38%
1.82%2.02%
1.84% 1.92% 1.82%2.04%
4.05%
0.56%0.29% 0.20% 0.12% 0.12% 0.12% 0.12% 0.09% 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00%
20.00%
40.00%
60.00%
80.00%
100.00%
0.00%
1.00%
2.00%
3.00%
4.00%
5.00%
6.00%
7.00%
8.00%
9.00%
10.00%
01‐Feb
02‐Feb
03‐Feb
04‐Feb
05‐Feb
06‐Feb
07‐Feb
08‐Feb
09‐Feb
10‐Feb
11‐Feb
12‐Feb
13‐Feb
14‐Feb
15‐Feb
16‐Feb
17‐Feb
18‐Feb
19‐Feb
20‐Feb
21‐Feb
22‐Feb
23‐Feb
24‐Feb
25‐Feb
26‐Feb
27‐Feb
28‐Feb
01‐M
ar
02‐M
ar
03‐M
ar
04‐M
ar
05‐M
ar
06‐M
ar
07‐M
a r
08‐M
ar
09‐M
ar
10‐M
ar
11‐M
ar
12‐M
ar
13‐M
ar
14‐M
ar
15‐M
ar
16‐M
ar
17‐M
ar
18‐M
ar
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 14 of 31
TURN AROUND RAS LAFFAN OLEFINS COMPANY [RLOC] FEB / MAR 2015
CRITICAL SYSTEMS / CRITICAL PATH OF TURN AROUND
MONTH February‐15 March‐15
DAYS 01‐Feb 02‐Feb 03‐Feb 04‐Feb 05‐Feb 06‐Feb 07‐Feb 08‐Feb 09‐Feb 10‐Feb 11‐Feb 12‐Feb 13‐Feb 14‐Feb 15‐Feb 16‐Feb 17‐Feb 18‐Feb 19‐Feb 20‐Feb 21‐Feb 22‐Feb 23‐Feb 24‐Feb 25‐Feb 26‐Feb 27‐Feb 28‐Feb 01‐Mar 02‐Mar 03‐Mar 04‐Mar 05‐Mar 06‐Mar 07‐Mar 08‐Mar 09‐Mar 10‐Mar 11‐Mar 12‐Mar 13‐Mar 14‐Mar 15‐Mar 16‐Mar 17‐Mar 18‐Mar
Daily Plan 0.26% 0.24% 0.24% 0.21% 0.21% 0.18% 0.12% 0.00% 5.60% 5.83% 7.36% 7.38% 9.28% 9.40% 7.79% 7.31% 6.00% 5.26% 4.54% 3.54% 3.99% 3.42% 4.06% 5.18% 0.48% 0.18% 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Daily Actul 0.26% 0.00% 0.00% 0.02% 0.00% 0.00% 0.00% 0.02% 0.10% 0.00% 2.06% 0.00% 6.58% 6.21% 1.62% 3.75% 7.17% 1.49% 10.22% 3.68% 4.07% 5.10% 3.98% 22.23% 2.64% 2.08% 1.96% 0.35% 4.40% 0.71% 0.07% 1.90% 0.81% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Cum Plan 2.15% 2.39% 2.63% 2.84% 3.04% 3.23% 3.34% 3.34% 8.94% 14.78% 22.13% 29.52% 38.79% 48.19% 55.98% 63.29% 69.29% 74.56% 79.10% 82.64% 86.63% 90.05% 94.11% 99.29% 99.77% 99.95% ####### 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Cum Actual 5.72% 5.72% 5.72% 5.74% 5.74% 5.74% 5.74% 5.76% 5.86% 5.86% 7.92% 7.92% 14.50% 20.71% 22.33% 26.08% 33.26% 34.74% 44.97% 48.64% 52.71% 57.80% 61.78% 84.02% 86.66% 88.74% 90.69% 91.04% 95.44% 96.15% 96.22% 98.12% 98.93% 98.93% 98.93% 98.93% 98.93% 98.93% 98.93%
COOLING WATER/SEA WATER PROGRESS
0.26% 0.24% 0.24% 0.21% 0.21% 0.18% 0.12% 0.00%
5.60% 5.83%
7.36% 7.38%
9.28% 9.40%
7.79%7.31%
6.00%5.26%
4.54%
3.54%3.99%
3.42%4.06%
5.18%
0.48%0.18% 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00%
20.00%
40.00%
60.00%
80.00%
100.00%
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
01‐Feb
02‐Feb
03‐Feb
04‐Feb
05‐Feb
06‐Feb
07‐Feb
08‐Feb
09‐Feb
10‐Feb
11‐Feb
12‐Feb
13‐Feb
14‐Feb
15‐Feb
16‐Feb
17‐Feb
18‐Feb
19‐Feb
20‐Feb
21‐Feb
22‐Feb
23‐Feb
24‐Feb
25‐Feb
26‐Feb
27‐Feb
28‐Feb
01‐M
ar
02‐M
ar
03‐M
ar
04‐M
ar
05‐M
ar
06‐M
ar
07‐M
ar
08‐M
ar
09‐M
ar
10‐M
ar
11‐M
ar
12‐M
ar
13‐M
ar
14‐M
ar
15‐M
ar
16‐M
ar
17‐M
ar
18‐M
ar
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 15 of 31
TURN AROUND RAS LAFFAN OLEFINS COMPANY [RLOC] FEB / MAR 2015
CRITICAL SYSTEMS / CRITICAL PATH OF TURN AROUND
MONTH February‐15 March‐15
DAYS 01‐Feb 02‐Feb 03‐Feb 04‐Feb 05‐Feb 06‐Feb 07‐Feb 08‐Feb 09‐Feb 10‐Feb 11‐Feb 12‐Feb 13‐Feb 14‐Feb 15‐Feb 16‐Feb 17‐Feb 18‐Feb 19‐Feb 20‐Feb 21‐Feb 22‐Feb 23‐Feb 24‐Feb 25‐Feb 26‐Feb 27‐Feb 28‐Feb 01‐Mar 02‐Mar 03‐Mar 04‐Mar 05‐Mar 06‐Mar 07‐Mar 08‐Mar 09‐Mar 10‐Mar 11‐Mar 12‐Mar 13‐Mar 14‐Mar 15‐Mar 16‐Mar 17‐Mar 18‐Mar
Daily Plan 0.18% 0.11% 0.03% 0.00% 0.00% 0.00% 0.98% 3.74% 2.53% 3.32% 4.44% 6.25% 8.23% 7.31% 5.67% 6.53% 9.60% 5.46% 5.05% 6.51% 6.50% 4.85% 3.93% 2.36% 0.95% 0.16% 0.16% 0.29% 0.41% 0.26% 0.16% 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Daily Actul 0.18% 0.00% 0.42% 0.00% 0.00% 3.32% 0.36% 0.00% 0.80% 3.33% 0.17% 0.00% 4.15% 4.14% 2.79% 10.19% 5.67% 6.24% 7.39% 7.73% 3.97% 5.82% 9.67% 6.38% 0.42% 1.02% 0.38% 0.03% 1.08% 0.00% 2.37% 4.65% 0.00% 0.00% 0.00% 0.49% 0.00% 0.01% 0.00% 0.00%
Cum Plan 4.13% 4.24% 4.26% 4.26% 4.26% 4.26% 5.24% 8.98% 11.51% 14.83% 19.27% 25.52% 33.75% 41.06% 46.72% 53.26% 62.86% 68.32% 73.37% 79.88% 86.38% 91.24% 95.17% 97.53% 98.47% 98.63% 98.78% 99.07% 99.48% 99.74% 99.90% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Cum Actual 3.80% 3.80% 4.22% 4.22% 4.22% 7.53% 7.90% 7.90% 8.70% 12.03% 12.20% 12.20% 16.35% 20.49% 23.28% 33.47% 39.14% 45.38% 52.77% 60.49% 64.47% 70.28% 79.95% 86.34% 86.75% 87.77% 88.15% 88.18% 89.27% 89.27% 91.64% 96.29% 96.29% 96.29% 96.29% 96.77% 96.77% 96.79% 96.79% 96.79%
DRYERS PROGRESS CURVE
0.18% 0.11% 0.03% 0.00% 0.00% 0.00%
0.98%
3.74%
2.53%
3.32%
4.44%
6.25%
8.23%
7.31%
5.67%
6.53%
9.60%
5.46%
5.05%
6.51% 6.50%
4.85%
3.93%
2.36%
0.95%
0.16% 0.16% 0.29% 0.41%0.26% 0.16% 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00%
20.00%
40.00%
60.00%
80.00%
100.00%
0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
01‐Feb
02‐Feb
03‐Feb
04‐Feb
05‐Feb
06‐Feb
07‐Feb
08‐Feb
09‐Feb
10‐Feb
11‐Feb
12‐Feb
13‐Feb
14‐Feb
15‐Feb
16‐Feb
17‐Feb
18‐Feb
19‐Feb
20‐Feb
21‐Feb
22‐Feb
23‐Feb
24‐Feb
25‐Feb
26‐Feb
27‐Feb
28‐Feb
01‐M
ar
02‐M
ar
03‐M
ar
04‐M
ar
05‐M
ar
06‐M
ar
07‐M
ar
08‐M
ar
09‐M
ar
10‐M
ar
11‐M
ar
12‐M
ar
13‐M
ar
14‐M
ar
15‐M
ar
16‐M
ar
17‐M
ar
18‐M
ar
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 16 of 31
TURN AROUND RAS LAFFAN OLEFINS COMPANY [RLOC] FEB / MAR 2015
CRITICAL SYSTEMS / CRITICAL PATH OF TURN AROUND
MONTH February‐15 March‐15
DAYS 01‐Feb 02‐Feb 03‐Feb 04‐Feb 05‐Feb 06‐Feb 07‐Feb 08‐Feb 09‐Feb 10‐Feb 11‐Feb 12‐Feb 13‐Feb 14‐Feb 15‐Feb 16‐Feb 17‐Feb 18‐Feb 19‐Feb 20‐Feb 21‐Feb 22‐Feb 23‐Feb 24‐Feb 25‐Feb 26‐Feb 27‐Feb 28‐Feb 01‐Mar 02‐Mar 03‐Mar 04‐Mar 05‐Mar 06‐Mar 07‐Mar 08‐Mar 09‐Mar 10‐Mar 11‐Mar 12‐Mar 13‐Mar 14‐Mar 15‐Mar 16‐Mar 17‐Mar 18‐Mar
Daily Plan 0.47% 0.31% 0.25% 0.22% 0.09% 0.00% 0.00% 0.00% 4.97% 7.98% 3.73% 4.18% 5.18% 6.55% 4.58% 5.18% 4.27% 5.49% 5.61% 4.79% 4.40% 3.08% 3.61% 4.99% 4.54% 5.62% 2.96% 0.62% 0.27% 0.24% 0.24% 0.22% 0.16% 0.13% 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Daily Actul 0.47% 0.05% 0.07% 1.96% 0.00% 0.00% 0.77% 1.45% 0.36% 0.9% 1.6% 0.7% 3.9% 6.1% 1.5% 2.8% 4.4% 2.1% 1.1% 6.7% 2.2% 3.3% 3.2% 6.7% 4.9% 3.1% 1.6% 0.9% 1.8% 5.1% 2.2% 17.9% 0.0% 0.0% 0.0% 0.0% 0.0% 0.6% 0.4% 0.0%
Cum Plan 5.49% 5.80% 6.06% 6.28% 6.37% 6.37% 6.37% 6.37% 11.35% 19.33% 23.05% 27.23% 32.41% 38.96% 43.55% 48.72% 52.99% 58.48% 64.09% 68.88% 73.28% 76.36% 79.98% 84.97% 89.51% 95.13% 98.09% 98.71% 98.98% 99.22% 99.46% 99.68% 99.83% 99.96% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Cum Actual 5.33% 5.38% 5.45% 7.41% 7.41% 7.41% 8.18% 9.62% 9.98% 10.9% 12.4% 13.1% 17.0% 23.2% 24.7% 27.5% 31.9% 34.0% 35.1% 41.8% 44.0% 47.3% 50.5% 57.2% 62.1% 65.2% 66.8% 67.7% 69.5% 74.6% 76.8% 94.7% 94.7% 94.7% 94.7% 94.7% 94.7% 95.2% 95.6% 95.6%
