City of Seattle Edward B. Murray, Mayor Department of Construction and Inspections Nathan Torgelson, Director RECOMMENDATION OF THE SOUTHWEST DESIGN REVIEW BOARD Project Number: 3022717 Address: 3039 SW Avalon Way Applicant: Steve Fischer, NK Architects Date of Meeting: Thursday, January 05, 2017 Board Members Present: Robin Murphy, substitute Alexandra Moravec Matt Zinski, Chair Board Members Absent: Todd Bronk Donald Caffrey T. Frick McNamara SDCI Staff Present: Lisa Rutzick for Bruce Rips SITE & VICINITY Site Zone: Multi-family Midrise (MR) Nearby Zones: North. The MR zone stretches north from the site to SW Yancy St. along the SW Avalon corridor.

Department of Construction and Inspections Nathan Torgelson, … · 2017. 2. 8. · Alexandra Moravec Matt Zinski, Chair Board Members Absent: Todd Bronk Donald Caffrey T. Frick McNamara

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Department of Construction and Inspections Nathan Torgelson, … · 2017. 2. 8. · Alexandra Moravec Matt Zinski, Chair Board Members Absent: Todd Bronk Donald Caffrey T. Frick McNamara

City of Seattle Edward B. Murray, Mayor

Department of Construction and Inspections Nathan Torgelson, Director

RECOMMENDATION OF THE

SOUTHWEST DESIGN REVIEW BOARD

Project Number: 3022717 Address: 3039 SW Avalon Way Applicant: Steve Fischer, NK Architects Date of Meeting: Thursday, January 05, 2017 Board Members Present: Robin Murphy, substitute Alexandra Moravec Matt Zinski, Chair Board Members Absent: Todd Bronk Donald Caffrey T. Frick McNamara SDCI Staff Present: Lisa Rutzick for Bruce Rips

SITE & VICINITY Site Zone: Multi-family Midrise (MR) Nearby Zones:

North. The MR zone stretches north from the site to SW Yancy St. along the SW Avalon corridor.

Page 2: Department of Construction and Inspections Nathan Torgelson, … · 2017. 2. 8. · Alexandra Moravec Matt Zinski, Chair Board Members Absent: Todd Bronk Donald Caffrey T. Frick McNamara

EARLY DESIGN GUIDANCE #3022717 Page 2 of 12

South. The MR zone extends south from the site to SW Genesee St. and beyond. East. 30th Ave SW divides the MR zone on the west from the LR zone to the east.

West. The alley between Avalon and 32nd Ave SW demarcates the MR corridor along Avalon and the Single Family 5000 zone to the west.

Lot Area: 12,340 SF Site Characteristics & Current Development: The site, located midblock on the east side of SW Avalon Way, contains a 2-story duplex and has a notable slope from west down to east with a number of trees and large bushes including vegetation along the west and southwest property line. A platted alley dead ends at the southeast corner of the site, however it is currently used as surface parking for neighboring properties and contains a rockery and vegetation towards the northern portion of the alley. Surrounding Development and Neighborhood Character: The development along SW Avalon Way is somewhat transitional with an increasing number of newer mid-rise buildings concentrated along the Avalon corridor as well as some older duplexes and low-rise development. Transitioning away from the Avalon corridor, the neighborhood consists of single family development to the west and a mix of single family and low-rise residential buildings to the east. SW Avalon Way is a moderately busy arterial street connecting the Junction to the West Seattle Bridge and includes a number of bus routes, including the Rapid Ride C Line, as well as a bike lane that serves as a primary bicycle route to and from West Seattle. Access: Existing vehicle access to the site is from SW Avalon Way. Proposed vehicle and pedestrian access to the site is from Avalon Way. At EDG, the applicant also proposed a code compliant option with no parking and therefore no vehicle access as well as an option with vehicle access from the adjacent under improved alley. Environmentally Critical Areas (ECAs): There are no mapped ECAs onsite. PROJECT DESCRIPTION Design Review Early Design Guidance to allow a six-story apartment building containing 71 residential units and 21 below grade parking stalls. Existing structure to be demolished.

