15
CTP System Installation and operation guide

CTP System Installation and operation guide€¦ · CTP System installation scenarios 3 New or complete upgrade i Installing a new CTP System in/on sites with ... and Manual test

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CTP System Installation and operation guide€¦ · CTP System installation scenarios 3 New or complete upgrade i Installing a new CTP System in/on sites with ... and Manual test

CTP System Installation and operation guide

Page 2: CTP System Installation and operation guide€¦ · CTP System installation scenarios 3 New or complete upgrade i Installing a new CTP System in/on sites with ... and Manual test

Contents1. CTP System installation scenarios 3

New or complete upgrade

i Installing a new CTP System in/on sites with less than 15 fittings 4

ii Installing a new CTP System in/on sites with more than 15 fittings 6

Progressive upgrades

iii Progressive upgrades on sites with less than 15 installed fittings 8

iv Progressive upgrades on sites with more than 15 installed fittings 10

2. Ongoing testing

i Ongoing Testing for a CTP System 12

ii Ongoing Testing for sites with a mix of CTP and Manual test fittings 13

3. Clevertronics Luminaire Register 1.0 14

4. Routine maintenance tasks for CTP Systems 16

5. LED Status indicators 17

6. CTP Self-test functions 18

7. Scanning CTP fittings with CleverSparky 19

8. Using the digital logbook 20

9. Using Quick Collect to gather test results 21

10. Maintenance reports and faults 22

11. Menu options explained 23

12. The CleverSparky Web App 24

13. Frequently asked questions 25

Select the scenario applies to your project. The instructions included in this leaflet will guide you through the process for installing and maintaining your CTP System.

Below are the different scenario options.

Installing a new CTP System for new sites with less than 15 exit and emergency lights Page 4 For new sites (or entire replacement of existing fittings) using 15 or less new CTP fittings, follow this process to install, activate and commission your new CTP System with the CleverSparky Mobile app.

Installing a new CTP System for new sites with more than 15 exit and emergency lights Page 6 For new sites (or entire replacement of existing fittings) using more than 15 new CTP fittings, follow this process to install, activate and commission your new CTP System using the CleverSparky Mobile app and the web app at Cleversparky.com

Progressive upgrades to sites with less than 15 exit and emergency lights Page 8Using only the mobile appWhen you have run a test on a site with less than 15 Manual test fittings and there are failures to replace, follow this process to add CTP self-test fittings and build your CleverSparky digital logbook for simple future testing using the CTP System.

Progressive upgrades to sites with more than 15 exit and emergency lights Page 10Using the web app and mobile appWhen you have run a test on a site with more than 15 Manual test fittings and there are failures to replace, follow this process to add CTP self-test fittings and build your CleverSparky digital logbook for simple future testing using the CTP System.

< 15 15 +

< 15 15 +

< 15 15 +

upgrade

< 15 15 +

upgrade

1. CTP installation scenarios

iii

ii

i

iv

Page 3: CTP System Installation and operation guide€¦ · CTP System installation scenarios 3 New or complete upgrade i Installing a new CTP System in/on sites with ... and Manual test

4 5

Step 6 – Collect the test resultsPress the Scan Fitting button in the app.

The CTP data encoded fast flashing occurs on the status LED in a loop for 20sec then a 10sec visual indicator appears.Point your device at the status LED on the first CTP fittingI Select either the Exit or Emergency light level

setting at the top of the screen.II Locate the status LED indicator in the centre

of the circle and Tap to Focus.III Press Scan while it is flashing fast green and

hold phone still for up to 8 sec.

IV After a successful scan enter the fitting ID, location, switchboard; install date and any other details required. If unsuccessful repeat process. If scan cannpt be completed add test results manually using visual indicator on page 17. (See page 19 for more details on scanning).

Save, and move to the next fitting and repeat until all are collected.

Step 4 – Enter site detailsOpen the CleverSparky App and Add Site details and complete all the relevant fields on the screen and Save. Then press Add New Group.

Step 5 – Create the electronic logbook

Click on the Create New logbook button.

Add details into the following fields; collection date, date the fitting tested and duration required to pass this test.(120min for initial test and 90min for subsequent tests).

Step 7 – Generate a reportSelect the More button

Then press Send reports to instantly generate and email a test report. This report is your logbook report for the site showing fitting information and testing details as per AS/NZ2293.2.

Test reports are sent to your email inbox.

Step 1 – Before installing the fittingsEnsure all fittings have an ID number and QR code attached before installing.

*Labels included in carton

Step 2 – Charge batteriesCharge the batteries for 16 hours.

Step 3 – Activate the CTP function and perform the initial 120 minute self-test

Use the circuit breaker to activate the CTP self-test function by switching the lighting circuit on and off in the following sequence: (use a stopwatch as the timer needs to be accurate).

The 120min self-test will now begin.

Installing a new CTP System for new sites with less than 15 exit and emergency lights Using only the mobile appFor new sites (or entire replacement of existing emergencies) using 15 or less new CTP fittings, follow this process to install, activate and commission your new CTP System with the CleverSparky Mobile app.