QUENCH TOWER PROGRESS CURVE
0.47% 0.31% 0.25% 0.22% 0.09% 0.00% 0.00% 0.00%
4.97%
7.98%
3.73%4.18%
5.18%
6.55%
4.58%5.18%
4.27%
5.49% 5.61%
4.79%4.40%
3.08%3.61%
4.99%4.54%
5.62%
2.96%
0.62%0.27% 0.24% 0.24% 0.22% 0.16% 0.13% 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00%
20.00%
40.00%
60.00%
80.00%
100.00%
0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
14.00%
16.00%
18.00%
20.00%
01‐Feb
02‐Feb
03‐Feb
04‐Feb
05‐Feb
06‐Feb
07‐Feb
08‐Feb
09‐Feb
10‐Feb
11‐Feb
12‐Feb
13‐Feb
14‐Feb
15‐Feb
16‐Feb
17‐Feb
18‐Feb
19‐Feb
20‐Feb
21‐Feb
22‐Feb
23‐Feb
24‐Feb
25‐Feb
26‐Feb
27‐Feb
28‐Feb
01‐M
ar
02‐M
ar
03‐M
ar
04‐M
ar
05‐M
ar
06‐M
ar
07‐M
ar
08‐M
ar
09‐M
ar
10‐M
ar
11‐M
ar
12‐M
ar
13‐M
ar
14‐M
ar
15‐M
ar
16‐M
ar
17‐M
ar
18‐M
ar
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 17 of 31
TURN AROUND RAS LAFFAN OLEFINS COMPANY [RLOC] FEB / MAR 2015
EQUIPMENT TYPE WISE PROGRESS JOB TYPE WISE PROGRESS
93.64%
99.42%
99.11%
99.59%
99.85%
97.97%
94.76%
92.08%
99.61%
95.24%
86.24%
99.81%
98.11%
99.81%
96.47%
98.14%
98.95%
93.38%
99.81%
95.78%
96.55%
84.44%
100.00%
96.53%
93.53%
83.90%
93.72%
98.85%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
PIPING
CONTROL VALVE
EXCHANGER
ROT EQP
PRV
DRUM
FILTER
ELECTRICAL
MOV
TOWER
INSTRUMENT
ELECT HEATER
TANK
SUMP
ACTUAL PLANNED
98.51%
99.41%
83.90%
99.64%
99.61%
99.53%
99.85%
86.43%
99.83%
96.86%
96.97%
99.28%
99.95%
99.61%
100.00%
98.36%
98.14%
96.06%
97.37%
93.13%
96.24%
99.81%
93.49%
96.95%
93.76%
94.61%
97.35%
100.00%
80.16%
100.00%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
PIPING CW
CV OVL
PRJCT CPX
INSPECTION
ROT EQUIP
PIPING MECH
PRV
PRJCT
INSPN+TSA
CUI
INST
CUI+INSP
LDAR
INSULATION
ELECTRICAL
ACTUAL PLANNED
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 18 of 31
TA JOB TAG WISE PROGRESS
EQUIPMENT TYPE SYSTEM JOB TYPE TA15 JOB ID EQPT TAG PLANNED TILL DATE ACTUAL TILL DATE VARIANCE % % COMPLETION REMARKS
CUI R15E‐620‐027 RC2‐32‐620‐95‐T‐602 100.00% 100.00% 0.00% 100.00%CUI+INSP R15E‐610‐011 RC2‐32‐610‐95‐T‐601 100.00% 100.00% 0.00% 100.00%CUI+INSP R15E‐330‐014 RC2‐32‐330‐95‐T‐301 100.00% 100.00% 0.00% 100.00%PRJCT R15E‐330‐016 RC2‐32‐330‐95‐T‐301 100.00% 100.00% 0.00% 100.00%
DE‐ETHANISER CUI+INSP R15E‐510‐035 RC2‐32‐510‐95‐T‐501 100.00% 100.00% 0.00% 100.00%DE‐METHANISER / HYDROGEN PRJCT R15E‐420‐012 RC2‐32‐420‐95‐T‐401 100.00% 99.69% ‐0.31% 99.69%ETHYLENE PRODUCT CUI+INSP R15E‐520‐034 RC2‐32‐520‐95‐T‐502 100.00% 100.00% 0.00% 100.00%PYGAS CUI R15E‐710‐044 RC2‐32‐710‐95‐T‐701 100.00% 100.00% 0.00% 100.00%
CHEM CLEAN R15E‐210‐018 RC2‐32‐210‐95‐T‐201 100.00% 100.00% 0.00% 100.00%CUI+INSP R15E‐220‐021 RC2‐32‐220‐95‐T‐202 100.00% 100.00% 0.00% 100.00%MEDIA RPL R15E‐210‐019 RC2‐32‐210‐95‐T‐201 100.00% 100.00% 0.00% 100.00%
THERMAL OXIDIZER REFRACTORY R15U‐050‐003 RC2‐31‐050‐36‐C‐1224 100.00% 100.00% 0.00% 100.00%ACID STORAGE INSPECTION R15U‐075‐008 RC2‐31‐075‐95‐TK‐1148 100.00% 100.00% 0.00% 100.00%C9+ STORAGE INSPECTION R15U‐075‐006 RC2‐31‐075‐95‐TK‐1144 100.00% 70.56% ‐29.44% 70.56%
R15U‐060‐007 RC2‐31‐060‐95‐TK‐1213 100.00% 100.00% 0.00% 100.00%R15U‐075‐007 RC2‐31‐075‐95‐TK‐1147 100.00% 100.00% 0.00% 100.00%
ETHANE STORAGE INSPECTION R15U‐071‐015 RC2‐31‐071‐95‐TK‐1140 100.00% 100.00% 0.00% 100.00%PYGAS INSPECTION R15U‐074‐002 RC2‐31‐074‐95‐TK‐1152 100.00% 76.48% ‐23.52% 76.48%SPENT CAUSTIC OXIDATION CUI+INSP R15U‐080‐005 RC2‐31‐080‐95‐TK‐341 100.00% 100.00% 0.00% 100.00%
R15U‐022‐007 RC2‐31‐022‐95‐TK‐1263 100.00% 100.00% 0.00% 100.00%R15U‐022‐008 RC2‐31‐022‐95‐TK‐1264 100.00% 100.00% 0.00% 100.00%R15U‐060‐006 RC2‐31‐060‐95‐TK‐1212 100.00% 100.00% 0.00% 100.00%R15U‐060‐008 RC2‐31‐060‐95‐TK‐1244 100.00% 100.00% 0.00% 100.00%R15U‐060‐013 RC2‐31‐060‐95‐TK‐1248 100.00% 95.76% ‐4.24% 95.76%
PIPING MECH R15U‐060‐019 RC2‐31‐060‐095‐TK‐1249 100.00% 97.78% ‐2.22% 97.78%PRJCT CPX R15U‐060‐012 RC2‐31‐060‐95‐TK‐1244 100.00% 100.00% 0.00% 100.00%
SUMP STEAM/ CONDENSATE INSPECTION R15U‐022‐006 RC2‐31‐022‐95‐S‐1228 100.00% 100.00% 0.00% 100.00%R15E‐310‐010 RC2‐32‐310‐16‐C‐302A 100.00% 100.00% 0.00% 100.00%R15E‐310‐011 RC2‐32‐310‐16‐CC‐301A 100.00% 99.02% ‐0.98% 99.02%R15E‐310‐012 RC2‐32‐310‐16‐CC‐301C 100.00% 99.18% ‐0.82% 99.18%R15E‐310‐119 RC2‐32‐310‐16‐CC‐301B 100.00% 98.60% ‐1.40% 98.60%R15E‐310‐120 RC2‐32‐310‐16‐C‐302B 100.00% 100.00% 0.00% 100.00%R15E‐820‐002 RC2‐32‐820‐16‐C‐802 100.00% 100.00% 0.00% 100.00%R15E‐820‐025 RC2‐32‐820‐84‐ST‐802 100.00% 100.00% 0.00% 100.00%R15E‐810‐002 RC2‐32‐810‐16‐C‐801 100.00% 100.00% 0.00% 100.00%R15E‐810‐039 RC2‐32‐810‐84‐ST‐801 100.00% 100.00% 0.00% 100.00%
PIPING MECH R15E‐310‐045 RC2‐32‐310‐84‐ST‐301 100.00% 100.00% 0.00% 100.00%ROT EQUIP R15E‐310‐044 RC2‐32‐310‐84‐ST‐301 100.00% 100.00% 0.00% 100.00%
C3/C4 PRV R15E‐620‐057 RC2‐32‐620‐93‐V‐0404 100.00% 100.00% 0.00% 100.00%R15E‐400‐004 RC2‐32‐400‐93‐V‐1086 100.00% 100.00% 0.00% 100.00%R15E‐400‐005 RC2‐32‐400‐93‐V‐1087 100.00% 100.00% 0.00% 100.00%R15E‐400‐006 RC2‐32‐400‐93‐V‐1088 100.00% 100.00% 0.00% 100.00%R15E‐400‐007 RC2‐32‐400‐93‐V‐1089 100.00% 100.00% 0.00% 100.00%R15E‐410‐023 RC2‐32‐410‐93‐V‐0033 100.00% 100.00% 0.00% 100.00%R15E‐410‐066 RC2‐32‐410‐93‐V‐0029 100.00% 100.00% 0.00% 100.00%R15E‐820‐026 RC2‐32‐820‐93‐V‐1406 100.00% 100.00% 0.00% 100.00%R15E‐820‐069 RC2‐32‐820‐93‐V‐1033 100.00% 100.00% 0.00% 100.00%R15E‐810‐049 RC2‐32‐810‐93‐V‐1128 100.00% 100.00% 0.00% 100.00%
TOWER
C3/C4
CAUSTIC TOWER
QUENCH TOWER
TANK
CAUSTIC STORAGE INSPECTION
STEAM/ CONDENSATE INSPECTION
WASTE WATERINSPECTION
ROT EQP
CGC ROT EQUIP
ETHYLENE REFRIGERATION ROT EQUIP
PROPANE REFRIGERATION ROT EQUIP
VHP
PRV
DE‐METHANISER / HYDROGEN PRV
ETHYLENE REFRIGERATION PRV
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 19 of 31
TA JOB TAG WISE PROGRESS
EQUIPMENT TYPE SYSTEM JOB TYPE TA15 JOB ID EQPT TAG PLANNED TILL DATE ACTUAL TILL DATE VARIANCE % % COMPLETION REMARKS
R15E‐810‐050 RC2‐32‐810‐93‐V‐1205 100.00% 100.00% 0.00% 100.00%R15E‐810‐051 RC2‐32‐810‐93‐V‐1406 100.00% 100.00% 0.00% 100.00%R15E‐810‐101 RC2‐32‐810‐93‐V‐1025 100.00% 100.00% 0.00% 100.00%
QUENCH TOWER PRV R15E‐310‐123 RC2‐32‐310‐93‐V‐1430 100.00% 100.00% 0.00% 100.00%STEAM/ CONDENSATE PRV R15E‐002‐017 RC2‐31‐002‐PRV‐0029 A/C/D/E/F/G 100.00% 100.00% 0.00% 100.00%
