D 1/Page 1 of 2 OPERATIONS & MAINTENANCE MANUAL New Construction Start-Up No. D 1 Project Design Review 1992 - 1997, Michael Robert McCormick All Rights Reserved 1. Specification Review The Chief Engineer will be responsible for reviewing the complete project specifications to familiarize him/her with a general overview of the architectural details and finished schedules, as well as MEP provisions. This should be done by highlighting and tagging each Division Section for the following: a. Warranties, Guarantees and Certifications; b. Surplus Material and Maintenance Stock; c. Maintenance Manuals; d. Testing, Inspections and Quality Control; and e. Training Sessions. Once the review is completed, refer to No. D 2, Specifications Checklist procedures for correlating all the highlighted information. 2. Project Drawing Review When reviewing the MEP drawings, as well as the Architectural drawings to familiarize yourself with the layout of the project, it is essential that the proposed “Engineering Space” and/or a space be determined with the following recommendations to ensure adequate space provisions: a. Engineer’s office - with HVAC condition. 1. Chief Engineer’s office - 10' x 15'; 2. Assistant Chief Engineer (if applicable) 10' x 12'; 3. Restroom, shower stall and lockers per staffing requirements; 4. Combination lunch room and conference room 12' x 15'; and 5. Combination files, drawings, supply storage, etc., room 10' x 12'. b. Engineer Shop and Storage Space 200 sq. ft. per 150,000 gross sq. ft. building.

D OPERATIONS & MAINTENANCE MANUALM Manual... · Submit maintenance data and spare parts list for each fixture type and trim item, including instruction for care of finishes. • Piping

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • D • 1/Page 1 of 2

    OPERATIONS & MAINTENANCE MANUAL New Construction Start-Up

    No. D • 1 Project Design Review

    1992 - 1997, Michael Robert McCormick

    All Rights Reserved

    1. Specification Review

    The Chief Engineer will be responsible for reviewing the complete project specifications to

    familiarize him/her with a general overview of the architectural details and finished

    schedules, as well as MEP provisions. This should be done by highlighting and tagging

    each Division Section for the following:

    a. Warranties, Guarantees and Certifications;

    b. Surplus Material and Maintenance Stock;

    c. Maintenance Manuals;

    d. Testing, Inspections and Quality Control; and

    e. Training Sessions.

    Once the review is completed, refer to No. D • 2, Specifications Checklist procedures for

    correlating all the highlighted information.

    2. Project Drawing Review

    When reviewing the MEP drawings, as well as the Architectural drawings to familiarize

    yourself with the layout of the project, it is essential that the proposed “Engineering Space”

    and/or a space be determined with the following recommendations to ensure adequate space

    provisions:

    a. Engineer’s office - with HVAC condition.

    1. Chief Engineer’s office - 10' x 15';

    2. Assistant Chief Engineer (if applicable) 10' x 12';

    3. Restroom, shower stall and lockers per staffing requirements;

    4. Combination lunch room and conference room 12' x 15'; and

    5. Combination files, drawings, supply storage, etc., room 10' x 12'.

    b. Engineer Shop and Storage Space 200 sq. ft. per 150,000 gross sq. ft. building.

  • D • 1/Page 2 of 2

    OPERATIONS & MAINTENANCE MANUAL New Construction Start-Up

    No. D • 1 Project Design Review

    1992 - 1997, Michael Robert McCormick

    All Rights Reserved

    These items and others are fully defined in No. D • 3, Management Checklist. These areas should

    be evaluated for best accessibility to engineering personnel, vendors and deliveries.

    3. Project Review Evaluation

    Once the review is completed and engineering space is determined, it will be essential to

    determine and develop an FF&E List (Furniture, Fixtures and Equipment) for the following:

    a. Office Furniture, Computers and Copiers;

    b. Hand Tools and Equipment; and

    c. Large Equipment (Manlifts, Portable Generators, etc.).

    This list must be done in a timely manner and submitted to the Manager for review and

    submission to the Start-up Budget.

  • D • 2/Page 1 of 13

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 2 Specifications Checklist

    In this Section, using the Format Example, you will correlate all the highlighted information from

    the specifications as described in Section I, Project Design Review.

    Once the information is compiled and typed, make (6) copies and submit to the Manager for

    submission to the General Contractor. Make (4) bound copies with project name and section

    category. Be creative.

    Submit (2) copies to the Manager and keep (2) copies for your files.

    Format

    The following format is to be used in developing the specifications checklist:

    1. Cover Sheet

    a. Company Name

    b. Company Division

    c. Company Region

    d. Project Name; and

    e. Specifications Checklist.

    2. Contents

    a. Section I: Warranties, Guarantees and Certification;

    b. Section II: Surplus Material and Maintenance Stock;

    c. Section III: Maintenance Manuals;

    d. Section IV: Testing, Inspections and Quality Control; and

    e. Section V: Training Sessions.

  • D • 2/Page 2 of 13

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 2 Specifications Checklist

    3. Introduction

    The purpose of this information, which the specified requirements under the specifications

    for (Enter Project Name) covers: warranties; guarantees; certification; maintenance

    manuals; surplus materials; spare parts list; equipment testing and factory training sessions,

    to provide a thorough and accurate checklist for ensuring all provisions are fulfilled as

    required on this project.

    If there have been any changes or modifications of these provisions, please acknowledge

    any changes, so that the appropriate list can be corrected.

    4. Section I

    A. Introduction Cover

    SECTION I

    WARRANTIES, GUARANTEES AND CERTIFICATIONS

    All work not conforming to the Contractor’s warranties under the Contract Documents,

    including substitutions not approved and authorized, may be considered defective. If

    required by the Owner, the Contractor shall furnish satisfactory evidence as to the kind and

    quality of materials and equipment. The Contractor’s warranties under the Contract

    Documents are not limited by the provision of Paragraph 13.2.

    For further details, refer to Warranties Provisions specified in the Contract Documents.

    B. Section I Examples

    When developing the specifications checklist, number the section data sheets in conjunction

    with the section number, for example, Section I has two pages (SI-1 and SI-2).

    • Factory Fabricated Cooling Towers, page 15Q1-1:

    Provide manufacturer’s certification of tower cooling capacity, based on factory

    performance tests, and provide performance curve plotting leaving water

    temperature (LWT) against wet bulb temperature (WBT).

    • Packaged Heating and Cooling Units, page 15T2-5, Compressor and Refrigeration

    Circuit Guarantee:

  • D • 2/Page 3 of 13

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 2 Specifications Checklist

    The compressors and refrigeration circuits for each unit shall be guaranteed for five

    (5) years from date of acceptance by the owners, to include labor and materials.

    • Duct Accessories, page 15V3-6, Certification:

    With submittals, the manufacturer shall supply certified test data on dynamic

    insertion loss, self noise power levels, and aerodynamic performance for reverse and

    forward flow test conditions. Test data shall be for a standard product. All rating

    tests shall be conducted in the same facility, shall utilize the same silencer, and shall

    be open to inspection upon request from the architect and engineer.

