Corynth, NY The Curtis Palmer hydro facility consists of two run-of- river hydroelectric generating stations located on the Hudson River, in Corynth, NY. In 2014, CHC provided two 2250 mm vertical axial flow Kaplan open flume tur- bines to replace two of the five horizontal units located in the Curtis powerhouse, which were running but in poor mechanical condition. The existing generators were removed, reconfigured as vertical units, and rein- stalled with the new turbines. The turbine replacement was completed in the Spring of 2014 and the two-unit combined capacity has increased from 2.2 to 3.0 MW. PROJECT FACTS Two Unit Replacement - Increased Plant Capacity Two (2) 2250 mm Axial Flow Kaplan Open Flume Net Head 6.95 m (22.8 ft) 1590 kW per unit Commissioned 2014 CURTIS HYDRO REDEVELOPMENT ATLANTIC POWER 16 Main Street W., PO 640, Almonte, ON K0A 1A0 613-256-1983 [email protected] REHABILITATION

CURTIS HYDRO REDEVELOPMENT · The Curtis Palmer hydro facility consists of two run-of-river hydroelectric generating stations located on the Hudson River, in Corynth, NY. In 2014,

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CURTIS HYDRO REDEVELOPMENT · The Curtis Palmer hydro facility consists of two run-of-river hydroelectric generating stations located on the Hudson River, in Corynth, NY. In 2014,

Corynth, NY The Curtis Palmer hydro facility consists of two run-of-river hydroelectric generating stations located on the Hudson River, in Corynth, NY. In 2014, CHC provided two 2250 mm vertical axial flow Kaplan open flume tur-bines to replace two of the five horizontal units located in the Curtis powerhouse, which were running but in poor mechanical condition. The existing generators were removed, reconfigured as vertical units, and rein-stalled with the new turbines. The turbine replacement was completed in the Spring of 2014 and the two-unit combined capacity has increased from 2.2 to 3.0 MW.

PROJECT FACTS

Two Unit Replacement - Increased Plant Capacity

Two (2) 2250 mm Axial Flow Kaplan Open Flume

Net Head 6.95 m (22.8 ft)

1590 kW per unit

Commissioned 2014

CURTIS HYDRO

REDEVELOPMENT ATLANTIC POWER

16 Main Street W., PO 640, Almonte, ON K0A 1A0 613-256-1983 [email protected] REHABILITATION

Page 2: CURTIS HYDRO REDEVELOPMENT · The Curtis Palmer hydro facility consists of two run-of-river hydroelectric generating stations located on the Hudson River, in Corynth, NY. In 2014,

CURTIS HYDRO

REDEVELOPMENT ATLANTIC POWER

16 Main Street W., PO 640, Almonte, ON K0A 1A0 613-256-1983 [email protected] REHABILITATION