DACNETDACNET- -
A Central Sector Scheme of A Central Sector Scheme of Ministry of Agriculture Ministry of Agriculture
to bring in to bring in e-Governancee-Governance in the in the Directorates/Attached Offices/ Subordinate Directorates/Attached Offices/ Subordinate
Offices & Field Units of Offices & Field Units of The Department of Agriculture & Cooperation The Department of Agriculture & Cooperation
(DAC) and is a turn-key project being (DAC) and is a turn-key project being executed by National Informatics Centreexecuted by National Informatics Centre (NIC)(NIC)
The objective…
An Intranet (DACNET) for e-governance applications to implement various e-Governance solutions in :-
All the Directorates/Attached/Subordinate Offices ~ 53
All the field units of the ~ 122
of Department of Agriculture and Cooperation
& make it as showcase for other Government Departments to follow.
Logical Model
A Central Corporate System of DAC
Sectional Systems, which surround the Central Corporate System in the hub-and-spoke arrangement of Directorates and Field Units
Logical Model
Each of the above system will comprise of
Document management systems
Workflows
Decision Support Systems
Application Specific Systems
Databases
Portals
Broadcastings
Central Data Centre (NIC)
Department of Agriculture & Cooperation
NICNET
Dire
cto
rate
1Dir
ec
tora
te2
Field Office2
2 MBps leased line
LAN1
Field Office1
DACNET Architecture
LAN2
Central Data Centre -Central Data Centre -OverviewOverview
Biztalk ServerEnterprise Edition for
Application-to-Application IntegrationE-Commerce Infrastructure on
Commerce Server 2000
Windows 2000Advanced Server
SMTP Server for WebMailDACNET
Central Databaseon SQL Server
Enterprise Edition
DACNETCentral Database
on SQL ServerEnterprise EditionShared Storage for
Central Databaseand
MessagingInfrastructure
Fibre Optic HubSatellite dish
Router
100 Mbps Switch
100 Mbps Switch
DACNETSharePoint Portal
ServerEnterprise Edition
DACNETMailing & WorkFlowon Exchange Server
Enterprise Edition
DACNETMailing & WorkFlowon Exchange Server
Enterprise Edition
100 Mbps Switch
DACNETSharePoint Portal
ServerEnterprise Edition
Firewall
Central Data Centre Central Data Centre InfrastructureInfrastructure
The HQ will have state of the art The HQ will have state of the art Hardware to support the application Hardware to support the application infrastructure for DACNETinfrastructure for DACNET
The application domains are divided The application domains are divided as followsas follows Messaging & CollaborationMessaging & Collaboration DACNET Intranet PortalDACNET Intranet Portal Database Infrastructure for various Database Infrastructure for various
Line-of-Business applicationsLine-of-Business applications E-Procurement SolutionE-Procurement Solution
At the Central Data Centre the Hardware will be :-
Cluster Server - two nos.
Server - six nos.
Printer with Fax, Copier and Scanning Facility
The Software will be :-
Windows advanced 2000 server ( 9 Lic.) OLP
SQL server Enterprise Edition (2 lic.) OLP
MS Exchange Server 2000 Enterprise Edition
Visio 2002 Enterprise Edition
Biz Talk Server 2001 Enterprise (1 proc. Lic.) OLP
Commerce Server 2000 (1 proc. Lic.) OLP
MS SharePoint Portal Server 2001 Enterprise Edition
Visual Studio.NET Enterprise Architecture
Trend Micro ( Email antivirus on Win 2k Advanced Server)
Messaging & Messaging & CollaborationCollaboration Based on Microsoft Based on Microsoft Clustering TechnologiesClustering Technologies
in Windows 2000in Windows 2000 Exchange Server 2000Exchange Server 2000 will be hosted in a will be hosted in a
clustered environment to provide a highly clustered environment to provide a highly available available Messaging environmentMessaging environment to the to the entire DACNET users across India.entire DACNET users across India.