    • Energy Monitoring and Management Systems, page 15X1-0019 and 0020,

    Guarantee:

    The control contractor shall guarantee the system free from defects in material and

    workmanship for a period of two (2) years from the date of acceptance by the

    owner. Any material or workmanship found to be defective during the guarantee

    period shall be repaired or replaced at no charge to the owner for parts or labor.

    • Electrical General Provisions, page 16A1-4, Guarantee:

    General: The electrical contractor shall leave the entire electrical system installed

    under this contract in proper working order and shall, without charge, replace any

    work or materials which develop defects, except from ordinary wear and tear, within

    one (1) year of the date of the final acceptance of the owner for beneficial use.

    5. Section II

    A. Section Cover

    SECTION II

    SURPLUS MATERIALS

    and

    MAINTENANCE STOCK

  • D • 2/Page 4 of 13

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 2 Specifications Checklist

    Under these provisions, as specified, general contractor and all subcontractors will provide

    required quantities of surplus materials and maintenance stock, known as “attic stock” and

    will turn over to owner’s representative at a time when time allows proper storing in a

    secured area under lock and key.

    B. Section II Examples

    • Acoustical Ceilings, page 9E0-2, Maintenance Stock, Acoustical Ceilings:

    At time of completing the installation, deliver stock of maintenance material to the

    owner. Furnish full size units matching the units installed, package with protective

    covering for storage and identified with appropriate labels.

    Acoustical Units: Furnish and amount equal to one percent (1%) of the amount

    installed in the base building construction.

    • Carpeting, page 9R1-3, Extra or Surplus Materials:

    Carpet Overrun: Limited production overrun on each carpet to an amount necessary

    to insure complete installation without extra seams. Deliver all unused carpet and

    large scraps, except unused rolls and portion of rolls longer than 15 feet, to the

    owner for his attic stock. Dispose of scraps less than two square feet in area or less

    than eight inches in width.

    • Mechanical General Provision, page 15A1-12, Valve Identification. They are as

    follows:

    Tags: Polished brass with 1/4 inch high stamped, engraved lettering, different

    shapes for each generic piping service.

    Application: Tag every valve, cock and control device in each mechanical work

    piping system; exclude check valves, valves within equipment units, hose bibs,

    faucets and shutoff valves and plumbing fixtures, valves at HVAC terminal

    heating/cooling units, and similar multiple unit terminal valves.

    Valve Schedule: Prepare and submit valve tag schedule (in duplicate), listing each

    tag valve by location, service, and tag description. Install each page of one copy of

    the valve schedule in glazed frames, and mount where directed.

  • D • 2/Page 5 of 13

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 2 Specifications Checklist

    Duct Work: Provide stencil painted identification on duct work and housings of the

    air handling system with letter size sufficient for reading, but not less than 3/4 inch,

    and including arrows to show direction of flow. Indicate service and system

    numbers at housings and at primary duct connections and branches. On access

    doors, indicate service and equipment being accessed. Space identification at 50

    feet intervals along exposed ducts. Where ducts are concealed behind access doors

    or removable ceilings, identification may be by plastic ties/tags in lieu of stencil

    painted markers.

    Equipment: Signs -- provide engraved plastic laminated signs at locations of major

    equipment units, primary control devices, emergency equipment, dangerous

    eliminates of mechanical work and similar places. Provide text of sufficient clarity

    and lettering of sufficient size to convey adequate information at each location, and

    mount permanently in an appropriate and effective location. Comply with the

    recognized industry standards for color and design.

    Operational Tags: Where needed for proper and adequate information on operation

    and maintenance of mechanical systems, provide tags of plasticized card stock,

    either preprinted or hand printed to convey the message; examples: DO NOT

    CLOSE THIS VALVE EXCEPT WHEN BURNER IS OFF.

    6. Section III

    A. Section Cover

    SECTION III

    MAINTENANCE MANUALS

    Under these provisions, as specified, maintenance manuals will consist of two final copies,

    including flow diagrams, maintenance instruction, operating instructions, parts listing, and

    copies of other submittals indicated for inclusion.

    Organize each maintenance manual with index and thumb tab markers for each section of

    information; bind in two-inch, three-ring, vinyl covered binders with pockets to contain

    folder sheets, properly labelled on spine and face of binder.

    B. Section III Examples

    • Mechanical General Provisions, page 15A1-7, General:

  • D • 2/Page 6 of 13

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 2 Specifications Checklist

    For mechanical work, the following quantities are required for each category of

    submittal (in lieu of quantities specified in Division I), unless otherwise indicated in

    individual work sections (quantity does not include copies required by governing

    authorities, or by Contractor for its own purposes):

    Shop Drawings: 6 sets, including 2 for maintenance manuals;

    Product Data: 6 sets (or 8 sets where required in maintenance manuals);

    Samples: 4 sets for final submission;

    Certifications: 3 copies;

    Test Reports: 3 copies; and

    Warranties (Guarantees): 5 copies, including 2 for maintenance manuals.

    • Plumbing Equipment, page 15L1-2, Maintenance Data:

    Submit maintenance data and parts list for each item of plumbing equipment.

    Include trouble-shooting maintenance guides and this data in the maintenance

    manual.

    • Plumbing Fixtures and Trim, page 15M1-3, Maintenance Data:

    Submit maintenance data and spare parts list for each fixture type and trim item,

    including instruction for care of finishes.

    • Piping Specialties, page 15O1-1, Maintenance Data:

    Submit maintenance data and spare parts list for each type of manufactured piping

    specialty, and include this data in maintenance manual.

    • Centrifugal Chillers, page 15P1-2, Maintenance Data:

    Submit maintenance data and spare parts list for each centrifugal chiller, control,

    and accessary; including trouble-shooting maintenance guide. Include this data and

    product data in maintenance manual; in accordance with requirement of Division I.

  • D • 2/Page 7 of 13

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 2 Specifications Checklist

    • Factory Fabricated Cooling Towers, page 15Q1-2, Maintenance Data:

    Submit maintenance data and spare parts list for each cooling tower and include

    trouble-shooting maintenance guide and include this data in maintenance manual.

    • Heat Exchangers, page 15R1-2, Maintenance Data:

    Submit maintenance data and spare parts list for each type of heat exchanger and

    include this data in maintenance manual.

    • Terminal Units (Electric), page 15S1-2, Maintenance Data:

    Submit maintenance instruction, including lubrication procedures, filter

    replacement, motor and drive replacement and spare parts list. Include this data and

    product data in maintenance manual.

    • Electrical Heating Coils, page 15S2-1, Maintenance Data:

    Submit maintenance instructions, including spare parts list and include this dadta in

    maintenance manual.

    • Chilled Water Duct Coils, pate 15S3-2, Maintenance Data:

    Submit maintenance instruction, including spare parts list and include data in

    maintenance manual.

