12
Demand Control

Demand Controller

Embed Size (px)

Citation preview

Demand Control

1.1.1.1. Overview

2.2.2.2. Examples of Electricity Billing System

3. Explain of Demand System

4. Demand Monitoring System

Confidential

CONTENTS

BackgroundBackground

1.Overview

In Japan, the energy saving became most important by the Great East

Japan Earthquake.

The sales of the demand power monitor device increased rapidly.

In future, we think that the demand for this device will increase equally

in the overseas market where power supply becomes more difficult.

Electricity billing System and PurposeElectricity billing System and Purpose

1.Overview

The electric bill of a factory and the building is the total of a rate of the

consumption electricity (kWh) and the rate of the max. mean electricity (kW).

In the case of Japan, the mean electricity is the mean of 30 minutes.

The rate of the max. mean electricity is a measure to promote equalization

of the energy consumption.

It is the same purpose that the daytime electric rate is set higher than the

nighttime.

The demand monitor deviceThe demand monitor device

The demand monitor device calculates the present and future mean

electricity.

When the future mean electricity is more than the target value, the

device issues the alarms.

Electric bill = Energy consumption (kWh) × rate + Max. Mean electricity (kW) ×rate

Demand (power)= Mean electricity (power consumption)

Electricity billing System in Japan

NOTE: The timetable is different every electric power company.

Rate of charge

Demand Power

of Demand

Charge

Total Charge=Basic Charge+kWh Charge

Basic Charge=Demand Charge × Power Factor Discount rate

Power Factor Discount rate:1-(Power Factor-0.85)→Maximum 15% discount

The way of

Calculation

DetailItem

2. Examples of Electricity Billing System

Holiday

Weekdays

Y yen/kWhX yen/kW

Y yen/kWhZ yen/kWhY yen/kWh

Q yen/kW

More than

500kW

R yen/kW

08.30~18.30

kWh Charge

21.30~08.30

Demand Charge

Less than 500kW

18.30~21.30

The maximum of the past 12 monthsLess than 500kW

To contract with the electric power company based on the results.More than 500kW

Electricity billing System in Thailand

Total Charge=Demand Charge+kWh ChargeTOD

Total Charge=Demand Charge + kWh Charge + Service ChargeTOU

SystemType

Z THB/kWh0Y THB/kWX THB/kW

Off21.30~08.30

Partial08.30~18.30

Peak18.30~21.30

kWh Charge

Demand Charge

kWh Charge

X THB/kW

Demand Charge

Z THB/Month

Z THB/unit0

Off22.00~09.00

Saturday, Sunday, Holiday

Y THB/kW

Peak09.00~22.00Monday ~

Friday

Service Charge

2. Examples of Electricity Billing System

Demand system A(Japan, Taiwan, Thailand etc.)

t

kWh

1 month

kWh1

kWh2

kWh3

kWh4 kWhn

Demand = kWh of T term×60min./Tmin.

Demand max. = Max.( Demand1…..n) 15minTaiwan

30min.Japan

3. Explain of Demand System

Demand system B(China etc.)

Demand = kWh of T term×60min./Tmin.

Demand max. = Max.( Demand1…..n) 1minΔT

15min.T

TTΔT

kWh

kWh1kWh2

3. Explain of Demand System

4. Demand Monitoring System

6600V

Energy Meter(Electric power company)

Pulse

Demand monitor device(Mitsubishi Electric)

Alarm output

Demand system A Monitoring System (in Japan)

It is important to match the clock of

the demand monitor device with the

clock of the energy meter.

Demand

Monitoring

andControl

4. Demand Monitoring System

Demand monitor device(Mitsubishi Electric)

Alarm output

Demand system A Monitoring System (in Japan)

When the calculated demand

exceeds the target demand,

this device produces alarm

outputs.

Present Demand Calculated demand

Target demand

Present time

This device measures the present

demand. And this device

calculates demand arriving at the

end of the interval for 30 minutes.

4. Demand Monitoring System

High Voltage

Circuit

Energy Meter(Electric power company)

Demand system B Monitoring System

PC

or

PLC

ModBusI/F

Demand

Monitoring

and

Control

Research Items

5. Research Items

What is used for demand control?

Requirements to the demand

monitoring device

System constitution Refer to 4.Demand monitoring

SystemDemand

Monitoring

System

1month, 12monthes or OtherMaximum term of switching

Demand

System

Weekend and Holiday

discount System

Examples

a. Triple tariffs(Three counters)

b. Pass word function

c. Clock function etc.

Power Factor discount system

Nighttime discount System

A, B or OtherRefer to 3.Explain of demand System

Type

Refer to 2.Examples of

Electricity Billing SystemThe way of CalculationBilling

System

NoteItem