12
MUHAMMAD NASIR Career Summary Experience 1. Coating inspector (May 2013 – Present): PT. McDermott Indonesia Duties & Responsibility : Enforcement and verification of work performed in accordance with specification, manufacturer recommendations and coating procedure. Measure ambient conditions, surface temperature and air quality requiremants Inspect type of blasting equipment and tools to be used Inspect type and size of blasting media Inspect metal surface imperfections / defect Test indication of oil or water in compressed Test analysis of water-soluble ionic contamination ofblasting media air Inspect pre-cleaning, solven cleaning of surface, mechanical surface preparation during pre-fabrication and onsite portable centrifugal blasting,open air blast cleaning,vacuum blast cleaning, hand and power tool cleaning Measure compressad air pressure Inspect degree of cleanliness required Measure surface profile of blast cleaned surface Assess surface cleanliness of blast cleaned surface Inspect coating material storage conditions Monitor thinning, mixing,induction time and pot life Inspect type of coating application equipment,Thermal sprayed aluminium, Insulation, Passive fire protection, Self leveling compounds, Anti-skid deck coatings, Coated Hot dip Galvanizing and its acceptance. Rev.1, Date: 28/03/2014 Page 1 of 12 Muhammad Nasir

CV - QC Coating - M. Nasir

Embed Size (px)

Citation preview

Page 1: CV - QC Coating - M. Nasir

MUHAMMAD NASIR

Career Summary

Experience

1. Coating inspector (May 2013 – Present): PT. McDermott Indonesia Duties & Responsibility :

Enforcement and verification of work performed in accordance with specification, manufacturer recommendations and coating procedure. Measure ambient conditions, surface temperature and air quality requiremants Inspect type of blasting equipment and tools to be used Inspect type and size of blasting media Inspect metal surface imperfections / defect Test indication of oil or water in compressed Test analysis of water-soluble ionic contamination ofblasting media air Inspect pre-cleaning, solven cleaning of surface, mechanical surface preparation during pre-fabrication and onsite portable centrifugal blasting,open air blast cleaning,vacuum blast cleaning, hand and power tool cleaning Measure compressad air pressure Inspect degree of cleanliness required Measure surface profile of blast cleaned surface Assess surface cleanliness of blast cleaned surface Inspect coating material storage conditions Monitor thinning, mixing,induction time and pot life Inspect type of coating application equipment,Thermal sprayed aluminium, Insulation, Passive fire protection, Self leveling compounds, Anti-skid deck coatings, Coated Hot dip Galvanizing and its acceptance. Monitor application method, type and pattern Measure wet film thickness by notch gages Non-destructive measurement of dry film thickness of non magnetic coating / non conductive coatings applied to ferrous surface Monitor re-coating and final curing schedules Test discontinuity (holidays or pinholes) of coating and linings Inspection of defects on coated surface To stop non-conforming work and inform the production supervisor of required corrective rework Documentation of the daily inspection activities and others as per the project recuirement

. Project Assigned & Involved Project : Kepodang gas developmentRev.1, Date: 28/03/2014 Page 1 of 17 Muhammad Nasir

Page 2: CV - QC Coating - M. Nasir

Client : Petronas

Project : Vetco grey Client : Chevron

Project : Inpex Client :

2. Blasting / Painting Foreman (Sept 2005 – May 2013): PT. McDermott Indonesia - Batam Island, Indonesia.

Duties & Responsibility Foreman Foreman (all Pain system) Check and record Material Take Number (Material Treacebility Number) Visual Inspection after Blasting & Painting

Project Assigned & Involved : Project : Woodside Client : Foste wheeler LNG –V Expansion Project : Sutu Vang Client : Cuulong Project : Maersk Client : Peregrino Fpso Topside Project : KTT Module Platform, Jacket and flare Boom Client : Esso Project : Gorgon Client : Chevron

3. Blasting/Painting Applicator (November 2002 – October 2004): PT. McDermott Indonesia - Batam Island, Indonesia.

Duties & Responsibility : Applicator Blasting Painter (all Paint system) Check and record Material Take Number ( Material Treacebility Number ) Visual Inspection after Blasting

Project Assigned & Involved : Project : Belanak Wellheads Central Processing Platform Project Client : Conoco Philips Project : FPSO Belanak Natuna Client : Conoco Philips

Education

Senior High Scool

Rev.1, Date: 28/03/2014 Page 2 of 17 Muhammad Nasir

Page 3: CV - QC Coating - M. Nasir

On Job Training and Courses

SSPC PCI Protective Coating Inspector Level 2 ID #25934 (expires 12/31/2016). In house Training for Implementasion and Inspecsion of Blasting and painting by

NACE Certified Inspector # 6858 Mr Mujianto Ali Thermal Spraying Aplicator By CHT Internasional Pte Ptd Basic Painting & Blasting Certificate no CC18-057 PTW & CSE By Industrialindo Konsultrain Services Certivicate no.PTW

13774/IKS/08 Quality Awareness Level I Scafolding Awareness Training Fist Aid & CPR Training

Firms

September 2005 – Present PT. McDermott Indonesia

November 2002 – Oct 2004 PT. McDermott Indonesia

Personal Details

Name : Muhammad Nasir

Nationality : Indonesia

Place, Date of Birth : Bangkalan 08 Januari 1973

Gender : Male

Address : Taman laguna indah Blok B3/ 32 Tanjung Riau

Sekupang Batam

Phone Number : 082126758703 (mobile phone)

E-mail : [email protected]

[email protected]

Civil Status : Maried

Emp. No : 3083B / 102280

Rev.1, Date: 28/03/2014 Page 3 of 17 Muhammad Nasir

Page 4: CV - QC Coating - M. Nasir

Rev.1, Date: 28/03/2014 Page 4 of 17 Muhammad Nasir

Page 5: CV - QC Coating - M. Nasir

Rev.1, Date: 28/03/2014 Page 5 of 17 Muhammad Nasir

Page 6: CV - QC Coating - M. Nasir

Rev.1, Date: 28/03/2014 Page 6 of 17 Muhammad Nasir

Page 7: CV - QC Coating - M. Nasir

Rev.1, Date: 28/03/2014 Page 7 of 17 Muhammad Nasir

Page 8: CV - QC Coating - M. Nasir

Rev.1, Date: 28/03/2014 Page 8 of 17 Muhammad Nasir

Page 9: CV - QC Coating - M. Nasir

Rev.1, Date: 28/03/2014 Page 9 of 17 Muhammad Nasir

Page 10: CV - QC Coating - M. Nasir

Rev.1, Date: 28/03/2014 Page 10 of 17 Muhammad Nasir

Page 11: CV - QC Coating - M. Nasir

Rev.1, Date: 28/03/2014 Page 11 of 17 Muhammad Nasir

Page 12: CV - QC Coating - M. Nasir

Rev.1, Date: 28/03/2014 Page 12 of 17 Muhammad Nasir

Page 13: CV - QC Coating - M. Nasir

Rev.1, Date: 28/03/2014 Page 13 of 17 Muhammad Nasir

Page 14: CV - QC Coating - M. Nasir

Rev.1, Date: 28/03/2014 Page 14 of 17 Muhammad Nasir

Page 15: CV - QC Coating - M. Nasir

Rev.1, Date: 28/03/2014 Page 15 of 17 Muhammad Nasir

Page 16: CV - QC Coating - M. Nasir

Rev.1, Date: 28/03/2014 Page 16 of 17 Muhammad Nasir

Page 17: CV - QC Coating - M. Nasir

Rev.1, Date: 28/03/2014 Page 17 of 17 Muhammad Nasir