  • D • 2/Page 8 of 13

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 2 Specifications Checklist

    7. Section IV

    A. Section Cover

    SECTION IV

    TESTING, INSPECTIONS AND QUALITY CONTROL

    The required testing and quality control under the provisions of the specifications for this

    product (product name) are as follows, excluding only tests specified to be paid for by the

    owner, and tests and testing performed by a testing engineer and an employee of the owner,

    the contractor shall be responsible for the execution of all tests and testing by the

    specifications and by all authorities have jurisdiction.

    B. Section IV Examples

    • Inspection and Acceptance, page 2V1-10:

    When the landscape work is completed, including maintenance, the architect will,

    upon request, make an inspection to determine acceptability.

    • Pre-cast concrete planters and pavers, page 3G-5, Testing:

    A set of four (4) test cylinders must be made with each sample to determine the

    quality of the concrete before the actual production of the elements is started. A

    minimum of four (4) test cylinders for every five (5) cubic yards of concrete must be

    taken during production to maintain a close control over the uniform quality of the

    concrete. On each set of four (4) cylinders, two (2) must be tested at seven (7) days

    and two (2) after twenty-eight (28) days. Casting and curing of the cylinders shall

    be done by the manufacturer’s laboratory shell and shall, at all times, be open for

    inspection by the architect.

    • Mechanical General Provisions, page 15A1-18, Tests and Adjustments:

    Specifically, all piping shall be flushed out prior to testing the equipment and all

    standards shall be cleaned. All ducts and apparatus casing shall be thoroughly

    cleaned before fans and filters are operated. After the equipment has been tested, all

    filters shall be cleaned or renewed.

  • D • 2/Page 9 of 13

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 2 Specifications Checklist

    After the systems have been completed, and before each system is accepted, the

    capacity and general operating tests on the systems shall be conducted by a

    competent and experienced engineer and the tests shall demonstrate the specified

    capacities of the various pieces of equipment. All equipment shall be adjusted so

    that it will perform as specified and required to give satisfactory operation. The

    entire temperature control system shall be adjusted and placed in operation by the

    manufacturer and all adjustments necessary to accomplish the specified results

    during the first year of operation shall be made without cost to the owner. Setting of

    valves, cogs, etc., shall be permanently marked so that they can be restored if

    destroyed at any time.

    Air duct sytems shall be adjusted in balance so that air quantities at all outlets are as

    indicated and so the distribution from supply outlets is free from drafts and uniform

    over the face of each outlet. Setting of dampers and other volume adjusting devices

    shall be permanently marked so that they can be restored if disturbed at any time.

    (NOTE: all air duct balances shall be performed by a separate company, approved

    by the architect other than the installing contractor, which has competent personnel

    and the necessary instruments to conduct the required tests and balances. A written

    record of final balance air quantities shall be submitted to the engineer for approval.)

    Upon completion and prior to acceptance of the installation, the contractor shall

    subject the system to such operating tests as may be required by the architect to

    demonstrate satisfactory functions and operating efficiency. Operating tests shall

    cover a period of not less than eight hours for each system, and all tests shall be

    conducted at such times as the architect may direct. All instruments, facilities, and

    levers required to promptly conduct the test shall be provided by the contractor at no

    additional cost to the owner. Fuel, water and electricity required for tests shall be

    furnished by the owner.

    • HVAC Pumps, page 15G1-7, Adjusting and Cleaning:

    Alignment: Check alignment, and where necessary, realign shafts of motors and

    pumps within recommended tolerance by manufacture and in presence of

    manufacturer’s service representative.

    Start up: Lubricate pumps before start up period. Start up in accordance with

    manufacturer's instructions.

    • Testing, Adjusting and Balancing, page 15 1-1, Description of Work of this

    Division for Testing Purposes:

  • D • 2/Page 10 of 13

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 2 Specifications Checklist

    Extent of testing, adjusting, and balancing work is indicated by requirements of this

    section, and also by drawings and schedules and is defined to include, but is not

    necessarily limited to, air distribution sytems, hydronic distribution systems, and

    associated equipment and apparatus of mechanical work. The work consists of

    setting speed and volume (but not flow) adjusting facilities provided for systems,

    recording data, conducting tests, preparing and submitting reports, and

    recommending modifications to work as required by contract documents.

    Component types of testing, adjusting, balancing specified in this section includes

    the following as applied to mechanical equipment:

    fans;

    air conditioning units;

    duct work systems;

    pumps;

    chillers;

    condensers;

    cooling towers;

    coils and heat exchangers;

    piping systems; and

    terminal units.

    • Electrical General Provisions, page 16A1-8, Quality Control of Coordination with

    Mechanical:

    Coordinate closeout operations with closeout of mechanical systems, elevators, food

    service equipment, and other power consuming equipment. Accurately record

    locations of conductors which are underground or otherwise concealed. Test run

    electrical equipment in coordination with test runs of mechanical systems. Clean

    and lubricate operational equipment. Instruct owners operating safety/emergency

    provisions of the electrical systems. Turn over the operations to the owner’s

    personnel at the time(s) of substantial completion. Until the time of the final

    acceptance of the total work of the contract, respond promptly with consultation and

    services to assist the owner’s personnel with operation of electrical systems.

    • Fire Protection Pumps, page 15G2-4, Field Quality Control:

  • D • 2/Page 11 of 13

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 2 Specifications Checklist

    Upon completion of installation of fire protection pumps, perform field acceptance

    tests of pumps, complying with operating instructions and procedures of NFPA20,

    to demonstrate compliance with requirements. Where possible, field correct

    malfunctioning units, then retest to demonstrate compliance. Replace units which

    cannot be satisfactorily corrected.

    8. Section V

    A. Section Cover

    SECTION V

    TRAINING SESSIONS

    Prior to making requests for final inspection, the contractor shall put mechanical systems

    and equipment into operation and shall make tests and adjustments. The contractor shall

    furnish proper instructions to the owner in the presence of the architect or the architect’s

    representative concerning the operation and maintenance of mechanical and related

    electrical equipment. In addition, the contractor shall provide written instructions for

    operation and maintenance of mechanical systems.

    B. Section V Examples

    • Mechanical General Provisions, page 15A1-19, Operating Instructions:

    Conduct a full day walk through instruction seminar for the owner’s personnel to be

    involved in the continued operation and maintenance of mechanical equipment and

    systems. Explain the identification system, operational diagrams, emergency and

    alarm provisions, sequence requirements, seasonal provisions, security, safety,

    efficiency and similar features of the system.

    Turnover of operation: at the time of substantial completion, turnover the prime

    responsibility for operation of the mechanical equipment and systems to the owner’s

    operating personnel. However, until the time of the final acceptance, provide one

    full-time operating engineer, who is completely familiar with the work, to consult

    with and continue training the owner’s personnel.