Page 3: Department of Construction and Inspections Nathan Torgelson, … · 2017. 2. 8. · Alexandra Moravec Matt Zinski, Chair Board Members Absent: Todd Bronk Donald Caffrey T. Frick McNamara

EARLY DESIGN GUIDANCE #3022717 Page 3 of 12

The design packet includes materials presented at the meeting, and is available online by entering the project number at this website: http://www.seattle.gov/DPD/aboutus/news/events/DesignReview/SearchPastReviews/default.aspx The packet is also available to view in the file, by contacting the Public Resource Center at SDCI:

Mailing Address:

Public Resource Center 700 Fifth Ave., Suite 2000 P.O. Box 34019 Seattle, WA 98124-4019

Email: [email protected]

EARLY DESIGN GUIDANCE February 18, 2016

PUBLIC COMMENT At EDG, several members of the public were present. One speaker provided the following comments:

Questioned why departures would be justified if they were only for the marketability of the project.

All public comments submitted in writing for this project can be viewed using the following link and entering the project number: http://web6.seattle.gov/dpd/edms/

PRIORITIES & BOARD RECOMMENDATIONS

After visiting the site, considering the analysis of the site and context provided by the proponents, and hearing public comment, the Design Review Board members provided the following siting and design guidance. EARLY DESIGN GUIDANCE February 18, 2016 1. Vehicular Access, Solid Waste Storage, & Safety: The Board discussed vehicular access and

solid waste pick-up from SW Avalon Way at length and noted that safety was the primary concern due to SW Avalon Way being an arterial street with several bus routes, notable vehicular traffic, a well-used bicycle route, and a number of pedestrians. (DC1-B-1, DC1-C-2, DC1-C-4, PL4-A-1, CS1-C-1)

a. There is a strong preference for solid waste servicing to be from the alley if possible and the applicant should explore solid waste servicing options from the alley. (DC1-B-1, DC1-C-4, CS1-C-1).

Page 4: Department of Construction and Inspections Nathan Torgelson, … · 2017. 2. 8. · Alexandra Moravec Matt Zinski, Chair Board Members Absent: Todd Bronk Donald Caffrey T. Frick McNamara

EARLY DESIGN GUIDANCE #3022717 Page 4 of 12

b. If solid waste servicing from the alley is not possible, the Board would support servicing from SW Avalon Way if it could be done in a way that was safe and minimized potential vehicle, bicycle, and pedestrian conflicts to the maximum extent feasible. The logistics and staging should be well thought out and fully integrated into the design to maximize safety and minimize aesthetic impacts on the right-of-way. If possible, staging should be pulled back from the property line. (DC1-B-1, DC1-C-4)

c. The Board deferred to the SDCI director and SDOT on the vehicular access, as safety was the primary concern and aesthetically the design of street access could be resolved by softening the access entry with landscaping and human scale detailing. (CS1-C-1, DC1-B-1, DC1-C-2, DC1-C-4, PL4-A-1)

2. Massing & Architectural Concept: The Board unanimously supported the Applicant’s preferred option, Option C, noting the front setback, east/west unit orientation, at-grade streetscape relationship, and massing articulation resulted in an overall simple and successful composition.

a. The 11’ ground level setback created a desirable streetscape relationship, setting a precedent for future adjacent development, and should be maintained. (CS2-C-2, CS2-D-2, PL3-B-1, PL3-B-2)

b. The expression of materials should reinforce the concept diagram shown on page 17 of the EDG packet, with simple, high quality materials expressing the larger forms and clear transitions between the masses. (CS2-III-iii, DC2-A-2, DC2-B-1&2, DC2-I-ii, DC4-A-1)

c. The Board cautioned that the preferred massing option was less successful than the concept diagram and stated that the massing and material composition should articulate the larger masses, vertical gaskets, and a strong base, as shown in the concept diagram. (CS2-III-iii, DC2-A-2, DC2-B-1&2, DC2-I-ii)

d. Because the north and south facades would have less transparency and greater blank wall area, the design of these walls should be well thought out with high quality detailing of the materials to break up the facades. (DC2-A, DC2-B-1, DC2-B-2, DC2-D, DC4-A-1)

e. The blank concrete wall at the base should be detailed in a way that provided texture and scale, specifically along the north, south, and especially the east façade due to its overall height and exposure. Landscaping alone would not be adequate to address the blank base facades. (DC2-A, DC2-B-1, DC2-B-2, DC2-D, DC4-A-1)

