23
Cupar North Sustainable Cupar 23/04/22 1 sustainablecupar.org.uk

Cupar North Sustainable Cupar

Embed Size (px)

DESCRIPTION

Cupar North Sustainable Cupar. Sustainable Cupar. We are a SCIO ( Scottish Charitable Incorporated Organisation ) with 74 members and 10 trustees. We have the following sub-groups: FAB (Fruit and Blossom) Transport Energy Book club Cupar North. Cupar North. - PowerPoint PPT Presentation

Citation preview

Page 1: Cupar  North Sustainable Cupar

Cupar North

Sustainable Cupar

19/04/23 1sustainablecupar.org.uk

Page 2: Cupar  North Sustainable Cupar

Sustainable CuparWe are a SCIO (Scottish Charitable Incorporated Organisation) with 74 members and 10 trustees. We have the following sub-groups:

• FAB (Fruit and Blossom)• Transport• Energy• Book club • Cupar North

19/04/23 2sustainablecupar.org.uk

Page 3: Cupar  North Sustainable Cupar

Cupar NorthA large area has been allocated for development in the Local Development Plan (LDP): • 1,400 houses• Industrial park• Primary school• Amenity space• Relief road• Strategic Development Area (SDA)

19/04/23 3sustainablecupar.org.uk

Page 4: Cupar  North Sustainable Cupar

Master PlanBefore work starts a master plan must be produced showing how people, work, and the environment are integrated in a sustainable way:• Road network• Path network• Public transport• Access for recycling, emergency services, etc.• Zones (housing, industrial, schooling, recreation)• Produced by development consortium (not Fife Council)

19/04/23 4sustainablecupar.org.uk

Page 5: Cupar  North Sustainable Cupar

Possible negative impactsPotential pressure on existing infrastructure and services including:• Education• Roads• Public transport• Drainage, sewerage and flood protection• Hospital and sheltered housing• Possible loss of business due to relief road

19/04/23 5sustainablecupar.org.uk

Page 6: Cupar  North Sustainable Cupar

Possible positive impactsPotential benefits:• Less through traffic when relief road completed• More customers for existing businesses• Job creation in new retail outlets and school• Carbon efficiency via integrated and retrofitted

heat network• Reduction in per capita carbon footprint• Exemplar of sustainable living

19/04/23 6sustainablecupar.org.uk

Page 7: Cupar  North Sustainable Cupar

Sustainable Cupar proposalA sustainable development (a statutory requirement), based on 'Village homes' and others. Key points:• Double sided housing• Greenways• Housing orientation• Narrow streets, shared space, filtered permeability• Natural drainage• Edible landscaping• Amenity space

19/04/23 7sustainablecupar.org.uk

Page 8: Cupar  North Sustainable Cupar

Sustainable transportA comprehensive and safe path network to encourage community spirit:

• Discourage car use by providing indirect route into town

• Minimal shared surface for vehicles• Shared front garden space for safe

path network• Shared amenity space and safe

play areas

19/04/23 8sustainablecupar.org.uk

Page 9: Cupar  North Sustainable Cupar

Green arterial pathA continuous, safe path around the existing town must be built before any other development.

• For traversing Cupar North

• For access into town centre

19/04/23 9sustainablecupar.org.uk

Red dotted line is arterial path

Page 10: Cupar  North Sustainable Cupar

Relief road and existing infrastructureRelief road must be used for all new development access. Must have safe links into the town.• Radial roads terminated:• at the arterial path (greenway)• near the centre of town

• Existing streets:• one way• shared space• wider pavements/cycle paths

19/04/23 10sustainablecupar.org.uk

Page 11: Cupar  North Sustainable Cupar

House layoutHouses have access from the front and the back:• Houses front on to path network (Greenway)• Private gardens and off street car parking at the

rear• Mixed tenure (affordable/social/private housing

intermixed)

19/04/23 11sustainablecupar.org.uk

Page 12: Cupar  North Sustainable Cupar

Estate layoutFiltered permeability for pedestrians, cyclists and mobility scooters:

• Separate path network• Shared space cul-de-sacs.• Greenways Interlaced with Cul-de-

sacs (GIC)

19/04/23 12sustainablecupar.org.uk

Page 13: Cupar  North Sustainable Cupar

GIC example

19/04/23 sustainablecupar.org.uk 13

http://www.greenwayneighborhoods.net

Page 14: Cupar  North Sustainable Cupar

Super Efficient Buildings• Passive House as standard (heating demand

15kWh/m2/a)• South orientation default for solar access• On district heat network• Appropriate shading to prevent overheating• http://vimeo.com/74294955

19/04/23 14sustainablecupar.org.uk

Page 15: Cupar  North Sustainable Cupar

Darnstadt Passive house

19/04/23 sustainablecupar.org.uk 15

Craigrothie Passive House

Blebocraigs BRE Demonstrator

Page 16: Cupar  North Sustainable Cupar

150 passive house development HerefordshireBy Archihaus

19/04/23 16sustainablecupar.org.uk

Page 17: Cupar  North Sustainable Cupar

19/04/23 17sustainablecupar.org.uk

• Cupar’s own Heating + Cooling Network• Anaerobic Digestion plant• Solar powered heat pump on sewer (integrated

solar PV on roofs)

• Inter-seasonal heat store (sugar beet silo or underground)

• Biomas (Elmwood), fossil fuel (Bell Baxter for peak loads)

• Synergy Environ – Feasibility Study

Cupar Heat Network

Page 18: Cupar  North Sustainable Cupar

Anaerobic Digester

19/04/23 18sustainablecupar.org.uk

Economic Benefit:•cheap low carbon heat and cool•organic matter disposal (Food waste regulations tightening, distillers/ brewers/ any business with organic waste)

•prolonged growing season•chilling facility •job creation

Page 19: Cupar  North Sustainable Cupar

Green spaces, drainageSUDS and Flood protection:• Narrow streets – minimise non permeable surface area

• Greenways – open planted swales, edible landscape

• Rain water harvesting

19/04/23 19sustainablecupar.org.uk

Page 20: Cupar  North Sustainable Cupar

Public transportIt is vital that everyone has easy access to public transport:• Path network to access buses• Regular bus service to town centre, railway station

and industrial park

19/04/23 20sustainablecupar.org.uk

Page 21: Cupar  North Sustainable Cupar

Sustainable economicsCupar North will take many years to complete:• Phasing of development• Funding of infrastructure (arterial path and relief

road)• Environmental management• Attracting new business

19/04/23 21sustainablecupar.org.uk

Page 22: Cupar  North Sustainable Cupar

Engagement with developersCupar must have its say:• Development consortium will draw up master

plan• Community need to engage with the developers• Important that we present a united front

19/04/23 22sustainablecupar.org.uk

Page 23: Cupar  North Sustainable Cupar

Q & A

Website: sustainablecupar.org.ukFacebook: Sustainable CuparTwitter: @Sustain_Cupar

19/04/23 23sustainablecupar.org.uk