R15E‐310‐050 RC2‐32‐310‐93‐V‐1712 100.00% 100.00% 0.00% 100.00%R15E‐310‐051 RC2‐32‐310‐93‐V‐1713 100.00% 100.00% 0.00% 100.00%R15E‐600‐004 RC2‐32‐610‐95‐T‐601 100.00% 100.00% 0.00% 100.00%R15E‐600‐005 RC2‐32‐620‐95‐T‐602 100.00% 100.00% 0.00% 100.00%R15E‐600‐006 RC2‐32‐620‐95‐R‐682B 100.00% 100.00% 0.00% 100.00%R15E‐600‐007 RC2‐32‐620‐95‐R‐682B 100.00% 100.00% 0.00% 100.00%R15E‐610‐026 RC2‐32‐610‐61‐H‐0008/0009 100.00% 100.00% 0.00% 100.00%R15E‐620‐016 RC2‐32‐620‐95‐R‐681B 100.00% 100.00% 0.00% 100.00%R15E‐620‐017 RC2‐32‐620‐95‐R‐681A/B 100.00% 100.00% 0.00% 100.00%R15U‐073‐005 RC2‐31‐073‐93‐V‐0052A 100.00% 100.00% 0.00% 100.00%R15U‐073‐006 RC2‐31‐073‐93‐V‐0052B 100.00% 100.00% 0.00% 100.00%R15E‐620‐019 RC2‐32‐620‐95‐R‐681A/B 100.00% 99.42% ‐0.58% 99.42%R15E‐620‐024 RC2‐32‐620‐95‐R‐682A/B 100.00% 100.00% 0.00% 100.00%R15E‐330‐009 RC2‐32‐330‐95‐T‐301 100.00% 100.00% 0.00% 100.00%R15E‐330‐011 RC2‐32‐330‐95‐T‐301 100.00% 100.00% 0.00% 100.00%R15E‐330‐038 RC2‐32‐330‐61‐H‐0002 100.00% 100.00% 0.00% 100.00%R15E‐330‐003 RC2‐32‐330‐43‐L‐0020 100.00% 100.00% 0.00% 100.00%R15E‐330‐004 RC2‐32‐330‐67‐P‐302A 100.00% 100.00% 0.00% 100.00%R15E‐330‐006 RC2‐32‐330‐67‐P‐302C 100.00% 100.00% 0.00% 100.00%R15E‐330‐012 RC2‐32‐330‐95‐T‐301 100.00% 100.00% 0.00% 100.00%
LDAR R15E‐710‐098 RC2‐32‐320‐25‐D‐301A 100.00% 100.00% 0.00% 100.00%R15E‐310‐018 RC2‐32‐310‐41‐E‐301 100.00% 100.00% 0.00% 100.00%R15E‐310‐035 RC2‐32‐310‐43‐L‐0143 100.00% 100.00% 0.00% 100.00%R15E‐410‐057 RC2‐32 100.00% 100.00% 0.00% 100.00%R15E‐410‐058 RC2‐32‐310‐16‐C‐301 100.00% 92.34% ‐7.66% 92.34%R15E‐310‐049 RC2‐32‐310‐93‐V‐0201A 100.00% 100.00% 0.00% 100.00%R15E‐310‐056 RC2‐32‐310‐95‐D‐323 100.00% 100.00% 0.00% 100.00%R15E‐310‐124 RC2‐32‐310‐SV‐1936 / 1937A&B 100.00% 100.00% 0.00% 100.00%
PRJCT CPX R15E‐310‐113 RC2‐31‐045‐41‐E‐1213 100.00% 100.00% 0.00% 100.00%INSPECTION R15U‐025‐001 RC2‐31‐025 100.00% 100.00% 0.00% 100.00%
R15E‐210‐017 RC2‐32‐210‐95‐T‐201 100.00% 100.00% 0.00% 100.00%R15U‐025‐007 RC2‐31‐025‐41‐E‐1204 A TO O 100.00% 100.00% 0.00% 100.00%R15U‐025‐010 RC2‐31‐025‐67‐P‐1205A 100.00% 100.00% 0.00% 100.00%R15U‐025‐018 RC2‐31‐025‐41‐E‐1204 A‐O 100.00% 100.00% 0.00% 100.00%R15E‐210‐001 RC2‐32‐210‐41‐E‐202C 100.00% 100.00% 0.00% 100.00%R15E‐310‐023 RC2‐32‐310‐41‐E‐304 100.00% 100.00% 0.00% 100.00%R15U‐024‐021 RC2‐31‐024‐ST‐1202B 100.00% 100.00% 0.00% 100.00%R15U‐025‐008 RC2‐31‐025‐41‐E‐1204 E 100.00% 100.00% 0.00% 100.00%R15U‐025‐009 RC2‐31‐025‐41‐E‐1204G 100.00% 100.00% 0.00% 100.00%R15U‐025‐011 RC2‐31‐025‐67‐P‐1205A 100.00% 100.00% 0.00% 100.00%
PRJCT CPX R15U‐025‐002 RC2‐31‐025‐41‐E‐1204A 100.00% 100.00% 0.00% 100.00%PIPING CW R15E‐510‐074 RC2‐32‐510‐95‐R‐581A 100.00% 97.95% ‐2.05% 97.95%
R15E‐510‐007 RC2‐32‐510‐41‐E‐502 100.00% 100.00% 0.00% 100.00%R15E‐510‐011 RC2‐32‐510‐41‐E‐503B 100.00% 100.00% 0.00% 100.00%
PROPANE REFRIGERATION PRV
VHP PRV
CGC
PIPING CW
PIPING MECH
COOLING WATER/SEA WATER
PIPING CW
PIPING MECH
C3/C4
PIPING CW
PIPING MECH
PRJCT
CAUSTIC TOWER
PIPING CW
PIPING MECH
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 20 of 31
TA JOB TAG WISE PROGRESS
EQUIPMENT TYPE SYSTEM JOB TYPE TA15 JOB ID EQPT TAG PLANNED TILL DATE ACTUAL TILL DATE VARIANCE % % COMPLETION REMARKS
R15E‐510‐026 RC2‐32‐510‐67‐P‐501A 100.00% 100.00% 0.00% 100.00%R15E‐510‐027 RC2‐32‐510‐67‐P‐501B 100.00% 100.00% 0.00% 100.00%R15E‐510‐028 RC2‐32‐510‐67‐P‐501B 100.00% 100.00% 0.00% 100.00%R15E‐510‐066 RC2‐32‐510‐43‐AT‐0255 100.00% 100.00% 0.00% 100.00%
PRJCT R15E‐510‐002 RC2‐32‐510‐41‐E‐503 100.00% 94.85% ‐5.15% 94.85%R15E‐410‐003 RC2‐32‐410‐16‐C‐401 100.00% 96.97% ‐3.03% 96.97%R15E‐410‐007 RC2‐32‐410‐16‐C‐403 100.00% 96.97% ‐3.03% 96.97%R15E‐410‐002 RC2‐32‐410‐16‐C‐401 100.00% 86.43% ‐13.57% 86.43%R15E‐410‐004 RC2‐32‐410‐16‐C‐402 100.00% 76.25% ‐23.75% 76.25%R15E‐410‐006 RC2‐32‐410‐16‐C‐403 100.00% 76.25% ‐23.75% 76.25%R15E‐410‐008 RC2‐32‐410‐16‐C‐404 100.00% 64.06% ‐35.94% 64.06%R15E‐410‐018 RC2‐32‐410‐43‐L‐0120 OF D‐421 (INST) 100.00% 100.00% 0.00% 100.00%R15E‐410‐063 RC2‐32‐410‐43‐L‐0132 OF D‐422 (INST) 100.00% 100.00% 0.00% 100.00%R15E‐410‐065 RC2‐32‐410‐24‐E‐404 100.00% 100.00% 0.00% 100.00%R15E‐420‐001 RC2‐32‐420‐95‐T‐401 100.00% 100.00% 0.00% 100.00%R15E‐420‐006 RC2‐32‐420‐67‐P‐401A 100.00% 100.00% 0.00% 100.00%R15E‐420‐008 RC2‐32‐420‐67‐P‐401B 100.00% 100.00% 0.00% 100.00%R15E‐620‐013 RC2‐32‐620‐43‐P‐0045 100.00% 100.00% 0.00% 100.00%R15E‐400‐003 RC2‐32‐400‐43‐U‐1035 100.00% 100.00% 0.00% 100.00%R15E‐410‐024 RC2‐32‐410‐95‐D‐421 100.00% 100.00% 0.00% 100.00%R15E‐410‐026 RC2‐32‐410‐95‐D‐423 100.00% 100.00% 0.00% 100.00%R15E‐420‐007 RC2‐32‐420‐67‐P‐401B 100.00% 98.26% ‐1.74% 98.26%R15E‐420‐029 RC2‐32‐420‐67‐P‐401A 100.00% 100.00% 0.00% 100.00%
PRJCT R15E‐320‐012 RC2‐32‐320‐43‐P‐0070 100.00% 100.00% 0.00% 100.00%DRYERS PRJCT R15E‐320‐015 RC2‐32‐320‐25‐D‐301A 100.00% 98.04% ‐1.96% 98.04%
R15U‐097‐002 RC2‐31‐097‐43‐F‐0022 100.00% 100.00% 0.00% 100.00%R15U‐097‐003 RC2‐31‐097‐43‐F‐0023 100.00% 100.00% 0.00% 100.00%
PRJCT R15U‐071‐016 RC2‐31‐071‐95‐TK‐1140 100.00% 97.19% ‐2.81% 97.19%PRJCT CPX R15E‐151‐008 RC2‐32‐151‐41‐E‐201 100.00% 100.00% 0.00% 100.00%
R15E‐151‐009 0 100.00% 100.00% 0.00% 100.00%R15E‐500‐005 RC2‐32‐500‐43‐H‐0014 100.00% 100.00% 0.00% 100.00%R15E‐510‐072 RC2‐32‐510‐61‐H‐0006/0007 100.00% 100.00% 0.00% 100.00%R15E‐000‐005 RC2‐32‐000 100.00% 76.67% ‐23.33% 76.67%R15E‐510‐070 RC2‐32‐510‐95‐R‐581A 100.00% 100.00% 0.00% 100.00%R15E‐510‐071 RC2‐32‐510‐41‐E‐507 100.00% 100.00% 0.00% 100.00%R15E‐520‐005 RC2‐32‐520‐95‐T‐502 100.00% 100.00% 0.00% 100.00%R15E‐520‐006 RC2‐32‐520‐95‐D‐524 100.00% 100.00% 0.00% 100.00%R15E‐520‐023 RC2‐32‐520‐67‐P‐502A 100.00% 98.10% ‐1.90% 98.10%R15E‐500‐001 RC2‐32‐500‐43‐H‐0014 100.00% 100.00% 0.00% 100.00%R15E‐520‐002 RC2‐32‐520‐25‐D‐501 100.00% 94.83% ‐5.17% 94.83%
INSULATION R15E‐820‐001 RC2‐32‐820‐16‐C‐802 100.00% 100.00% 0.00% 100.00%R15E‐820‐023 RC2‐32‐820‐84‐ST‐802 100.00% 99.23% ‐0.77% 99.23%R15E‐820‐028 RC2‐32‐820‐95‐TK‐807 100.00% 100.00% 0.00% 100.00%R15E‐820‐068 RC2‐32‐820‐35‐F‐807A 100.00% 100.00% 0.00% 100.00%
PRJCT R15E‐820‐003 RC2‐32‐820‐16‐C‐802 100.00% 96.10% ‐3.90% 96.10%R15U‐072‐008 RC2‐31‐072‐93‐V‐0115 100.00% 96.23% ‐3.77% 96.23%R15U‐072‐009 RC2‐31‐072‐93‐V‐0121 100.00% 100.00% 0.00% 100.00%R15U‐072‐027 RC2‐31‐072‐P‐1111A 100.00% 100.00% 0.00% 100.00%R15U‐072‐029 RC2‐31‐072‐P‐1111 B 100.00% 100.00% 0.00% 100.00%
PIPING MECH
ETHYLENE REFRIGERATION PIPING MECH
PIPING CW
ETHANE STORAGEPIPING MECH
ETHYLENE PRODUCT
PIPING CW
PIPING MECH
PRJCT
ETHYLENE STORAGE
DE‐ETHANISER PIPING MECH
DE‐METHANISER / HYDROGEN
INSPECTION
INSULATION
PIPING CW
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 21 of 31
TA JOB TAG WISE PROGRESS
EQUIPMENT TYPE SYSTEM JOB TYPE TA15 JOB ID EQPT TAG PLANNED TILL DATE ACTUAL TILL DATE VARIANCE % % COMPLETION REMARKS
