Table  of  contents  

1.  Review  of  current  fleet  

2.  Hydro  development  possibili:es  a.  Rehabilita:on  of  old  Plants  b.  New  Hydro  Plants  c.  Micro-­‐Hydro  on  non-­‐river  streams  

3.  Conclusion  

Page 3: Tableofcontents - CEDROcedro-undp.org/content/uploads/event...Micro-Hydro Dams Hydro Plants Existing Hydro Plants Hydro Plant Protected Area River&Stream& NewSitesList NahrAbou Moussa(

1.  Current  Installed  Capacity  RIVER  STREAM   ESTABLISHMENT   PLANT  NAME   YEAR   INSTALLED  CAPACITY   MW   REMARKS  

LITANI  AWALI  RIVERS  

LITANI  WATER  AUTHORITY  

MARKABI     1961   1  x  17.9  MW  +  1  x  19  MW  

199   In  Service  -­‐  Will  be  affected  by  Conveyor  800  Project  AWALI     1964   3  x  37.76  MW  

JOUN     1967   2  x  24.65  MW  

NAHR  IBRAHIM  RIVER  

SOCIETE  PHOENICIENE  DES  FORCES  DE  NAHR  IBRAHIM  DES  EAUX  ET  

ELECTRECITE  

CHOUANE   1961   2  x  7.5  MW  

32   In  Service  -­‐  Needs  Rehabilita:on  /  Upgrade  

YAHCHOUCH   1955   2  x  4.984  MW  +  1  x  2.464  MW  

FITRI   1951   3  x  1.664  MW  

WADI  KADISHA  

LA  KADISHA  -­‐  SOCIETE  ANONYME  

D'ELECTRECITE  DU  LIBAN  NORD  S.A.L.                                    (EDL  OWNED)  

BECHARE   1924    2    x  0.82  MW  

21   In  Service  -­‐  Needs  Rehabilita:on  /  Upgrade  

MAR  LICHA   1957   3  x  1.04  MW  

BLAOUZA  II   1961   3  x  2.8  MW  

ABU-­‐ALI   1932   2  x  2.72  MW  +  1  x  2.04  MW  

NAHR  AL  BARED   AL  BARED  CONCESSION      

AL  BARED  1   1936     3  x  4.5  MW  

17   In  Service  -­‐  Needs  Rehabilita:on  /  Upgrade    AL  BARED  2    1936   1  x  1.2  MW  +    1  x  2.5  MW  

SAFA  SPRING   ELECTRECITE  DU  LIBAN   RICHMAYA  -­‐  SAFA   1931   2  x  3.1  MW  +    1  x  6.8  MW   13   In  Service  -­‐  Needs  Rehabilita:on  /  Upgrade  

                                                                                                                                                                                                                                                                           TOTAL  INSTALLED  CAPACITY               282      MW  

Page 4: Tableofcontents - CEDROcedro-undp.org/content/uploads/event...Micro-Hydro Dams Hydro Plants Existing Hydro Plants Hydro Plant Protected Area River&Stream& NewSitesList NahrAbou Moussa(

Plant   Net  Installed  Capacity  MW   Current  Yearly  ProducNon  GWh   Rehabilitated  Plant  Yearly  ProducNon  GWh  

Zouk   607   1,897   3,164  

Jieh   327   1,218   1,704  

Deir  Ammar   450   2,977   3,275  

Zahrani   450   2,984   3,283  

Baalbek   64   166   186  

Tyr   72   187   209  

Hrayche   70   200   364  

Total  Thermal   2,040   9,629   12,185  

Kadisha  Hydro   21   72   82  

Litani   199   680   775  

Nahr  Ibrahim   32   92   105  

Bared   17   54   62  

Richmaya   13   20   23  

Total  Hydro   282   918   1,047  

Total  Thermal  &  Hydro   2,322   10,547   13,232  

%  of  Hydro  Energy  8.70%   7.91%  

1.  Current  Share  of  Hydro  Energy  

Page 5: Tableofcontents - CEDROcedro-undp.org/content/uploads/event...Micro-Hydro Dams Hydro Plants Existing Hydro Plants Hydro Plant Protected Area River&Stream& NewSitesList NahrAbou Moussa(