Fitting ID #

L22-023

0004D518

Fitting ID #

L22-023

0004D518

Fittin

g I

D #

L2

2-0

23

0004D518

Fitting ID #

L22-023

0004D518

From

a p

ower

“O

N”

stat

e

OFF

6 s

ecs

ON

2

secs

ON

2 s

ecs

OFF

2 s

ecs

OFF

2 s

ecs

ON

Log Book Edit

10:15 am

Create New Logbook

Entry

Create Duplicate Logbook

Entry

Create Report

Office Supplies

100 Elizabeth Street Brisbane

Groups Logbook Faults Scan More

Lights

Add New Site

10:15 am

Unit/Level

1

Address

100 Elizabeth Street Brisbane

Save

Business Name

Office Sup_

Buiding Name

Contact Name

Contact Email

Groups Logbook Faults Scan More

Sites

10:15 am

This is where you’ll see a list of your site.Tap the button below to add a new site

Search your sites

Add Site

Sites

10:15 am

Add your first group.Tap the button below to add a new site

Add New Group

Office Supplies

100 Elizabeth Street Brisbane

Groups Logbook Faults Scan More

Add Site Add details Add New Group

Sites

10:15 am

This is where you’ll see a list of your site.Tap the button below to add a new site

Search your sites

Add Site

Add New Site

10:15 am

Unit/Level

1

Address

100 Elizabeth Street Brisbane

Save

Business Name

Office Sup_

Buiding Name

Contact Name

Contact Email

Groups Logbook Faults Scan More

Sites

10:15 am

Add your first group.Tap the button below to add a new site

Add New Group

Office Supplies

100 Elizabeth Street Brisbane

Groups Logbook Faults Scan More

Create new logbook entry

Log Book Edit

10:15 am

Create New Logbook

Entry

Create Duplicate Logbook

Entry

Create Report

Office Supplies

100 Elizabeth Street Brisbane

Groups Logbook Faults Scan More

Log Book Edit

10:15 am

Scan Fitting ManuallyAdd Fitting

Quick CollectResults

Add a new fitting using thebuttons below.

Test Collection date – 22-08-18Next Collection due – 21-02-19

Groups included – Engineering, Buisness, Admin, Gym Block 12, Car park A … etc

Site NameAddress

Groups Logbook Faults Scan More

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Send Reports

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

More

More

10:15 am

Send Reports

Preferred Wholesaler

Add Wholesaler Account Details

Offline Mode

Unsynced Data

Reset Tooltips

Support

Profile

Change Password

Save

Log Out

V1.1.10(641)

Groups Logbook Faults Scan More

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

More

10:15 am

Send Reports

Preferred Wholesaler

Add Wholesaler Account Details

Offline Mode

Unsynced Data

Reset Tooltips

Support

How to Videos

Profile

Change Password

Save

Log Out

V1.1.10(641)

Groups Logbook Faults Scan More

Tap screen to focus LED

Locate circle over LED indicator

Press scan

Scan Fitting

Log Book Edit

10:15 am

Scan Fitting ManuallyAdd Fitting

Quick CollectResults

Add a new fitting using thebuttons below.

Test Collection date – 22-08-18Next Collection due – 21-02-19

Groups included – Engineering, Buisness, Admin, Gym Block 12, Car park A … etc

Site NameAddress

Groups Logbook Faults Scan More

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

< 15 15 +

Log Book10:15 am

Save

Test collection date

Fitting test date (optional or scan)

Next collection date

Test duration

7 June 2015

8 July 20169 August 201710 September 201811 October 201912 November 202013 December 2021

Done

Groups Logbook Faults Scan More

Test collection date (automatically populated)

Fitting date (click box to auto populate)

Test duration (120 minutes for initial tests)

Wait for the 120min test to finish before proceeding.

Log Book10:15 am

Save

Test collection date

Fitting test date (optional or scan)

Next collection date

Test duration

7 June 2015

8 July 20169 August 201710 September 201811 October 201912 November 202013 December 2021

Done

Groups Logbook Faults Scan More

i

Page 4: CTP System Installation and operation guide€¦ · CTP System installation scenarios 3 New or complete upgrade i Installing a new CTP System in/on sites with ... and Manual test

6 7

Step 1 – Before installing the fittingsEnsure all fittings have an ID number and QR code attached before installing.

Add a duplicate sticker into the installation register provided in this booklet along with the corresponding fitting ID, fitting location, group name, install date and any other details you would like to capture. You can do this as you install the fittings OR complete the register from the site drawings.

Step 2 – Charge batteriesCharge the batteries for 16 hours.

Step 3 – Activate the initial 120 minute self-test

Use the circuit breaker to activate the CTP self-test function by switching the lighting circuit on and off in the following sequence: (use a stopwatch as the timer needs to be accurate).

The 120min self-test will now begin.

2 Installing a new CTP System for new sites with more than 15 exit and emergency lightsUsing only the mobile appFor new sites (or entire replacement of existing fittings) using more than 15 new CTP fittings, follow this process to install, activate and commission your new CTP System using the CleverSparky Mobile and web app at Cleversparky.com

< 15 15 +

Fitting ID #

L22-023

0004D518

Fitting ID #

L22-023

0004D518

Fittin

g I

D #

L2

2-0

23

0004D518

Fitting ID #

L22-023

0004D518

Step 4 – Go to cleversparky.com on your PC

While the fittings are testing, use a PC to Login to your account on the at www.cleversparky.com and add a new site by searching for the address. Give the site a name, save then select it.Download the CSV template and enter the information from the installation register and save on your PC.Press the upload CSV button and select the saved file.All your fitting data will now be uploaded to the CleverSparky web and mobile app so you can collect the results using CleverSparky on your phone.

Step 5 – Create the electronic logbook

Open the CleverSparky mobile app. Select your site. Click on the Create New Logbook button.

Add details into the following fields; collection date, date the fitting tested and duration required to pass this test.(120min for initial test and 90min for subsequent tests).

Step 6 – Collecting test resultsOption 1 – Quick Collect I Press the Quick Collect button, select one

fitting at a time or Select All. II Walk to each fitting and inspect the

flashing LED. The LED will flash fast Green for 20 sec (Scanning mode) then a 10 sec visual mode. During the visual mode look for the very slow amber and green flash or a solid green which indicates a pass.

III Any other flashing sequence is a likely fail and you should scan the fitting using the process on page 19 to accurately log the fault/status. When all fittings are collected press Save.