FURNACE PIPING CW R15E‐101‐006 RC2‐32‐151‐61‐H‐0001 / RC2‐32‐101‐61‐H‐0001 to H‐0009 100.00% 100.00% 0.00% 100.00%PIPING CW R15U‐037‐007 RC2‐31‐037‐FI‐0013 100.00% 100.00% 0.00% 100.00%PRJCT CPX R15U‐000‐004 RC2‐31‐060‐95‐TK‐1244 100.00% 100.00% 0.00% 100.00%PIPING CW R15E‐071‐004 RC2‐31‐071‐41‐E‐1101 100.00% 100.00% 0.00% 100.00%
R15E‐810‐026 RC2‐32‐810‐43‐L‐0060 100.00% 100.00% 0.00% 100.00%R15E‐810‐038 RC2‐32‐810‐67‐P‐801 100.00% 100.00% 0.00% 100.00%R15E‐810‐094 RC2‐32‐810‐95‐D‐822 100.00% 96.51% ‐3.49% 96.51%R15E‐810‐096 RC2‐32‐810‐43‐L‐0060 100.00% 100.00% 0.00% 100.00%R15E‐710‐017 RC2‐32‐710‐41‐E‐705A 100.00% 100.00% 0.00% 100.00%R15E‐710‐092 RC2‐32‐710‐43‐F‐0236 100.00% 100.00% 0.00% 100.00%R15E‐710‐103 RC2‐32‐710‐61‐H‐0001/0002 100.00% 100.00% 0.00% 100.00%R15E‐710‐039 RC2‐32‐710‐95‐R‐782A 100.00% 100.00% 0.00% 100.00%R15E‐710‐042 RC2‐32‐710‐95‐R‐781A 100.00% 100.00% 0.00% 100.00%R15E‐710‐043 RC2‐32‐710‐95‐R‐782B 100.00% 100.00% 0.00% 100.00%R15E‐710‐037 RC2‐32‐710‐95‐R‐781A/B 100.00% 97.29% ‐2.71% 97.29%R15E‐710‐040 RC2‐32‐710‐95‐R‐782A/B 100.00% 100.00% 0.00% 100.00%R15E‐710‐102 RC2‐32‐710‐41‐E‐705A 100.00% 98.83% ‐1.17% 98.83%R15E‐108‐001 RC2‐32‐108‐36‐H‐108 100.00% 100.00% 0.00% 100.00%R15E‐108‐004 RC2‐32‐108‐43‐F‐0005 100.00% 100.00% 0.00% 100.00%R15E‐210‐030 T‐201 100.00% 100.00% 0.00% 100.00%R15E‐210‐034 RC2‐32‐210‐95‐D‐222 100.00% 100.00% 0.00% 100.00%R15E‐210‐035 RC2‐32‐210‐95‐T‐201 100.00% 100.00% 0.00% 100.00%R15E‐210‐036 RC2‐32‐210‐61‐H‐0003 100.00% 100.00% 0.00% 100.00%R15E‐220‐015 RC2‐32‐220‐67‐P‐204A 100.00% 100.00% 0.00% 100.00%R15E‐220‐038 RC2‐32‐220‐61‐H‐0001/0002 100.00% 100.00% 0.00% 100.00%R15E‐151‐001 RC2‐32‐151‐41‐E‐201 100.00% 100.00% 0.00% 100.00%R15E‐210‐002 RC2‐32‐210‐41‐E‐202D 100.00% 100.00% 0.00% 100.00%R15E‐210‐003 RC2‐32‐210‐41‐E‐202E 100.00% 100.00% 0.00% 100.00%R15E‐210‐031 RC2‐32‐210‐F‐203A 100.00% 100.00% 0.00% 100.00%R15E‐220‐002 RC2‐32‐220‐35‐F‐202B 100.00% 100.00% 0.00% 100.00%R15E‐210‐032 RC2‐32‐220‐35‐F‐202A 100.00% 99.17% ‐0.83% 99.17%R15E‐210‐033 RC2‐32‐210‐95‐D‐222 100.00% 100.00% 0.00% 100.00%
INSPECTION R15E‐820‐065 RC2‐32‐820‐61‐J‐813 100.00% 100.00% 0.00% 100.00%R15E‐002‐001 RC2‐31‐002‐43‐T‐0016 100.00% 100.00% 0.00% 100.00%R15E‐002‐002 RC2‐31‐002‐43‐T‐0040 100.00% 100.00% 0.00% 100.00%R15E‐002‐003 RC2‐31‐002‐43‐T‐0016 100.00% 100.00% 0.00% 100.00%R15E‐002‐014 RC2‐31‐002‐43‐F‐0022 100.00% 100.00% 0.00% 100.00%R15E‐002‐015 RC2‐31‐002‐43‐P‐0001 100.00% 100.00% 0.00% 100.00%R15E‐002‐016 RC2‐31‐002‐43‐P‐0065 100.00% 100.00% 0.00% 100.00%R15E‐010‐001 RC2‐31‐010‐43‐P‐0010 100.00% 100.00% 0.00% 100.00%R15E‐101‐001 RC2‐32‐101‐36‐H‐101 100.00% 100.00% 0.00% 100.00%R15E‐104‐002 RC2‐32‐104‐36‐H‐104 100.00% 100.00% 0.00% 100.00%R15E‐106‐001 RC2‐32‐106‐43‐F‐0163 100.00% 100.00% 0.00% 100.00%R15E‐107‐002 RC2‐32‐107‐36‐H‐107 100.00% 100.00% 0.00% 100.00%R15E‐108‐002 RC2‐32‐108‐36‐H‐108 100.00% 100.00% 0.00% 100.00%R15E‐109‐003 RC2‐32‐109‐43‐X‐0171 100.00% 100.00% 0.00% 100.00%R15E‐109‐005 RC2‐32‐109‐43‐X‐0171 100.00% 100.00% 0.00% 100.00%R15E‐210‐010 RC2‐32‐210‐67‐P‐203B 100.00% 100.00% 0.00% 100.00%R15E‐210‐014 RC2‐32‐210‐95‐D‐222 100.00% 100.00% 0.00% 100.00%
INSTRUMENT AIR
PROPANE REFRIGERATIONPIPING MECH
PRJCT
PYGAS
PIPING CW
PIPING MECH
PRJCT
QUENCH TOWER
PIPING CW
PIPING MECH
PRJCT CPX
PIPING
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 22 of 31
TA JOB TAG WISE PROGRESS
EQUIPMENT TYPE SYSTEM JOB TYPE TA15 JOB ID EQPT TAG PLANNED TILL DATE ACTUAL TILL DATE VARIANCE % % COMPLETION REMARKS
R15E‐210‐015 RC2‐32‐210‐95‐D‐222 100.00% 100.00% 0.00% 100.00%R15E‐220‐004 RC2‐32‐220‐35‐F‐204B 100.00% 100.00% 0.00% 100.00%R15E‐220‐012 RC2‐32‐220‐43‐L‐0052 100.00% 100.00% 0.00% 100.00%R15E‐220‐013 RC2‐32‐220‐43‐T‐0058 100.00% 100.00% 0.00% 100.00%R15E‐220‐016 RC2‐32‐220‐67‐P‐204A 100.00% 100.00% 0.00% 100.00%R15E‐310‐040 RC2‐32‐310‐61‐SP‐302A 100.00% 100.00% 0.00% 100.00%R15E‐310‐041 RC2‐32‐310‐84‐ST‐301 100.00% 100.00% 0.00% 100.00%R15E‐310‐042 RC2‐32‐310‐84‐ST‐301 100.00% 100.00% 0.00% 100.00%R15E‐320‐007 RC2‐32‐320‐41‐E‐307 100.00% 100.00% 0.00% 100.00%R15E‐320‐011 RC2‐32‐320‐43‐L‐0080 100.00% 100.00% 0.00% 100.00%R15E‐510‐009 RC2‐32‐510‐41‐E‐503A 100.00% 100.00% 0.00% 100.00%R15E‐510‐018 RC2‐32‐510‐41‐E‐506 100.00% 100.00% 0.00% 100.00%R15E‐510‐019 RC2‐32‐510‐41‐E‐506 100.00% 100.00% 0.00% 100.00%R15E‐510‐022 RC2‐32‐510‐41‐E‐506 100.00% 100.00% 0.00% 100.00%R15E‐510‐024 RC2‐32‐510‐43‐L‐0050 100.00% 100.00% 0.00% 100.00%R15E‐510‐065 RC2‐32‐510‐43‐T‐0279 100.00% 100.00% 0.00% 100.00%R15E‐810‐041 RC2‐32‐810‐84‐ST‐803 100.00% 100.00% 0.00% 100.00%R15E‐810‐044 RC2‐32‐810‐84‐ST‐804 100.00% 100.00% 0.00% 100.00%R15E‐820‐013 RC2‐32‐820‐41‐E‐806 100.00% 100.00% 0.00% 100.00%R15U‐000‐003 RC2‐30‐000‐ 100.00% 100.00% 0.00% 100.00%R15U‐002‐001 RC2‐31‐002‐24‐A‐1206 100.00% 100.00% 0.00% 100.00%R15U‐002‐005 RC2‐31‐002‐43‐T‐0078 100.00% 100.00% 0.00% 100.00%R15U‐002‐022 RC2‐31‐002‐24‐A‐1206 100.00% 100.00% 0.00% 100.00%R15U‐011‐001 RC2‐31‐011‐07‐B‐1207A 100.00% 100.00% 0.00% 100.00%R15U‐011‐002 RC2‐31‐011‐07‐B‐1207A 100.00% 100.00% 0.00% 100.00%R15U‐012‐001 RC2‐31‐012‐07‐B‐1207B 100.00% 100.00% 0.00% 100.00%R15U‐012‐002 RC2‐31‐012‐07‐B‐1207B 100.00% 100.00% 0.00% 100.00%R15U‐013‐001 RC2‐31‐013‐07‐B‐1207C 100.00% 100.00% 0.00% 100.00%R15U‐013‐003 RC2‐31‐013‐84‐ST‐1207C 100.00% 100.00% 0.00% 100.00%R15U‐020‐008 RC2‐31‐020‐95‐D‐1221 100.00% 100.00% 0.00% 100.00%R15U‐020‐012 RC2‐31‐020‐95‐D‐1222 100.00% 100.00% 0.00% 100.00%R15U‐020‐021 RC2‐31‐020‐95‐D‐1222 100.00% 100.00% 0.00% 100.00%R15U‐020‐022 RC2‐31‐020‐95‐D‐1222 100.00% 100.00% 0.00% 100.00%R15U‐022‐004 RC2‐31‐022‐84‐ST‐1203 100.00% 100.00% 0.00% 100.00%R15U‐022‐005 RC2‐31‐022‐84‐ST‐1203 100.00% 100.00% 0.00% 100.00%R15U‐024‐001 RC2‐31‐024‐43‐P‐0090 100.00% 100.00% 0.00% 100.00%R15U‐024‐006 RC2‐31‐024‐84‐ST‐1202 100.00% 100.00% 0.00% 100.00%R15U‐024‐007 RC2‐31‐024‐84‐ST‐1202 100.00% 100.00% 0.00% 100.00%R15U‐024‐008 RC2‐31‐024‐84‐ST‐1224 100.00% 100.00% 0.00% 100.00%R15U‐024‐009 RC2‐31‐024‐84‐ST‐1224 100.00% 100.00% 0.00% 100.00%R15U‐025‐012 RC2‐31‐025‐84‐ST‐1205 100.00% 100.00% 0.00% 100.00%R15U‐037‐002 RC2‐31‐037‐84‐ST‐1201 100.00% 100.00% 0.00% 100.00%R15U‐037‐008 RC2‐31‐037‐84‐ST‐1201 100.00% 100.00% 0.00% 100.00%R15U‐037‐009 RC2‐31‐037‐84‐ST‐1201 100.00% 100.00% 0.00% 100.00%R15U‐046‐003 RC2‐31‐046‐41‐E‐1207B 100.00% 100.00% 0.00% 100.00%R15E‐220‐007 RC2‐32‐220‐41‐E‐205D 100.00% 100.00% 0.00% 100.00%R15E‐220‐012 RC2‐32‐220‐43‐L‐0052 100.00% 100.00% 0.00% 100.00%R15E‐220‐017 RC2‐32‐220‐93‐V‐0056I 100.00% 100.00% 0.00% 100.00%R15E‐320‐008 RC2‐32‐320‐41‐E‐307 100.00% 100.00% 0.00% 100.00%
