Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations

Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Dashboards:

Beyond the Pretty Pictures

Eric Shimmin

Director of US Operations

Page 2: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters
Page 3: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Preparation for a Dashboard

• Meters

• Virtual Meters

• Access to Data

• Future Analysis

• Dashboard Tour

Page 4: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Meters

What constitutes a meter?

Electrical

Water

Gas BTU

Page 5: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

What makes something a Meter?

• Measures and Totalizes Energy Use

• Electrical Meter

• Measures Kilowatts (Voltage & Current)

use over Time (KWH)

• BTU Meter

• Measures Water or Air Flow

• Measures Supply and Return

temperature

• Calculates BTU

Page 6: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Are These Meters?

Temperature

Current

Flow

Page 7: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Make a Fan System Meter

• Need Fan Current Reading

• Analog Current transducer

• Also One for the Return Fan

• Need Temperature difference across fan

system

• Mixed air temperature

• Supply air temperature

• Need Air Flow

• Lets assume a constant volume fan

Page 8: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Virtual Fan System BTU Meter

• Fan Heating/Cooling BTU

• CFM*Temperature Differential*Constant = BTU

• 12,000 * (90 – 55) * 1.08 = 453 MBH

• Sample every 15 minutes

• Provide discrete and cumulative values

• Store on your Historian server

• You have a BTU METER

Page 9: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Virtual Fan KW Meter

• We have a 3 phase fan, but only one Analog CT

• Amps * Volts * Power Factor * 1.73/1000

• 20 * 208 * 0.9 * 1.73/1000 = 6.47 KW

• Sample every 15 minutes

• Provide discrete and cumulative values

• Store on your Historian server

• You have an Virtual Electrical METER

• Note: Power Factor comes from Overall Building Meter

Page 10: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Variable Volume Fan System Meter

• Need Real Time Air Flow

• If you have VAV boxes then add up the flow

• If not, you can do this in multiple other ways

• If you have either Outdoor air or Supply air

flow you can calculate all the other air flows

• If you have a VSD with pressure then you

can approximate air flow

• Calculate your Virtual BTU

Page 11: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Overall Fan System Meter

• Combine your BTU & KW into overall energy use

• 1 KW = 3412 BTU/Hr

• 453 MBH / 3.412 + 6.47 KW = 139.2 KW

Page 12: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Other Virtual Meters

• Heat Exchangers and Pumps

• Chillers, Cooling Towers

• Boilers

• Primary Loop

• Secondary Loops

• Ground Source Heat Pump Loop

Page 13: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

What about a VAV Box?

• Need Real Time Air Flow

• You have it already

• Temperature difference

• If it has a reheat coil then you need supply air

temperature

• With Air Flow and Supply Air Temperature

(subtract fan SAT)

• Another Virtual BTU Meter

Page 14: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

What about a Heat Pump?

• Need Air Flow

• Generally Constant Flow

• Temperature difference

• Using Temperature difference is difficult

• Use current sensor on overall Heat Pump

(Compressor and Fan)

• Another Virtual KW Meter

Page 15: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Access to Data

• Where are you going to store all this Historical

Data – you own it!

• Metering, Dashboard and Fault Diagnostic firms

• Most of these firms store the data on their

remote servers and send you reports

• If you want some raw data then they typically

send you sub-sets of coma delineated files, at

preset intervals (Daily, Monthly)

Page 16: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Access to Data

This causes Current Problems:

• Limits the BMS system effectiveness as it has

no “Real Time” energy data

• Prevents integration of Energy & Operational

Data

• Limits integrating “Real Meter” with “Virtual

Meter” data preventing drilling down to into your

systems

• Sometimes you need to fix the data as you can

get missed samples

Page 17: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Access to Data

This causes Future Problems:

• Multiple applications tools are coming onto the

market that can analyze your historical Energy

and Operational Data

• Fault Diagnostic systems are in their infancy

• Other Tools will appear that we haven’t even

thought of

• Great future if they can get access to the Data!