IV See the CTP Faults and Maintenance section on Page 16 for information on how to manage any replacement fittings

Option 2 – ScanFollow the process on page 19 to scan the LED during the fast green flashing mode which will add the test result automatically. NB. For larger sites this will take longer than Option 1.

Step 7 – Generate a reportSelect the More button

Then press Send reports to instantly generate and email a test report. This report is your logbook report for the site showing fitting information and testing details as per AS/NZ2293.2.

Test reports are sent to your email inbox.

Log Book Edit

10:15 am

Create New Logbook

Entry

Create Duplicate Logbook

Entry

Create Report

Office Supplies

100 Elizabeth Street Brisbane

Groups Logbook Faults Scan More

Create New Logbook

Log Book Edit

10:15 am

Create New Logbook

Entry

Create Duplicate Logbook

Entry

Create Report

Office Supplies

100 Elizabeth Street Brisbane

Groups Logbook Faults Scan More

Log Book10:15 am

Save

Test collection date

Fitting test date (optional or scan)

Next collection date

Test duration

7 June 2015

8 July 20169 August 201710 September 201811 October 201912 November 202013 December 2021

Done

Groups Logbook Faults Scan More

Test collection date (automatically populated)Fitting date (click box to auto populate)

Test duration (120 minutes for initial tests)

Wait for the 120min test to finish before proceeding.

Log Book10:15 am

Save

Test collection date

Fitting test date (optional or scan)

Next collection date

Test duration

7 June 2015

8 July 20169 August 201710 September 201811 October 201912 November 202013 December 2021

Done

Groups Logbook Faults Scan More

Send Reports

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

More

More

10:15 am

Send Reports

Preferred Wholesaler

Add Wholesaler Account Details

Offline Mode

Unsynced Data

Reset Tooltips

Support

Profile

Change Password

Save

Log Out

V1.1.10(641)

Groups Logbook Faults Scan More

More

10:15 am

Send Reports

Preferred Wholesaler

Add Wholesaler Account Details

Offline Mode

Unsynced Data

Reset Tooltips

Support

How to Videos

Profile

Change Password

Save

Log Out

V1.1.10(641)

Groups Logbook Faults Scan More

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

From

a p

ower

“O

N”

stat

e

OFF

6 s

ecs

ON

2

secs

ON

2 s

ecs

OFF

2 s

ecs

OFF

2 s

ecs

ON

RECENTLY PASSED. The fitting has passed a test. This indication remains for 5 days after the test and then changes to green.

VERY SLOW AMBER & GREEN FLASH* (4s amber, 1s Green)

If battery is disconnected, 3s off

ii

Page 5: CTP System Installation and operation guide€¦ · CTP System installation scenarios 3 New or complete upgrade i Installing a new CTP System in/on sites with ... and Manual test

8 9

Step 5 – Replacing fittings To replace the fittings in the system select each fitting in your group that has been replaced, press the maintenance tab then “Add maintenance report.”

Tap repaired and select replaced fitting, add notes if required and save.

Press the Scan button. Choose the fitting type you are scanning, Exit or Emergency and scan the LED indicator on the fitting when it flashes fast green.

After a successful scan enter the fitting ID, location, install date and any other details required and save.

Step 6 – Generate a reportSelect the More button

Press send reports to instantly generate and email a test report. This report is your logbook report for the site showing fitting information and testing details as per AS/NZ2293.2.

Test reports are sent to your email inbox.

Progressive upgrades to sites with less than 15 exit and emergency lightsUsing only the mobile appWhen you have run a test on a site with less than 15 manual test fittings and there are failures to replace, follow this process to add CTP self-test fittings and build your digital logbook.

Step 1 – Enter site detailsDownload and Open the CleverSparky app, add your site details and a group name that identifies the area of the fittings.

Step 2 – Add all pre existing fittingsSelect your group and press “manually add fitting.” Enter in the fitting ID and location details for the pre-existing fittings on site, including any that failed the last test.

Step 3 – Install the replacement CTP fittings

Ensure all fittings have an ID number and stick unique QR code to any CTP lamp heads before installing.

Step 4 – Activate the CTP function

Log Book Edit

10:15 am

Scan Fitting ManuallyAdd Fitting

Quick CollectResults

Add a new fitting using thebuttons below.

Test Collection date – 22-08-18Next Collection due – 21-02-19

Groups included – Engineering, Buisness, Admin, Gym Block 12, Car park A … etc

Site NameAddress

Groups Logbook Faults Scan More

10:15 am

Add a Maintenance Report using the button below

Add Maintenance Report

Fitting Test & Status Maintenance

EditL1-03

Groups Logbook Faults Scan More

Add New Maintenance

10:15 am

Replaced FittingReplaced Battery

Replaced Control GearReplaced Lamp

Repair Date

05-09-2018

Repaired

Replaced Fitting

Add Notes

Save

Done

Groups Logbook Faults Scan More

Manually Add Fitting

< 15 15 +

upgrade

Add New Site

10:15 am

Unit/Level

1

Address

100 Elizabeth Street Brisbane

Save

Business Name

Office Sup_

Buiding Name

Contact Name

Contact Email

Groups Logbook Faults Scan More

Sites

10:15 am

This is where you’ll see a list of your site.Tap the button below to add a new site

Search your sites

Add Site

Sites

10:15 am

Add your first group.Tap the button below to add a new site

Add New Group

Office Supplies

100 Elizabeth Street Brisbane

Groups Logbook Faults Scan More

Add Site Add details Add New Group

Sites

10:15 am

This is where you’ll see a list of your site.Tap the button below to add a new site

Search your sites

Add Site

Add New Site

10:15 am

Unit/Level

1

Address

100 Elizabeth Street Brisbane

Save

Business Name

Office Sup_

Buiding Name

Contact Name

Contact Email

Groups Logbook Faults Scan More

Sites

10:15 am

Add your first group.Tap the button below to add a new site

Add New Group

Office Supplies

100 Elizabeth Street Brisbane

Groups Logbook Faults Scan More

Log Book Edit

10:15 am

Scan Fitting ManuallyAdd Fitting

Quick CollectResults

Add a new fitting using thebuttons below.