Apart from Messaging, a number of Apart from Messaging, a number of workflow applicationsworkflow applications based on Exchange based on Exchange 2000 are also planned2000 are also planned
The critical nature of this application requires The critical nature of this application requires the clustering solution for maximum uptimethe clustering solution for maximum uptime
DACNET Intranet PortalDACNET Intranet Portal
To percolate information across the To percolate information across the entire organisation it is important to have entire organisation it is important to have a a organisational portalorganisational portal
Another requirment for this portal is to Another requirment for this portal is to ensure that the efforts are directed ensure that the efforts are directed towards towards content generationcontent generation rather than rather than application generation for the portal itselfapplication generation for the portal itself
Sharepoint portalSharepoint portal server provides a server provides a framework to framework to quickly implement a quickly implement a intranet portal solutionintranet portal solution
The The intranet portalintranet portal is a critical application is a critical application and has therefore been planned on and has therefore been planned on 2 2 serversservers, to achieve high availability, to achieve high availability
Database driven Database driven ApplicationsApplications This is the life line of the entire dacnet This is the life line of the entire dacnet
project.project. It provides the infrastructure for building It provides the infrastructure for building
the line of the line of business applicationsbusiness applications which which will be utilised across all offices.will be utilised across all offices.
The solution required has to meet a The solution required has to meet a stringent criteria of not only being stringent criteria of not only being highly highly reliablereliable but also have very but also have very high high performanceperformance capabilities capabilities
SQL Server 2000SQL Server 2000 has therefore been has therefore been deployed in a deployed in a clusteredclustered environment environment
E-Procurement SolutionE-Procurement Solution
It has been planned to host a It has been planned to host a e-e-ProcurementProcurement solution under the solution under the DACNET project to show case the DACNET project to show case the viability of IT in automating such viability of IT in automating such transactional process transactional process
Commerce Server 2002 & Biztalk Commerce Server 2002 & Biztalk Server 2002Server 2002 will be used to create the will be used to create the E-Procurement infrastructure.E-Procurement infrastructure.
In DMI – In DMI – e-Procuremente-Procurement software will be software will be givengiven
BizTalk ServerBizTalk Server Cost effectively integrate applications Cost effectively integrate applications
within and between organizationswithin and between organizations
B2BB2BQuickly implement secure, reliable trading Quickly implement secure, reliable trading partner relationships over the Internetpartner relationships over the Internet
Business Process AutomationBusiness Process AutomationDefine and implement integrated business Define and implement integrated business processes using EAI and B2B servicesprocesses using EAI and B2B services
BizTalk ServerBizTalk Server Delivering on Web Services todayDelivering on Web Services today
Create enterprise Web ServicesCreate enterprise Web ServicesAddress challenges of Address challenges of state management, state management, concurrency, data normalization, transaction and concurrency, data normalization, transaction and exceptionsexceptions
Expose Expose existing applications as Web Servicesexisting applications as Web Services Make data from Make data from any any application available as an XML application available as an XML Web Service with no application modificationsWeb Service with no application modifications
Aggregate services into business processesAggregate services into business processes
E-Business EvolutionE-Business Evolution
Presence Commerce Interaction
Publish Publish InfoInfo
ProcessProcessTransactionsTransactions
DigitalDigitalRelationshipsRelationships
Web contentWeb content B2CB2C B2B, B2EB2B, B2E
Web sitesWeb sites Web-enable existing Web-enable existing
systemssystems BusinessBusiness
transformationtransformation
Unique VisitorsUnique Visitors RevenueRevenue ProfitProfit
PagesPages TransactionsTransactions Business processesBusiness processes
Commerce Server 2002Commerce Server 2002Product HighlightsProduct Highlights
GlobalE-Commerce
Enhanced Catalog Features
Support for Multinational Sites
Profiling
Powerful Business Analytics
Marketing & advertising campaigns
RapidDevelopment
Developer Portal
Commerce Server Application Runtime
Commerce Server Base Class Library