• Story about a local large Consultant firm …..

Page 18: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Technical Dashboard Demo

Seattle University

Page 19: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Thank you!

Eric Shimmin

Director US Operations

425.487.8613

www.escautomation.com

Page 20: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

APPA & Your Pathway to

Performance Measurement

Facilities Performance Indicators (FPI)

1

Duane Hickling

Hickling Associates, Inc.

[email protected]

www.hicklingassociates.com

December 2012 – UW- Bothell APPA Drive In Conference

Page 21: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

FPI Discussion Agenda

What is the APPA FPI Program

Why participate in the FPI

How to do the FPI survey

Benefits and barriers to the FPI

How to work with FPI results –

case studies

2

Page 22: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

What is APPA’s FPI?

Portfolio of key facilities

performance measures that address

the essential questions every facilities

professional must be able to answer in

order to effectively perform their roles.

3

Page 23: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Why Use the FPI?

Self Assessment

Self Improvement

Peer Comparison

Performance Measurement

Gain Understanding of the

Data/Information

Your Roadmap to Future

Excellence

4

Page 24: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

How To Do the FPI Survey

• Full survey or essential set of questions?

• Include auxiliaries or exclude auxiliaries?

• Understand the definitions

• Find the data sources – or, who has access to

them

• Institutions may array the data differently than

the survey asks for it

• Call an APPA FPI Advisor

5

Page 25: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

How To Work With FPI Results

• The FPI provides a set of analytical

metrics which informs on the

performance of the campus facilities

portfolio

• How well is your facilities portfolio in

alignment with your institution’s

strategic direction?

6

Page 26: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Data Prepares You For

Tough Questions • Do you know exactly how much space you have

on campus & how efficiently the facilities operate?

• Do you know how your campus stands up to its

peers? Or, what the best practices are?

• Do you know what areas within your operation

which are performing best? Opportunities for

improvement?

• Answering these and many other such questions

will help you make the business case for your

facilities’ needs.

7

Page 27: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

FPI Data Can Be Segmented

•APPA region

• Carnegie classification

• Public & private institutions

• Enrollment size

• Auxiliaries included or excluded

•Building age

• Etc 8

Page 28: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Balanced Scorecard

9

Page 29: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Facilities Management’s Role

• Ensure that the buildings and infrastructure are a

strategic enabler for the business of higher

education

• Stewardship role for the largest capital asset on

campus, buildings and infrastructure

• Facilities Management is typically the largest

Administrative Department on campus so it is ripe

for downsizing

• Facilities must be able to tell their story to decision

makers – or play a role in the decision making!

• How equipped are you to tell the story?

10

Page 30: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

The CFO Business View:

What They’ll Find Invaluable

• Budgets are often based on a mix of historical

data, consumer price index (CPI) increases, and

need based budgeting.

• Ask the CFO or VP what they see as important in

helping make decisions relating to capital

expenditures, staffing, and maintenance funding.

• Identify important numbers at your institution with

FPI (square footage, enrollment, endowment, etc.)

and compare your data with other participating

institutions/peer groups.

• Having current survey data on expenditures greatly

improves your chances in increasing your overall

budget.

• Work together to set goals and strategies.

11

Page 31: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Benefits of FPI Report

•Defines essential data points, vastly reducing the

number of indicators you need to collect.

•Gives you a framework with which to educate

campus decision makers about critical asset

management realities.

•Makes the business case for your facilities’ needs

•Creates a balanced performance scorecard based

on critical data findings.

12

Page 32: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

More Benefits of FPI Report

• Allows you the simplicity you need for data entry, and

packages the data in a framework to help you tell your

story.

• Gives you the choice as to how much data you need

to input.

• Allows you to compare and contrast with data from

other campuses.

• Aligns facilities planning with your institution’s

mission and vision.