Test Collection date – 22-08-18Next Collection due – 21-02-19

Groups included – Engineering, Buisness, Admin, Gym Block 12, Car park A … etc

Site NameAddress

Groups Logbook Faults Scan More

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Locate circle over LED indicator

Scan

Add Maintenance Report

Replaced Fitting

10:15 am

Add a Maintenance Report using the button below

Add Maintenance Report

Fitting Test & Status Maintenance

EditL1-03

Groups Logbook Faults Scan MoreAdd New Maintenance

10:15 am

Replaced FittingReplaced Battery

Replaced Control GearReplaced Lamp

Repair Date

05-09-2018

Repaired

Replaced Fitting

Add Notes

Save

Done

Groups Logbook Faults Scan More

Fitting ID #

L22-023

0004D518

Fitting ID #

L22-023

0004D518

Fittin

g I

D #

L2

2-0

23

0004D518

Fitting ID #

L22-023

0004D518

Fitt

ing

ID #

L2

2-0

23

0004D518Fitting ID #

L22-023

0004D518

Fitt

ing

ID #

L2

2-0

23

0004D518Fitting ID #

L22-023

0004D518

Send Reports

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

More

More

10:15 am

Send Reports

Preferred Wholesaler

Add Wholesaler Account Details

Offline Mode

Unsynced Data

Reset Tooltips

Support

Profile

Change Password

Save

Log Out

V1.1.10(641)

Groups Logbook Faults Scan More

More

10:15 am

Send Reports

Preferred Wholesaler

Add Wholesaler Account Details

Offline Mode

Unsynced Data

Reset Tooltips

Support

How to Videos

Profile

Change Password

Save

Log Out

V1.1.10(641)

Groups Logbook Faults Scan More

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

iii

Activate the CTP self-test at each fitting by pushing the test button as shown. (Please note pushing the button after this sequence will move the next test forward one month each press see iv on page 18)

Step 1 Push the test button for 6 seconds, release then press again once.

Step 2 Wait 60 sec and then initiate a 24 hour delayed test to allow the battery to charge by holding the test button for 10 sec until it flashes fast red. The fitting will now test in 24 hours.

Page 6: CTP System Installation and operation guide€¦ · CTP System installation scenarios 3 New or complete upgrade i Installing a new CTP System in/on sites with ... and Manual test

10 11

Step 4 – Replacing fittings To replace the fittings in the system select each fitting in your group that has been replaced, press the maintenance tab then “Add maintenance report.”

Tap Repaired and select replaced fitting, add notes if required and save.

Press the Scan button.

Step 5 – Collect the test resultsPress the Scan Fitting button in the app.

The CTP data encoded fast flashing occurs in a loop for 20sec then a 10sec visual indicator appears.Point your device at the status LED on the first CTP fittingI Select either the Exit or Emergency light

level setting at the top of the sreen.II Locate the status LED indicator in the centre

of the circle and Tap to Focus.III Press Scan while it is flashing fast green and

hold phone still for up to 8 sec.

IV After a successful scan enter the fitting ID, location, switchboard; install date and any other details required. If unsuccessful repeat process. If scan cannpt be completed add test results manually using visual indicator on page 17. (See page 19 for more details on scanning).

Save, and move to the next fitting and repeat until all are collected.

Step 6 – Generate a reportSelect the More button

Press send reports to instantly generate and email a test report. This report is your logbook report for the site showing fitting information and testing details as per AS/NZ2293.2.

Test reports are sent to your email inbox.

Progressive upgrades to sites with more than 15 exit and emergency lightsUsing the web app and mobile appWhen you have run a test on a site with more than 15 Manual test fittings and there are failures to replace, follow this process to add CTP self-test fittings and build your digital logbook.

Step 1 – Go to cleversparky.com on your PC and set up the site

Download a csv template and use the existing logbook or site drawings to enter the fitting ID, group, location,installed date and any other details required for the existing fittings on site including any that failed the last test.

Save, then upload the file to populate the data to the site.

Step 2 – Install the replacement CTP fittings

Ensure all fittings have an ID number and stick unique QR code to any CTP lamp heads before installing.

Step 3 – Activate the CTP functionActivate the CTP self-test at each fitting by pushing the test button as shown. (Please note pushing the button after this sequence will move the next test forward one month each press see iv on page 18)