Common Language Runtime Layer
Largest set of best-of-breed partners
Performance,Availability,
Management
Improved Manageability
Enhanced Security
High Availability
Superior Recoverability
Benefits SPS 2001Benefits SPS 2001
Simplest Simplest AccessAccess
Industry-leading search technology
Access most important enterprise content
Stay current using scalable persistent query services
Automatically group content with auto categorization
Scalable search for most demanding intranet portals
Unleash Unleash ProductivityProductivity
Most intuitive solution for Office and Windows users
Incorporate business processes around documents
Easily manage security and access to documents
Profile documents for better discovery
Web browser as an alternative user interface
Easily Build Easily Build and and
CustomizeCustomize
Rapidly deploy an out-of-the-box portal
Easily customizable using Web Parts technology
Internet and industry standard interfaces
Leverage ASP and ADO to add web collaboration
CustomizableCustomizableHome PageHome Page
PortalPortal
Digital Dashboard FrameworkDigital Dashboard Framework
RichRichSearchSearch
CategoryCategoryBrowsingBrowsing
DocumentsDocuments
Web-basedWeb-basedDMDM
Document ManagementDocument Management Mainstream document managementMainstream document management
VersioningVersioning Publishing and approvalPublishing and approval Role-based securityRole-based security
Design goalsDesign goals Flexible policyFlexible policy Ease of useEase of use Enables relevant searchesEnables relevant searches
Designed from ground upDesigned from ground up Office integrationOffice integration Internally HTTP and XML-basedInternally HTTP and XML-based Seamless schema and security Seamless schema and security
integrationintegration
SearchSearch Best-of-breed enterprise search Best-of-breed enterprise search
technologytechnology Design goalsDesign goals
ComprehensiveComprehensive RelevantRelevant TimelyTimely
Commercial reliability and securityCommercial reliability and security Timely dataTimely data ScalableScalable
Overall Directorate ViewOverall Directorate View
Windows 2000 ServerWith IIS 5.0 and
SQL Server Standard(DACNET Local Database)
Satellite dish
Router
100 Mbps Switch
Workstation forData Entry/Access
Loaded withWindows XP
Office XPVisio Tools
Workstation forData Entry/Access
Loaded withWindows XP
Office XPVisio Tools
Workstation forData Entry/Access
Loaded withWindows XP
Office XPVisio Tools
DACNETInternet Security
& Acceleration Serveron High-End Desktop
AcceptConnections
fromField offices
Workstation forData Entry/Access
Loaded withWindows XP
Office XPVisio Tools
Directorate officesDirectorate offices
The Directorate office will have The Directorate office will have just just enough infrastructureenough infrastructure to continue to continue working independently on key Line of working independently on key Line of business application even in the event of business application even in the event of connectivity failureconnectivity failure
Since the infrastructure is Since the infrastructure is exposed to the exposed to the outside worldoutside world, it was important to , it was important to provide provide firewall protection at the Directorate firewall protection at the Directorate levellevel. This protection will also percolate . This protection will also percolate to the Field unit level which will connect to the Field unit level which will connect to each of their respective directorates to each of their respective directorates using a modemusing a modem
At The Directorates, the Hardware will be :-
Server: - One Number
Client Configuration - Five Numbers
On-Line UPS – 2 Kva – One Number
UPS 700 VA Line-Interactive – Five Numbers
LAN ITEMS - one server and five clients need to be connected in LAN with the provision of LAN node in each room
Deskjet – Five Number
Laser Printer – One Number
Scanner – One Number
Digitizer (A4 Size) – One Number
Directorate officesDirectorate offices
To achieve this minimum requirement To achieve this minimum requirement the following infrastructure has been the following infrastructure has been providedprovided SQL Server 2000SQL Server 2000
For maintaining their local copy of For maintaining their local copy of databasedatabase
To provide a framework for creating a local To provide a framework for creating a local data warehouse at a later stagedata warehouse at a later stage
ISA Server 2000ISA Server 2000 For protecting their internal infrastructure For protecting their internal infrastructure
against unauthorised accessagainst unauthorised access For controlling their internal user access to For controlling their internal user access to
the outside worldthe outside world To optimise bandwidth usage by their To optimise bandwidth usage by their
internal usersinternal users
At The Directorates, the Software will be :-
Windows 2000 Server OLP (2 lic.) - 1 no.