    • Centrifugal Chillers, page 15P1-11, Training of Owner’s Personnel:

  • D • 2/Page 12 of 13

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 2 Specifications Checklist

    Provide services of manufacturer’s technical representative for two, eight-hour days

    to instruct owner’s personnel in operation and maintenance of centrifugal chillers.

    Schedule training with owner, provide at least 7 days’ notice to contractor and

    engineer of training date.

    Pneumatic Temperature Control Systems, page 15W1-10, Final Adjustment of

    Equipment:

    Provide two days of minimum operating instructions for the building owner’s

    operating personnel. Arrange with the building owners for time of instruction, and

    provide a minimum two weeks’ written notice prior to the instruction period. All

    systems must be complete, tested and functioning properly at the time of instruction

    period.

    NOTE: Provisions of this section also apply to electronic temperature control

    systems, page 15W2-9.

    • Energy Monitoring and Management Systems, page 15X1-0002, of the Revised

    Specifications for the Energy Management System:

    Under these provisions, the contractor shall provide necessary training of the

    owner’s representative in the operation of the system. This includes 40 hours of on-

    site instruction during start-up and one week of classroom sessions.

    Demonstrate to satisfaction of owner’s representative, prior to final acceptance, that

    the system is calibrated, installed and operating as required.

    Initial Start-Up and Programs: Provide eight (8) routing after start-up system checks

    during the first two (2) years of operation, during which additional system training

    shall be provided, totalling one eight hour session. The contractor shall have 24

    hour emergency service capability inhouse and shall provide the owner with a yearly

    service contract for the third year.

    • Grounding and Ground Fault Protection, page 16E2-7, Personnel Training:

  • D • 2/Page 13 of 13

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 2 Specifications Checklist

    Building Maintenance Personnel Training: Train owner’s building maintenance

    personnel in procedures for testing and determining resistance to ground values of

    grounding system. Also, instruct maintenance personnel in preparation and

    application of chemical solution for earth surrounding grounding for reducing ohmic

    resistance to required levels.

    NOTE: No training requirements specified for automatic transfer switch,

    switchboard or emergency generator.

  • D • 3/Page 1 of 10

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 3 Management Checklist

    In the early stages of a new construction project or management takeover of a building, prior to the

    substantial completion date, or within 90 days of new management contract, it is critical to conduct

    an assessment of the feasibility of or current operation and to check for adequate provisions of the

    following:

    Checklist Categories

    1. Janitorial Services 9. Elevators

    2. Window Washing 10. Restrooms

    3. Maintenance and Repairs 11. Main Lobby

    4. Security 12. Exterior

    5. Service Areas 13. Building Signs

    6. Engineering Office and Shop 14. Building Features

    7. HVAC, Electrical and Other 15. Loading Dock

    Mechanical Systems

    8. Parking Garage

    Review the checklist forms (refer to No. H, “Sample Forms,” D3-1 to D3-11, New Building

    Checklist) prior to conducting the survey with the Manager, to develop a plan on how to efficiently

    determine the feasibility for each item described.

    Once the survey is completed, forward a copy to Manager, and/or as directed, for review. Also,

    any items requiring greater details or information should be addressed in a separate memo with all

    specific concerns.

    Checklist Issues

    Review the specific components of each category and check off each item which applies to the

    project and/or add/delete those items not applicable or not identified on the appropriate checklist

    form.

    A. Janitorial

  • D • 3/Page 2 of 10

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 3 Management Checklist

    1. Central office/staging/storage areas.

    2. Storage and utility sink on floors.

    3. Common area electrical outlets.

    4. Water supply and floor drains in restrooms.

    5. Check practicality of personnel and materials flow.

    6. Identify items which may result in high expense in cleaning (i.e., finish materials,

    bronze, glass, unusual flooring, ceiling heights, atriums, service corridors, freight

    elevators, etc.).

    7. Trash removal process.

    8. Unusual tenant requirements, if applicable.

    9. Are coin operated dispensers designed to cover cost of supplies dispensed (example:

    Tampax, Kotex machines)?

    B. Window Washing

    1. Type of rig proposed.

    2. Potential involvement required of engineering staff (i.e., set-up, relocation for drops,

    take down, etc.).

    3. Any ill effects on pedestrian traffic with weekday washing.

    4. Can supplier provide service and inspection?

    5. Are there any related unusual expenses?

    6. Is power provided on roof for rig lifts?

    7. Are there tie-offs for rigging ropes?

    8. Are there terraces which require inspection provisions?

  • D • 3/Page 3 of 10

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 3 Management Checklist

    C. Maintenance and Repair

    1. Attic stock planned for unusual items (i.e., windows, energy management system

    parts, security system parts, metal pan ceiling, unusual lighting, special order carpet

    and wall covering, hardware, etc.).

    2. Will there be unusually high maintenance expense created by certain finish

    materials?

    3. Life safety systems review. Supplies and service availability and equipment.

    4. Are there fountains or pools planned? If so, do they lend themselves to easy

    maintenance?

    5. What type of locks are scheduled for base building? Is the system expandable to

    provide for one master key in the event additional buildings are constructed on the

    same site?

    D. Security

    1. Review type of system proposed and control functions (i.e., manpower, electronic

    surveillance, combination).

    2. Does the proposed system cover any and all possibilities for intrusion or exit?

    3. How does the security system respond during power failure, emergency evacuation,

    etc.? Is it failsafe?

    4. Review security plan for dock and service areas.

    5. Can security personnel see the after hours entrance from the console?

    6. Is there a P.A. system planned? Does it have floor segregation capabilities?

    E. Service Areas

    1. Evaluate dock capacity.

    2. Evaluate traffic flow and ease of access.

  • D • 3/Page 4 of 10

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 3 Management Checklist

    3. Water source available for wash down of dock and dumpster area?

    4. Are restroom facilities provided for dock attendant, if applicable?

    5. Are doors at dock entrance manual or electric lift?

    6. If dock is adjacent to or beneath tenant space, has adequate insulation and plenum

    been planned for cold weather and noise reduction?

    F. Engineering Office and Locker Room

    1. Is mechanical equipment visible from the Chief Engineer’s office?

    2. Is a shower provided in engineers’ locker room?

    3. Has adequate shop and storage area been provided? (Minimum = 200 square feet

    for each 150,000 square feet of gross building square footage.)

    4. Has a dedicated circuit been provided for Energy Management System or personal

    computer?

    5. Is office area large enough for file cabinets, blue print cabinets, desk and

    miscellaneous chairs, book case, etc.?

    6. Has miscellaneous electrical power been provided for equipment testing purposes?

    7. Based on system design, determine if shop requires air and control for VAV, or

    condenser water for heat pumps to set up work test station in shop.

    8. Is shop area provided with the following:

    a. exhaust fan;

    b. domestic water (hot and cold)

    c. slop sink

    d. accessible to service elevator

    G. HVAC, Electrical and Other Mechanical Systems

    1. Review water treatment equipment, location, serviceability, deliveries.

  • D • 3/Page 5 of 10

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 3 Management Checklist

    2. Review chiller capacities (i.e., tonnage, capacity flexibility, condenser water bypass,

    basin heaters, etc.).

