Perspectives and schedules Oct-Dec Jul-SepMar-JunDec-Feb Sep-Nov May-Aug Selection of the grid team and administration assistance to facilitate their travel to Europe. Work Package Three Progress Knoweldge transfer to the WP3 team in France and Italy. Selection and training of grid management team. Pre- Production test of tier 3 gride node. Production of tier 3 gride node. Continue formations at LLR. Pre- Production test of tier 2 gride node. Production of tier 2 gride node.

Citation preview

Page 1: Current Status Work Package Three By: Mohamed Elshamy

Current Status

Work Package Three

By: Mohamed Elshamy

Page 2: Current Status Work Package Three By: Mohamed Elshamy

Current Progress

• Solving installation issues in grid node in Egypt.

• Registering the grid site in Egypt on GOCDB.

• Learning Ansible. Ansible is attempted to automate IT by making deploying, configuring, and updating software on one machine like doing it on thousand of machines.

• To use Ansible we have to configure playbooks. Those playbooks are the files which contain the commands that will deployed on the machines.

• Test deploying grid node with Ansible.

Page 3: Current Status Work Package Three By: Mohamed Elshamy

Perspectives and schedules

Oct-DecJul-SepMar-JunDec-FebSep-NovMay-Aug

3

5

1

2

4

6

Selection of the grid team

and administration assistance to facilitate their

travel to Europe.

Wor

k Pa

ckag

e Th

ree

Prog

ress

2013 2014

Knoweldge transfer to the WP3 team in France and

Italy.

Selection and training of grid management

team.

Pre-Production test of tier 3 gride node.

Production of tier 3 gride

node.

Continue formations at

LLR.

Pre-Production test of tier 2 gride node.

Production of tier 2 gride

node.

Page 4: Current Status Work Package Three By: Mohamed Elshamy

Current status

• Currently Grid node is up and working with some issues

• The grid is consisting from the following1. One machine acts as a BDII_SITE.2. One machine acts as a UI.3. One machine acts as a CE.4. One machine acts as a WN. 5. One machine acts as a DPM_MYSQL.6. One machine acts as a DPM_DISK.7. One machine acts as a SQUID.

• All the machines are installed on Physical machines.

Page 5: Current Status Work Package Three By: Mohamed Elshamy

Current status

• All the machines have the following specs:

CPU Two Quad core processor, Intel(R) Xeon(R) CPU E5345 @ 2.33GHzx86_64 Arch, with 4 M L2 cash

HD 320 Gb

Ram 16 G

Display (AMD/ATI) ES1000

• Also we have two virtual machines acting as TOP-BDII and UI.

• The site is now registered on GOCDB under this link:https://goc.egi.eu/portal/index.php?Page_Type=Site&id=961

• It is important to mention that all the services registered on GOCDB are monitored with AfricaArabia ROC in South Africa.

• We have one last issue with the servers certificates.

Page 6: Current Status Work Package Three By: Mohamed Elshamy

THANK YOU!