< 15 15 +

upgrade

10:15 am

Add a Maintenance Report using the button below

Add Maintenance Report

Fitting Test & Status Maintenance

EditL1-03

Groups Logbook Faults Scan More

Add New Maintenance

10:15 am

Replaced FittingReplaced Battery

Replaced Control GearReplaced Lamp

Repair Date

05-09-2018

Repaired

Replaced Fitting

Add Notes

Save

Done

Groups Logbook Faults Scan More

Add Maintenance Report

Replaced Fitting

10:15 am

Add a Maintenance Report using the button below

Add Maintenance Report

Fitting Test & Status Maintenance

EditL1-03

Groups Logbook Faults Scan More

Add New Maintenance

10:15 am

Replaced FittingReplaced Battery

Replaced Control GearReplaced Lamp

Repair Date

05-09-2018

Repaired

Replaced Fitting

Add Notes

Save

Done

Groups Logbook Faults Scan More

Fitting ID #

L22-023

0004D518

Fitting ID #

L22-023

0004D518

Fittin

g I

D #

L2

2-0

23

0004D518

Fitting ID #

L22-023

0004D518

Sites

UNIT/LEVEL ADDRESS BUSINESS NAME BUILDING NAME CREATED AT

Search

To start populating your sites,click on the addsite button below

+ Add Site

Clever Tower6 Tronic Street

NAME FITTINGS FAULTS CREATED AT

CSV Upload TemplateBack to sites

Groups

Logbook

Faults

Deleted Fittings

Site Details

To start populating your sites,click on the addsite button below

+ Add Site

Upload CSV ReportClever Tower6 Tronic Street

NAME FITTINGS FAULTS CREATED AT

CSV Upload TemplateBack to sites

Groups

Logbook

Faults

Deleted Fittings

Site Details

To start populating your sites,click on the addsite button below

+ Add Site

Upload CSV Report

Go to cleversparky.com on your pc

Download csv and upload csv templates

Clevertronics - 2018-01-03 to 2018-01-10 - Test Results Report - 2018-10-25

SerialNumber

DeviceReference

AssetCode

GroupID

GroupName

Building Level Location ProductCode

Test Date RequiredDuration

TestDuration

TestFault

TestResult

Next Test

00000022 EM2 3 Level 1 officearea

Marketing area CLIFE-PRO 03/01 /2018 90 90 N/A Pass 05/07/2018

00000025 EM3 1 Ground Leveloffices

Hallway CLIFE-PRO 03/01 /2018 90 90 N/A Pass 05/07/2018

0000A53E EM4 1 Ground Leveloffices

Lunch Room CLIFE 04/01 /2018 90 90 N/A Pass 05/07/2018

0000A04B EM5 1 Ground Leveloffices

QA Enginering CLIFE 04/01 /2018 90 90 N/A Pass 05/07/2018

0000A520 EM6 2 Ground LevelFactory

QA Repair room1

CLIFE 04/01 /2018 90 90 N/A Pass 05/07/2018

0000002A EM7 2 Ground LevelFactory

Surface Mountroom

CLIFE-PRO 03/01 /2018 90 90 N/A Pass 05/07/2018

0000000C EX1 3 Level 1 officearea

Finance CUBPRO 03/01 /2018 90 90 N/A Pass 05/07/2018

0000000D EX10 1 Ground Leveloffices

Front office CUBPRO 03/01 /2018 90 90 N/A Pass 05/07/2018

00000003 EX3 3 Level 1 officearea

Reception Stairs CUBLED 04/01 /2018 90 90 N/A Pass 05/07/2018

0000002C EX4 1 Ground Leveloffices

Front door CUBPRO 03/01 /2018 90 90 N/A Pass 05/07/2018

0000000E EX5 1 Ground Leveloffices

Hallway to frontdoor

CUBPRO 03/01 /2018 90 90 N/A Pass 05/07/2018

0000ABBF EX6 2 Ground LevelFactory

Factory side door CCFLED 04/01 /2018 90 90 N/A Pass 05/07/2018

0000ABBE EX7 2 Ground LevelFactory

Factory backdoor

CCFLED 04/01 /2018 90 90 N/A Pass 05/07/2018

0000B38B EX8 2 Ground LevelFactory

Door to office CCFLED 04/01 /2018 90 90 N/A Pass 05/07/2018

0000ABBA EX9 2 Ground LevelFactory

QA repair sidedoor

CCFLED 04/01 /2018 90 90 N/A Pass 05/07/2018

01234578 ery 2 Ground LevelFactory

Reception CLIFE-PRO 03/01 /2018 90 90 Battery Fail 05/07/2018

Completed register

Clevertronics - 2018-01-03 to 2018-01-10 - Test Results Report - 2018-10-25

SerialNumber

DeviceReference

AssetCode

GroupID

GroupName

Building Level Location ProductCode

Test Date RequiredDuration

TestDuration

TestFault

TestResult

Next Test

00000022 EM2 3 Level 1 officearea

Marketing area CLIFE-PRO 03/01 /2018 90 90 N/A Pass 05/07/2018

00000025 EM3 1 Ground Leveloffices

Hallway CLIFE-PRO 03/01 /2018 90 90 N/A Pass 05/07/2018

0000A53E EM4 1 Ground Leveloffices

Lunch Room CLIFE 04/01 /2018 90 90 N/A Pass 05/07/2018

0000A04B EM5 1 Ground Leveloffices

QA Enginering CLIFE 04/01 /2018 90 90 N/A Pass 05/07/2018

0000A520 EM6 2 Ground LevelFactory

QA Repair room1

CLIFE 04/01 /2018 90 90 N/A Pass 05/07/2018

0000002A EM7 2 Ground LevelFactory

Surface Mountroom

CLIFE-PRO 03/01 /2018 90 90 N/A Pass 05/07/2018

0000000C EX1 3 Level 1 officearea

Finance CUBPRO 03/01 /2018 90 90 N/A Pass 05/07/2018

0000000D EX10 1 Ground Leveloffices

Front office CUBPRO 03/01 /2018 90 90 N/A Pass 05/07/2018

00000003 EX3 3 Level 1 officearea

Reception Stairs CUBLED 04/01 /2018 90 90 N/A Pass 05/07/2018

0000002C EX4 1 Ground Leveloffices

Front door CUBPRO 03/01 /2018 90 90 N/A Pass 05/07/2018

0000000E EX5 1 Ground Leveloffices

Hallway to frontdoor

CUBPRO 03/01 /2018 90 90 N/A Pass 05/07/2018

0000ABBF EX6 2 Ground LevelFactory

Factory side door CCFLED 04/01 /2018 90 90 N/A Pass 05/07/2018

0000ABBE EX7 2 Ground LevelFactory

Factory backdoor

CCFLED 04/01 /2018 90 90 N/A Pass 05/07/2018

0000B38B EX8 2 Ground LevelFactory

Door to office CCFLED 04/01 /2018 90 90 N/A Pass 05/07/2018

0000ABBA EX9 2 Ground LevelFactory

QA repair sidedoor

CCFLED 04/01 /2018 90 90 N/A Pass 05/07/2018

01234578 ery 2 Ground LevelFactory

Reception CLIFE-PRO 03/01 /2018 90 90 Battery Fail 05/07/2018

Log Book Edit

10:15 am

Scan Fitting ManuallyAdd Fitting

Quick CollectResults

Add a new fitting using thebuttons below.