    3. Energy management and automation capabilities and flexibilities.

    4. Elevator equipment room air conditioning units should be provided. Accessibility

    to elevator equipment room.

    5. Wind tunnel effect and pressurization of tunnels, corridors, common areas, etc.

    6. Are restroom heaters planned if restrooms are adjacent to elevator shafts or exterior

    walls?

    7. Ensure there is a by-pass for domestic water pumps. This allows domestic pumps to

    be taken out of service for repair without deleting city water from the fire pump

    system.

    8. Be certain that buss duct connections are tight prior to opening. This includes a

    check of factory tightening prior to installation.

    9. Review and evaluate practicality of tenant planned HVAC equipment.

    10. Review equipment supplied by emergency generator system. Evaluate location of

    generator system. Should be easily accessible to engineering personnel, and not at

    top of tape.

    11. Be sure all exposed water pipes will have electrical heat tape.

    12. Be sure a quick fill is provided to the condenser water source.

    13. Be sure sump pumps are connected to the emergency power source.

    14. Insure that tenant metering devices provide KWH consumption rather than demand.

    15. Insure hallway lighting is controlled from an accessible area and not located in a

    secure area.

    16. Landscape areas should have electrical outlets for Christmas lighting power.

  • D • 3/Page 6 of 10

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 3 Management Checklist

    H. Parking Garage

    1. Are ceiling hung graphics on stabilized rods, or do they swing from chain or cable?

    Stabilized rods are highly preferred due to wind abuse and cable breakage.

    2. Are wall mounted graphics painted or taped? Taped graphics contract and expand

    with weather changes causing them to crack and peel off too quickly.

    3. Is sufficient storage planned for gate arms, ice melt, sweeper equipment, sand, etc.?

    4. Insure that roof level lights have photocell on/off controls.

    I. Elevators

    1. Number of elevators?

    2. Number of passenger elevators?

    3. Number of service elevators?

    4. Do elevators meet handicap code requirements?

    5. Are proper signage and licenses displayed?

    6. Elevator cab height (service & passenger)?

    7. Are pads furnished?

    8. Is ceiling removable?

    9. Maximum elevator weight and speed?

    J. Restrooms

    1. Are there toilet seat cover dispensers?

    2. What type of paper towel dispensers?

  • D • 3/Page 7 of 10

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 3 Management Checklist

    3. What type of toilet tissue dispensers?

    4. Type of faucets (auto/standard)?

    5. Type of soap dispensers? Do they work?

    6. What type of partitions (ceiling or floor type)? Color and finish?

    7. Are the counter tops cultured marble or laminate?

    8. Wall finish type (tile, wall covering or both?

    9. Is there a floor drain?

    K. Main Lobby

    1. What type of entrance doors (swing through or revolving)?

    2. Brass or aluminum thresholds?

    3. Floor type (marble, granite and travertine)?

    4. Type of ceiling: Height?

    5. Light bulb replacement accessibility?

    6. Are there outlets provided?

    7. What type of directory board is provided?

    8. What is the availability of directory strips?

    9. What is the lead time?

    L. Exterior

    1. Are planters provided?

    2. Do planters impede window washers?

    3. Are benches provided?

  • D • 3/Page 8 of 10

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 3 Management Checklist

    4. Are there adequate frost free hose bibs?

    5. Is there adequate lighting?

    6. How much snow melt will be needed during the winter months?

    7. What snow removal equipment will be required?

    8. Is there a courtyard? Are there adequate drains?

    9. Are there sufficient trash receptacles?

    M. Building Signs

    1. Building name?

    2. Building address?

    3. Directional signs?

    4. Stair signs?

    5. Exit signs?

    6. Floor numbers?

    7. Storage sign?

    8. Management signs?

    9. Life safety signs?

    N. Building Features

    1. Owned or Managed?

    2. Building size and description?

    3. Rentable square footage?

  • D • 3/Page 9 of 10

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 3 Management Checklist

    4. Year built?

    5. Architect?

    6. Number of floors? Typical size?

    7. Floor load?

    8. Column spacing?

    9. Ceiling height?

    10. Elevators (type/quantity/service/shuttle)?

    11. Parking ratio? Available spaces?

    O. Loading Dock

    1. Does dock provide ease of traffic flow and access?

    2. Is water source available for wash down and cleaning?

    3. Is there an attendant’s office?

    4. Are dock entrance gates manual/electric or both?

    5. Is trash area a minimum of 10' x 40'?

    6. Has electric power been provided for compactor?

    7. Is there an exhaust fan system?

    8. Is the dock sprinklered?

    9. What is the ceiling height (minimum 18')?

  • D • 4/Page 1 of 1

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 4 Equipment Data Procedures

    In the first three months of the project, the Chief Engineer will be responsible for collecting all the

    necessary information for each piece of mechanical equipment throughout the complex using the

    Equipment Inventory sheets and Master File Index Forms. Refer to No. B • 1, Preventive

    Maintenance Program guidelines for specific instruction.

  • D • 5/Page 1 of 1

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 5 Field/Warranty Reporting

    The following procedures are to be implemented by the Chief Engineer during the start-up period

    and throughout the first year warranty period. Originals are to be sent to the Client’s Project

    Manager on a weekly basis or as directed by the Manager.

    I. Field/Warranty Report

    This report is to be sent to all parties concerning the issue at hand in a timely fashion

    to ensure adequate response time from the contractor, minimizing disruption to the

    building operation (refer to No. H, “Sample Forms,” Form D5-1).

    NOTE: Always confirm the facts and information before issuing this form.

    II. Field/Warranty Register

    This summary form, Form D5-2 (refer to No. H, “Sample Forms”), is to be used to

    document each report generated to ensure timely follow-up on each issue, with each

    weekly reports submitted.

    All outstanding reports exceeding 30 days will require a follow-up memo to the Client’s Project

    Manager to request status up-date of pending issues.

    When writing this follow-up memo, include report number, general description and date issued.

    Also, copy your immediate Company supervisor.

    III. Polaroid Pictures

    A Polaroid camera is to be purchased and will be used to document the deficiency as

    identified in each Field/Warranty Report. Attach the picture to a separate blank

    page and attach to report.

  • D • 6/Page 1 of 3

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 6 Contractor Assistance Procedures

    During the Tenant Construction build-out period, construction contractors will request the services

    of the building staff on many occasions. This will require accurate documentation of these events

    to record delays, damage or general design deficiencies which may delay a Tenant move-in date and

    any engineering overtime. The main area of concern will be with sprinkler drain downs and fill up

    requests.

    The Chief Engineer is responsible for developing and implementing the necessary procedures and

    request form should include the following:

    Guidelines

    • 24-Hour Notice Request from contractor;

    • Scope of work;

    • Assistance required from engineering;

    • Date, timeframe and time accumulated; and

    • Conclusion of work.