3. Landscape & Open Space: The Board unanimously supported the conceptual landscaping and open space plan and noted that it should stay true to what was presented at EDG. (DC4-all)

RECOMMENDATION January 5, 2017

PUBLIC COMMENT Several members of the public attended the meeting. Speakers raised the following issues:

Page 5: Department of Construction and Inspections Nathan Torgelson, … · 2017. 2. 8. · Alexandra Moravec Matt Zinski, Chair Board Members Absent: Todd Bronk Donald Caffrey T. Frick McNamara

EARLY DESIGN GUIDANCE #3022717 Page 5 of 12

1. The patios along SW Avalon will not be used. Due to traffic noise, tenants will not likely use these outdoor areas. The same tenants of the units facing Avalon will obscure the large amounts of glazing with opaque surfaces creating inactive frontages.

2. The proposed departures encroach upon the side setbacks obscuring views from residents who live across the street and the preservation of these open spaces is compromised.

3. It is unclear where the placement of trash and recycling will occur on pick-up days. The applicant should designate a discrete place where there is no parking.

All public comments submitted in writing for this project can be viewed using the following link and entering the project number: http://web6.seattle.gov/dpd/edms/

1. Massing & Architectural Concept: The Board agreed that the direction provided at the

previous meeting had clearly translated Option 3 into the proposed design. The Board had cautioned at EDG, however, that in order for this option to be most successful, the massing and material composition should articulate the larger masses, vertical gaskets, and a strong base, as shown in the concept diagram.

a. The Board raised concerns at the Recommendation meeting that the building forms, while successful in concept, did not provide enough depth and texture. As shown, the Board agreed that the lack of texture conveys more of a super graphic quality due to the flatness of the horizontal and vertical scaling. Therefore, the Board recommended a condition in order to achieve better articulation and establish a clearer hierarchy among the building elements, as follows:

i. The black organizing frame feature should be off set from the interior building face by at least 6 inches to create a more significant plane change and emphasize the drama of this element. (CS2-III-iii, DC2-B-1, DC2-D2, DC2-I-ii, DC4-all)

b. The Board was very supportive of the high quality materials expressing the larger forms and highlighting the clear transitions between the massing form shown at the EDG (page 17 of the EDG packet). At the Recommendation meeting, the Board was disappointed that a Hardi panel 2.0 system was proposed for the majority of the building. The Board was very supportive of the pro deema wood panels and concluded that the three organizing elements should not only be three different colors, but three different materials to reinforce the building design hierarchy discussed above. Therefore the Board recommended the following condition:

i. The black frame should be a material other than hardi panel. This third material could be integral color cement, composite metal, metal or other high quality material. (CS2-III-iii, DC2-B-1, DC2-I-ii, DC4-A-1)

c. The Board agreed that the north and south facing side elevation have been well designed with a variety of materials, colors and detailing that wrap around from the street and alley elevation in a consistent manner, providing visual interest and breaking up the facades. (DC2-A, DC2-B-1, DC2-B-2, DC2-D, DC4-A-1)

Page 6: Department of Construction and Inspections Nathan Torgelson, … · 2017. 2. 8. · Alexandra Moravec Matt Zinski, Chair Board Members Absent: Todd Bronk Donald Caffrey T. Frick McNamara

EARLY DESIGN GUIDANCE #3022717 Page 6 of 12

d. The Board was supportive of the treatment of the concrete wall at the base with horizontal reveal lines that provide texture and scale. (DC2-A, DC2-B-2, DC2-D, DC4-A-1)

e. The Board encouraged, but did not recommend a condition, that the design of the juliette balconies be simplified to avoid creating an overly busy appearance at this vertical notch or gasket above the main entrance. (CS2-III-iii, DC2-B-1, DC2-I-ii, DC4-A-1)

