Electrical Transient Analyzer Program
ETAP PowerStation
Load Flow Analysis
Loading Category: Design
Number of Buses:
Swing Generator Load Total
Number of Branches:
XFMR2 Reactor Line/Cable Impedance Tie PDXFMR3 Total
1 0 3 4
2 0 0 1 0 0 3
Load Diversity Factor: None
Maximum No. of Iteration: 99
System Frequency: 60.00
Unit System: English
Project Filename: Juni
Output Filename: C:\ETAP 400\PowerStation\Juni\Untitled.lf1
Precision of Solution: 0.000100
Method of Solution: Newton-Raphson Method
Location:
Engineer:
Study Case: LF
4.0.0C
Page: 2
SN: KLGCONSULT
Filename: Juni
Project:
ETAP PowerStation
Contract:
Date: 11-10-2015
Revision: Base
Config.: Normal
BUS Input Data
ID Type kV % Mag. Ang. MW Mvar MW Mvar MW Mvar Max. Min.
Bus Initial Voltage Generator Motor Load Static Load Mvar Limits
100.0 0.0 13.800Bus1 Swing
0.850 100.0 0.0 3.400 2.107 -1.473 4.160Bus2 Load
100.0 0.0 4.160Bus3 Load
0.595 1.0 0.0 2.380 1.475 -0.631 0.480Bus4 Load
-2.104 3.582 1.445 Total Nunmber of Buses: 4 0.000 0.000 5.780
Location:
Engineer:
Study Case: LF
4.0.0C
Page: 3
SN: KLGCONSULT
Filename: Juni
Project:
ETAP PowerStation
Contract:
Date: 11-10-2015
Revision: Base
Config.: Normal
LINE / CABLE Input Data
ID Library SizeT (°C)
R X Y
Line/Cable Ohms or Mohs / 1000 ft per Conductor (Cable) or per Phase (Line)
Length(ft) #/Phase
Cable1 5MCUS3 6 200.0 1 0.510000 0.061000 75
Line / Cable resistances are listed at the specified temperatures.
Location:
Engineer:
Study Case: LF
4.0.0C
Page: 4
SN: KLGCONSULT
Filename: Juni
Project:
ETAP PowerStation
Contract:
Date: 11-10-2015
Revision: Base
Config.: Normal
2-WINDING TRANSFORMER Input Data
ID MVA Prim. kV Sec. kV % Z X/R Prim. Sec.
Transformer % Tap Setting
% Tol.
Rating Z Variation
+ 5% - 5%
Phase Shift
Type Angle% Z
Adjusted
T1 20.000 13.800 4.160 6.500 18.6 0 0 0 0 0 Std Pos. Seq. 0.0 6.5000
T2 3.500 4.160 0.480 6.500 18.6 -40.000 -40.000 0 0 0 Std Pos. Seq. 0.0 6.5000
Location:
Engineer:
Study Case: LF
4.0.0C
Page: 5
SN: KLGCONSULT
Filename: Juni
Project:
ETAP PowerStation
Contract:
Date: 11-10-2015
Revision: Base
Config.: Normal
BRANCH CONNECTIONS
ID From Bus To Bus R X ZType
CKT/Branch % Impedance, Pos. Seq., 100 MVAbConnected Bus ID
Y
T1 Bus1 1.74 32.45 32.50Bus22W XFMR
T2 Bus3 3.59 66.76 66.86Bus42W XFMR
Cable1 Bus2 58.94 7.05 59.36Bus3Cable
Location:
Engineer:
Study Case: LF
4.0.0C
Page: 6
SN: KLGCONSULT
Filename: Juni
Project:
ETAP PowerStation
Contract:
Date: 11-10-2015
Revision: Base
Config.: Normal
EQUIPMENT CABLE Input Data
ID ID Type Library Size #/ph R X Y
Equipment Cable Equipment
O/L
R (ohm)
Heaterohms / 1000 ft per Conductor
L(ft)T (°C)
Location:
Engineer:
Study Case: LF
4.0.0C
Page: 7
SN: KLGCONSULT
Filename: Juni
Project:
ETAP PowerStation
Contract:
Date: 11-10-2015
Revision: Base
Config.: Normal
LOAD FLOW REPORT
Bus Load Flow
Ang. MW Mvar MW Mvar MW Mvar AmpID kV IDMW Mvar
Voltage Generation Motor Load Static Load
% Tap
XFMR
%PF%Mag.