13

Page 33: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Commonly Expressed Barriers

to Comparative Analysis

• Hard to find an appropriate comparison group

• Concern that data is not accurate – or, data is

tracked differently at different institutions

• Unable to get ‘apples to apples’ comparisons

• Time commitment to do it well

• ‘Not sure how it will help us’

• ‘It might make us look bad to our executive

leadership’

14

Page 34: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Reasons for Comparative Analysis

• How are we doing? Can we improve?

• Identify existing best practices

• Identify potential impacts of a change of

practices or policy

• Identify areas of potential ‘breakthrough’

performance

15

Page 35: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Case Studies

The following are four case studies

demonstrating how to use the

APPA FPI information.

16

Page 36: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

FACILITIES MANAGEMENT

SERVICE LEVELS

Page 37: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Definitions:

Level 1 Orderly Spotlessness

Level 2 Ordinary Tidiness = Floors and base moldings shine and/or are bright and

clean. There is no buildup in corners or along walls, but there can be up to two days worth of

dust, dirt, stains, or streaks; All vertical and horizontal surfaces are clean, but marks, dust,

smudges, and fingerprints are noticeable upon close observation. Lights all work and fixtures

are clean; Washroom and shower fixtures and tile gleam and are odor-free. Supplies are

adequate; Trash containers and pencil sharpeners hold only daily waste, are clean and odor-

free;

Level 3 Casual Inattention = Floors are swept or vacuumed clean, but upon close

observation there can be stains. A buildup of dirt and/or floor finish in corners and along walls

can be seen; There are dull spots and/or matted carpet in walking lanes. There are streaks or

splashes on base molding; All vertical and horizontal surfaces have obvious dust, dirt, marks,

smudges, and fingerprints. Lamps all work and fixtures are clean; Trash containers and pencil

sharpeners hold only daily waste, are clean and odor-free;

Level 4 Moderate Dinginess

Level 5 Unkempt Neglect

Custodial Service (Staffing) Level

APPA Standards

18

Page 38: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Desired Level of

Service ► 1- Showpiece Facility

2 - Comprehensive

Stewardship

3 - Managed

Care

4 - Reactive

Management

Customer

Service &

Response Time

Able to respond to virtually any

service; immediate response.

Response to most service needs,

typically in a week.

Services available only by reducing

maintenance; response times of one

month or less.

Services available only by

reducing maintenance;

response times of one year

or less.

Customer Satisfaction Proud of facilities. High level of

trust for facilities organization

Satisfied with facilities related

services; usually complimentary

of staff

Basic level of care. Able to perform

mission duties. Lack of pride in physical

environment

Generally critical of cost,

responsiveness, and quality

of facilities services

PM vs. CM 100% 75 – 100% 50 – 75% 25 – 50%

Maintenance

Mix

All PM is scheduled and

performed on time. Emergencies

(e.g. power outages) are

infrequent and handled

efficiently

A well developed PM program;

PM done less than defined

schedule. Occasional

emergencies caused by

equipment failures, etc.

Reactive maintenance high due to

systems failing. High number of

emergencies causes reports to upper

management

Worn-out systems require

staff to be scheduled to

react to failure. PM work

consists of simple tasks

done inconsistently

Aesthetics,

Interior

Like new finishes Clean, crisp finishes Average finishes Dingy finishes

Aesthetics,

Exterior

Windows, doors, trim, exterior

walls are like new

Watertight, good clean

appearance of exterior

Minor leaks and blemishes; average

exterior appearance

Somewhat drafty and leaky,

rough-looking exterior

Aesthetics,

Lighting

Bright and clean, attractive

lighting

Bright and clean attractive

lighting

Small percentage of lights out; well lit

and clean

Numerous lights out;

missing diffusers; secondary

areas dark

Service

Efficiency

Maintenance activities appear

highly organized and focused.

Service and maintenance calls

are responded to immediately

Maintenance activities appear

organized with direction.

