1
SELLER DOCUMENT REVIEW Permission to proceed does not constitute acceptance or approval of design detail, calculations, analysis, test methods, or materials developed or selected by SELLER, and does not relieve SELLER from full compliance with contractual obligation. 1 work may proceed 3 Revise & Resubmit. Work may NOT proceed 2 Revise & Resubmit. Work make proceed Subject to incorporation of change 4 Review not required. Work may proceed 5 Cancelled / Supersede Document Status: Review Name: Discipline: Job# Subm VP# Date: Document Type Code: Equip# Program# Job# SEQ# VP# Equip# 4 Aldo Contreras EM - Mechanical 25635 001 NA; 7/12/2013 V1A 25635-220-V1A-MZA0-00033 0392-ZMF-0003;

Delkor

  • Upload
    ositorx

  • View
    214

  • Download
    0

Embed Size (px)

DESCRIPTION

Manual

Citation preview

  • SELLER DOCUMENT REVIEWPermission to proceed does not constitute acceptance or approval of design detail, calculations,

    analysis, test methods, or materials developed or selected by SELLER, and does not relieve SELLER from full compliance with contractual obligation.

    1 work may proceed 3 Revise & Resubmit. Work may NOT proceed2 Revise & Resubmit. Work make proceed

    Subject to incorporation of change 4 Review not required. Work may proceed5 Cancelled / Supersede

    Document Status:Review Name: Discipline: Job# Subm

    VP#

    Date:Document Type Code:

    Equip#Program#Job# SEQ#

    VP#Equip#

    4

    Aldo Contreras

    EM - Mechanical

    25635

    001

    NA;

    7/12/2013

    V1A

    25635-220-V1A-MZA0-00033

    0392-ZMF-0003;