12
Alptekin Erman PK:13 MesaKoru Postoffice Çayyolu / Çankaya - Ankara / Turkey Mobile Phone: +90 541 69 222 97 Home Phone: +90 312 912 0 747 e-mail: [email protected] Web: www.alptekinerman.com Professional Profile A professional Manager who enjoys being part of, as well as leading, a successful and productive team. Quick to grasp new ideas and concepts and develop innovative and creative solutions to problems and or targets. Able to work well on his own initiative and can demonstrate the high levels of motivation required to meet the tightest of deadlines. Even under significant pressure, possesses a strong ability to perform effectively. Objective I am now looking to build on my extensive range of technical and manager skills within a suitably challenging role. Keen to achieve further professional development. Key Management Skills I have executed more than 30 turn key projects/contracts with Turkish Main Automotive Industry. (Please find details on next pages) I have executed more than 5 turn key projects/contracts with T.C. MSB (Military) Factories. I have worked with T.C. MSB Factories related to more than 10 turn key projects/contracts on contract/specifications preparation phase of projects.

CV_03.2015

Embed Size (px)

Citation preview

Page 1: CV_03.2015

Alptekin Erman PK:13 MesaKoru Postoffice Çayyolu / Çankaya - Ankara / Turkey

Mobile Phone: +90 541 69 222 97Home Phone: +90 312 912 0 747

e-mail: [email protected]: www.alptekinerman.com

Professional ProfileA professional Manager who enjoys being part of, as well as leading, a successful and productive team. Quick to grasp new ideas and concepts and develop innovative and creative solutions to problems and or targets. Able to work well on his own initiative and can demonstrate the high levels of motivation required to meet the tightest of deadlines. Even under significant pressure, possesses a strong ability to perform effectively.

ObjectiveI am now looking to build on my extensive range of technical and manager skills within a suitably challenging role. Keen to achieve further professional development.

Key Management SkillsI have executed more than 30 turn key projects/contracts with Turkish Main Automotive Industry. (Please find details on next pages)

I have executed more than 5 turn key projects/contracts with T.C. MSB (Military) Factories.

I have worked with T.C. MSB Factories related to more than 10 turn key projects/contracts on contract/specifications preparation phase of projects.

During my previous duties I had responsible to facilitate test and automation systems and engine/vehicle test cells to Turkish Defense and Main Automotive Industries.

One of my previous companies Temucin Kocaturk Corp. (TK) was representative of AVL List Graz, (Zollner GmbH), Mecmesin Ltd., Dr. Staiger Mohilo and similar unique functioned companies for Turkey and sister company Tuzeks Corp., was only handling import and custom duties according to Temucin Kocaturk business.

After my attempt to those companies they started to perform engineering, after sales support services, localization and providing to turn key facility solution to all range of customers.

Page 2: CV_03.2015

Now 200 people are working under Kocaturk group companies. They are facilitate all engine test cells in Turkey., They are producing/integrating their own EC (Eddy Current) dynamometers, Active (AC) dynamometers, Gear and throttle shift robots, PC Base Test Cell Automation System, Software (MOTEST), water, air, oil, fuel temperature conditioning units, etc and also all mechanics.

Now they are finalizing Euro 2.000.000.- avg. annually projects since last 8 years.

My all previous companies was expended their existing market and annual turnovers and now they are managing their projects according to Customer Related Management procedures. The Project managers are analyzing customer’s production lines, understanding their usuals, grabbing their blind areas, gaps, and finding and presenting to them the new, needed, proper and product able tools/systems/solutions.

My last marketing project is www.bydyno.com. This web base marketing system is ready to be used for all range of test systems and products.

I have redesigned, developed and implemented all these strategies and business. I also have managed many projects during my duty and all my customers get due benefits. This is the reason; Those companies are on the market. Please find important projects list on following pages.