Test Collection date – 22-08-18Next Collection due – 21-02-19

Groups included – Engineering, Buisness, Admin, Gym Block 12, Car park A … etc

Site NameAddress

Groups Logbook Faults Scan More

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Send Reports

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

More

More

10:15 am

Send Reports

Preferred Wholesaler

Add Wholesaler Account Details

Offline Mode

Unsynced Data

Reset Tooltips

Support

Profile

Change Password

Save

Log Out

V1.1.10(641)

Groups Logbook Faults Scan More

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

More

10:15 am

Send Reports

Preferred Wholesaler

Add Wholesaler Account Details

Offline Mode

Unsynced Data

Reset Tooltips

Support

How to Videos

Profile

Change Password

Save

Log Out

V1.1.10(641)

Groups Logbook Faults Scan More

Tap screen to focus LED

Locate circle over LED indicator

Press scan

Scan Fitting

Log Book Edit

10:15 am

Scan Fitting ManuallyAdd Fitting

Quick CollectResults

Add a new fitting using thebuttons below.

Test Collection date – 22-08-18Next Collection due – 21-02-19

Groups included – Engineering, Buisness, Admin, Gym Block 12, Car park A … etc

Site NameAddress

Groups Logbook Faults Scan More

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Fitt

ing

ID #

L2

2-0

23

0004D518Fitting ID #

L22-023

0004D518

Fitt

ing

ID #

L2

2-0

23

0004D518Fitting ID #

L22-023

0004D518

iv

Step 1 Push the test button for 6 seconds, release then press again once.

Step 2 Wait 60 sec and then initiate a 24 hour delayed test to allow the battery to charge by holding the test button for 10 sec until it flashes fast red. The fitting will now test in 24 hours.

Page 7: CTP System Installation and operation guide€¦ · CTP System installation scenarios 3 New or complete upgrade i Installing a new CTP System in/on sites with ... and Manual test

12 13

Step 1 – Select your site on the CleverSparky phone app

Open the CleverSparky Mobile app and select your site.

i Click on the Logbook button and click create new logbook.

ii Enter the start date of the collection period.

ii The date the fittings tested. iv The duration required for a pass result

(120min for initial test and 90min for subsequent tests.

v Then select your first group to begin collecting results.

Step 2 – Collecting test resultsOption 1 – Quick Collect i Press the Quick Collect button, select one

fitting at a time or Select All. ii Walk to each fitting and inspect the

flashing LED. The LED will flash fast Green for 20 sec (Scanning mode) then a 10 sec visual mode. During the visual mode look for the very slow amber and green flash or a solid green which indicates a pass.

III Any other flashing sequence is a likely fail and you should scan the fitting using the process at Step 3 below to accurately log the fault/status. When all fittings are collected press Save.

IV See the CleaverSparky reports on Page 22 for information on how to manage any replacement fittings.

Option 2 – ScanAlternatively you can follow the process below to scan the LED during the fast green flashing mode which will add the test result automatically. NB. For larger sites this will take longer than Option 1.

Step 3 - Scan the LED indicator for any fittings displaying a failed test result

Select Scan Fitting to open the camera on your phone.Choose the Exit or Emergency light level setting at the top of the screen.During the 20 sec “Fast Green Flash” locate the circle on your screen over the LED Indicator. Best results are achieved between 30cm to 1m from the fitting.The circle should now be green. Tap the circle to focus your camera on the LED indicator.Press Scan Fitting to collect the result.

After a successful scan save, move to the next fitting and repeat until all are collected.

Step 4 – Generate a test reportSelect Send reports to instantly generate and email your test report.

2 Ongoing Testing 2.1 Ongoing Testing for a CTP SystemThe process below is for ongoing testing of a site with only CTP activated fittings. You can use quick collect feature or scan each fitting as detailed below.

RECENTLY PASSED. The fitting has passed a test. This indication remains for 5 days after the test and then changes to green.

VERY SLOW AMBER & GREEN FLASH* (4s amber, 1s Green)

If battery is disconnected, 3s off

Step 1 – Select your site on the CleverSparky phone app

Open the CleverSparky Mobile app and select your site.

i Click on the Logbook button and click create new logbook.

ii Enter the start date of the collection period. ii The date the fittings tested. iv The duration required for a pass result

(120min for initial test and 90min for subsequent tests.

v Then select your first group to begin collecting results.

Step 2 – Collecting the test results of the CTP fittings

i Press the Quick Collect button, select one fitting at a time or Select All.

ii Walk to each fitting and inspect the flashing LED. The LED will flash fast Green for 20 sec (Scanning mode) then a 10 sec visual mode. During the visual mode look for the very slow amber and green flash or a solid green which indicates a pass.

III Any other flashing sequence is a likely fail and you should scan the fitting using the process at Step 3 below to accurately log

the fault/status. When all fittings are collected press Save.

IV See the CleaverSparky reports on Page 22 for information on how to manage any replacement fittings.

Step 3 – Put the SPU ( Manually tested) fittings into test

1 Put the SPU fittings into test using the manual test switch timer. Doing this will also remove power to the CTP fittings causing the emergency lights to come on but will not affect self-test timer.