2. Vehicular Access, Solid Waste Storage, & Safety: The Board discussed vehicular access and solid waste pick-up from SW Avalon Way and supported the design as shown on page 11 of the packet. (DC1-B-1, DC1-C-2, DC1-C-4, PL4-A-1, CS1-C-1)

a. At the EDG, The Board noted that if solid waste servicing from the alley is not possible, the Board would support servicing from SW Avalon Way if it could be done in a way that was safe and minimized potential vehicle, bicycle, and pedestrian conflicts to the maximum extent feasible. The logistics and staging should be well thought out and fully integrated into the design to maximize safety and minimize aesthetic impacts on the right-of-way. If possible, staging should be pulled back from the property line. At the Recommendation meeting, the Board agreed that the proposed location of solid waste storage in the building that is brought out to a designated, clear on street location on collection days will not interfere with the sidewalk or pedestrian circulation sufficiently responded to their guidance (DC1-B-1, DC1-C-2, DC1-C-4, PL4-A-1)

b. At the Recommendation meeting, the Board was supportive of the street access and agreed that it was designed to have minimal intrusion upon the sidewalk and responded to neighborhood concerns. The Board also agreed that the design of the access point had been softened with landscaping on either end, as well as providing a continuous, uninterrupted sidewalk grid across the driveway. (DC1-B-1, DC1-C-2, DC1-C-4, PL4-A-1)

3. Landscape & Open Space: The Board unanimously supported the landscape design as well

considered and thoughtful of the specific conditions and challenges of this site, particularly at street level.

a. The Board continued to support the front setback, east/west unit orientation, at-grade streetscape relationship with a 13’ ground level setback.

b. The Board acknowledged the public comment regarding these street level residential units, but agreed that the generous patio dimensions combined with the layering of landscaping staying under the 2-3 feet in height for a depth of 4 feet would create defensible, semi buffered, usable spaces. (CS2-D-2, PL3-B-1, PL3-B-2, DC2-II, DC4-D)

DESIGN REVIEW GUIDELINES

Page 7: Department of Construction and Inspections Nathan Torgelson, … · 2017. 2. 8. · Alexandra Moravec Matt Zinski, Chair Board Members Absent: Todd Bronk Donald Caffrey T. Frick McNamara

EARLY DESIGN GUIDANCE #3022717 Page 7 of 12

The priority Citywide and Neighborhood guidelines identified by the Board as Priority Guidelines are summarized below, while all guidelines remain applicable. For the full text please visit the Design Review website.

CONTEXT & SITE

CS1 Natural Systems and Site Features: Use natural systems/features of the site and its surroundings as a starting point for project design. CS1-C Topography

CS1-C-1. Land Form: Use natural topography and desirable landforms to inform project design. CS1-C-2. Elevation Changes: Use the existing site topography when locating structures and open spaces on the site.

CS2 Urban Pattern and Form: Strengthen the most desirable forms, characteristics, and patterns of the streets, block faces, and open spaces in the surrounding area. CS2-A Location in the City and Neighborhood

CS2-A-1. Sense of Place: Emphasize attributes that give a distinctive sense of place. Design the building and open spaces to enhance areas where a strong identity already exists, and create a sense of place where the physical context is less established. CS2-A-2. Architectural Presence: Evaluate the degree of visibility or architectural presence that is appropriate or desired given the context, and design accordingly.

CS2-C Relationship to the Block CS2-C-2. Mid-Block Sites: Look to the uses and scales of adjacent buildings for clues about how to design a mid-block building. Continue a strong street-edge and respond to datum lines of adjacent buildings at the first three floors.

CS2-D Height, Bulk, and Scale CS2-D-1. Existing Development and Zoning: Review the height, bulk, and scale of neighboring buildings as well as the scale of development anticipated by zoning for the area to determine an appropriate complement and/or transition. CS2-D-2. Existing Site Features: Use changes in topography, site shape, and vegetation or structures to help make a successful fit with adjacent properties. CS2-D-4. Massing Choices: Strive for a successful transition between zones where a project abuts a less intense zone. CS2-D-5. Respect for Adjacent Sites: Respect adjacent properties with design and site planning to minimize disrupting the privacy of residents in adjacent buildings.