SQL Server 2000 standard - 1 no.
Windows XP ProEnterprise with proofing tools - 5 nos.
MS Office XP Enterprise with proofing tools - 5 nos
ISA Server 2000 Standard (1 proc. Lic.) – 1 no.
Visio 2002 Prof. Edition - 1 no
SPSS - 1 no
GIS Package – 1 no
Client Access Lic. for SQL 2000, Exchange, Share Point Portal Server 2001, Win 2K - 5nos.
For DMI – e-procurement Package
Overall Field Offices ViewOverall Field Offices View
PSTN/ISDN Dial-up
Client
INTERNET
Field Unit Set Up
(Windows XP Preloaded & office XP)
Field OfficesField Offices
The field offices have been provided The field offices have been provided with the with the minimum infrastructureminimum infrastructure which is required to efficiently which is required to efficiently enable them carry out the DACNET enable them carry out the DACNET project responsibilitiesproject responsibilities
Also due to the Also due to the limited technical limited technical resource availabilityresource availability at the field at the field offices they have been provided offices they have been provided only with the only with the desktop clientsdesktop clients
The planned applications will be The planned applications will be web based to ensure minimum web based to ensure minimum deployment issuesdeployment issues
The Hardware at the Field The Hardware at the Field Units:-Units:-
Client Configuration - 1 noClient Configuration - 1 no
UPS 700 VA Line-Interactive – 1 no UPS 700 VA Line-Interactive – 1 no
Deskjet – 1 no Deskjet – 1 no
Modem – 1 no Modem – 1 no
The Software at the Field The Software at the Field Units:-Units:-
Windows XP Enterprise with proofing tools – 1 Windows XP Enterprise with proofing tools – 1 nono
MS Office XP Enterprise with proofing tools – 1 MS Office XP Enterprise with proofing tools – 1 nono
Client Access License for Exchange 2000, Client Access License for Exchange 2000,
SharePoint Portal Server 2001, SQL Server SharePoint Portal Server 2001, SQL Server 2000, Win 2K– 1 no2000, Win 2K– 1 no
INFRASTRUCTURE PROVISION FOR OFFICES / FIELD OFFICES UNDER DACNET PROJECT
Divisions/Attached/Subordinate Offices StatusMain Regl. Field
office OfficeUnits Server/LP
Digitizer
Scanner
UPS(OL)
Dte. Of Economics and Statistics, New Delhi Att 1 1 2Market Intelligence Units 13
Commission for Agricultural Costs and Prices, New Delhi Att 1 1Crops Division
Dte. Of Jute Development, Culcutta Sub 1 1Dte. Of Rice Development, Patna Sub 1 1Dte. Of Sugarcane Development, Lucknow Sub 1 1Dte. Of Wheat Development, Ghaziabad Sub 1 1Dte. Of Millets Development, Jaipur Sub 1 1Dte. Of Cotton Development, Bombay Sub 1 1Dte. Of Tobacco Development, Madras Sub 1 1
TMOP Division Dte. Of Oil Seeds Development, Hyderabad Sub 1 1Dte. Of Pulses Development, Bhopal Sub 1 1
Fertilizer DivisionCentral Fert. Quality Control Trg. Ins., Faridabad Sub 1 1CFQCTI-Regional Centres [Chennai,Mumbay,Nadia] 3National Bio-Fertilizer Dev. Centre, Ghaziabad Sub 1 1NBDC-Regional Centres [HSR,NGPR,BBSR,BGLR,IMPL,JBLPR] 6
Extension DivisionDte. Of Extension, Pusa, Delhi Sub 1 1