2 Inspect the SPU fittings to ensure they have gone into test.

Step 4 – Collect the test result of the SPU fittings after 90 min test

1 Open your Phone app, select your site and testing group.

i Click on the Logbook button. ii Select the current logbook. iii Select your first group. iv Press Quick Collect walk the site and

select the illuminated fittings that are still passed and press Pass Fittings.

V Select fittings that have not reached 90 mins, press Fail Fittings and enter the fail reasons under Test Status and save.

Step 7 – Generate a reportSelect the More button

Then press Send reports to instantly generate and email a test report. This report is your logbook report for the site showing fitting information and testing details as per AS/NZ2293.2.

Test reports are sent to your email inbox.

2.2 Ongoing Testing for sites with a mix of CTP and Manual test fittingsThe process below is for the ongoing testing of a site with both CTP and manual test fittings. Using the Quick Collect feature is recommended on these sites.

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Tap to focus

Locate circle over LED indicator

Scan

Log Book Edit

10:15 am

Create New Logbook

Entry

Create Duplicate Logbook

Entry

Create Report

Office Supplies

100 Elizabeth Street Brisbane

Groups Logbook Faults Scan More

Create New Logbook

Log Book Edit

10:15 am

Create New Logbook

Entry

Create Duplicate Logbook

Entry

Create Report

Office Supplies

100 Elizabeth Street Brisbane

Groups Logbook Faults Scan More

Log Book Edit

10:15 am

Create New Logbook

Entry

Create Duplicate Logbook

Entry

Create Report

Office Supplies

100 Elizabeth Street Brisbane

Groups Logbook Faults Scan More

Create New Logbook

Log Book Edit

10:15 am

Create New Logbook

Entry

Create Duplicate Logbook

Entry

Create Report

Office Supplies

100 Elizabeth Street Brisbane

Groups Logbook Faults Scan More

Send Reports

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

More

More

10:15 am

Send Reports

Preferred Wholesaler

Add Wholesaler Account Details

Offline Mode

Unsynced Data

Reset Tooltips

Support

Profile

Change Password

Save

Log Out

V1.1.10(641)

Groups Logbook Faults Scan More

More

10:15 am

Send Reports

Preferred Wholesaler

Add Wholesaler Account Details

Offline Mode

Unsynced Data

Reset Tooltips

Support

How to Videos

Profile

Change Password

Save

Log Out

V1.1.10(641)

Groups Logbook Faults Scan More

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

RECENTLY PASSED. The fitting has passed a test. This indication remains for 5 days after the test and then changes to green.

VERY SLOW AMBER & GREEN FLASH* (4s amber, 1s Green)

If battery is disconnected, 3s off

Page 8: CTP System Installation and operation guide€¦ · CTP System installation scenarios 3 New or complete upgrade i Installing a new CTP System in/on sites with ... and Manual test

Download this template at www.cleversparky.com

Clevertronics Luminaire Register 1.0 Clevertronics Pty Ltd Site Name

Serial Number (as per QR code Product Code Group Name Fitting ID Location Install Date Building Level Switchboard Circuit Asset Code

00053310 LCFLED Office EX1 Reception 8/2/2019 Main G DB1 I N/A

Page 9: CTP System Installation and operation guide€¦ · CTP System installation scenarios 3 New or complete upgrade i Installing a new CTP System in/on sites with ... and Manual test

16 17

4. Routine maintenance tasks for CTP Systems

5.LED Status indicators

i Battery Replacements 1 Disconnect the failed battery and connect

the correct new replacement2 Energise the fitting then hold down the test

button for 10 seconds until the LED flashes fast red. This will set a delayed 24hr test to allow the battery to fully charge. This test will run for 120 mins as per the AS/NZS2293.2 requirement.

ii Complete Fitting Replacements1 Remove the existing fitting.2 Label the new fitting/s with an ID number

and ensure the QR code with serial number is clearly visible.

3 When installed and energised, activate CTP by holding the test button down for 6 seconds until the light flashes green, release then press again once. At this time if required you can adjust the future test date in monthly blocks by additional presses of the test button.( i.e. 2 times = test in 2 months).

4 Wait 60 seconds then using the test button again, put the fitting into a 24hr delayed test by holding the test button down for 10 seconds until the LED flashes fast red. This test will run for 120 mins.

iii Replacing fitting in CleverSparkyTo replace the fittings in the system select each fitting in your group that is being replaced, press the maintenance tab then “Add maintenance report.”

Tap Repaired and select replaced fitting, add notes if required and save.

Press the Scan button.

Choose fitting the type you are scanning, Exit or Emergency and scan the LED indicator on the fitting when it flashes fast green.

After a successful scan enter the fitting ID, location, install date and any other details required and save. If scan fails add fitting manually.

iv Additional info• After battery replacement The status LED will

flash indicating either a fault or no test result until the fitting has tested.

• Battery disconnection for more than a few seconds may cause the fitting to lose the existing 6 month self-test timing schedule. This will be shown as the “Complete timer failure” LED indication.

• A Complete timer failure occurs when a fitting is disconnected from the main supply and battery for an extended time. When the main power supply is returned CTP will still be activated, The 6 month timer will start from the time the power is reinstated.

• Activating CTP starts the 6 month self-test timer. The timing is accurate to within +/- 30 mins every 6 months so keep this in mind as the fittings will perform future discharge tests at roughly the same time of day.

• You can synchronise the test date/time of all fittings on a circuit at any time by performing a CTP activation sequence at the breaker (see Page 4).