STEAM/ CONDENSATE
PIPING CW
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 23 of 31
TA JOB TAG WISE PROGRESS
EQUIPMENT TYPE SYSTEM JOB TYPE TA15 JOB ID EQPT TAG PLANNED TILL DATE ACTUAL TILL DATE VARIANCE % % COMPLETION REMARKS
R15E‐510‐012 RC2‐32‐510‐41‐E‐503B 100.00% 100.00% 0.00% 100.00%R15E‐510‐017 RC2‐32‐510‐41‐E‐506 100.00% 100.00% 0.00% 100.00%R15E‐510‐025 RC2‐32‐510‐43‐T‐0042 100.00% 100.00% 0.00% 100.00%R15E‐510‐058 RC2‐32‐510‐41‐E‐503A 100.00% 100.00% 0.00% 100.00%R15E‐710‐093 RC2‐32‐710‐41‐E‐708 100.00% 100.00% 0.00% 100.00%R15E‐710‐100 RC2‐32‐710‐43‐L‐0045 100.00% 100.00% 0.00% 100.00%R15E‐810‐028 RC2‐32‐810‐43‐L‐1229 100.00% 100.00% 0.00% 100.00%R15E‐810‐029 RC2‐32‐810‐43‐L‐1234 100.00% 100.00% 0.00% 100.00%R15U‐002‐020 RC2‐31‐002‐PRV‐0089A 100.00% 100.00% 0.00% 100.00%R15E‐220‐020 RC2‐32‐220‐95‐D‐224 100.00% 100.00% 0.00% 100.00%R15E‐220‐030 RC2‐31‐020‐95‐D‐1221 100.00% 100.00% 0.00% 100.00%R15U‐020‐001 RC2‐31‐020‐95‐D‐1222 100.00% 100.00% 0.00% 100.00%
PIPING CW R15E‐108‐003 RC2‐32‐108‐36‐H‐108 100.00% 100.00% 0.00% 100.00%R15E‐310‐047 RC2‐32‐310‐93‐V‐0050B 100.00% 100.00% 0.00% 100.00%R15E‐310‐122 RC2‐32‐310‐93‐V‐0050 A/C/D/E/F/G 100.00% 100.00% 0.00% 100.00%
PRJCT CPX R15E‐310‐008 RC2‐32‐310‐16‐C‐301 100.00% 100.00% 0.00% 100.00%R15U‐060‐011 RC2‐31‐060‐95‐TK‐1244 100.00% 98.94% ‐1.06% 98.94%R15U‐060‐015 RC2‐31‐060‐95‐TK‐1254 100.00% 92.63% ‐7.37% 92.63%R15U‐060‐016 RC2‐31‐060‐95‐TK‐1254 100.00% 100.00% 0.00% 100.00%R15E‐101‐005 RC2‐32‐101‐43‐X‐0171 100.00% 100.00% 0.00% 100.00%R15E‐102‐002 RC2‐32‐102‐43‐X‐0171 100.00% 100.00% 0.00% 100.00%R15E‐103‐002 RC2‐32‐103‐43‐X‐0171 100.00% 100.00% 0.00% 100.00%R15E‐104‐001 RC2‐32‐104‐43‐X‐0171 100.00% 100.00% 0.00% 100.00%R15E‐105‐002 RC2‐32‐105‐43‐X‐0171 100.00% 100.00% 0.00% 100.00%R15E‐106‐003 RC2‐32‐106‐43‐X‐0171 100.00% 100.00% 0.00% 100.00%R15E‐107‐004 RC2‐32‐107‐43‐X‐0171 100.00% 100.00% 0.00% 100.00%R15E‐108‐005 RC2‐32‐108‐43‐X‐0171 100.00% 100.00% 0.00% 100.00%R15E‐109‐002 RC2‐32‐109‐43‐X‐0171 100.00% 100.00% 0.00% 100.00%
CAUSTIC TOWER INST R15E‐330‐002 RC2‐32‐330‐43‐F‐0038 100.00% 100.00% 0.00% 100.00%PRJCT R15E‐410‐027 RC2‐32‐410‐95‐D‐425 100.00% 100.00% 0.00% 100.00%PRJCT CPX R15E‐410‐064 RC2‐32‐410‐24‐E‐404 100.00% 97.74% ‐2.26% 97.74%INST R15E‐710‐032 RC2‐32‐710‐43‐F‐0241 100.00% 100.00% 0.00% 100.00%PRJCT CPX R15E‐710‐041 RC2‐32‐710‐95‐R‐782A/B 100.00% 100.00% 0.00% 100.00%
ETHYLENE PRODUCT PRJCT R15E‐520‐027 RC2‐32‐520‐95‐T‐502 100.00% 97.15% ‐2.85% 97.15%ETHYLENE STORAGE PIPING CW R15U‐072‐028 RC2‐31‐072‐43‐FT‐0104 100.00% 97.10% ‐2.90% 97.10%
PRJCT R15E‐610‐014 RC2‐32‐610‐95‐T‐601 100.00% 97.70% ‐2.30% 97.70%PRJCT CPX R15E‐810‐098 RC2‐32‐810‐16‐C‐801 100.00% 100.00% 0.00% 100.00%
R15E‐220‐010 RC2‐32‐220‐43‐F‐0068 100.00% 100.00% 0.00% 100.00%R15U‐024‐016 RC2‐31‐024‐AI‐0034 100.00% 41.83% ‐58.17% 41.83%
PRJCT R15U‐024‐011 RC2‐31‐024‐43‐P‐0012 100.00% 100.00% 0.00% 100.00%R15E‐310‐013 RC2‐32‐310‐35‐F‐301 100.00% 100.00% 0.00% 100.00%R15E‐310‐014 RC2‐32‐310‐35‐F‐308 100.00% 100.00% 0.00% 100.00%R15E‐310‐015 RC2‐32‐310‐35‐F‐309 100.00% 100.00% 0.00% 100.00%R15E‐310‐016 RC2‐32‐310‐35‐F‐310 100.00% 100.00% 0.00% 100.00%R15E‐310‐017 RC2‐32‐310‐35‐F‐311 100.00% 100.00% 0.00% 100.00%
DRYERS INSPECTION R15E‐320‐005 RC2‐32‐320‐35‐F‐312 100.00% 98.65% ‐1.35% 98.65%ETHANE STORAGE PIPING MECH R15U‐097‐009 RC2‐32‐151‐35‐F‐225 100.00% 100.00% 0.00% 100.00%ETHYLENE REFRIGERATION INSPECTION R15E‐820‐067 RC2‐32‐820‐16‐C‐802 100.00% 100.00% 0.00% 100.00%PROPANE REFRIGERATION INSPECTION R15E‐810‐099 RC2‐32‐810‐16‐C‐801 100.00% 100.00% 0.00% 100.00%
PIPING MECH
PRJCT
VHP PIPING MECH
WASTE WATER PIPING CW
MOV QUENCH TOWER INST
INSTRUMENT
DE‐METHANISER / HYDROGEN
DMDS
PROPANE REFRIGERATION
STEAM/ CONDENSATEINST
FILTER
CGC INSPECTION
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 24 of 31
TA JOB TAG WISE PROGRESS
EQUIPMENT TYPE SYSTEM JOB TYPE TA15 JOB ID EQPT TAG PLANNED TILL DATE ACTUAL TILL DATE VARIANCE % % COMPLETION REMARKS
QUENCH TOWER PRJCT CPX R15E‐210‐024 RC2‐32‐210‐67‐P‐203A 100.00% 98.93% ‐1.07% 98.93%INSPECTION R15U‐022‐002 RC2‐31‐022‐35‐F‐1202 100.00% 100.00% 0.00% 100.00%MEDIA RPL R15U‐022‐002 RC2‐31‐022‐35‐F‐1202 100.00% 100.00% 0.00% 100.00%
R15E‐620‐003 RC2‐32‐620‐41‐E‐606A 100.00% 100.00% 0.00% 100.00%R15E‐620‐005 RC2‐32‐620‐41‐E‐606B 100.00% 100.00% 0.00% 100.00%
CUI+INSP R15E‐620‐007 RC2‐32‐620‐41‐E‐607 100.00% 100.00% 0.00% 100.00%R15E‐610‐001 RC2‐32‐610‐41‐E‐601 100.00% 100.00% 0.00% 100.00%R15E‐610‐004 RC2‐32‐610‐41‐E‐603A 100.00% 100.00% 0.00% 100.00%R15E‐610‐006 RC2‐32‐610‐41‐E‐603B 100.00% 100.00% 0.00% 100.00%
CUI R15E‐310‐026 RC2‐32‐310‐41‐E‐309 100.00% 100.00% 0.00% 100.00%R15E‐310‐019 RC2‐32‐310‐41‐E‐301 100.00% 100.00% 0.00% 100.00%R15E‐310‐020 RC2‐32‐310‐41‐E‐302 100.00% 100.00% 0.00% 100.00%R15E‐310‐021 RC2‐32‐310‐41‐E‐303 100.00% 100.00% 0.00% 100.00%R15E‐310‐022 RC2‐32‐310‐41‐E‐304 100.00% 100.00% 0.00% 100.00%R15E‐310‐024 RC2‐32‐310‐41‐E‐305 100.00% 100.00% 0.00% 100.00%R15E‐310‐025 RC2‐32‐310‐41‐E‐306 100.00% 100.00% 0.00% 100.00%
PRJCT CPX R15E‐310‐028 RC2‐32‐310‐41‐E‐310 100.00% 100.00% 0.00% 100.00%R15E‐510‐005 RC2‐32‐510‐41‐E‐501 100.00% 100.00% 0.00% 100.00%R15E‐510‐023 RC2‐32‐510‐41‐E‐507 100.00% 100.00% 0.00% 100.00%R15E‐510‐008 RC2‐32‐510‐41‐E‐502 100.00% 100.00% 0.00% 100.00%R15E‐510‐014 RC2‐32‐510‐41‐E‐504 100.00% 100.00% 0.00% 100.00%
INSPECTION R15E‐510‐064 RC2‐32‐510‐41‐E‐505 100.00% 100.00% 0.00% 100.00%R15E‐410‐010 RC2‐32‐410‐24‐E‐404 100.00% 100.00% 0.00% 100.00%R15E‐420‐002 RC2‐32‐420‐41‐E‐401 100.00% 100.00% 0.00% 100.00%R15E‐320‐016 RC2‐32‐320‐41‐E‐307 100.00% 100.00% 0.00% 100.00%R15E‐320‐018 RC2‐32‐320‐41‐E‐308 100.00% 100.00% 0.00% 100.00%
ETHANE STORAGE CUI R15E‐151‐005 RC2‐32‐151‐41‐E‐511 100.00% 100.00% 0.00% 100.00%R15E‐500‐002 RC2‐32‐500‐41‐E‐512 100.00% 100.00% 0.00% 100.00%R15E‐500‐004 RC2‐32‐500‐41‐E‐513 100.00% 100.00% 0.00% 100.00%R15E‐520‐017 RC2‐32‐520‐41‐E‐510 100.00% 100.00% 0.00% 100.00%R15E‐520‐010 RC2‐32‐520‐41‐E‐508A 100.00% 100.00% 0.00% 100.00%R15E‐520‐014 RC2‐32‐520‐41‐E‐508B 100.00% 100.00% 0.00% 100.00%R15E‐520‐016 RC2‐32‐520‐41‐E‐509 100.00% 100.00% 0.00% 100.00%R15E‐820‐009 RC2‐32‐820‐41‐E‐804 100.00% 100.00% 0.00% 100.00%R15E‐820‐011 RC2‐32‐820‐41‐E‐805 100.00% 100.00% 0.00% 100.00%R15E‐820‐014 RC2‐32‐820‐41‐E‐806 100.00% 100.00% 0.00% 100.00%R15E‐820‐015 RC2‐32‐820‐41‐E‐812A 100.00% 100.00% 0.00% 100.00%R15E‐820‐016 RC2‐32‐820‐41‐E‐812B 100.00% 100.00% 0.00% 100.00%