1-­‐  RehabilitaNon  &  Upgrade  of  ExisNng  Hydro  Plants  :              Will  increase  the  available  Hydro  genera:on  capacity  at  least            from  190  to  282  MW  (+  92  MW)      2-­‐  InstallaNon  of  New  Hydro  Plants  –  Master  Plan:            32  new  sites  were  iden:fied  as  follows:              -­‐  Around  263  MW  (1,271  GWh/y)  with  a  cost  of  667  M.$  in  Run  of  River  scheme              -­‐  Around  368  MW  (1,363  GWh/y)  with  a  cost  of  772  M.$  in  Peak    scheme                25  of  these  are  economically  viable  with  Minimum  Selling  Tariff  less  than  12  $c/kWh:                -­‐  Around  233  MW  (1,126  GWh/y)  with  a  cost  of  560  M.$  in  Run  of  River  scheme              -­‐  Around  315  MW  (1,217  GWh/y)  with  a  cost  of  665  M.$  in  Peak    scheme    3-­‐  Micro-­‐Hydro  on  Non-­‐River  Streams  –  Pilot  Study:        13  pilot  sites  iden:fied  on  exis:ng  power  plants  &  water  infrastructure  installa:ons                  with  Produc:on  capacity  around  5  MW  

2.  Hydro  Development  PossibiliNes  

Page 6: Tableofcontents - CEDROcedro-undp.org/content/uploads/event...Micro-Hydro Dams Hydro Plants Existing Hydro Plants Hydro Plant Protected Area River&Stream& NewSitesList NahrAbou Moussa(

Yammouneh

Qaa el Rim

Jezzine

Chabrouh

Micro-Hydro

Dams

Hydro Plants

Existing Hydro Plants

Hydro Plant Protected Area

River  Stream                New  Sites  List  

Nahr  Abou  Moussa   Mechmech,  Qarn,  El  Mara  

Nahr  Sukkar   Sir  

Nahr  Sir   Qamne,  El  Oua:e  

Nahr  Abou  Ali   Kannoubin,  Bchanin  

Nahr  El  Jouz   Beit  Chlala,  Bustan,  Mseilha  

Nahr  Ibrahim   Hdaine,  Ibrahim  4,  Janne  

Nahr  El  Kelb   Mayrouba,  Daraya,  Chamra,  Boqaata  

Nahr  Beirut   Baabdat,  Dachouniye  

Nahr  Al  Damour   Rechmaya,  Mtaile,  El  Boum,  Damour  

Nahr  El  Awali   Bisri,  Aval  Joun  

Nahr  El  Litani   Blat,  Khardale,  Kfarsir  

2.  New  Hydro  &  Micro-­‐Hydro  Sites  Map  

Page 7: Tableofcontents - CEDROcedro-undp.org/content/uploads/event...Micro-Hydro Dams Hydro Plants Existing Hydro Plants Hydro Plant Protected Area River&Stream& NewSitesList NahrAbou Moussa(

       *  Chart  from  Sogreah  Study  

2.2  New  Hydro  368  MW  Capacity  DistribuNon    

Page 8: Tableofcontents - CEDROcedro-undp.org/content/uploads/event...Micro-Hydro Dams Hydro Plants Existing Hydro Plants Hydro Plant Protected Area River&Stream& NewSitesList NahrAbou Moussa(

 

Mechmech

Qarn

El  Mara

Sir  (Sukkar)

Sir  (Bared  sup)

Qattine

El  Ouatié

Bared

Kannoubin

Bchanine

Beit  Chlala)

Boustane

Mseilha

Hdaine

Janneh*

Ibrahim  4

Chabrouh

MayroubaBoqaata*  

BlatDaraya*

Dachouniyé

Rechmaya

Mtaile

El  Boum

Jezzine

Aval  Joun

Chamra*

Yammouneh0,0

1,0

2,0

3,0

4,0

5,0

6,0

7,0

8,0

9,0

10,0

11,0

12,0

0 2 4 6 8 10 12 14 16 18 20

Impa

ct  en

viron

nemen

tal

Tarif  de  vente  minimum  du  kWh  [$cts]

résultats  de  l'analyse  multicritères

Impa

ct  en

viron

nemen

tal  croiss

ant

Niveau 1

Niveau 2

Niveau 3

Thermique

 au  ga

z

Thermique

 HFO

Level  1  

Level  2  

Level  3  

Results  of  Multi-­‐criteria  Analysis  

Minimum  kWh  Selling  Tariff  [$cts]  