    Service Request Procedures

    When the contractor makes a request for service, use Form D6 (refer to No. H, “Sample Forms”) to

    submit to the Management office within 24-hours’ notice of work request date, requiring the

    assistance of the building staff for the following areas:

    1. Sprinkler work/fire pump shut down;

    2. Fire alarm work;

    3. Electrical tie-ins or shut downs;

    4. Plumbing - riser shut downs, etc.;

    5. HVAC tie-ins or shut downs, etc.; and

    6. Other - i.e., access to closet doors, machine rooms and or service elevator usage, etc., but

    not limited to the foregoing list.

  • D • 6/Page 2 of 3

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 6 Contractor Assistance Procedures

    Contractor Instructions

    Provide the contractor with the specific instructions on where to obtain the forms and procedure on

    completing the form.

    Instruction Example

    This form can be obtained from the Chief Engineer or the Property Management office. Fill out the

    form in the areas that pertain to you.

    1. Name of person making request;

    2. Company Name;

    3. Date work is to be done;

    4. Job type;

    5. Description of work details;

    a. Work to be done;

    b. Number of workers;

    c. Estimated time of completion: hours, days or weeks, etc.; and

    6. Sign and date of request.

    NOTE: There are NO EXCEPTIONS to this procedure and any unauthorized work will be

    stopped.

    Contractor Assistance Policy

    The Chief Engineer will, to the extent of his or staff's assistance with contractors, be limited to

    access, electrical power, water and specific information as it relates to the work being performed.

    No physical work or assistance will be allowed.

    As identified in the Company’s standard indemnity and liability contract language, the contractor

    becomes completely responsible for any injuries and all damages, indemnifying the manager and

    the owner against any and all losses, liabilities and claims.

    Indemnity and Liability

  • D • 6/Page 3 of 3

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 6 Contractor Assistance Procedures

    c. If any arrangement, however informal and of whatever duration, is made whereby

    employees of manager are used by Contractor, they shall, while engaged in such

    work, be considered for all purposes employees of Contractor and not of Manager

    irrespective of the party paying them. Contractor shall indemnify Manager and

    Owner against any and all liability, loss, cost, damage or expense, by reason of any

    act or omission of any such employee while he is being used by Contractor.

  • D • 7/Page 1 of 1

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 1 Requisition Procedures

    Attic Stock

    During the start-up period of a new construction project, many supplies and standard building

    materials as defined in the specifications will be turned over to the Management group for attic

    stock and protection.

    The Contractors will requisition certain items during tenant build-out such as: lock sets,

    thermostats, miscellaneous hardware, ceiling tiles, etc., as defined in the build-out specifications.

    The Requisition Form (refer to No. H, “Sample Forms,” Form D7-1) is to be generated by the

    Contractor with 24-hours’ notice to Management for approval and distribution scheduling. These

    forms are to be given to the Tenant’s Contractor Manager/Foreman.

    Each completed Requisition Form is to be entered on the Requisition Log (refer to No. H, “Sample

    Forms,” Form D7-2) and must be filed with the completed Requisition forms by the Chief

    Engineer.

    As this system is implemented, it is imperative that the Chief Engineer keep track of the inventory

    of the attic stock to prevent waste of materials. Check with the Project Manager for floor-by-floor

    material allowance.

    When attic stock is turned over to the engineering department, enter necessary information on the

    Inventory Control Log form and file the construction receipt under the Attic Stock File.

  • D • 8/Page 1 of 3

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 8 Final Acceptance Procedures

    The Chief Engineer should refer to the Mechanical General Provisions section of the project

    specifications to be familiarized with the HVAC System Final Acceptance Procedures.

    General Guidelines

    A. Under the Mechanical Work Closeout general provisions, the mechanical contractor is

    generally responsible for maintaining a daily log of operational data on mechanical

    equipment and systems throughout the closeout period for the following:

    1. Recorded hours of operation;

    2. Assigned personnel;

    3. Fuel consumption; and

    4. Copy of report submitted to owner.

    B. Under the provisions, the Mechanical Contractor is to provide “Record Drawings” for

    mechanical work, giving special attention to the complete and accurate recording of

    mechanical systems of concealed and non-accessible work and to change orders that were

    shown accurately in the contract documents.

    C. Under the Closeout Equipment/Systems Operations provision, the mechanical contract is to

    provide a sequence of operations with the following requirements:

    1. Coordinate with seasonal requirements;

    2. Operate each item of equipment and each system in a test run of appropriate

    duration with the Architect/Engineer and Owner’s Representative present and with

    the Owner’s operating personnel.

    3. Demonstrate sustained and satisfactory performance.

    4. Conduct the Systems Demonstration and Tests in conformance with written report.

    5. Adjust and correct operations as required for proper performance.

    6. Clean and lubricate each system and replace dirty filters, excessively worn parts and

    similar expendable items of the work.

  • D • 8/Page 2 of 3

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 8 Final Acceptance Procedures

    7. Contractor is required to replace all equipment connected to the closed piping

    systems damaged due to negligence of removing debris from the piping systems.

    D. Under the Test and Adjustments provisions, the mechanical contractor will be responsible

    for the following:

    1. All piping shall be cleaned inside to remove dirt and loose scale, welding slag and

    general construction debris (i.e., food, coffee cups, work boots, etc.).

    2. All ducts and apparatus casing shall be thoroughly cleaned before fans and filters are

    operated. After completion of the test, all filters shall be cleaned and/or replaced.

    E. Final Acceptance will occur when the systems tests have been completed; however, before

    each system is accepted, the following must meet with the satisfaction of the Engineer and

    Owner’s representative:

    1. Capacity and general operating tests on the systems shall be conducted by a

    competent and experienced engineer, and the tests shall demonstrate the specified

    capacities of the various pieces of equipment.

    2. All equipment shall be adjusted to perform as specified and required to give

    satisfactory operation.

    3. The entire temperature control system shall be adjusted and placed in operation by

    the manufacturer, and all adjustments necessary to accomplish the specified results

    during the first year of operation shall be made without cost to the Owner.

    4. Setting of all valves, cocks, etc., shall be permanently marked to allow for

    restoration if disturbed at any time.

    5. The Owner’s right to site test shall include, but not be limited to, the following:

    a. Air conditioning units;

    b. Heat units;

    c. Chillers;

    d. Pump systems; and

    e. Cooling towers.

  • D • 8/Page 3 of 3

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 8 Final Acceptance Procedures

    If the equipment does not meet the capacity requirements, the Contractor is

    responsible for modification or replacement of equipment and all expenses

    necessary to satisfy compliance of the design conditions.

    After all the provisions have been met under the Acceptance provisions, the mechanical contractor

    shall leave the entire mechanical system installed under this contract in proper working order and

    shall, without charge, replace any work or materials which develop defects, except from ordinary

    wear and tear, within one year from the Date of Final Acceptance of the Owner for “Beneficial”

    use.

