Upload
allen-rice
View
214
Download
1
Tags:
Embed Size (px)
Citation preview
Dan Cloak, P.E.18 September 2007
to achieve water quality benefitsin Contra Costa County
Implementing Low Impact Development
Low Impact Development
Design the site to mimic natural drainage.
Disperse runoff to landscape where possible.
Use Integrated Management Practices distributed around the site.
Reservoir, 12" min. depth
Reverse bend trap or hooded overflow
18" sandy loam, minimum infiltration rate 5" per hour
12" open-graded gravel, approx. ½" dia.
Perforated pipe
Downspout
Building exterior wall
Cobbles or splash block
Filter fabric
Concrete or other structural planter wall with waterproof membrane
Additional waterproofing on building as needed
Drain to storm drain or discharge; bottom-out or side-out options
Planter Box
Integrated Management Practices
Detain and treat runoff
Typically fit into setbacks and landscaped areas
Accommodate diverse plant palettes
Low-maintenance Don’t breed
mosquitoes Can be attractive
Soil surface must be 6-12" lower than surrounding pavement
Require 3-4 feet of vertical “head”
Can affect decisions about placement of buildings, roadways, and parking
Advantages Challenges
Contra Costa’s Path to Low Impact Development
Stormwater NPDES permit Early outreach to
land development community Staff work groups developed
LID approach to compliance Model ordinance Guidebook Training for designers &
reviewers Collaborative problem-solving
LID concept for urban areas
Planting medium
Gravel or drain rock
Turf or planting
Perforated pipe
4% of tributary impervious area
9-acre, mixed use
Multi-family Residential
Retail nursery
Retail
Restaurant
Clay soils Flat grades Max. use Storm drains Setbacks
Area “C-2”
Follow roof peaks and grade breaks
Area size determined by site layout
Use valley gutters instead of catch basins
25,825 x 0.04 = 1,033 square feet
1,033 ÷ 8 = 129 feet of swale
Difficulties Implementing LID
Developers plan buildings, streets, parking, and drainage before considering treatment requirements
Proprietary devices = quick fix
Integration with landscapingDeficiencies in construction
What’s worked for Contra Costa
State mandateLocal compliance strategy
●Collaboration and consensus●Expertise and ownership
Municipal Staff Work Groups ●Mutual support at staff level●Continuous improvement of
design guidance