20
Member Certified

Del. Seatek Company Profile - Diving - Feb Draft.pptseatekindia.com/sites/default/files/del-seatek-company-profile.pdf · to service the ever growing Oil and Gas Industry in the Middle

Embed Size (px)

Citation preview

MemberCertified

Del.Seatek India Pvt. Ltd.Company Profile.

Del. Seatek India Pvt. Ltd. was incorporated in 2003 to provide high quality underwater services to the Oil & Gas and Marine Industries.

The Directors of Del. Seatek India Pvt. Ltd. have serviced the offshore oil fields in the North Sea, Middle East, South East Asia, West Africa and India through international companies.

Seatek Offshore Pvt Ltd (Mauritius) was incorporated in 2006 to service our overseas clients for their international projects.

Seatek Oil & Gas Services LLC was formed in 2012 in Abu Dhabi to service the ever growing Oil and Gas Industry in the Middle East sector.

Services offered:

Saturation and Air Diving Intervention for Construction,

Inspection, Maintenance and Remedial Subsea works

Provision of Dive Personnel – Air and Saturation Teams

Industrial Rope Access for inspection, testing, and structural survey

at heights or in areas where access is difficult with any other

techniques

Recruitment and HR Services of personnel Oil and Gas Industry.

Fabrication and Installation of Concrete Mattresses for pipeline

stabilization and protection

Service Agreements and Representation of Overseas Clients.

Introduction

Our Client List and Offshore Diving projects.

Client : HPCL Mittal Energy Limited

Project Consultants : Engineers India Ltd.Project : Free Span Rectification of 48 inch Pipeline from SPM to LFP

at Mundra.

Location : Gulf of Kutch, Near Mundra Port , India.

Vessel : IBIS Barge and AHT Sea Melody.

Period : April – June 2014

Diver Installed Underwater Grout Bags for Pipeline Supports.

No Client Project  Locations Actual

Description Start DateCompletion 

Date

1 TransoceanDrill Ship GSF Explorer

Subsea Remedial Works Rajamundhary 21.06.2014 02.07.2014

2 Transocean

Semi Sub M.G. HulmeSubsea inspections and remedial worksUnder ABS Class UWILD Surveyor

Kakinada 16.06.2014 Ongoing

UWILDDs conducted for ABS and IRS CLASS SurveysFor Jackup Rigs, Semi Submersibles and Drill ships.

Using Commercial Diving and Rope Access techniquesYear 2014 – 2015.

Client :CCC Underwater Engineering UEProject : Provision of Dive Teams for Air and Saturation Diving

Inspection and Construction Diving.

Location : Middle East, Qatar, etc

Vessel : CCC Pioneer, HLS 2000, Maridive Constructor, DLB 750

Period : June 2014 – Ongoing.

Client :Cairn India Limited.

Project Exposed Pipeline Rectification works

Location : Suvali, West Coast India.

Period : January 2014 – February 2014

Client :Cairn India Limited.

Project : Diving Services - 4 year IMR Contract

Platform Inspection and Remedial as per DNV Standards

SBM Maintenance

Location : Ravva Field, East Coast India.

Vessel : MV Collard Tide.

Period : January 2014 – March 2014

Client :CCC Underwater Engineering UEProject : Provision of Dive Teams for Air and Saturation Diving

Inspection and Construction Diving.

Location : Middle East and India.

Vessel : CCC Pioneer, HLS 2000, Maridive Constructor, DLB 750

Period : Sept. 2006 – June 2014.

UWILDDs conducted for ABS and IRS CLASS SurveysFor Jackup Rigs, Semi Submersibles and Drill ships.

Using Commercial Diving and Rope Access techniquesYear 2013 - 2014

No Client Project  Locations Actual

Description Start DateCompletion 

Date

1 Transocean

Semi Sub M.G. HulmeTopside inspections Using Rope Access Techniqques for ABS Class Survey

Kakinada 05.03.2014 19.03.2014

2 TransoceanSemi Sub ActiniaTopside Inspections using Rope Access techniques.

Kakinada 21.02.2014 26.02.2014

3 TransoceanDrill Ship GSF Explorer

Subsea Remedial Works 

Offshore 

Kakinada10.02.2014 15.02.2014

4 Shelf DrillingRig J T Angel

Rope Access for Remedial WorksPipavav Yard 06.01.2014 23.02.2014

5 TransoceanRig F G Mclintock

UWILD : Diving and Rope AccessMumbai High 12.12.2013 17.01.2014

6 Shelf Drilling

Rig Ron Tappmeyer

UWILD : Diving and Rope Access

Gusset Plate Renewal using Rope 

Access

Mumbai High 09.11.2013 17.01.2014

7 Shelf DrillingRig J T Angel

UWILD : Diving and Rope AccessMumbai High 22.11.2013 06.01.2014

8

Global Remote 

Integrated 

Access 

Solutions Pvt 

Ltd

Rig Aban IV – Underwater Weld Crack 

Removal with Underater burr grinding 

and rectification works.