Service and maintenance calls

are responded to in a timely

manner

Maintenance activities appear to be

somewhat organized, but remain people

dependant. Service/maintenance calls are

sporadic w/out apparent cause

Maintenance activities are

somewhat chaotic and

people dependant. Service/

maintenance calls are

typically not responded to in

a timely manner

Building

Systems’

Reliability

Breakdown maintenance rare;

limited to vandalism and abuse

repairs

Breakdown maintenance limited

to system components short of

MTBF

Building and systems components

periodically or often fail

Systems unreliable.

Constant need for repair.

Backlog repair exceeds

resources

Operating Budget as

% of CRV > 4.0 3.5 – 4.0 3.0 – 3.5 2.5 – 3.0

Campus Average

FCI < 0.05 0.06 – 0.15 0.15 – 0.29 0.30 – 0.50

APPA Standards 19

Page 39: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Case Study I

Key Question:

What is the state of the funding for

facilities management at a particular

institution?

Page 40: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Institution I: FM Performance Metrics vs.

Average of APPA & Research Institutions

Key Performance Metrics (Annual) Inst. I All APPA Res. V. High

AFOE + PU/GSF $4.98 $6.91 $7.46

Fac. Operations Exp. % of CRV .33% 1.61% 1.29%

Fac. Operations Exp. % of G.I.E. 1.91% 6.00% 4.03%

Capital Exp. on Exist. Space - % of CRV .37% 2.71% 2.17%

Utilities: Cost/GSF $2.66 $2.02 $2.97

Utilities: Cost/Million BTUs $12.46 $17.86 $17.25

Utilities: BTUs/GSF 213,473 121,361 179,832

Institution I’s qualitative performance for custodial, building maintenance and

grounds is a level 4.

21

Page 41: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Case Study II

Key Question:

How do we compare multiple institutions

that may be dissimilar?

22

Page 42: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Sample Medical Campuses:

Campus Operating Costs

Inst. Fac. Op. Exp./

% of CRV

Fac. Op. Exp. / G.I.E.

A 1.4% 3.8%

B 1.1% 1.2%

C 1.9% 1.9%

D 0.5% 3.2%

E 1.2% 1.5%

Med.

Avg.

1.4% 2.2%

R.V.H.

Avg.

1.6% 6.3%

CRV = Current Replacement Value

G.I.E. = Gross Institutional Expenses

Med. Avg. = Medical Group Average

R.V.H. = Research Very High (Carnegie Classification)

Info taken APPA FPI database

23

Page 43: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Energy Efficiency Expenditure

& Utilities Usage

Inst.

Energy

BTU/GSF

Energy Cost

W/ P.U.

$/MMBTU

Energy Eff.

$/% of Util.

Exp.

A 234,444 $50.80 0.1%

B 233,942 $14.66 0.2%

C 160,686 $18.21 22.5%

D 387,411 $10.10 0.0%

E 341,400 $12.67 0.0%

Med. Avg. 253,418 $16.92 9.9%

R.V.H. Avg. 193,949 $19.60 6.1%

BTU = British Thermal Unit

P.U. = Purchased Utilities

Med. Avg. = Medical Group Average

R.V.H. = Research Very High (Carnegie Classification)

Info taken APPA FPI database

24

Page 44: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Sample Medical Campuses:

Operating Costs per GSF

Inst. Admin. Custod. Utilities Bldg.

Maint.

Op. w/o

Util.

Op. w/

Util.

A $1.61 $2.62 $11.91 $3.37 $8.43 $16.48

B $0.45 $1.28 $3.43 $1.00 $3.09 $6.32

C $0.18 $1.03 $2.93 $2.30 $3.64 $6.56

D $0.19 $0.45 $3.91 $0.80 $1.38 $4.25

E $0.26 $1.23 $4.33 $1.75 $3.03 $5.64

Med. Avg. $0.34 $1.23 $3.93 $1.74 $3.57 $6.99

R.V.H. Avg. $0.45 $1.55 $3.22 $2.18 $5.28 $8.36

Med. Avg. = Medical Group Average

R.V.H. = Research Very High (Carnegie Classification)

Info from APPA FPI database

25

Page 45: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Sample Medical Campuses: Cleaning

and Maintenance Standards

Inst. Custodial

Service Level

Maintenance

Service Level

Total Fac. Op.