Envir

onmen

tal  Im

pact  

       *  Chart  from  Sogreah  Study  

2.2  New  Sites  Feasibility  MulN-­‐Criteria  Chart  

Page 9: Tableofcontents - CEDROcedro-undp.org/content/uploads/event...Micro-Hydro Dams Hydro Plants Existing Hydro Plants Hydro Plant Protected Area River&Stream& NewSitesList NahrAbou Moussa(

Level-­‐1  Minimum  Selling  Tariff  <  8.1  c$  

Level-­‐2  Minimum  Selling  Tariff    >8.1  c$  &  <12c$  

Level-­‐3  Minimum  Selling  Tariff  >12  c$   Total  

Number  of  Sites   13   12   4   29  

Power  (MW)   139   94   17   250  

CAPEX  (M$)   273   287   78   638  

Produc:on  (GWh)   713   413   68   1,194  

Average  cost  of  installed  Kw  $/Kw   2,070   3,220   4,310      

       *  Chart  from  Sogreah  Study  

2.2  New  Hydro  Sites  Tariff  &  Feasibility  

Page 10: Tableofcontents - CEDROcedro-undp.org/content/uploads/event...Micro-Hydro Dams Hydro Plants Existing Hydro Plants Hydro Plant Protected Area River&Stream& NewSitesList NahrAbou Moussa(

•  Dam  Storage  Capacity  37  Mm3  •  Water  Height  350  to  429  m  depending  on  the  water  level  in  the  dam.  •  3  Pelton  Mul:jets  Turbines  to  adapt  easily  to  varia:ons  in  water  flow    •  Base  Power  32  MW  /  Peak  Power  96  MW  •  ROR  Capex  47.8  M.$  /  Peak  Capex  111.5  M.$  •  ROR    162  Gwh/year  /  Peak  207  Gwh/year    •  Minimum  selling  Tariff  12%  IRR:                  Base  Tariff  3.4  c/kwh  /  Peak  Tariff  11.22  c/kWh              EDL  selling  Tariff  9.58  c/kWh          EDL  Thermal  Plants  lowest  produc:on  cost    20  c/kWh      

2.2  Janneh  Hydro  Plant  –  Case  Study  

Page 11: Tableofcontents - CEDROcedro-undp.org/content/uploads/event...Micro-Hydro Dams Hydro Plants Existing Hydro Plants Hydro Plant Protected Area River&Stream& NewSitesList NahrAbou Moussa(

Micro  Hydro  Stream   Public  InsNtuNon  

Irriga:on  Channels  &  Conveyors   All  Water  Establishments,  Ministry  of  Agriculture  

Waste  Water  Treatment  Plants  Intakes  &  Ouralls    

All  Water  Establishments,  CDR  

Electric  Power  Plants  Ourall  Channels  

EDL  Electric  Power  Plants  

Municipal  Water  Distribu:on  Networks  

All  Water  Establishments,  Municipali:es  

No.  of  Studied  Sites  todate  

MW  

4   1.270  

1   0.123  

5   3.421  

4   0.144  

*  Data  from  UNDP-­‐CEDRO  Study  

2.3  Non  River  Streams  Micro  Hydro  Assessment  

Page 12: Tableofcontents - CEDROcedro-undp.org/content/uploads/event...Micro-Hydro Dams Hydro Plants Existing Hydro Plants Hydro Plant Protected Area River&Stream& NewSitesList NahrAbou Moussa(

Conclusion  

•  There  is  a  poten:al  to  increase  significantly  the  contribu:on  of  the  Hydro  &  Micro-­‐Hydro  energy  in  the  Lebanese  energy  mix  

 •  There  is  an  imminent  need  to  clear  up  the  Legal  Framework  for  the  Hydro  Energy  

produc:on  to  allow  for  the  development  to  take  place  :  –  The  Water  Code  that  is  currently  under  finaliza:on  does  not  address  this  issue  –  The  DGRHE  has  the  exclusive  rights  on  the  exploita:on  of  the  Hydraulic  

resources  –  With  the  excep:on  of  the  Bared,  Kadisha,  Nahr-­‐Ibrahim  &  Litani  concessions,  

EDL  has  the  exclusive  rights  on  the  produc:on  &  distribu:on  of  the  Electrical  Energy  

–  A  legal  framework  must  be  elaborated  for  either  allowing  the  DGRHE  &  EDL  to  team  up  for  developing  the  Hydro  poten:al  in  Lebanon  or  lemng  the  private  sector  ini:ate  the  same  

 •  Hydro  development  requires  the  Feed-­‐In  Tariff  structure  of  the  Electrical  energy  to  

be  op:mized      

Conclusion