West Seattle Supplemental Guidance: CS2-III Height, Bulk and Scale

CS2-III-i. Zoning Context: Applicant must analyze the site in relationship to its surroundings. This should include:

a. Distance from less intensive zone; and b. Separation between lots in different zones (property line only, alley, grade changes).

Page 8: Department of Construction and Inspections Nathan Torgelson, … · 2017. 2. 8. · Alexandra Moravec Matt Zinski, Chair Board Members Absent: Todd Bronk Donald Caffrey T. Frick McNamara

EARLY DESIGN GUIDANCE #3022717 Page 8 of 12

CS2-III-ii. New Development in NC zones 65’ or Higher: a. Patterns of urban form in existing built environment, such as setbacks and massing compositions. b. Size of Code-allowable building envelope in relation to underlying platting pattern.

CS2-III-iii. Facade Articulation: New buildings should use architectural methods including modulation, color, texture, entries, materials and detailing to break up the façade— particularly important for long buildings—into sections and character consistent with traditional, multi-bay commercial buildings prevalent in the neighborhood’s commercial core (see map 1, page 1).

PUBLIC LIFE

PL3 Street-Level Interaction: Encourage human interaction and activity at the street-level with clear connections to building entries and edges. PL3-A Entries

PL3-A-1. Design Objectives: Design primary entries to be obvious, identifiable, and distinctive with clear lines of sight and lobbies visually connected to the street. PL3-A-2. Common Entries: Multi-story residential buildings need to provide privacy and security for residents but also be welcoming and identifiable to visitors. PL3-A-3. Individual Entries: Ground-related housing should be scaled and detailed appropriately to provide for a more intimate type of entry. PL3-A-4. Ensemble of Elements: Design the entry as a collection of coordinated elements including the door(s), overhead features, ground surface, landscaping, lighting, and other features.

PL3-B Residential Edges PL3-B-1. Security and Privacy: Provide security and privacy for residential buildings through the use of a buffer or semi-private space between the development and the street or neighboring buildings. PL3-B-2. Ground-level Residential: Privacy and security issues are particularly important in buildings with ground-level housing, both at entries and where windows are located overlooking the street.

PL4 Active Transportation: Incorporate design features that facilitate active forms of transportation such as walking, bicycling, and use of transit. PL4-A Entry Locations and Relationships

PL4-A-1. Serving all Modes of Travel: Provide safe and convenient access points for all modes of travel.

PL4-B Planning Ahead for Bicyclists PL4-B-1. Early Planning: Consider existing and future bicycle traffic to and through the site early in the process so that access and connections are integrated into the project along with other modes of travel.

Page 9: Department of Construction and Inspections Nathan Torgelson, … · 2017. 2. 8. · Alexandra Moravec Matt Zinski, Chair Board Members Absent: Todd Bronk Donald Caffrey T. Frick McNamara

EARLY DESIGN GUIDANCE #3022717 Page 9 of 12

PL4-B-2. Bike Facilities: Facilities such as bike racks and storage, bike share stations, shower facilities and lockers for bicyclists should be located to maximize convenience, security, and safety. PL4-B-3. Bike Connections: Facilitate connections to bicycle trails and infrastructure around and beyond the project.

DESIGN CONCEPT

DC1 Project Uses and Activities: Optimize the arrangement of uses and activities on site. DC1-B Vehicular Access and Circulation

DC1-B-1. Access Location and Design: Choose locations for vehicular access, service uses, and delivery areas that minimize conflict between vehicles and non-motorists wherever possible. Emphasize use of the sidewalk for pedestrians, and create safe and attractive conditions for pedestrians, bicyclists, and drivers.

