42
D2 Subway Public Meeting November 13, 2019

D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

D2 Subway

Public Meeting

November 13, 2019

Page 2: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

• To update the community on D2 Subway progress since last meeting in April 2019

• To get your feedback on:

– In progress 20% level of design

o Proposed street modifications

o Urban design plans

o Subway station concepts and access points

• IH 345/D2 Design Coordination Status

Purpose of Today’s Meeting

2

Page 3: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

D2 Subway Alignment

3

Page 4: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

Engineering and Proposed Street

Modifications

Page 5: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

• Several activities in progress for 20% design submittal in March 2020

– Finalized alignment/profile assumptions (see roll plots)

– Initiating design for street modifications

– Geotechnical report based on boring data along corridor

– Construction Methods Report

– Field surveys complete including visible utilities

– As-built research complete for underground utilities

– Building foundations data collected – Six key buildings/features along Commerce will have supplemental survey

Engineering Progress Update

5

Page 6: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

Construction Methods

6

• Tunnel construction approaches:

– Sequential Excavation Method (SEM)

– Tunnel Boring Machine (TBM)

– Cut-and-Cover

• DART will likely leave final method(s) up to contractor based on best time/cost efficiencies and considering staging area needs

SEM

TBM

Cut-and-Cover

Page 7: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

Proposed Street Modifications Victory/Museum Way Focus Area

7

Museum WayRemove median parking and construct D2 with embedded track

Victory Park LanePossibly remove north-south through movement to right-in, right-out only

River StreetCrossing panel by DART for future through street

Futu

re s

tree

t im

pro

vem

ents

by

oth

ers

Potential street opportunity

Broom StreetRelocated closer to freeway; lowered slightly at rail crossing

McKinney AvenueLowered slightly at rail crossing

Page 8: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

Museum Way Cross-SectionHouston Street to Victory Avenue

8

• DART owns 35’ of median right-of-way

• Current approach is to revise cross section to include parking lane along sidewalk and 10’ travel lane

Page 9: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

Proposed Street Modifications North Portal/Metro Center Area

9

Hord StreetRebuilt over D2 and remains open

Griffin StreetCut and cover construction temporary impacts; to be rebuilt

Corbin StreetTo be closed due to portal

Page 10: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

Proposed Street Modifications CBD East and Deep Ellum Focus Area

10

IH 345 Frontage RoadNorthbound road closed from Pacific to Swiss; possible local access south of portal

Good LatimerSections reconstructed with embedded track and relocated median station

Good Latimer to Live OakSouthbound left turn lane closed due to track widening for station

Miranda StreetClosed

Hawkins StreetAt-grade crossing; proposed reconstruction to align with Jett Way

Swiss AvenueProposed one-way westbound from Good Latimer to Hawkins

Rebuilt Street CrossingsCut and cover construction temporary impacts

Page 11: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

Urban Design and Station Plans

Page 12: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

• Creation of pedestrian friendly stations that are accessible, safe, encourage transit ridership and contribute to the public realm through street-level activation and high quality materials and detailing

• Contribution to a sustainable urban environment that follows low impact development standards and incorporates appropriate native landscaping

• Integration of streetscapes that enhance and encourage pedestrian activity while safely accommodating all other modes of transportation.

• Enhancement of economic development potential along transit corridors and transit-oriented development around station

Urban Design Principles

12

Page 13: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

DART Station Design Principles

13

Seamless, intuitive path of travel

Highly visible entries, street presence

Clear passenger information

Minimal blind spots

Avoiddead ends

Natural light to enhance wayfinding

Intermodal integration

Enhanced urban realm

Page 14: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

14

Museum Way Station Urban Design Plan

Page 15: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

15

Museum Way Station Urban Design Plan

Page 16: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

Museum Way Station

16

• Museum Way will be similar to Akard Station

• Side platform with canopies

• Opportunity for coordinated design with Perot Museum

Page 17: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

Me

tro

Ce

nte

r S

tati

on

Urb

an

De

sig

n P

lan

17

Page 18: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

Me

tro

Ce

nte

r S

tati

on

Urb

an

De

sig

n P

lan

18

Page 19: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

Metro Center StationArchitectural Concept

19

Page 20: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

Commerce Station HeadhouseProposed approach to avoid Cut-and-Cover along Commerce Street