CUI+INSP R15E‐810‐016 RC2‐32‐810‐41‐E‐802 100.00% 100.00% 0.00% 100.00%R15E‐071‐001 RC2‐31‐071‐41‐E‐1101 100.00% 100.00% 0.00% 100.00%R15E‐810‐014 RC2‐32‐810‐41‐E‐801A 100.00% 100.00% 0.00% 100.00%R15E‐810‐015 RC2‐32‐810‐41‐E‐801B 100.00% 100.00% 0.00% 100.00%R15E‐810‐019 RC2‐32‐810‐41‐E‐807 100.00% 100.00% 0.00% 100.00%
CUI R15E‐710‐010 RC2‐32‐710‐41‐E‐702 100.00% 100.00% 0.00% 100.00%R15E‐710‐008 RC2‐32‐710‐41‐E‐701 100.00% 100.00% 0.00% 100.00%R15E‐710‐012 RC2‐32‐710‐41‐E‐703 100.00% 100.00% 0.00% 100.00%R15E‐710‐021 RC2‐32‐710‐41‐E‐707A 100.00% 100.00% 0.00% 100.00%R15E‐710‐023 RC2‐32‐710‐41‐E‐707B 100.00% 100.00% 0.00% 100.00%R15E‐710‐026 RC2‐32‐710‐41‐E‐709 100.00% 100.00% 0.00% 100.00%
INSPECTION
DE‐ETHANISER
CUI
CUI+INSP
DE‐METHANISER / HYDROGEN INSPECTION
STEAM/ CONDENSATE
EXCHANGER
C3/C4
CUI
INSPECTION
CGC
PROPANE REFRIGERATIONINSPECTION
PYGAS
CUI+INSP
DRYERS INSPECTION
ETHYLENE PRODUCT
CUI
INSPECTION
ETHYLENE REFRIGERATION
CUI+INSP
INSPECTION
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 25 of 31
TA JOB TAG WISE PROGRESS
EQUIPMENT TYPE SYSTEM JOB TYPE TA15 JOB ID EQPT TAG PLANNED TILL DATE ACTUAL TILL DATE VARIANCE % % COMPLETION REMARKS
R15E‐710‐014 RC2‐32‐710‐41‐E‐704A 100.00% 100.00% 0.00% 100.00%R15E‐710‐015 RC2‐32‐710‐41‐E‐704B 100.00% 100.00% 0.00% 100.00%R15E‐710‐020 RC2‐32‐710‐41‐E‐706 100.00% 100.00% 0.00% 100.00%R15E‐710‐025 RC2‐32‐710‐41‐E‐708 100.00% 100.00% 0.00% 100.00%R15E‐710‐028 RC2‐32‐710‐41‐E‐711 100.00% 100.00% 0.00% 100.00%
QUENCH TOWER CUI+INSP R15E‐151‐002 RC2‐32‐151‐41‐E‐201 100.00% 100.00% 0.00% 100.00%CUI R15U‐020‐004 RC2‐31‐020‐41‐E‐1210 100.00% 100.00% 0.00% 100.00%CUI+INSP R15U‐020‐005 RC2‐31‐020‐41‐E‐1211 100.00% 100.00% 0.00% 100.00%
R15U‐020‐003 RC2‐31‐020‐41‐E‐1205 100.00% 100.00% 0.00% 100.00%R15U‐024‐013 RC2‐31‐024‐41‐E‐1201 100.00% 100.00% 0.00% 100.00%
VHP INSPECTION R15E‐310‐029 RC2‐32‐310‐41‐E‐316 100.00% 100.00% 0.00% 100.00%R15U‐005‐020 RC2‐31‐005‐29‐EL‐1201 100.00% 100.00% 0.00% 100.00%R15U‐005‐022 RC2‐31‐005‐29‐EL‐1202 100.00% 100.00% 0.00% 100.00%
ELECT HEATER PYGAS INSPECTION R15E‐710‐002 RC2‐32‐710‐30‐H‐710 100.00% 86.67% ‐13.33% 86.67%R15E‐330‐007 RC2‐32‐330‐95‐D‐330 100.00% 100.00% 0.00% 100.00%R15E‐330‐008 RC2‐32‐330‐95‐D‐331 100.00% 100.00% 0.00% 100.00%R15E‐310‐052 RC2‐32‐310‐95‐D‐321 100.00% 100.00% 0.00% 100.00%R15E‐310‐063 RC2‐32‐310‐95‐D‐327 100.00% 100.00% 0.00% 100.00%R15E‐310‐055 RC2‐32‐310‐95‐D‐322 100.00% 100.00% 0.00% 100.00%R15E‐310‐057 RC2‐32‐310‐95‐D‐323 100.00% 100.00% 0.00% 100.00%R15E‐310‐058 RC2‐32‐310‐95‐D‐324 100.00% 100.00% 0.00% 100.00%R15E‐310‐059 RC2‐32‐310‐95‐D‐325 100.00% 100.00% 0.00% 100.00%R15E‐310‐061 RC2‐32‐310‐95‐D‐326 100.00% 100.00% 0.00% 100.00%
COOLING WATER/SEA WATER INSPECTION R15U‐025‐014 RC2‐31‐025‐95‐D‐1227 100.00% 100.00% 0.00% 100.00%DE‐ETHANISER CUI+INSP R15E‐510‐029 RC2‐32‐510‐95‐D‐521 100.00% 100.00% 0.00% 100.00%
R15E‐320‐002 RC2‐32‐320‐25‐D‐301A 100.00% 95.91% ‐4.09% 95.91%R15E‐320‐004 RC2‐32‐320‐25‐D‐301B 100.00% 100.00% 0.00% 100.00%R15E‐500‐007 RC2‐32‐500‐95‐D‐525 100.00% 100.00% 0.00% 100.00%R15E‐520‐024 RC2‐32‐520‐95‐D‐523A 100.00% 100.00% 0.00% 100.00%R15E‐520‐025 RC2‐32‐520‐95‐D‐523B 100.00% 100.00% 0.00% 100.00%
MEDIA RPL R15E‐520‐008 RC2‐32‐520‐25‐D‐501 100.00% 92.46% ‐7.54% 92.46%ETHYLENE REFRIGERATION CUI R15E‐820‐027 RC2‐32‐820‐95‐D‐824 100.00% 100.00% 0.00% 100.00%PROPANE REFRIGERATION CUI R15E‐810‐053 RC2‐32‐810‐95‐D‐823 100.00% 100.00% 0.00% 100.00%QUENCH TOWER CUI+INSP R15E‐210‐013 RC2‐32‐210‐95‐D‐221 100.00% 75.34% ‐24.66% 75.34%SPENT CAUSTIC OXIDATION INSPECTION R15U‐080‐004 RC2‐31‐080‐95‐D‐1290 100.00% 100.00% 0.00% 100.00%
R15E‐220‐019 RC2‐32‐220‐95‐D‐224 100.00% 100.00% 0.00% 100.00%R15U‐020‐009 RC2‐31‐020‐95‐D‐1221 100.00% 100.00% 0.00% 100.00%R15U‐024‐010 RC2‐31‐024‐95‐D‐1223 100.00% 100.00% 0.00% 100.00%R15E‐610‐020 RC2‐32‐610‐43‐F‐0012 100.00% 100.00% 0.00% 100.00%R15E‐610‐022 RC2‐32‐610‐43‐L‐0060 100.00% 100.00% 0.00% 100.00%R15E‐620‐011 RC2‐32‐620‐43‐E‐0050 100.00% 100.00% 0.00% 100.00%R15E‐620‐033 RC2‐32‐620‐43‐E‐0225 100.00% 100.00% 0.00% 100.00%R15U‐073‐008 RC2‐31‐073‐43‐E‐0070 100.00% 100.00% 0.00% 100.00%R15U‐075‐009 RC2‐31‐075‐43‐E‐0119 100.00% 100.00% 0.00% 100.00%R15U‐075‐011 RC2‐31‐075‐43‐E‐0069 100.00% 100.00% 0.00% 100.00%R15E‐330‐030 RC2‐32‐330‐43‐L‐0082 100.00% 100.00% 0.00% 100.00%R15E‐330‐032 RC2‐32‐330‐43‐P‐0090 100.00% 100.00% 0.00% 100.00%R15E‐330‐033 RC2‐32‐330‐43‐P‐0120 100.00% 100.00% 0.00% 100.00%R15E‐310‐071 RC2‐32‐310‐43‐F‐1203 100.00% 100.00% 0.00% 100.00%
INSPECTION
STEAM/ CONDENSATEINSPECTION
ELECTRICAL STEAM/ CONDENSATE ELECTRICAL
DRUM
CAUSTIC TOWER INSPECTION
CGC
CUI+INSP
INSPECTION
DRYERS INSPN+TSA
ETHYLENE PRODUCTCUI
STEAM/ CONDENSATE CUI+INSP
C3/C4 CV OVL
C9+ STORAGE CV OVL
CAUSTIC TOWER CV OVL
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 26 of 31
TA JOB TAG WISE PROGRESS
EQUIPMENT TYPE SYSTEM JOB TYPE TA15 JOB ID EQPT TAG PLANNED TILL DATE ACTUAL TILL DATE VARIANCE % % COMPLETION REMARKS
R15E‐310‐072 RC2‐32‐310‐43‐F‐1211 100.00% 100.00% 0.00% 100.00%R15E‐310‐082 RC2‐32‐310‐43‐L‐0143 100.00% 100.00% 0.00% 100.00%R15E‐310‐083 RC2‐32‐310‐43‐L‐0173 100.00% 100.00% 0.00% 100.00%R15E‐310‐088 RC2‐32‐310‐43‐P‐1508 100.00% 100.00% 0.00% 100.00%R15E‐310‐089 RC2‐32‐310‐43‐P‐1510 100.00% 100.00% 0.00% 100.00%R15E‐310‐090 RC2‐32‐310‐43‐P‐0199 100.00% 100.00% 0.00% 100.00%R15E‐310‐091 RC2‐32‐310‐43‐P‐0010 100.00% 100.00% 0.00% 100.00%R15E‐310‐092 RC2‐32‐310‐43‐P‐0236 100.00% 100.00% 0.00% 100.00%R15E‐310‐097 RC2‐32‐310‐43‐P‐1512 100.00% 100.00% 0.00% 100.00%R15E‐310‐098 RC2‐32‐310‐43‐P‐1565 100.00% 100.00% 0.00% 100.00%R15E‐310‐121 RC2‐32‐310‐43‐L‐0080 100.00% 100.00% 0.00% 100.00%
INST R15E‐310‐037 RC2‐32‐310‐43‐P‐1439 100.00% 100.00% 0.00% 100.00%COOLING WATER/SEA WATER CV OVL R15U‐025‐016 RC2‐31‐025‐43‐P‐0020 100.00% 100.00% 0.00% 100.00%
