16
DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status • The mechanical design is ~95% completed. • ~5% = finalize mounting to telescope. • For the prototype, we are ignoring telescope requirements for cooling water, temperature monitoring, and other instrumentation. • Most prototype manufactured parts are out for quote. • Most prototype purchased parts are on hand.

DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design

Embed Size (px)

Citation preview

Page 1: DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design

DES FE Workshop at FNAL December 14-15, 2005Vaidas Simaitis, University of Illinois at Urbana-Champaign

1

DHE Crate Design and Status

• The mechanical design is ~95% completed.• ~5% = finalize mounting to telescope.• For the prototype, we are ignoring telescope

requirements for cooling water, temperature monitoring, and other instrumentation.

• Most prototype manufactured parts are out for quote.

• Most prototype purchased parts are on hand.

Page 2: DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design

DES FE Workshop at FNAL December 14-15, 2005Vaidas Simaitis, University of Illinois at Urbana-Champaign

2

6-SLOT + 4-SLOT Crate

Schroff Card Guides and Rails are on hand. 4-slot backplane is on hand, 6-slot on order

Chassis plate designs finished, drawings out for quote.

Page 3: DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design

DES FE Workshop at FNAL December 14-15, 2005Vaidas Simaitis, University of Illinois at Urbana-Champaign

3

HEAT EXCHANGERS & FANS

2 Fan Manifold and 2 Cooling Manifold drawings out for quote

2 fans on hand from early Monsoon design

1 heat exchanger on hand, 1 on back order

Page 4: DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design

DES FE Workshop at FNAL December 14-15, 2005Vaidas Simaitis, University of Illinois at Urbana-Champaign

4

MAIN MANIFOLDS

2 Main manifold drawings out for quote

Heat sink extrusion just arrived.

2 Thermo-electric coolers (TEC) not yet ordered.

Page 5: DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design

DES FE Workshop at FNAL December 14-15, 2005Vaidas Simaitis, University of Illinois at Urbana-Champaign

5

POWER SUPPLIES

2 Power Supply Mount drawings out for quote

2 Power Supplies to be ordered by Todd

Page 6: DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design

DES FE Workshop at FNAL December 14-15, 2005Vaidas Simaitis, University of Illinois at Urbana-Champaign

6

POWER SUPPLY MANIFOLDS

2 power supply manifold drawings out for quote

2 delrin crate mounting bars on hold until mounting design is done (not shown)

Page 7: DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design

DES FE Workshop at FNAL December 14-15, 2005Vaidas Simaitis, University of Illinois at Urbana-Champaign

7

PROTOTYPE ASSEMBLY

• Expect to receive chassis and manifolds by the end of January

• Assemble prototype, without heat shields• If assembly is OK, order heat shields• Order TEC’s, and TEC mounts• Test air flow and heating and cooling

through February• Install TEC’s and heat shields

Page 8: DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design

DES FE Workshop at FNAL December 14-15, 2005Vaidas Simaitis, University of Illinois at Urbana-Champaign

8

THERMOELECTRIC MOUNT

DELRIN INSULATOR / SPACER

TEC

HEAT SHIELD WILL ATTACH TO COPPER PLATE

Page 9: DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design

DES FE Workshop at FNAL December 14-15, 2005Vaidas Simaitis, University of Illinois at Urbana-Champaign

9

View with HEAT SHIELDS

Page 10: DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design

DES FE Workshop at FNAL December 14-15, 2005Vaidas Simaitis, University of Illinois at Urbana-Champaign

10

CRATE Installed on Cylinder

Page 11: DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design

DES FE Workshop at FNAL December 14-15, 2005Vaidas Simaitis, University of Illinois at Urbana-Champaign

11

MOUNTING PIVOTS

NORMAL LOCKED POSITION

EXTENDED POSITION

PIVOT

LOCK

Page 12: DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design

DES FE Workshop at FNAL December 14-15, 2005Vaidas Simaitis, University of Illinois at Urbana-Champaign

12

Why PIVOTS ?

• Allow some FLEXIBILITY to avoid possible obstructions, for extraction or insertion of front modules or transition cards.

• PIVOTS allow either end to be angled out, and are locked in position for SAFE access.

• Little extra $$ for a lot of SAFETY!

• Final design is on hold until mounting method and position is OK’ed by FNAL

Page 13: DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design

DES FE Workshop at FNAL December 14-15, 2005Vaidas Simaitis, University of Illinois at Urbana-Champaign

13

Z-AXIS VIEW WITH R=52” ID

Page 14: DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design

DES FE Workshop at FNAL December 14-15, 2005Vaidas Simaitis, University of Illinois at Urbana-Champaign

14

WORST-CASE MODULE ACCESS

Page 15: DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design

DES FE Workshop at FNAL December 14-15, 2005Vaidas Simaitis, University of Illinois at Urbana-Champaign

15

CRATE PIVOTED FOR ACCESS

Page 16: DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design

DES FE Workshop at FNAL December 14-15, 2005Vaidas Simaitis, University of Illinois at Urbana-Champaign

16

DESIGN DETAILS

• Our design resides in much detail at our UIUC website at CLICK HERE or copy and paste:

• web.hep.uiuc.edu/Engin/DES/DHE_10_Crate/DHE_10_Crate.html

• The best way to see the design is to download the free DWF Viewer.

• You can then rotate, zoom in/out, hide parts in assemblies so you can see the insides, and print any view you like.

• Else, you’re stuck with the 2D PDF views.