Costs .W/ P. U.

A 3 3 $55.40 M

B 3 3 $13.92 M

C 3 3 $44.33 M

D 3 4 $13.32 M

E 2 2 $33.74 M

Info from APPA FPI database

26

Page 46: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Case Study III

Key Question:

Will an investment in facilities

management information systems

(FMIS) yield improvements in facilities

management productivity?

27

Page 47: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Information Systems Impact

• FMIS enhances management’s ability to:

– Prioritize work

– Increase productivity

– Improve facilities cost reporting

– Reduce the administrative overhead

28

Page 48: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Creating A Business Case:

FMIS Investment • Resource: Data from APPA’s Facilities

Performance Indicators (FPI)

• Action: Compare the results of FPI Data of

institutions with well deployed FMIS vs.

institutions with little or no FMIS investment

• Objective: Create a convincing business case

that shows the benefits of a well deployed

FMIS system.

29

Page 49: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Institutions With Well Deployed Systems

vs. Institutions w/ Little FMIS Investment

• FMIS in place for several years;

• FMIS is used extensively by all levels of the

organization (management, supervision, and

workers);

• Extensive training for the organization on

work processes and FMIS use;

• Regular use of FMIS to support work

prioritization, scheduling, management and

reporting.

30

Page 50: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Institutional Sample • Heavily invested in FMIS systems:

– 3 public and 1 private institution;

– 3 research institutions; 1 master’s (Carnegie

Classification);

– Size range from 3 million to 13.8 million GSF of

bldg. space;

– 2 are in CAPPA, 1 SRAPPA and 1 is in the

PCAPPA region;

– Both in-house staff and contracted services used.

31

Page 51: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Institutional Sample

• Little investment or experience in using FMIS

systems:

– 3 private and 1 public institution;

– 1 research, 1 baccalaureate, 1 master’s,

& 1 doctoral institution (Carnegie Classification);

– Size range: 4.6 million to 800 thousand GSF of

bldg. space;

– 1 in ERAPPA, 1 MAPPA and 2 PCAPPA region;

– Both in-house staff and contracted services used.

32

Page 52: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Institutional Sample

Funding Carnegie Region Campus Size (GSF)

1 Public Masters PCAPPA 3.0 million

2 Public Research CAPPA 6.8 million

3 Public Research CAPPA 13.8 million

4 Private Research SRAPPA 5.8 million

A Private Masters MAPPA .8 million

B Private Baccalaureate PCAPPA 1.2 million

C Public Research ERAPPA 4.5 million

D Private Doctoral PCAPPA 1.5 million

Institutions 1-4 have invested heavily in FMIS

Institutions A-D have not yet made significant investments in FMIS

33

Page 53: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

BUILDING MAINTENANCE COST

IMPACT

Page 54: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Maintenance

Service Level

Cost/GSF (dollars) GSF/Maintenance FTE

1 3 – Managed Care $1.42 77,272

2 3 – Managed Care $0.73 112,003

3 3 – Managed Care $1.09 70,485

4 2 –

Comprehensive

Stewardship

$1.70 70,280

A 4 – Reactive

Management $2.58 86,097

B 3 – Managed Care $1.53 71,176

C 3 – Managed Care $1.48 74,360

D 2 –

Comprehensive

Stewardship

$2.22 40,346

APPA

Average $1.57 71,192

35

Page 55: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

BUILDING MAINTENANCE,

LABOR, MATERIALS, & SERVICE

COST

Page 56: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Maintenance

Service Level

Cost/GSF

(dollars)