  • D • 9/Page 1 of 1

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 9 Maintenance Manual Submission

    The Chief Engineer will define requirements of the General Contractor for submitting (to the

    Owner’s Representative) maintenance manuals from all Contractors affected by MEP provisions

    for approval by the Design Engineer.

    Under the General Provisions, the following quantities are required for each category of submittal,

    unless otherwise indicated in individual work sections (i.e., Elevators, Electrical, Plumbing,

    HVAC, etc.):

    The Maintenance Manuals shall consist of (2) final copies, organized with index and

    thumb-tab markers for each section of information, bound in 3-ring or expanding vinyl-

    covered binders with pockets to contain folded sheets, properly labeled on spine and face of

    binder, including, but not limited to, the following: (Refer to specifications section for

    indicated inclusions.)

    1. Warranties - 2 copies.

    2. Air and Water Balance Reports - 2 copies.

    3. Flow diagrams.

    4. Maintenance instructions for all equipment.

    5. Operating instructions.

    6. Parts listings.

    7. Valve schedules.

    8. Energy Management Systems.

    9. Miscellaneous plumbing fixtures.

    10. Electrical switch-gear and panels.

    11. All fire alarm panels and field equipment.

    12. Base building lighting equipment.

    13. Elevator maintenance manuals.

    14. All special equipment.

    15. Copies of approved sprinkler drawings and hydraulic design calculations.

    16. Complete set of as-built drawings and sepias.

    After the submission, these manuals should be reviewed thoroughly and to verify and confirm their

    compliance with the project specifications (refer to No. D • 2, Specifications Checklist).

    Once the maintenance manuals are accepted, any and all information missing will have to be

    obtained by you; therefore, please make sure the manuals are complete before sending your

    Acceptance Letter to the Project Manager and the Manager.

  • D • 10/Page 1 of 2

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 10 Utility Accounts

    In the early stages of the project, it will be essential for the Chief Engineer to be aware of the Main

    Utility final connection dates and schedules for the following:

    • Main Water Service;

    • Electrical Service;

    • Main Telephone Service; and

    • Natural Gas Service (if applicable).

    Each of these utilities service connection dates will be critical to meet the project completion date.

    As the project completion date approaches, the Management Team will need to establish Utility

    Accounts under the Company name.

    Telephone Service

    When the main telephone service is established for the building, it will be essential to

    determine the telephone requirements for the following areas:

    1. Engineer’s office and shop;

    2. Security desk;

    3. Loading dock office;

    4. Elevator cabs;

    5. Fire alarm system;

    6. Security system; and

    7. Energy management system.

    Electrical Service

    When transferring the “electricity” account from the General Contractor to the Management

    Account, it will be essential to review the “Utility Schedule,” which can be obtained from

    the utility company.

    When contacting the utility company to transfer the account, contact the Billing

    Conservation Department and request a copy of the current Utility Rate Schedule.

    Once the account is established, fill out and submit the Usage Data Form to the

    Management Development Department for those projects serviced by Utility Company

    only.

  • D • 10/Page 2 of 2

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 10 Utility Accounts

    This Usage report will provide a computerized print-out of each month’s demand,

    consumption per half hour intervals and a graphic printout to help determine the project’s

    consumption and demand profile.

    Water Service

    When transferring the Water Authority account from the General Contractor to the

    Management Account, it will be necessary to review the Water Rate schedules.

    Once the account is transferred, fill out and submit the Water User Credit Application for

    Cooling Tower evaporation loss. This applies to projects located in Washington, D.C..

    Each form submitted must be copied to the Manager and to the file.

    This should give you a general idea on establishing utility accounts and why the timing is

    critical to these accounts.

  • D • 11/Page 1 of 1

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 11 OTAC Calculations

    The Chief Engineer will use these OTAC calculation procedures for both new and existing projects

    when evaluating the cost associated with operating the HVAC equipment after normal project

    operating hours.

    Once the equipment data is collected, enter the necessary information on the Equipment Operating

    Cost Format form, Form D11 (refer to No. H, “Sample Forms”) and submit final calculations to the

    Manager for review and then enter the necessary data in to computer program.

  • D • 12/Page 1 of 7

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 12 Key Control Procedures

    In this section, using the Key Control Made Easy format, the Chief Engineer will meet with the

    Supplier and Project Manager to finalize the keying requirements and obtain final instructions in

    writing.

    Review the Supplier’s proposed key system for compliance with the Finish Hardware division and

    owner requirements.

    Once the key system is signed over to Management Division, the Chief Engineer will be

    responsible for organizing the key system within the guidelines establishing in the Key Control

    Procedures.

    After cutting Tenant Keys, cut an original key using the bitting numbers on a key code key machine

    and then duplicate the key on the automatic key machine for key quantities. Remember, always cut

    keys from an original when cutting quantities of keys or better use the key code machine. Third

    generation keys will not work correctly and will cause damage to the pins in the cylinder.

    GLOSSARY

    OF

    MASTER KEYING TERMS

    1. MASTER KEY SYSTEM:

    Single master key, with different change keys set up under this master key.

    2. GRAND MASTER KEY SYSTEM:

    Grand master key, with two or more master key systems set up under this grand master key.

    3. GREAT GRAND MASTER KEY SYSTEM:

    Great grand master key, with two or more great grand master key systems set up under this

    great grand master key.

    TYPES OF KEYS USED

    1. CHANGE KEYS:

    Single key that operates one lock, or group of locks, keyed alike, subject to this same

    change key.

  • D • 12/Page 2 of 7

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 12 Key Control Procedures

    2. MASTER KEY;

    Single key that operates all locks that are keyed different or alike, under this master key.

    3. GRAND MASTER KEY:

    Single key that operates all locks in a large group, which contain two or more individual

    master key groups, under this grand master key.

    4. GREAT GRAND MASTER KEY:

    Single key that operates all locks in several large groups of locks, which contain two or

    more individual grand master key groups under this great master key.

    5. CONSTRUCTION MASTER KEY:

    Single key that operates all locks, (subject to this key) during construction, but is canceled

    out, or made inoperable, when the owner’s individual change keys are first used in these

    locks.

    6. ENGINEER’S KEY:

    Single key that acts the same as a grand or great grand master key, to gain access through

    many different outside doors, etc., each under different master or grand master keys, in

    order to reach the room doors which contain electrical, heating, air conditioning, plumbing

    and general maintenance areas.

    7. MAINTENANCE KEY:

    Single key that operates all locks in one or more area controlled by maintenance supervisor,

    such as store rooms, janitor’s closet, etc.

    8. PRIVACY KEY:

    Single key that operates one lock, or group of locks subject to this same change key, and is

    not subject to any of the master keys in the system. This type key is used for food storage

    rooms, narcotic cabinets in hospitals, liquor storage rooms, and bars in hotels, etc.

    SPECIAL MASTER KEY TERMS

    1. KEYED ALIKE:

    Two more cylinders operated by the same change keys.