Goa 09.10.2013 14.10.2013

9 TransoceanRig GSF 140

Remedial Works and UWILDD

Offshore 

Kakinada10.08.2013 14.10.2013

10Greatship

(India) Ltd

Rig GD Chetna

ABS CLASS UWILDD Survey Bassin Field 12.11.2013 14.11.2013

11 TransoceanRig Trident – XII

Corrosion cap InstallationPipavav 28.04.2013 09.05.2013

12 Transocean

Rig MG Hulme

UWILDD for Semi‐Submersible MG 

Hulme

Vizac 22.03.2013 30.04.2013

Client : Great Offshore / Engineers India Ltd. (EIL)

Project Mangalore Refinery and Petrochemicals Ltd.

(Phase # 2 Completion)

Installation of Collar Clamps on 48” Spool Piece on

PLEM side and Pipeline Flanges.

Final Pressure testing of 48” pipeline.

Installation of Altimeter and Subsea assistance for

SBM commissioning.

Vessel : Malaviya # 3.

Location : Mangalore, West Coast India.

Period : Oct.2013 – Nov.2013

Client : Great Offshore / Engineers India Ltd. (EIL)

Project Mangalore Refinery and Petrochemicals Ltd.

Gasket change and Leak rectification

works on 48” tie in Spool (PLEM to Pipeline)

Installation of Grout bags for Pipe Stabilisation works

Vessel : GAL Constructor

Location : Mangalore, West Coast India.

Period : April – June 2013

Client : Hyundai Heavy Industries, Korea

Project Indian Oil Co. Ltd. SBM # 1

Gasket change and Leak rectification

works on 48” tie in Spool (PLEM to Pipeline)

Installation of Collars on Subsea Hoses.

Installation of Anodes with Underwater Welding

Installation of Fabrication aids of the PLEM

Vessel : Hyundai HD2500

Location : Paradip, East Coast India.

Period : Feb. 2013 – March. 2013

UWILDDs conducted for ABS and IRS CLASS SurveysFor Jackups, Semi Submersibles and Drill ships.Year 2012 - 2013

No Client Project Locations

Actual

Description Start DateCompletion

Date

1ONGC , Mumbai

Rig Sagar ShaktiUWILDD for Rig Sagar Shakti

Mumbai High 28.12.2012 10.01.2013

2

Pipavav Technical Services Pvt.ltd.Pipavav Gujrat.

Anode replacements with Rope Access on Rig Noble Kennedy Delaney

Pipavav Ship yard

10.11.2012 15.11.2012

3

Pipavav Technical Services Pvt.ltd.Pipavav Gujrat.

NDT with Rope Access on Rig Noble Kennedy DalaneyCarrying Out all technical Services for Rig NKD. Operate the installed equipmentsand Manpower Required for the Subject Work.

Pipavav Ship yard

18.06.2012 11.07.2012

4

Transocean Holding LLCTransocean Mumbai

Top Site ABS – Rig - RAN DOLPH YOST Top Site Rig Inspection with Rope Access Team, Welding, MPI , CVI and remedial work

Pipava, Gujrat 07.05.12 17.11.2012

5

Deepwater Pacific 1 INC. -IndiaTransocean, Mumbai

Top Site ABS – Rig DDKG1 Top Site Rig Inspection with Rope Access Team, Welding, MPI , CVI and remedial work

Paradip 15.05.12 21.05.12

6

Sedco Forex International Drilling Inc.Transocean House - India

UWILD under ABS – Trident –IITop Side and UWILDD, MPI Project Works

Mumbai High 19.04.12 08.05.12

7

Triton Holdings Transocean, Mumbai

UWILD under ABS – Rig Trident XII Mumbai High 10.04.12 30.04.12

8

Greatship (India) Ltd.Mumbai

UWILD under ABS – Rig GD – ChetnaUWILDD of Rig with Diving Team

NhavaSeva,NaviMumbai

31.03.12 19.04.12

9

Triton Holdings Transocean, Mumbai

UWILD under ABS – CETAnode Replacement , Top Side and UWILDD, Replacement & MPI Of Brace, Project Works

Goa 19.03.12 30.04.12

Client : Hyundai Heavy Industries, Korea

Project Pipeline, SPM installationand Tie ins for IOCL Ltd.