DC1-C Parking and Service Uses DC1-C-2. Visual Impacts: Reduce the visual impacts of parking lots, parking structures, entrances, and related signs and equipment as much as possible. DC1-C-4. Service Uses: Locate and design service entries, loading docks, and trash receptacles away from pedestrian areas or to a less visible portion of the site to reduce possible impacts of these facilities on building aesthetics and pedestrian circulation.

DC2 Architectural Concept: Develop an architectural concept that will result in a unified and functional design that fits well on the site and within its surroundings. DC2-A Massing

DC2-A-1. Site Characteristics and Uses: Arrange the mass of the building taking into consideration the characteristics of the site and the proposed uses of the building and its open space. DC2-A-2. Reducing Perceived Mass: Use secondary architectural elements to reduce the perceived mass of larger projects.

DC2-B Architectural and Facade Composition DC2-B-1. Façade Composition: Design all building facades—including alleys and visible roofs— considering the composition and architectural expression of the building as a whole. Ensure that all facades are attractive and well-proportioned. DC2-B-2. Blank Walls: Avoid large blank walls along visible façades wherever possible. Where expanses of blank walls, retaining walls, or garage facades are unavoidable, include uses or design treatments at the street level that have human scale and are designed for pedestrians.

DC2-D Scale and Texture DC2-D-1. Human Scale: Incorporate architectural features, elements, and details that are of human scale into the building facades, entries, retaining walls, courtyards, and exterior spaces in a manner that is consistent with the overall architectural concept DC2-D-2. Texture: Design the character of the building, as expressed in the form, scale, and materials, to strive for a fine-grained scale, or “texture,” particularly at the street level and other areas where pedestrians predominate.

Page 10: Department of Construction and Inspections Nathan Torgelson, … · 2017. 2. 8. · Alexandra Moravec Matt Zinski, Chair Board Members Absent: Todd Bronk Donald Caffrey T. Frick McNamara

EARLY DESIGN GUIDANCE #3022717 Page 10 of 12

West Seattle Supplemental Guidance: DC2-I Architectural Concept and Consistency

DC2-I-i. Integrate Upper-Levels: New multi-story developments are encouraged to consider methods to integrate a building’s upper and lower levels. This is especially critical in areas zoned NC-65’ and greater, where more recent buildings in the Junction lack coherency and exhibit a disconnect between the commercial base and upper residential levels as a result of disparate proportions, features and materials. The base of new mixed-use buildings – especially those zoned 65 ft. in height and higher – should reflect the scale of the overall building. New mixed-use buildings are encouraged to build the commercial level, as well as one to two levels above, out to the front and side property lines to create a more substantial base. DC2-I-ii. Cohesive Architectural Concept: The use and repetition of architectural features and building materials, textures and colors can help create unity in a structure. Consider how the following can contribute to a building that exhibits a cohesive architectural concept:

a. facade modulation and articulation; b. windows and fenestration patterns; c. trim and moldings; d. grilles and railings; e. lighting and signage.

DC2-II Human Scale DC2-II-i. Pedestrian-Oriented Facades: Facades should contain elements that enhance pedestrian comfort and orientation while presenting features with visual interest that invite activity.

DC4 Exterior Elements and Finishes: Use appropriate and high quality elements and finishes for the building and its open spaces. DC4-A Exterior Elements and Finishes

DC4-A-1. Exterior Finish Materials: Building exteriors should be constructed of durable and maintainable materials that are attractive even when viewed up close. Materials that have texture, pattern, or lend themselves to a high quality of detailing are encouraged. DC4-A-2. Climate Appropriateness: Select durable and attractive materials that will age well in Seattle’s climate, taking special care to detail corners, edges, and transitions.

DC4-C Lighting DC4-C-1. Functions: Use lighting both to increase site safety in all locations used by pedestrians and to highlight architectural or landscape details and features such as entries, signs, canopies, plantings, and art. DC4-C-2. Avoiding Glare: Design project lighting based upon the uses on and off site, taking care to provide illumination to serve building needs while avoiding off-site night glare and light pollution.