Also I have designed and managed implementation of the our company data management systems by PC base server and Microsoft and Linux base operating systems and relevant server and client application. I have established internal and external file and data sharing structure, intranet, VPN, Internet Telephony/VoIP, etc, and web base customer equipments/systems monitoring database and relevant interfaces as named www.techlogbook.com as a personal hobby project.

Key Technical Skills

My last larger contract / project was 24.000 rpm and 8.500 rpm High Speed Turbine Engines Test Dynamometers Facility at T.C. MSB Land Air Force Revision Factory.

During my AVL representative business I have many certificated trainings on site, on AVL Austria Graz Tech. Center and Zollner Kiel about Dynamometers, Controllers, Test Cell Automation and Control Systems and other control systems, Electronics, Software.

I also have experience about Hybrid Vehicle Systems and Components as controllers, hub drives and others sub systems, Consumption Measurement and Conditioning Systems,

Electronic, Micro Controllers, Micro Processors and Computer Systems are my main interests and my preliminary hobbies since high school and that is the reason of my university program.

Related to industrial systems research, development and production skill; I have detailed production knowledge about following industrial systems and units: All range of hydraulic, EC and active dynamometers, Dynamometer control units, Facility control systems, Measurement Units as blowby, gravimetric consumption mesarement devices, sensors, etc, Air, Water, Oil and Fuel Conditioning systems, Emission analyzers, Mechanical actuators, Chassis dynamometers, Anechoic chambers, etc.

Page 3: CV_03.2015

Business History,2011 – Baturalp Taylan Ltd. Şti.

Business Development and Managing Partner

1989 – 2011 Tuzeks Corp., (sister companys Temucin Kocatruk Corp., (Turkish Representative (Tr) of AVL List GmbH) andARGEN Automotive Engineering)1989 – 1992 Electronic Design, Installation, Commissioning and After Sales Support Engineer,

Tuzeks Corp., AVL Tr, Temucin Kocaturk1992 – 1994 Service Manager/ Project Manager,

Tuzeks Corp., AVL Tr, Temucin Kocaturk1996 – 1999 Service Manager/ Project Manager/ IT Department Manager,

Tuzeks, AVL Tr, Temucin Kocaturk, Argen,1999 – 2004 Technical Manager, General Manager,

Tuzeks Corp., AVL Tr, Temucin Kocaturk2004 – 2011 CTO, VP

Tuzeks Corp., Temucin Kocaturk

Career Summary,1989 – 2006 FORD Otosan Projects,

1- Istanbul Plant (ex) ;.- Dynamic Engine Test Cell .- Stationary Engine Test Cell.- On The Road Test Systems,.- End of Line Component Test Stations (as heat exchanger leakage tester),.- Filling Stations, (engine oil, break oil, AC gasses, hydrolics, etc).- Multi Spindle Automatic Tighting systems (as Engine head, wheel hub, etc),

2 – Inonu Plant,.- Production Engine Test Cell (16x Test Cell).- Quality Control Test Cells (4x Test Cell).- On The Road Test Systems,.- End of line Production Chassis Dynamometer,

3.- Golcuk Plant,.- R&D Engine Test Cells (3x Test Cell) Euro 4 + 5 Emission regulations related engine developement, Combustion Chamber Developement, New Engine Developement,.- End of line Production Chassis Dynamometer

1990, OTOKAR Durability Test Cell Project.- ZOLLNER Hydraulic Dynamometer,.- AVL EDACS Software.- integrated with my design DAQ Hardware

1991 HEMA Transmission (Allison Transmission Producer)

Page 4: CV_03.2015

.- 3x AVL (ELIN) Active Dynamometer Plant,

.- Transmission Test Cell,

.- AVL PUMA Base System,

.- AVL Test Commander System,

1992 IETT (Istanbul Public Transportation Unit Engine Revision Plant).- 1x End of Line Engine Test Cell,.- Zöllner EC Dynamometer,.- Our own software Motest,.- Consumption Measurement and Conditioning Systems