Season III

Complete Diving Services

Vessel : Hyundai HD2500

Location : Paradip, East Coast India

Period : Dec. 2012 – Feb. 2013

Client : Hyundai Heavy Industries, Korea

Project Pipeline, SPM installationand Tie ins for IOCL Ltd.

Season II

Complete Diving Services

Vessel : Hyundai HD1000

Location : Paradip, East Coast India

Period : November 2011 – April 2012

2011-2012

1Transocean, Mumbai

Topside Rope Access Survey and UWILD, under ABS.

Mumbai High 08.09.11

2Transocean, Mumbai

Topside Rope Access Survey and UWILD, under ABS

Mumbai High 04.03.11 14.05.11

2009-2010

3 Transocean (India) Ron Tappmeyer - UWILDMumbai High, India

22.09.09 01.12.09

4 Transocean (India) MODU C E Thornton - UWILDMumbai High, India

08.09.09 01.12.09

5 Transocean (India) Rig Trident II - UWILDMumbai High, India

01.04.09 14.05.09

6 2008-2009

7 Transocean (India) Rig Trident 12 - UWILDMumbai High, India

27.01.09 06.03.09

8 Transocean (India) Rig J.T.Angel - UWILDMumbai High, India

19.09.08 04.11.08

9 Transocean (India) Remedial Works on Drillship D534East Coast , India.

01.04.08 15.04.08

2007-2008

10 Transocean (India)Remedial Works on Drillship Deepwater

FrontierEast Coast, India 17.03.08 24.03.08

11 Transocean (India) Remedial Works on Charles Kirk Rhien Jr. East Coast, India 02.12.07 17.12.07

UWILDDs conducted for ABS and IRS CLASS SurveysFor Jackups, Semi Submersibles and Drill ships.Year 2007 - 2011

Client : Leighton Contractors (India)

Project : SPM System for Cairn Energy Ltd

Complete Air Diving Services for

Pipelaying, SBM Installation,

installation of Tie Spool.

Vessel : Leighton Eclipse

Location : Gujurat, India

Period : October 2010 – June 2011

Client : Hyundai Heavy Industries, Korea

Project : SPM System and Pipeline Installation for IOCL LtdSeason I

Complete Diving Services

Vessel : Hyundai HD2500

Location : Paradeep, East Coast India

Period : December 2010 – April 2011

Client : Indian Oil Corporation

Project :SBM J Tube Repair works

Vessel : SBM

Location : Vadinar, India

Period : 14th Dec.2011 – 15th Jan.2012

Client : Vantage Drilling

Project : Remedial Underwater works

Vessel : Platinum Explorer

Location : Offshore Kakinada, India

Period : 20th Nov. – 29th Nov. 2011

Client : Leighton Contractors (India)

Project : SPM System for Cairn Energy Ltd

Complete Air Diving Services

Vessel : Leighton MYNX

Location : Gujurat, India

Period : October 2010 – June 2011

Client : Neptune Marine Services

Australia

Project : IRM Works for Qatar Gas

Vessel : DP2 Neptune Trident

Location : Offshore Qatar

Period : January 2010 – May 2010

Client : K2 Specialist Services M.EProject : Inspection & Diving Suopport

ServicesLocation : Abudhabi,U.A.EPeriod : July 2010 -Ongoing

Client : Leighton Contractors (India)

Project : I0200 SPM System for HPCL

48” Pipelaying,

SBM installation,

Installation of 2 x 48” Tie in Spools.

Vessel : Leighton Stealth

Location : Visakhapatnam, India

Period : December 2009

Client: Seatek Offshore Pvt Ltd

Project: Fabrication of Air/Mix Gas Diving System

Location: Mumbai , India

Period: 01.07.09 to Ongoing

Client: Helix Energy Systems, Houston

Project: Supply of Construction Crew on DPDSV Rem Forza

Location: East Coast, , India

Period: July – September 2009

Client: Leighton (India) Pvt Ltd

Project: Fabrication of 30nos Concrete

Mattress Size: Length 5 mtrs x

width 3 mtrs x height 300 mm

Location: Mumbai, India.

Period: August – September 2009

Client: Leighton India Pvt.Ltd

Project: Fabrication of Concrete

Sleepers for Subsea pipelines.