DC4-D Trees, Landscape, and Hardscape Materials

Page 11: Department of Construction and Inspections Nathan Torgelson, … · 2017. 2. 8. · Alexandra Moravec Matt Zinski, Chair Board Members Absent: Todd Bronk Donald Caffrey T. Frick McNamara

EARLY DESIGN GUIDANCE #3022717 Page 11 of 12

DC4-D-1. Choice of Plant Materials: Reinforce the overall architectural and open space design concepts through the selection of landscape materials. DC4-D-2. Hardscape Materials: Use exterior courtyards, plazas, and other hard surfaced areas as an opportunity to add color, texture, and/or pattern and enliven public areas through the use of distinctive and durable paving materials. Use permeable materials wherever possible. DC4-D-3. Long Range Planning: Select plants that upon maturity will be of appropriate size, scale, and shape to contribute to the site as intended. DC4-D-4. Place Making: Create a landscape design that helps define spaces with significant elements such as trees.

DC4-E Project Assembly and Lifespan DC4-E-1. Deconstruction: When possible, design the project so that it may be deconstructed at the end of its useful lifetime, with connections and assembly techniques that will allow reuse of materials.

DEVELOPMENT STANDARD DEPARTURES The Board’s recommendation on the requested departures will be based on the departure’s potential to help the project better meet these design guidelines priorities and achieve a better overall project design than could be achieved without the departures. The Board’s recommendation will be reserved until the final Board meeting. At the time of the Recommendation meeting, the following departures were requested:

1. Driveway Sight Triangles (SMC.23.54.030.G.4): The Code requires driveways adjacent to a side lot line to start 5’ from the lot line. (See Exhibit F for SMC 23.54.030). The applicant proposes 3’4” separation between the driveway and the north property line. The change represents a 1’8” change. The Board recommended the departure’s approval by a 3-0 vote noting that the condition maximizes pedestrian safety related to Design Guidelines PL2 Walkability, and DC1 -B-1 Access Location and Design.

2. Upper Level Setback (SMC 23.45.518.B): The Code requires a 7’ minimum and 10’

average setback above 42’. The applicant proposes a 7’-6” minimum and 8’-3” average setback along the north façade above 42’, resulting in 1’-9” less that the required average setback above 42’.

By a 3-0 vote, the Board supported the requested setback noting that it resulted in a simpler form and a more cohesive composition consistent with Design Guidelines CS2 Urban Pattern and Form, DC2-A-Massing and DC2-B-Architectural and Facade Composition.

Page 12: Department of Construction and Inspections Nathan Torgelson, … · 2017. 2. 8. · Alexandra Moravec Matt Zinski, Chair Board Members Absent: Todd Bronk Donald Caffrey T. Frick McNamara

EARLY DESIGN GUIDANCE #3022717 Page 12 of 12

3. Upper Level Setback (SMC 23.45.518.B): The Code requires a 7’ minimum and 10’ average setback above 42’. The applicant proposes a 7’-5” minimum and 7’-5” average setback along the south façade above 42’, resulting in 2’-7” a reduction in the required average setback above 42’.

The Board recommended approval of the requested setback by a 3-0 vote, noting that it resulted in a simpler and more cohesive overall building composition consistent with Design Guidelines CS2 Urban Pattern and Form, DC2-A-Massing and DC2-B-Architectural and Facade Composition.

BOARD DIRECTION The recommendation summarized above was based on the design review packet dated Thursday, January 05, 2017, and the materials shown and verbally described by the applicant at the Thursday, January 05, 2017 Design Recommendation meeting. After considering the site and context, hearing public comment, reconsidering the previously identified design priorities and reviewing the materials, the four Design Review Board members recommended APPROVAL of the subject design and departures with the following conditions:

1. The black organizing frame feature should be off set from the interior building face by at least 6 inches to create a more significant plane change and emphasize the drama of this element. (CS2-III-iii, DC2-A-2, DC2-B-1&2, DC2-I-ii)

2. The black frame element should be a material other than hardi panel. This third material could be integral color cement, composite metal, metal or other high quality material. (CS2-III-iii, DC2-A-2, DC2-B-1&2, DC2-I-ii, DC4-A-1)