R15E‐510‐048 RC2‐32‐510‐43‐E‐0233 100.00% 100.00% 0.00% 100.00%R15E‐510‐056 RC2‐32‐510‐43‐F‐0005 100.00% 100.00% 0.00% 100.00%R15E‐510‐057 RC2‐32‐510‐43‐P‐0115 100.00% 100.00% 0.00% 100.00%R15E‐510‐060 RC2‐32‐510‐43‐M‐0047 100.00% 100.00% 0.00% 100.00%R15E‐510‐063 RC2‐32‐510‐43‐M‐0054 100.00% 100.00% 0.00% 100.00%R15E‐510‐067 RC2‐32‐510‐43‐P‐0068 100.00% 100.00% 0.00% 100.00%R15E‐320‐014 RC2‐32‐320‐43‐P‐0070 100.00% 100.00% 0.00% 100.00%R15E‐400‐012 RC2‐32‐400‐43‐U‐1005 100.00% 100.00% 0.00% 100.00%R15E‐400‐013 RC2‐32‐400‐43‐U‐1005B 100.00% 100.00% 0.00% 100.00%R15E‐400‐014 RC2‐32‐400‐43‐U‐1013 100.00% 100.00% 0.00% 100.00%R15E‐400‐015 RC2‐32‐400‐43‐U‐1014 100.00% 100.00% 0.00% 100.00%R15E‐400‐016 RC2‐32‐400‐43‐U‐1015 100.00% 100.00% 0.00% 100.00%R15E‐400‐017 RC2‐32‐400‐43‐U‐1023 100.00% 100.00% 0.00% 100.00%R15E‐400‐018 RC2‐32‐400‐43‐U‐1024 100.00% 100.00% 0.00% 100.00%R15E‐400‐019 RC2‐32‐400‐43‐U‐1025 100.00% 100.00% 0.00% 100.00%R15E‐400‐020 RC2‐32‐400‐43‐U‐1033 100.00% 100.00% 0.00% 100.00%R15E‐400‐021 RC2‐32‐400‐43‐U‐1034 100.00% 100.00% 0.00% 100.00%R15E‐400‐022 RC2‐32‐400‐43‐U‐1035 100.00% 100.00% 0.00% 100.00%R15E‐400‐023 RC2‐32‐400‐43‐U‐1043 100.00% 100.00% 0.00% 100.00%R15E‐400‐024 RC2‐32‐400‐43‐U‐1044 100.00% 100.00% 0.00% 100.00%R15E‐400‐025 RC2‐32‐400‐43‐U‐1045 100.00% 100.00% 0.00% 100.00%R15E‐400‐026 RC2‐32‐400‐43‐X‐1011 100.00% 100.00% 0.00% 100.00%R15E‐400‐027 RC2‐32‐400‐43‐X‐1012 100.00% 100.00% 0.00% 100.00%R15E‐400‐028 RC2‐32‐400‐43‐X‐1021 100.00% 100.00% 0.00% 100.00%R15E‐400‐029 RC2‐32‐400‐43‐X‐1022 100.00% 100.00% 0.00% 100.00%R15E‐400‐030 RC2‐32‐400‐43‐X‐1031 100.00% 100.00% 0.00% 100.00%R15E‐400‐031 RC2‐32‐400‐43‐X‐1032 100.00% 100.00% 0.00% 100.00%R15E‐400‐032 RC2‐32‐400‐43‐X‐1041 100.00% 100.00% 0.00% 100.00%R15E‐400‐033 RC2‐32‐400‐43‐X‐1042 100.00% 100.00% 0.00% 100.00%R15E‐410‐017 RC2‐32‐410‐43‐E‐0121 100.00% 100.00% 0.00% 100.00%R15E‐410‐019 RC2‐32‐410‐43‐P‐0050 100.00% 100.00% 0.00% 100.00%R15E‐410‐020 RC2‐32‐410‐43‐P‐0163 100.00% 100.00% 0.00% 100.00%R15E‐410‐032 RC2‐32‐410‐43‐H‐0049 100.00% 100.00% 0.00% 100.00%R15E‐410‐033 RC2‐32‐410‐43‐H‐0064 100.00% 89.47% ‐10.53% 89.47%R15E‐410‐049 RC2‐32‐410‐43‐P‐1008 100.00% 100.00% 0.00% 100.00%R15E‐410‐050 RC2‐32‐410‐43‐P‐1108 100.00% 100.00% 0.00% 100.00%
DE‐METHANISER / HYDROGEN CV OVL
CGCCV OVL
DE‐ETHANISER CV OVL
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 27 of 31
TA JOB TAG WISE PROGRESS
EQUIPMENT TYPE SYSTEM JOB TYPE TA15 JOB ID EQPT TAG PLANNED TILL DATE ACTUAL TILL DATE VARIANCE % % COMPLETION REMARKS
R15E‐410‐051 RC2‐32‐410‐43‐P‐1208 100.00% 100.00% 0.00% 100.00%R15E‐410‐052 RC2‐32‐410‐43‐P‐1308 100.00% 100.00% 0.00% 100.00%R15E‐410‐055 RC2‐32‐410‐43‐T‐0127 100.00% 100.00% 0.00% 100.00%R15E‐420‐005 RC2‐32‐420‐43‐E‐0049 100.00% 100.00% 0.00% 100.00%R15E‐420‐017 RC2‐32‐420‐43‐E‐0044 100.00% 100.00% 0.00% 100.00%R15E‐420‐022 RC2‐32‐420‐43‐P‐0084 100.00% 100.00% 0.00% 100.00%R15E‐420‐024 RC2‐32‐420‐43‐T‐0070 100.00% 100.00% 0.00% 100.00%R15E‐420‐025 RC2‐32‐420‐43‐T‐0070 100.00% 100.00% 0.00% 100.00%R15E‐510‐069 RC2‐32‐510‐43‐F‐0135 100.00% 100.00% 0.00% 100.00%R15E‐620‐034 RC2‐32‐620‐43‐E‐0011 100.00% 100.00% 0.00% 100.00%R15E‐620‐036 RC2‐32‐620‐43‐E‐0013 100.00% 100.00% 0.00% 100.00%R15E‐710‐052 RC2‐32‐710‐43‐E‐0023 100.00% 100.00% 0.00% 100.00%R15U‐071‐006 RC2‐31‐071‐43‐P‐0041 100.00% 100.00% 0.00% 100.00%R15U‐071‐007 RC2‐31‐071‐43‐P‐0042 100.00% 100.00% 0.00% 100.00%R15U‐071‐008 RC2‐31‐071‐43‐P‐0042 100.00% 100.00% 0.00% 100.00%R15U‐071‐014 RC2‐31‐071‐43‐E‐0045 100.00% 100.00% 0.00% 100.00%R15U‐071‐017 RC2‐31‐071‐43‐E‐0005 100.00% 100.00% 0.00% 100.00%R15E‐500‐009 RC2‐32‐500‐43‐E‐0010 100.00% 100.00% 0.00% 100.00%R15E‐500‐014 RC2‐32‐500‐43‐F‐0005 100.00% 100.00% 0.00% 100.00%R15E‐500‐016 RC2‐32‐500‐43‐F‐0050 100.00% 100.00% 0.00% 100.00%R15E‐500‐019 RC2‐32‐500‐43‐H‐0014 100.00% 100.00% 0.00% 100.00%R15E‐500‐022 RC2‐32‐500‐43‐P‐0065 100.00% 100.00% 0.00% 100.00%R15E‐520‐038 RC2‐32‐520‐43‐E‐0200 100.00% 100.00% 0.00% 100.00%R15E‐520‐047 RC2‐32‐520‐43‐F‐0230 100.00% 100.00% 0.00% 100.00%R15E‐520‐059 RC2‐32‐520‐43‐L‐0186 100.00% 100.00% 0.00% 100.00%R15E‐520‐060 RC2‐32‐520‐43‐P‐0145 100.00% 100.00% 0.00% 100.00%R15E‐820‐033 RC2‐32‐820‐43‐F‐1254 100.00% 100.00% 0.00% 100.00%R15E‐820‐034 RC2‐32‐820‐43‐F‐1257 100.00% 100.00% 0.00% 100.00%R15U‐072‐013 RC2‐31‐072‐43‐E‐0001 100.00% 100.00% 0.00% 100.00%R15U‐072‐015 RC2‐31‐072‐43‐E‐0031 100.00% 100.00% 0.00% 100.00%R15U‐072‐017 RC2‐31‐072‐43‐E‐0051 100.00% 100.00% 0.00% 100.00%R15U‐072‐019 RC2‐31‐072‐43‐E‐0054 100.00% 100.00% 0.00% 100.00%R15U‐072‐020 RC2‐31‐072‐43‐E‐0061 100.00% 100.00% 0.00% 100.00%R15U‐072‐021 RC2‐31‐072‐43‐E‐0081 100.00% 100.00% 0.00% 100.00%R15U‐072‐022 RC2‐31‐072‐43‐F‐0145 100.00% 100.00% 0.00% 100.00%R15U‐072‐024 RC2‐31‐072‐43‐P‐0101 100.00% 100.00% 0.00% 100.00%R15U‐072‐026 RC2‐31‐072‐43‐P‐0102 100.00% 100.00% 0.00% 100.00%
FURNACE CV OVL R15E‐151‐007 RC2‐32‐151‐43‐P‐0013 100.00% 100.00% 0.00% 100.00%R15E‐810‐059 RC2‐32‐810‐43‐F‐1254 100.00% 100.00% 0.00% 100.00%R15E‐810‐060 RC2‐32‐810‐43‐F‐1257 100.00% 100.00% 0.00% 100.00%R15E‐810‐082 RC2‐32‐810‐43‐P‐0025 100.00% 100.00% 0.00% 100.00%R15E‐810‐083 RC2‐32‐810‐43‐P‐0065 100.00% 100.00% 0.00% 100.00%R15E‐810‐085 RC2‐32‐810‐43‐P‐0090 100.00% 100.00% 0.00% 100.00%R15E‐810‐086 RC2‐32‐810‐43‐P‐0092 100.00% 100.00% 0.00% 100.00%R15E‐710‐048 RC2‐32‐710‐43‐E‐0363 100.00% 100.00% 0.00% 100.00%R15E‐710‐066 RC2‐32‐710‐43‐F‐0066 100.00% 100.00% 0.00% 100.00%R15E‐710‐067 RC2‐32‐710‐43‐F‐0086 100.00% 100.00% 0.00% 100.00%R15E‐710‐068 RC2‐32‐710‐43‐F‐0172 100.00% 100.00% 0.00% 100.00%R15E‐710‐070 RC2‐32‐710‐43‐F‐0236 100.00% 100.00% 0.00% 100.00%
ETHYLENE REFRIGERATION CV OVL
ETHYLENE STORAGE CV OVL
PROPANE REFRIGERATION CV OVL
CONTROL VALVE
PYGAS CV OVL
ETHANE STORAGE CV OVL
ETHYLENE PRODUCT CV OVL
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 28 of 31
TA JOB TAG WISE PROGRESS
EQUIPMENT TYPE SYSTEM JOB TYPE TA15 JOB ID EQPT TAG PLANNED TILL DATE ACTUAL TILL DATE VARIANCE % % COMPLETION REMARKS
R15U‐074‐005 RC2‐31‐074‐43‐ESV‐0130 100.00% 100.00% 0.00% 100.00%QUENCH TOWER CV OVL R15E‐210‐008 RC2‐32‐210‐43‐X‐0199 100.00% 100.00% 0.00% 100.00%
R15E‐002‐006 RC2‐31‐002‐43‐P‐0023 100.00% 100.00% 0.00% 100.00%R15E‐002‐007 RC2‐31‐002‐43‐P‐0050 100.00% 100.00% 0.00% 100.00%R15E‐002‐008 RC2‐31‐002‐43‐P‐0065 100.00% 100.00% 0.00% 100.00%R15E‐002‐009 RC2‐31‐002‐43‐T‐0016 100.00% 100.00% 0.00% 100.00%R15E‐002‐010 RC2‐31‐002‐43‐T‐0040 100.00% 100.00% 0.00% 100.00%R15E‐002‐011 RC2‐31‐002‐43‐T‐0058 100.00% 100.00% 0.00% 100.00%R15E‐002‐012 RC2‐31‐002‐43‐T‐0090 100.00% 100.00% 0.00% 100.00%R15E‐220‐008 RC2‐32‐220‐43‐E‐0045 100.00% 100.00% 0.00% 100.00%R15E‐220‐009 RC2‐32‐220‐43‐E‐0059 100.00% 100.00% 0.00% 100.00%R15E‐220‐031 RC2‐32‐220‐43‐P‐0067 100.00% 100.00% 0.00% 100.00%R15E‐220‐033 RC2‐32‐220‐43‐L‐0032 100.00% 100.00% 0.00% 100.00%R15E‐220‐034 RC2‐32‐220‐43‐L‐0091 100.00% 100.00% 0.00% 100.00%R15E‐220‐035 RC2‐32‐220‐43‐L‐0093 100.00% 100.00% 0.00% 100.00%R15E‐220‐036 RC2‐32‐220‐43‐P‐0066 100.00% 100.00% 0.00% 100.00%R15E‐220‐037 RC2‐32‐220‐43‐P‐0066 100.00% 100.00% 0.00% 100.00%R15E‐500‐023 RC2‐32‐500‐43‐T‐0052 100.00% 100.00% 0.00% 100.00%R15E‐710‐101 RC2‐32‐710‐43‐E‐0451 100.00% 100.00% 0.00% 100.00%R15E‐810‐087 RC2‐32‐810‐43‐P‐1215 100.00% 100.00% 0.00% 100.00%R15U‐002‐011 RC2‐31‐002‐43‐P‐0075 100.00% 100.00% 0.00% 100.00%R15U‐002‐016 RC2‐31‐002‐43‐T‐0078 100.00% 100.00% 0.00% 100.00%R15U‐020‐018 RC2‐31‐020‐43‐L‐0001 100.00% 100.00% 0.00% 100.00%R15U‐020‐019 RC2‐31‐020‐43‐L‐0030 100.00% 100.00% 0.00% 100.00%R15U‐020‐020 RC2‐31‐020‐43‐L‐0033 100.00% 100.00% 0.00% 100.00%R15U‐024‐017 RC2‐31‐024‐43‐L‐0001 100.00% 100.00% 0.00% 100.00%R15U‐024‐023 RC2‐31‐024‐43‐P‐0110 100.00% 100.00% 0.00% 100.00%