ONGC Pipeline replacement -2

Location: ONGC, Mumbai High, India

Period: February – March 09.

Client: Sea-Struct Pty. Ltd.

A Neptune Marine Services Co.

Project: Leighton India for PRP II,

Fabrication of 70 no. Sea Mats for

pipeline crossovers/ stabilisation.

Location: Mumbai High, India

Period: October 2008

Client: Leighton India Pvt.Ltd

Project: IOCL Residual Works.

Dive Support for 12 inch pipelay with Diffuser.

Installation of 25 meter 12” Tie in Spool piece.

Location: Paradeep, India.

Period: January - February 09.

Client: Cal Dive International

Project: DPDSV Eclipse

Base Support Services, Supply

of Rigging and Diving Personnel,

Supply of Diving Gases, Project

Consumables, Specialised Tools.

Location: Reliance KG D6 – East Coast of India

Period: Jan 2008 – December 2008

Client: Helix Energy Solutions – Houston USA

Project: DPDSV Eclipse

Base Support Services and hire

of heavy plant equipment,

Torque tools, etc.

Location: Reliance KG D6 – East Coast of India

Period: Jan 2008 – March 2009

Client: Upstream Petroleum, Australia

Golden Dream Shipping, Norway

Project: Crystal Sea Import Flow line Repair

Location: Platform N1 Bombay High North Field.

Phase – 1: August 2006 – January 2007

Seatek India carried out complete project management, engineering, preparation and approval of work scope, procurement, fabrication, mobilisation, offshore topside and sub sea works, third party verification, documentation and reporting.

Client: Clough Engineering, Australia

Project: Panna Field Development

Location: Panna Field, Offshore India

Period: 2005 - 2006

Project support services, Fabrication of Offshore Components and Installation AidsProcurement and Sourcing of Project Permanent and Temporary MaterialsLogistic support, Deployment of skilled manpower for top side and sub sea activities, Hire of plant and machineries.

Client: Logos – Russia / Russian Technology Centre, India

Project: Design and Fabrication.

Location: Gujarat and Hyderabad, India

Period: 2006 till date

Complete Design, Fabrication and Logistics of Weaponry / Armament simulator housings for the Indian Defence.

The Seatek Office was the centre of execution of the complete second phase of the Hazira Pipeline Stabilisation Project carried out by Clough Oil and Gas in India. Responsibilities included Project Management, Manpower deployment, Procurement, Fabrication, Hire of Heavy plant and machinery, Marine spread, Set up and operations of Fabrication Yard for Sub Sea Concrete Mattresses, Transportation of 315 concrete sea mats, 15 tons each, to Hazira for stabilisation of 12 inch gas pipeline.

Our client’s comments for the Project.

“The local company, SEATEK INDIA is supplying the necessaryoffice space, infrastructure and liaison services to Clough to make itall happen in the Epicenter of one of world’s most chaotic and bureaucratic metropolises.”

Client: Clough Engineering – AustraliaProject: Hazira Pipeline Stabilisation Location: Mumbai and Hazira, IndiaPeriod: 2004 - 2005

Supply of Marine Support Vessels, Transport of Equipment to Offshore construction barges including supply of heavy Machinery and fabrication of custom made non conventional tools for carrying out sub sea works.

Client: Clough Engineering – AustraliaProject: Hazira Pipeline Stabilisation Location: Hazira, West Coast, IndiaPeriod: 2003 - 2004

Suffolk Offshore Services Limited – West Africa:2002 - 2004.Supply of skilled manpower for Offshore and Marine Projects such as Air and Sat Divers, Life Support Supervisors, Technicians, Construction crews, etc.Procurement of specialized underwater equipment and fabrications of custom made tools.

Del. Seatek India Pvt. Ltd.: Contacts.Hormuz Aderianwalla Delzad KaraniMob : + 91 9820313118. Mob: + 91 9821418369Email: [email protected] Email: [email protected] Tel : + 91 22 2418 2852 Fax : +91 22 24182852Address : C-13/14, Antophill Warehousing Complex, Barkat Ali Road,

Wadala (E), Mumbai : 400037.

Seatek Oil & Gas Services LLC (Abu Dhabi)Mandar Apte (Operations Manager)Mob : +971 50 6898678Office : +971 2 6446052 Fax : +971 2 6446072Email : [email protected] URL : www.seatek.aeAddress : M 09, Al Salmeen Golden Tower, CBI Bank, Electra Street,

P.O. Box 36880, Abu Dhabi, United Arab Emirates.