    2. KEYED DIFFERENT:

    One or more cylinders keyed to different change keys.

    3. SUBJECT TO MASTER KEY ONLY:

  • D • 12/Page 3 of 7

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 12 Key Control Procedures

    Cylinders set up to be operated by only the master key.

    4. SUBJECT TO GRAND MASTER KEY ONLY:

    Cylinders set up to be operated by only the grand master key.

    5. SUBJECT TO GREAT GRAND MASTER KEY ONLY:

    Cylinder set up to be operated by only the great grand master key.

    TECHNICAL MASTER KEY TERMS

    1. MULTIPLEX MASTER KEYING:

    Method of enlarging a given master key system, by repeating the system on additional key

    sections, etc., because of the different shapes of the key warding. The grand master key can

    be specially milled to enter all the different key sections as desired.

    2. SPLIT PIN MASTER KEYING:

    This is accomplished by splitting the pins in the plug and using small master split pins to

    accommodate the different keys desired, such as change, master, grand master, etc.

    NOTES

    1. Gauge key pin depths before start of keying.

    2. There must be at least a two pin difference between each cut of change key and master key

    depth.

    3. Before keying, always check for existing master pins and remove from cylinder.

    4. If keying a six pin key system, be sure that a top pin and spring are in sixth pin hole.

    5. When removing or inserting cylinder plug, always turn the cylinder on its side.

    KEY CONTROL MADE EASY

  • D • 12/Page 4 of 7

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 12 Key Control Procedures

    This information is for those individuals who

    want to set up their own Key Control System for

    their building.

    PART 1 - SETTING UP YOUR KEY CONTROL FILE

    PART 2 - FIGURING THE LOCK COMBINATIONS

    PART 3 - KEYING THE LOCK

    PART I - SETTING UP YOUR KEY CONTROL FILE

    Items Needed: Company Key Control Sheet, Form D12-1.

    (To log all key bitting numbers supplied by contractor.)

    Company Key Combination Worksheet, Form D12-2.

    Company Key Index, Form D12-3. (For quick reference of room

    numbers and code numbers.)

    NOTE: Refer to No. H, “Sample Forms,” for appropriate Key Control Forms.

    1. Procure bitting numbers and keyway information from the contractor or supplier of the

    locks to be used.

    2. Make sure that you receive no less than 40 (extra) change key (door key) bitting numbers

    per floor.

    3. List Keyway in appropriate space.

    4. List Grand Master Key bitting numbers in the upper left hand corner of each Key Control

    sheet for your property.

    5. List each Floor Master Key bitting numbers by floor under the Grand Master Key bitting

    number.

    6. List each Tenant Master Key bitting numbers under each floor Master Key bitting number.

    7. List each Change Key bitting number under door Key Bitting on Key Control Sheet.

    8. Assign a code number for each bitting number listed on the Key Control Sheet.

    9. Using the Key Index Sheet list all codes in alphabetical and numerical order. This will be

    used for a fast reference of room numbers.

    The code number can start with a letter, followed by numbers (A-1, A-2, etc.).

    The code number is to be stamped on all corresponding keys before given to tenant.

  • D • 12/Page 5 of 7

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 12 Key Control Procedures

    PART II - FIGURING THE LOCK COMBINATIONS

    Tenants’ Requirements

    Room or Lock Locations

    Lock Combinations

    NOTE: Consult with the tenant before moving in concerning their keying needs in reference to

    their blueprints.

    Step 1:

    A. Using the Key Control sheet, assign a door or room number under the square for

    room numbers.

    B. List tenant name.

    C. Check squares for different keys that will operate particular locks.

    D. Enter the correct number of cylinders keyed to this bitting number.

    E. Enter the date the lock was keyed.

    Step 2:

    A. Using the Key Combination Worksheet (Grid Sheet), enter the date.

    B. Enter door or room number.

    C. Enter Grand Master Key bitting number and identify.

    D. Enter Floor Master Key bitting number and identify, if appropriate.

    E. Enter Tenant Master or Suite Master Key bitting number and identify, if appropriate.

    F. Enter Change (Door) Key bitting number.

    G. Draw line after last bitting number entered.

    Step 3:

    You are now ready to figure the lock combination using the Grid Sheet. The Grid will be

    referred to as columns and rows for ease of explanation. The columns are vertical, and the

    rows are horizontal.

  • D • 12/Page 6 of 7

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 12 Key Control Procedures

    A. Working with Column 1 only, enter the smallest number from Column 1, in Row 1,

    below the line.

    B. In Row 2, enter the difference between the smallest number and the second smallest

    number.

    C. Enter the difference between the second smallest number and third smallest number,

    etc.

    D. Do this until all the numbers below the line, in a column, add up to the highest

    number above the line.

    E. To figure the lock combination for the remaining columns, follow the directions

    above.

    NOTE: Always complete all paperwork before the actual keying of the lock.

    PART 3 - KEYING OF LOCK

    Tools Needed:

    1. Rekeying kit (for your type locks);

    2. Barrel holder (for your size barrel);

    3. 3" Vise;

    4. 2 Rat Tail key files;

    5. 2 tear drop files;

    6. Pocket size screw drivers (common & Phillips);

    7. 2 following tools;

    8. Code Cutting Key Machine;

    9. Bitting Cut Depth gauge;

    10. Hand vise;

    11. 1/8" Number Stamp Set;

    12. 1/8" Letters Stamp Set;

    13. 12-oz. Ball Peen Hammer;

    14. Safety Glasses; and

    15. Tweezers.

    Now you are ready to key your lock:

    1. Remove the cam from the rear of the cylinder barrel.

    2. Insert key.

    3. Turn key 90 degrees. (Be careful not to pull key.)

    4. Using a following tool behind the cylinder barrel, remove the barrel from cylinder.

    5. Remove old pins from barrel.

  • D • 12/Page 7 of 7

    MAINTENANCE MANAGEMENT OPERATIONS & MAINTENANCE MANUAL

    No. D • 12 Key Control Procedures

    6. Using a following tool, remove the old pins from cylinder (not the springs).

    7. Using a following tool, load new pins in cylinder.

    8. Load pins, using the numbers from the worksheet, into the barrel.

    Do this with the barrel holder clamped in the vise. Insert the barrel in the holder

    from the left. Now load the pins from the left to right. Load bottom pins in correct

    pin chamber in the barrel (from Row 1 of the combination). Load Master pins in

    correct pin chamber in the barrel (from Row 2 of the combination). Continue until

    all pins are loaded in correct pin chamber.

    9. Push the following tool out of the cylinder pin chamber barrel, assuring that the

    barrel is in a vertical position and the cylinder is turned 90 degrees.

    10. With the barrel all the way in the cylinder, turn the barrel until it is locked into

    position.

    11. Install cam on back of barrel.

    12. Try all the keys made for the lock.

    13. If everything is done correctly, the keys will turn easily.