CV OVL R15E‐002‐004 RC2‐31‐002‐43‐P‐0001 100.00% 100.00% 0.00% 100.00%R15E‐002‐005 RC2‐31‐002‐43‐P‐0003 100.00% 100.00% 0.00% 100.00%
VHP
STEAM/ CONDENSATE CV OVL
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 29 of 31
MANPOWER & EQUIPMENT STATUS EQUIPMENTA - DESCON INDIRECT MANPOWER # EQUIPMENT NAME PLAN ACTUAL
45 PLAN ACT PLAN ACT PLAN ACTMANAGEMENT 4 0 0 0 4 0
1 PROJECT MANAGER 1 0 0 0 1 02 TURNAROUND MANAGER 1 0 0 0 1 03 PROJECT SUPPORT MANAGER 1 0 0 0 1 04 EXECUTION MANAGER 1 0 0 0 1 05 EXECUTION MANAGER 0 0 0 0 0 0
PLANNING 7 7 0 1 7 8D 6 PLANNING IN CHARGE 1 1 0 0 1 1
7 LEAD PLANNING 0 0 0 0 0 08 FEDC ENGINEER 1 1 0 0 1 19 PLANNING ENGINEER 1 1 0 0 1 110 PLANNING ENGINEER 0 0 0 1 0 111 PLANNER / SCHEDULERS 2 2 0 0 2 212 IT OFFICER 1 0 0 0 1 013 QUANTITY SURVEYOR/TEST PACK COORDINATOR 0 1 0 0 0 114 WAREHOUSE IN CHARGE 1 1 0 0 1 115 MATERIAL CORDINATOR 0 0 0 0 0 016 MATERIAL HANDLER (Fitter) 0 0 0 0 0 017 DOCUMENT CONTROLLER 0 0 0 0 0 0
QA / QC 2 4 0 0 2 418 QA / QC IN CHARGE 1 0 0 0 1 019 QA / QC COORDINATOR 1 1 0 0 1 120 QA / QC COORDINATOR 0 0 0 0 0 021 QC INSPECTOR 0 0 0 0 0 022 NDT+PWHT COORDINATOR 0 1 0 0 0 123 PAINTING & INSULATION INSPECTOR 0 0 0 0 0 024 E&I QC INSPECTOR 0 1 0 0 0 125 WELDING INSPECTOR 0 1 0 0 0 126 DOCUMENT CONTROLLER 0 0 0 0 0 0
HEALTH SAFETY AND ENVIRONMENT 1 5 1 0 2 527 HSE IN CHARGE 1 1 0 0 1 128 LEAD HSE OFFICER 0 1 0 0 0 129 LEAD HSE OFFICER 0 0 0 0 0 030 HSE INSPECTOR (FIELD) 0 1 1 0 1 131 ENVIRONMENT COORDINATOR 0 1 0 0 0 132 HSE TRAINERS 0 0 0 0 0 033 TRAINING COORDINATOR 0 0 0 0 0 034 PARAMEDIC 0 1 0 0 0 1
EXECUTION 4 18 6 3 10 2135 INCHARGE SCAFFOLDING 1 1 0 0 1 136 INCHARGE CIVIL 0 1 0 1 0 237 PTW COORDINATOR 0 2 0 0 0 238 INCHARGE EQUIPMENTS 1 0 1 0 2 039 INCHARGE PROJECTS 1 1 0 0 1 140 RIGGER TEAM LEADERS 1 1 1 0 2 141 SUPERVISOR (EQUIPMENT) 0 2 1 0 1 242 SUPERVISOR (VALVES) 0 1 1 0 1 143 SUPERVISOR (RIGGING) 0 2 1 0 1 244 SUPERVISOR (PIPING) 0 5 1 1 1 645 SUPERVISOR (PIPING FOR ELBOW JOBS) 0 0 0 0 0 046 SUPERVISOR (WELDING) 0 1 0 0 0 147 SUPERVISOR (CIVIL) 0 1 0 1 0 2
E&P 1 2 0 0 1 248 E&P COORDINATORS 0 1 0 0 0 149 E&P SUPERVISOR 1 0 0 0 1 050 E&P SUPERVISOR 0 0 0 0 0 051 E&P ASSISTANTS 0 1 0 0 0 152 MECHANIC 0 0 0 0 0 0
COMMERCIAL& ACCOUNTS 0 1 0 0 1 153 SUBCONTRACTS COORDINATOR 0 0 0 0 1 054 CONTRACTS COORDINATOR 0 1 0 0 0 1
STORES 0 2 0 0 0 255 STORE IN CHARGE 0 0 0 0 0 056 STORE INCHARGE 0 0 0 0 0 057 STORE SUPERVISOR 0 1 0 0 0 158 STORE KEEPER 0 1 0 0 0 159 STORE HELPERS 0 0 0 0 0 0
ADMINISTRATION 2 6 2 2 4 860 ADMINISTRATION INCHARGE 1 1 0 0 1 161 ADMIN SUPERVISOR 0 0 0 0 0 062 ADMIN ASSISTANTS 0 1 0 1 0 263 TIME KEEPERS 0 1 1 1 1 264 GATEPASS COORDINATOR 0 0 0 0 0 065 MANPOWER COORDINATOR 0 1 0 0 0 167 TEA BOY 0 1 1 0 1 168 JANITOR 0 0 0 0 0 069 TRANSPORT COORDINATOR 1 1 0 0 1 170 DRIVERS / OPERATORS (OWN+RENTLE) 0 0 0 0 0 0
E&I 1 0 0 0 1 071 INCHARGE E&I DAY 1 0 0 0 1 072 INCHARGE E&I NIGHT 0 0 0 0 0 0
TOTAL - MANPOWER 22 45 9 6 31 51
DAY NIGHT TOTAL
RAS LAFFAN OLEFINS COMPANY LIMITED TURNAROUND 2015
MANPOWER & EQUIPMENT DETAIL REPORT
1 CRANE 250 TON
8 LOW BED TRAILER
2 CRANE 160 TON
CRANE 120 TON3
4
5
6
7
19 AIR COMPRESSOR 400CFM
20 POWER GENERATOR
21
AIR COMPRESSOR 750CFM16
12
13
14 FORKLIFT 5 TON
CRANE 100 TON
CRANE 50 TON
CRANE 25 TON
FLAT BED TRAILER
FORKLIFT 10 TON
FORKLIFT 7 TON
15 AIR COMPRESSOR 1600CFM
9 HYDROJETTING MACHINE
10 BUNDLE PULLER
11
1
0
0
0
0
0
0
0
22
23
24
VACCUM TANKER
WELDING GENERATOR (400AMP)
WELDING RCTIFIER
DIESEL TANKER
18 AIR COMPRESSOR 600CFM
AIR COMPRESSOR 825CFM17
BOOM TRUCK
GRAND TOTAL
0
0
0
1
2
0
1
0
0
0
0
4
0
0
2
0
0
0
0
0
0
0
0
1
0
0
1
0
1
5
0
4
0
1
0
0
0
1
0
0
7 18
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 30 of 31
MANPOWER & EQUIPMENT STATUS EQUIPMENT
RAS LAFFAN OLEFINS COMPANY LIMITED TURNAROUND 2015
MANPOWER & EQUIPMENT DETAIL REPORT
B - DESCON DIRECT MANPOWERPLAN ACT PLAN ACT PLAN ACT
1 LEAD WORKER 13 16 13 4 26 202 FABRICATOR 5 14 4 2 9 163 PIPE FITTER 58 54 52 11 110 654 WELDER 5 5 2 1 7 65 FIRE WATCH 5 5 2 3 7 86 RIGGER 8 19 1 5 9 247 HOLE WATCH 2 3 1 2 3 58 HYDROJETTER 2 2 0 0 2 29 WATERJETTER 0 0 0 0 0 010 INSTRUMENT TECH 2 0 0 0 2 011 ELECTRICAL TECH 0 2 0 0 0 2
TOTAL - MANPOWER 100 120 75 28 175 148C - MANPOWER SUPPLY
PLAN ACT PLAN ACT PLAN ACT1 LEAD WORKER ROTATING EQUIPMENT 0 6 0 3 0 92 LEAD WORKER MECHANICAL 0 9 0 3 0 123 LEAD WORKER INSTRUMENT 0 8 0 2 0 104 LEAD WORKER INSTRUMENT - DCS 0 1 0 2 0 35 LEAD WORKER ELECTRICAL 0 10 0 0 0 106 HIGHLY SKILLED ROTATING EQUIPMENT TECH'S 0 1 0 0 0 17 HIGHLY SKILLED MILLWRIGHT FITTERS 0 4 0 0 0 48 PIPE FITTERS (MECHANICAL) 0 4 0 10 0 149 PIPE FITTERS (WAREHOUSE) 0 1 0 0 0 110 PIPE FITTERS (WORKSHOP) 0 2 0 3 0 511 PIPE FITTERS (INSTRUMENT SUPPORT) 0 1 0 0 0 112 INSTRUMENT TECH'S FOR CONTROLVALVES 0 2 0 0 0 213 INSTRUMENT TECHNICIAN 0 7 0 2 0 914 INSTRUMENT TECHNICIAN -DCS 0 3 0 0 0 315 INSTRUMENT FITTER 0 3 0 1 0 416 ELECTRICAL TECHNICIANS (FIELD EQUIPMENT) 0 0 0 0 0 017 TECHNICAL LABOR (FOR INSTRUMENT & ELECTRICAL) 0 10 0 0 0 1018 TECHNICAL LABOR (WareHouse) 0 2 0 0 0 219 FABRICATOR 0 2 0 2 0 420 WELDERS 0 2 0 2 0 421 RIGGERS 0 9 0 2 0 1122 MACHINIST 0 1 0 0 0 123 FIRE WATCH 0 1 0 2 0 324 HOLE WATCH 0 0 0 2 0 225 CRANE/FORKLIFT OPERATORS 0 2 0 0 0 226 FORKLIFT OPERATORS WAREHOUSE 0 0 0 0 0 027 TECHNICAL LABOR (FOR PRODUCTION) 0 17 0 18 0 3528 FIELD COORDINATORS (MECHANICAL/PIPING) -TECH 0 3 0 1 0 429 FIELD COORDINATORS (INST. & ELECT.) - TECH 0 0 0 1 0 130 VALVE TECHNICIAN 0 2 0 2 0 431 SAFETY COMPLIANCE TRAINERS 0 0 0 0 0 032 PLANNERS 0 0 0 2 0 234 TOOL ROOM TECHNICIANS 0 1 0 1 0 235 TECHANICAL CLERKS - TA DOCUMENTATION 0 0 0 0 0 0
TOTAL - MANPOWER 0 114 0 61 0 175D - SUBCONTRACTOR
MANPOWER PLAN ACT PLAN ACT PLAN ACT1 INECO 25 167 4 14 29 1812 PRETECT/HYDRTIET 0 6 0 6 0 123 WELLUBE 0 0 0 0 0 04 SIEVERT 0 1 0 0 0 15 SEASHORE 0 2 0 0 0 26 QIES 10 0 10 0 20 0
TOTAL - MANPOWER 35 176 14 20 49 196GRAND TOTAL 157 455 98 115 255 570
DAY NIGHT TOTAL
DAY NIGHT TOTAL
DAY NIGHT TOTAL
DES-RLOC-PLN-DPR-040 DESCON DAILY RLOC TA-15 PROGRESS REPORT Page 31 of 31