1993 Halla Heavy Duty Track Producer – South Korea – Chungju Plant.- Modernisation and upgrading existing DAQ and Test Cell Control Hardware and software to our MOTEST System,.- Zöllner EC Dynamometer, old BME controller and Barber Colman Throtle Actuator,

1994 UZEL Corp., (One of the major Traktor Producer of Turkey) .- R&D Engine Test Cell Project

Engine redesign according to Tire 2 and 3 regulation .- with Zöllner EC dynamometer and AVL PUMA system

1995 MKEK Fiseksan Poligon Project, Ammo Test System,.- Electronic targeting, velocity, pressure, etc., measurement, analyses and reporting system.

1996 AVL Zöllner Dynamometer and Test Cell Controller Developement Project – Kiel – Germany.- by my design Motest Software and hardware.- EC and Hydrolic Dynamometer Control System Developement,.- Test Cell Automotion System Design and Developement.

1997 Renault Test Cells Upgrade Project.- Quality Test Cells (2x).- Modernization and Upgrading of Existing AVL PUMA v3 system to PUMA v5 FEM Topologie hardware and software

1997 TTF Powertrain Project.- PowerTrain Test Cell,.- 1xAPA PM + 2xAPA Break /w Gearboxes,.- Engine and whell simulation, AVL PUMA + EMCON 312

1998 TTF (Turk Traktor Factory) .- 1x Quality Control Engine Test Cell,.- Schenk EC Dynamometer,.- by my design `Motest` Software and hardware.- Consumption Measuremen and Conditioning Systems

1998 Military Project.- Balistic Test Center; Pressure, Digital Target and Range Test System,

1999 FMS NUROL / FNSS Military Panzer Heatexchanger Performance Test Project.- 40kNm at 2km/h Vehicle Speed Simulation Breaking and Heatexchanger performance test room with codition chamber..- ~250 ch temparature measurement,

Page 5: CV_03.2015

.- 2x Dynamoemter connected directly (via gearbox) to vehicle hub,

.- by my design `Motest` Software and hardware,

.- Measurement syncronisation and automotion of test steps,

1999 Alarko ALPOM Underwater Pump Performance Test Project.- Measuremen of all phisical values as flow, pressure, torque, etc, electrical values as currents, voltage, frequancy, etc and calculate sub values as power, eff., etc,, .- ~20 ch temparature measurement,.- Controlling to back pressure as `load`.- by my design `Motest` Software and hardware,.- Measurement syncronisation and automotion of test steps,

2000 Isuzu Project,.- 5x Production Engine Dynamometer.- by my design `Motest` Software and hardware,.- Zöllner EC Dynamoemters,.- Consumption Measuremen and Conditioning Systems

2002 Toyota Project.- Intake Air Conditioner System Installation and commissioning,.- Schenk Dynamometer and Automotion System

2003 Renault Dynamic Test Cell Services.- Engine Dynamic Test Cell with AVL AFA Dynamometer and PUMA System

2003 OTOKAR Durability Test Cell Modernization Project.- Modernization of existing hardware and software to MOTEST System

2004 TUBITA MAM CD Project .- Chasiss Dynamometer for Hybrid Vehicle (LCV).- Measurement Systems and Automotion,

2004 HYUNDAI Quality Lab. Project.- 1x Quality Control Engine Test Cell,.- AVL Zollner System One base Test Cell,.- Consumption Measuremen and Conditioning Systems.- Fully Automatic Test Cycle Manager

2004 TTF (Turk Traktor Factory) Quality Lab. Project.- 1x Quality Control Engine Test Cell Upgrade,.- Schenk EC Dynamometer,.- by my design `Motest` Software and hardware,.- Consumption Measuremen and Conditioning Systems