Mechinery DivisionCentral Farm Mech. Trg.& Testing Inst, Budni. Inst 1 1Northern Reg. Farm Mech. Trg. & Testing Int, Hisar Inst 1 1Southern Reg. Farm Mech.Trg. & Testing Int, Anantapur Inst 1 1North East Reg. Farm Mach. Trg. & Testing Inst,Sonitpur Inst 1 1
Horticulture DivisionDte. Of Arecanut & Spices Dev,Calicut Sub 1 1Dte. Of Cashewneut and Cocoa Development,Cochin Sub 1 1National Committee on Use of Plastics in Agriculture,N.Delhi Sub 1 1
NDM Division NilCredit Division NilCooperation Division NilChief Controller of Accounts 1 1
PAO (7)- [KOL, CNY, MBY(2), CCN, NGPR, FRDBD ] 7 7Small Pay and Accounts Office (6)- All in Delhi 6
UPS(LI)
Orgl Add
10135
5555555
55
5356
5
5555
555
5356
PC/DJP/
INFRASTRUCTURE PROVISION FOR OFFICES / FIELD OFFICES UNDER DACNET PROJECT
Divisions/Attached/Subordinate Offices StatusMain Regl. Field
office OfficeUnits Server/LP
Digitizer
Scanner
UPS(OL) Dte. Of Plant Protection Quarantine and Storage, Faridabad Att 1 2
Central IPM Centres (26)(each centre 2 PCs) 26Central Insecticide Laboratory(Faridabad) 1 1NPPT(1)-[Hyderabad] 1 1Locust Office - [Jodhpur] 1 1Small Locust Offices (5) 5Regl. Pesticides Testg. Labs(2) [CHD, KNPR] 2 2P.Q Stations (6) [CNY(7PCs), AMSR(9PCs), KOLK(7PCs), MBY(6), CCN(2 no server &VSAT), ND(9)] 6 5Small P.Q Stations (16)(1 extra for vishakhapatnam, Tuticorin, only 1 for pongaon) 16
Agricultural Marketing Division Dte. Of Marketing and Inspection, Faridabad Att 1 1
Branch Head Office (1) 1 1Central AGMARK LAB (1)-[Nagpur] 1 1Regional Offices (5) [KOLK,CNY,MBY,ND,GNTR] 5 5Sub Offices (40), computers only in 26 26Regional Laboratories (23), only in 21 offices 21
NRM DivisionAISLUS, New Delhi Sub 1 8 1Soil Conserv. Res. Demo. And Trg. Centre Inst 1 1Soil Conserv. Trg. Centre, Hazaribagh Inst 1 1
Seeds Division NilTrade Division NilAgricultural Census NilIC Division NilOffice of the Min. Agri. Embassy of India (Rome)Policy and Plan Div. NilFinance Div. NilBudget & Account Div. NilEconomic Administration NilAdministration Div. NilVigilance Div. Nil Total 28 25 130 53
The requirement of Project Implementation Unit (Higher end Server 7 nos with printers, system software and necessary Office infrastructure) is additional.
UPS(LI)
Orgl Add
PC/DJP/
205210855
104018
5 24109
252621
1355
465 24
NIC will procure, install, operationalise
Hardware itemsLAN items
Undertake IT Empowerment Provide NICNET services including Internet
access Undertake development of e-Governance
applications
Database Server
VSAT/ Leased Line(To Directorate Office)
Portal Servers
E-mail, Workflow Application Server
10/100Mbps Switch
10/100Mbps Switch
Central Router
Firewall
NICNET
Domain (Active Directory) Server
Project Implementation Unit forDACNET
LAN
External Zone
Additional Domain Controller
E-Commerce Server
H/A ClusterH/A Cluster
DACNET Directorate & Field Office
Database Server(Windows 2000 & SQL 2000 standard, Visio 2002 Prof.)
Internet Security &
Acceleration Server on High End Client (Win 2000 Server, ISA 2k)
LANLeased Line / VSAT (To NIC Network-HQ)
Switch(24 Port)
Client Nodes(Windows XP preloaded & Office XP)
NICNET
Directorate Office
PSTN/ISDN Dial-up Client
INTERNET
Field Unit
(Windows XP Preloaded & office XP)