Bus1* 100.000 0.0 7.25 1.79 Bus2 7.25 1.79 312 13.800 97.10 0 0 0
Bus2 99.319 -1.3 3.40 2.11 0.84 -1.45 Bus3 3.00 0.96 440 4.160 95.30 0
Bus1 -7.24 -1.61 1036 97.6
Bus3 97.471 -1.1 Bus2 -2.94 -0.95 440 4.160 95.10 0 0 0 0 0
Bus4 2.94 0.95 440 -40.000 95.1
Bus4 96.731 -2.3 2.38 1.47 0.56 -0.59 Bus3 -2.94 -0.88 3813 -40.000 0.480 95.80 0
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Location:
Engineer:
Study Case: LF
4.0.0C
Page: 8
SN: KLGCONSULT
Filename: Juni
Project:
ETAP PowerStation
Contract:
Date: 11-10-2015
Revision: Base
Config.: Normal
BUS LOADING Summary Report
ID
Bus
kV
Bus Total Load
MW Mvar MVA % PF Amp % LoadingRated Amp
Bus1 13.800 7.248 1.793 7.466 312.37 97.1
Bus2 4.160 7.238 3.066 7.861 1098.42 92.1
Bus3 4.160 2.940 0.951 3.090 440.04 95.1
Bus4 0.480 2.937 1.475 3.286 4086.42 89.4
Location:
Engineer:
Study Case: LF
4.0.0C
Page: 9
SN: KLGCONSULT
Filename: Juni
Project:
ETAP PowerStation
Contract:
Date: 11-10-2015
Revision: Base
Config.: Normal
BRANCH LOADING Summary Report
ID Type
Loading
Amp %
Capability
(MVA) MVA %
Loading (output)
CKT / Branch Cable & Reactor
Transformer
Loading (input)
%MVA
Ampacity
(Amp)
T1 Transformer 20.000 7.466 37.3 7.415 37.1
T2 Transformer 3.500 3.090 88.3 3.067 87.6
* Indicates a branch with operating load exceeding the branch capability
Location:
Engineer:
Study Case: LF
4.0.0C
Page: 10
SN: KLGCONSULT
Filename: Juni
Project:
ETAP PowerStation
Contract:
Date: 11-10-2015
Revision: Base
Config.: Normal
BRANCH LOSSES Summary Report
ID MW Mvar MW Mvar kW Kvar From To
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Vd
in Vmag
7.248 1.793 -7.238 -1.612 9.7 180.9 100.0 99.3 0.68T1
3.000 0.959 -2.940 -0.951 59.3 7.1 99.3 97.5 1.85Cable1
2.940 0.951 -2.937 -0.884 3.6 67.1 97.5 96.7 0.74T2
72.6 255.1
Location:
Engineer:
Study Case: LF
4.0.0C
Page: 11
SN: KLGCONSULT
Filename: Juni
Project:
ETAP PowerStation
Contract:
Date: 11-10-2015
Revision: Base
Config.: Normal
EQUIPMENT CABLE LOSSES Summary Report
ID Load Type kW kvar Bus Load
Equipment Cable Connected % Voltage% Drop
Vd
Losses
in Vmag
Vst
% for
Motor
Location:
Engineer:
Study Case: LF
4.0.0C
Page: 12
SN: KLGCONSULT
Filename: Juni
Project:
ETAP PowerStation
Contract:
Date: 11-10-2015
Revision: Base
Config.: Normal
Alert Summary Report
% Alert Settings
Critical Marginal
Loading
Bus
Cable
Reactor
Generator
Transformer
Protective Device
OverVoltage
UnderVoltage
OverExcited (Q Max.)
UnderExcited (Q Min.)
Bus Voltage
Generator Excitation
105.0 102.0
98.0
95.0
Marginal Report
ID Device Type Rating Unit Calculated %Mag. Condition
Bus3 Bus kV 4.160 4.055 97.5 UnderVoltage
Bus4 Bus kV 0.480 0.464 96.7 UnderVoltage
Location:
Engineer:
Study Case: LF
4.0.0C
Page: 13
SN: KLGCONSULT
Filename: Juni
Project:
ETAP PowerStation
Contract:
Date: 11-10-2015
Revision: Base
Config.: Normal
SUMMARY OF TOTAL GENERATION , LOADING & DEMAND
Lagging 85.00 6.800
Lagging
Lagging
Lagging
0.000 0.000
0.255 0.073
-2.044 1.395
3.582 5.780
97.07 7.466 1.793 7.248
100.00 0.000 0.000 0.000
97.07 7.466 1.793 7.248
% PFMVAMvarMW
Number of Iterations: 3
System Mismatch:
Apparent Losses:
Total Static Load:
Total Motor Load:
Total Demand:
Generators:
Swing Bus(es):