2004 ITU (Istanbul Technical University) Vehicle Body R&D Lab. Vibration Analysis Project.- Virbration analysis oriented High speed signal amplification, condition, filtering and DAQ.- Preprocess and postprocess,

2004 IETT (Istanbul Public Transportation Unit Engine Revision Plant) Maintenace Project.- 1x End of Line Engine Test Cell,.- Zöllner EC Dynamometer,.- Our own software Motest,

Page 6: CV_03.2015

.- Consumption Measurement and Conditioning Systems

2005 GYTE Electric Motor R&D Test Lab.- Variable Speed Elecric Motor Developement Lab..- with Active Dynamometer .- Turkish first local supplied Active Dynamometer Project

2005 Midle East Technical University Engine R&D Test Center.- Internal Combustion Engine Developement Lab..- with Zöllner EC Dynamometer

2005 Turish Agricultural Machinary Test and Certification Center.- 800k Euro Project.- 100kN Pulling Force Capacity, Self Propeller Towing Dynamometer Vehicle.- PTO Dynamometre Test Cell,.- Shaft Conditioning, Aging and Test System,

2006 Midle East Technical University Engine R&D Test Center.- Internal Combustion Engine Developement Lab..- with Zöllner Hidrolic Dynamometer

2007 TTF Durability Test Cells Project.- 500k Euro Project.- 2x Durability Test Cells with Our EC Dynamometer,.- by my design `Motest` Software and hardware,.- Consumption Measuremen and Conditioning Systems.- Our own Throtle Actuator,

2008 Matay Egzost R&D Test Lab Project.- Exhaust Line R&D Labrotary,.- Real Engine with Dynamometer and Conditioning Systems,.- by my design `Motest` Software and hardware

2008 FIAT NVH Project.- 3.5M Euro Project.- Preparation of the tender specification according to FIAT Italy regulation .- 48” Chasiss Dynamometer,.- Sound Isolation and Measurement Systems

2009 MILITARY TRANSMISSIN TEST FACILITIE.- 4M Euro project,.- 40.000 Nm cross and inline active dynamometrs,.- 2 test cell

2010 MARINE ENGINE TEST FACILITIE (Military Project).- 1.8M Euro project.- 10.000 Hp Engine Dynamometer,.- with all needed utility

2010 TUMOSAN (Engine and Tractor Producer) Emission Test Cell.- Active Dynamometer

Page 7: CV_03.2015

.- Tier 3/4 Certification Emission Lab.

.- My design Test and Automotion System MOTEST base

2010 TUMOSAN (Engine and Tractor Producer) Transmission Test Cell.- 3 x Active Dynamometer .- R&D Test Cell.- My design Test and Automotion System MOTEST base

2011 OTOKAR (OTOYOL) Engine Test Cell.- Modernization to my design TVT hardware and MOTEST Software System

2012 HIGH SPEED TURBINE ENGINE TEST FACILITY (Military Project).- 3.7M TL project.- 24.000 rpm and 8.500 rpm Turbine Engine Dynamometers,.- with all needed utility & Automotion HW+SW

2012 TÜRK TRAKTOR FACTORY,.- 9 pcs Test Cell Project .- Exhaust back pressure conditioning system .- Ricardo Test Automotion system Implementation project.- According to Tier 3 Test Cycles

2012 GUMUSHANE Univercity,.- VCR Engine with .- EC Dynamometer,.- Combustion Analysing system ,.- Laptop PC and softwarefor education

2012 19 Mayıs Univercity,.- VCR Engine with .- EC Dynamometer,.- Combustion Analysing system ,.- Laptop PC and softwarefor education

2013 MARGAS İzmir,.- 2 pcs Test Facility.- Hydraulic dynamometer and .- ANKA Test Cell Automotion Systems,.- Enviroment conditioning systems,

2013 ASELSAN, (Defence Industry Project).- 0,1 Nm capacity electric motor test bench.- % 0,1 Accuracy, .- with active dynamometer