Maint. Labor

Cost

Maint. Service &

Materials Costs

1 3 – Managed Care $1.42 $0.89 $0.53

2 3 – Managed Care $0.73 N/A N/A

3 3 – Managed Care $1.09 $0.80 $0.29

4 2 – Comprehensive

Stewardship $1.70 N/A N/A

A 4 – Reactive

Management $2.58 $0.76 $1.82

B 3 – Managed Care $1.53 $1.11 $0.42

C 3 – Managed Care $1.48 $0.73 $0.75

D 2 – Comprehensive

Stewardship $2.22 $1.52 $0.70

APPA

Ave. $1.57 $0.97 $0.83

37

Page 57: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

CUSTODIAL COST IMPACT

Page 58: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Custodial

Service Level

Cost/GSF

(dollars)

GSF/Custodial FTE

1 3 – Casual

Inattention $1.23 46,330

2 3 – Casual

inattention $0.99 49,422

3 2 – Ordinary Tidiness $0.99 40,363

4 2 – Ordinary Tidiness $1.10 30,068

A 3 – Casual

Inattention $2.01 25,113

B 2 – Ordinary Tidiness $1.88 28,287

C 2- Ordinary Tidiness $1.80 27,153

D 2- Ordinary Tidiness $1.97 26,657

APPA

Avg. $1.36 32,592

39

Page 59: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Custodial, Labor, Materials & Services

Costs

Page 60: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Custodial

Service Level

Cost/GSF

(dollars)

Labor Cost/GSF

(dollars)

Materials & Services

Costs /GSF (dollars)

1 3 – Casual Inattention $1.23 $1.01 $0.22

2 3 – Casual inattention $0.99 N/A N/A

3 2 – Ordinary Tidiness $0.99 $0.91 $0.08

4 2 – Ordinary Tidiness $1.10 N/A N/A

A 3 – Casual Inattention $2.01 $1.82 $0.19

B 2 – Ordinary Tidiness $1.88 $1.30 $0.58

C 2- Ordinary Tidiness $1.80 $1.64 $0.16

D 2- Ordinary Tidiness $1.97 $0.79 $1.18

APPA

Avg. $1.36 $1.24 $.012

41

Page 61: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Case Study IV

Key Question:

Can we afford to invest in improving

customer service at our institution?

42

Page 62: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

O&M Cost per GSF by Customer

Satisfaction Levels

Surveyed Customer

Satisfaction Levels

O&M Cost /GSF

Satisfied $7.48

Very Satisfied $6.41

Extremely Satisfied $9.02

Info from APPA FPI 2009-10 database

43

Page 63: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

What Did We Learn?

• Energy costs are the largest O&M expense – even

in ‘inexpensive’ utility markets

• Energy conservation can be an important

investment

• Higher quality services may not cost appreciably

more. Determine if the expenditures to support

them are delivering full value for your institution

• Highly productive FM operations can give a high

level of customer satisfaction for a reasonable

price

44

Page 64: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

What Have We Learned about FPI

Methodology?

• Know the metric: Each has a different use and

offers a different perspective

• Value and accuracy of performance measurement

is greater with multiple points of view

• Know how the metric is created: Even within the

same institution, different metrics are calculated on

different parameters

• Understand the qualitative as well as the

quantitative side of the metrics

45

Page 65: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Resources For You

•Visit the APPA website at www.appa.org

•The online FPI survey instrument can be accessed on the APPA

website from the end of August through December.

•Archived webinars on the website will instruct you on how to

complete the FPI survey instrument.

•Additional information on the FPI Qualified Advisors Program can

also be found on the APPA website @

http://appa.org/research/fpiadvisors.cfm

•Questions? Contact Christina Hills, APPA Research Specialist

Tel: 703/684-1446

Email: [email protected]

46

Page 66: Dashboards: Beyond the Pretty Pictures · Dashboards: Beyond the Pretty Pictures Eric Shimmin Director of US Operations . Preparation for a Dashboard • Meters • Virtual Meters

Thank YOU!

QUESTIONS & DISCUSSION?

For more information on

APPA’s programs, products, and

services, visit our web site at

www.appa.org

47