Commerce Subway Station Cavern

Pas

sen

ger

Acc

ess

WB Tunnel

EB Tunnel

WB Tunnel

EB Tunnel Egress Shaft

Station Head House

Pegasus Plaza

1517 Commerce StParking

Neiman Marcus

MercantileNational Bank

Building

AT&T CorporateHeadquarters

The Adolphus

Iron Cactus

The Joule Hotel

BrowderStreet Mall

AT&T Discovery District

Hampton Inn& Suites

DP&L Flats

Aka

rdSt

The Magnolia Hotel

20

Page 21: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

Co

mm

erc

e S

tati

on

Urb

an

De

sig

n P

lan

21

Page 22: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

Co

mm

erc

e S

tati

on

Urb

an

De

sig

n P

lan

22

Page 23: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

Commerce StationArchitectural Concept

23

Pegasus Plaza Headhouse Concept

Pegasus Plaza

Page 24: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

Pegasus PlazaExisting Condition

24

Opportunities• Arrival portal to heart of downtown• First Dallas experience for visitors• Renewed purpose for Plaza• Retains plaza design• Can help activate the park• Blend station with Plaza• Links public uses – Plaza/Station

Page 25: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

Pegasus Plaza Headhouse Concept

25

Page 26: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

Pegasus PlazaHeadhouse Concept

26

Page 27: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

CB

D E

ast

Sta

tio

n U

rba

n D

esig

n P

lan

27

Page 28: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

CB

D E

ast

Sta

tio

n U

rba

n D

esig

n P

lan

28

Page 29: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

CBD East Station Architectural Concept

29

MainElm

Page 30: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

East Portal Urban Design Plan

30

Page 31: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

East Portal Urban Design Plan

31

Page 32: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

Live Oak StationRelocation of Deep Ellum Station

32

• Community desire to retain station in this area

• Median station similar to today

• Objective is to remove ballast and use embedded track for more urban feel along Good Latimer

Page 33: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

FTA TOD Planning Grant Opportunity

33

• DART and the City of Dallas are partnering on grant opportunity for comprehensive transit-oriented development (TOD) plan along D2 Subway Corridor

– Plan must be associated with a fixed guideway or core capacity project

– Anticipated 2 year effort as sub-plan concurrent with city’s comprehensive plan update

• TOD Pilot Program intended to fund:

– Comprehensive planning that supports economic development, ridership, multimodal connectivity and accessibility, increased transit access for pedestrian and bicycle traffic, and mixed-use development near transit stations

– Encourages identification of infrastructure needs and engagement with the private sector

Page 34: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

Supplemental Draft Environmental Impact

Statement

Page 35: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

• Supplemental Draft Environmental Impact

Statement (SDEIS) in progress

• Initiated early reviews with FTA staff

• SDEIS will include information in potential

impacts and benefits of the project, along

with mitigation options where impacts are

identified

• Coordination with several entities, including:

City of Dallas, Dallas Park and Recreation

Board, Texas Historic Commission, TxDOT,

private property owners, utility providers

SDEIS Progress

35

Page 36: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

Agency Coordination Efforts

Page 37: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

• DART, City of Dallas, TxDOT and NCTCOG staff have met several times to discuss design interface

• TxDOT approval of a crossing permit pending completion of Feasibility Study – this could be 2-3 years or longer

– TxDOT would prefer DART at-grade crossing under IH 345

• DART continues to advance D2 Subway with portal at IH 345 but has reviewed other options with agency staff

• DART has also participated in interviews with Coalition for a New Dallas IH 345 study team

• Policy-level discussions are occurring to provide guidance

IH 345 Interface Coordination

37

Page 38: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

FTA Considerations & Next Steps

Page 39: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

• Project Development is the first phase of the federal funding process

• DART is doing Project Development locally and will request entry into Engineering after this phase is complete

FTA Capital Investment Grant Process

39

Page 40: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

• D2 received MEDIUM-HIGH ratings in 2015, 2016, 2017

• Project refined as subway in September 2017

– No formal rating submittal in September 2018

• FTA deadline for Project Ratings in 2019 was August 23

• DART provided letter to FTA with project update (no formal rating request at this time) and key milestones for next phase

• Early 2020, begin coordination to enter Engineering

• August 2020 – DART will request rating

FTA Coordination

40

Page 41: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

Key Milestones for FTA Schedule

Activity Date

10 percent design complete March 2019

Advance notice of Request to Enter Engineering

- Initiate Readiness Documents

February 2020

20 percent design March 2020

Draft Supplemental Environmental Impact Statement March 2020

30 percent design August 2020

Final Environmental Impact Statement/Record of

Decision (FEIS/ROD)

August 2020

Entry into Engineering

- FTA Rating

- Readiness documents review complete

Late 2020/

Early 2021

41

Page 42: D2 Subway - DART.org · Public Meeting November 13, 2019 • To update the community on D2 Subway progress since last meeting in April 2019 • To get your feedback on: –In progress

42