2014 KOMATSU TURKEY.- High capacity hydraulic dynamometers,.- Dynamometer Valve control unit,.- ANKA Test Cell Automotion Systems,.- Enviroment conditioning systems,

Page 8: CV_03.2015

2014 GAZİ Univercity.- Modernisation of existing “slide gate” dynamometers.- Dynamometer Valve control unit,.- ANKA Test Cell Automotion Systems,

2014 NİĞDE Univercity,.- Single cylinder engine,.- Hydraulic dynamometer.- Dynamometer Valve control unit,.- ANKA Test Cell Automotion Systems,

2015 Sivas Cumhuriyet Univercity,.- Single cylinder engine,.- Active dynamometer.- Dynamometer Control Unit.- ANKA Test Cell Automotion Systems,

2015 Kayseri Erciyes Univercity,.- Single cylinder combustion PV analysing system,.- with crank angle sensor,.- with piezo resistive pressure sensors,.- ANKA /CP Analysing Systems,

2015 TEI,.- Hydraulic dynamometer.- with lateral load, .- Dynamometer valve control unit,.- ANKA Dynamometer Power Control Unit,

2015 Istanbul Okan Univercity,.- High speed electrical motor test cell,.- Active dynamometer,.- Dynamometer Control Unit,.- ANKA Test Cell Automotion Systems,

Educational Qualification,1974 – 1977 Demirtaspasa İlkokulu, Sile, Istanbul / Turkey1977 – 1979 Icadiye İlkokulu, Üsküdar, Istanbul / Turkey1980 – 1986 Halide Edip Adıvar High School , Uskudar – Istanbul / Turkey1987 – 1992 MUTEF - Marmara Univercity Technical Education Faculity - Computer Division, Istanbul / Turkey

Computer Arthicectures, Logic and Analog Electronic,Micro Processors,Intel 80x Family Assembly Language,DAQ Systems,

Page 9: CV_03.2015

Amlifiers and Signal Processors,

Certification Programs and Professional Courses,1995 ,, 2007 AVL Academy Training Center, Austria

Test Cell, Controllers, Software and Enstrumantation TrainingsEMCON, BME,PUMA,FEM Topologie,Test Cell Installation and Comissioning,Conditioning Systems,Consumption Measurement Systems,

Complete Test Cell İnstallation and Commissioning at Ford Dunton UK Test Cell Nr.: 111, Engine and Gearbox Test Cell,1xPM + 2xDynamometer (Wheel simulation) Temparatute conditioned room (-30)Gear shift robot and Throtle Actuator Automated

Service Managers,Project Managers,

2001 ESAM Germany,Vibration Measurement Technics, Strain Guage installation and Commissioning Training,

Vibration orianted data aqusation and analyser system parametering,

2002 HPI Austria,Balistic Measurement Systems Training,

Pressure, Velocity, Displacement and Time MeasuremenElectronic target systems,

Personal Details,D.O.B.: 24.12.1967Status: Maried and have kids, (a girl and a boy)Healt: Excellent, non-smoker, height 1,86m, weight 80kgNational: Turkish,Language: Main Language is Turkish and Fluent English

Hobies, Interest and Activities,(1989 – 1994) Live Performance Sound Engineer

Page 10: CV_03.2015

Live Performance Stage Mixer Operator,Live Performance PA Mixer Operator,Live Performance PA Mixer Director,

1994 – 1996 Studio Sound EngineerStudio Record Engineer,Studio Mastering Engineer,Studio Technical Director,

2003 – Music Producer,- Photographer - Aviation,- Book Writer,

References;will be provided on request.

+By Dyno www.bydyno.comBaturalp Taylan Ltd. Şti., www.baturalpsistemleri.comTuzeks Corp., www.tuzeks.com.trTemucin Kocaturk Corp., www.temucinkocaturk.comAVL List GmbH www.avl.comArgen Automotive www.argen.com.tr