10:15 am

Add a Maintenance Report using the button below

Add Maintenance Report

Fitting Test & Status Maintenance

EditL1-03

Groups Logbook Faults Scan More

Add New Maintenance

10:15 am

Replaced FittingReplaced Battery

Replaced Control GearReplaced Lamp

Repair Date

05-09-2018

Repaired

Replaced Fitting

Add Notes

Save

Done

Groups Logbook Faults Scan More

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Fittin

g I

D #

L2

2-0

23

0004D518

10:15 am

Groups Logbook Faults Scan More

Tap screen to focus

Scan

Exit Emergency

Locate circle over LED indicator

Scan

Add Maintenance Report

Replaced Fitting

10:15 am

Add a Maintenance Report using the button below

Add Maintenance Report

Fitting Test & Status Maintenance

EditL1-03

Groups Logbook Faults Scan More

Add New Maintenance

10:15 am

Replaced FittingReplaced Battery

Replaced Control GearReplaced Lamp

Repair Date

05-09-2018

Repaired

Replaced Fitting

Add Notes

Save

Done

Groups Logbook Faults Scan More

Use the table below to visually interpret the test result using the flashing LED sequence. This indication is shown for 10 seconds, followed by 20 sec of fast flashing as per above.

NORMAL. Fitting is in a normal state awaiting next discharge test.

SOLID GREEN(not flashing)

RECENTLY PASSED. The fitting has passed a test. This indication remains for 5 days after the test and then changes to green.

VERY SLOW AMBER & GREEN FLASH* (4s amber, 1s Green)

FAILED LAST TEST. The fitting has been recently tested and has a lamp failure.

FAST AMBER & GREEN FLASH - Lamp*(0.5s amber, 0.5s Green)

FAILED LAST TEST. The fitting has been recently tested and has a control gear failure.

FAST AMBER & RED FLASH - Control Gear*(0.5s Amber, 0.5s Red)

FAILED LAST TEST. The fitting has been recently tested and has a battery failure.

FAST AMBER & OFF FLASH - Battery*(0.5s Amber, 0.5s Off)

FAST RED & OFF(0.5s Red, 0.5s Off)

COMPLETE TIMER FAILURE. The battery has failed, and the unit cannot keep time for scheduled tests during power outage.

FAST AMBER & RED FLASH WITH RED PAUSE(2s (0.5s Amber, 0.5s Red), 2s Red)

TESTING. Fitting is currently performing a test

SLOW AMBER FLASH(2s Amber, 2s Off)

* The LED when green displays that the emergency battery is present and charging or fully charged. If the battery is not present or not charging the LED will be off or AMBER. For items 4-8 this indication will remain until it is receives the required maintenance and passes a subsequent discharge test.

Data can be scanned with CleverSparky App during the 20 second fast flashing cycle

VERY FAST GREEN FLASH(20s Green then 10s of status indication as per below list)

1

2

3

4

5

6

7

8

If battery is disconnected, 3s off

If battery is disconnected, 3s off

If battery is disconnected, 3s off

If battery is disconnected, 3s off

If battery is disconnected, 3s off

If battery is disconnected, 3s off

NO TEST RESULT. Clevertest Plus has been enabled but no test completed.

Page 10: CTP System Installation and operation guide€¦ · CTP System installation scenarios 3 New or complete upgrade i Installing a new CTP System in/on sites with ... and Manual test

18 19

i Initiating an immediate discharge test

b Testing Individual fittings: Press the test button 3 times within a five second period for an immediate discharge test. This action does not alter the schedule for the six-month synchronised test.

6. CTP Self-test functions

From a power “ON” state

OFF 18 secs BACK ON

ii Delayed 24 hr test on individual fitting:

(If replacing a fitting that is not charged).From a power on state, press and hold the fitting test switch for 10 seconds. Hold the test button until the LED changes to a faster RED flash (greater than 10 seconds) this will indicate the command is complete. The unit will then test itself 24 hours later.

iii Terminating a discharge testWhile test in progress, press and hold the test button for 10 seconds to terminate the discharge test.

iv Adjusting the test timer on an individual fitting

The scheduled test date for a fitting can be shifted by 30-day increments up to 6 months using the fitting test switch. You may wish to do this after a fitting has been replaced and you want the fitting to test in a similar schedule to the other fittings on the same circuit. (Note: This sequence is the same as activating a fitting) and will NOT impact activation.

10:15 am

Scan

Tap screen to focus

Exit Emergency

Groups Logbook Faults Scan More

Ground Floor

10:15 am

Scan Fitting

Manually Added Fitting

Not Collected (19) Collected (0)

Batch

Groups Log book Faults Scan More

ENTRY-GND-01-LCFPRO

FOYER-GND-02-LLIFE

HALL-GND-03-LLIFE

KITCHEN-GND-04-LLIFE

10:15 am

Scan FittingManually

Add FittingQuick Collect

Results

Groups Log book Faults Scan More

Not Collected (19)

Qwe

Collected (0)

123

123

546

7. Scanning CTP fittings with CleverSparky

i Accessing scan featureYou can access the scan feature from the bottom menu or when in the fitting page for sites already set up.*Multiple users working under a business account can scan and add fittings to the same site at the same time!

ii Light level settingsChoose the Exit or Emergency light level setting.You may find one setting works across all fittings due to the light levels at the sites. The exposure of the camera is affected by what light it is exposed to when the settings are chosen. Experiment to find the best outcome on each site.

During the 20 sec Fast Green Flash locate the circle on your screen over the LED Indicator. Best results are achieved between 300mm to 1m from the fitting.

The circle should now be green. Tap the circle to focus your camera on the LED indicator so you can see it clearly.

Press scan fitting to collect the result, which will take 8 seconds maximum to complete. If unsuccessful try again from a different distance or light setting.

After a successful scan save, move to the next fitting and repeat process.

10:15 am

Groups Test Events Faults Scan More

Batch

LB1 – Section A

Test Collection date – 22-08-18Next Collection due – 21-02-19

Groups included – Engineering, Buisness, Admin, Gym Block 12, Car park A … etc

Exit Emergency

a Testing groups of fittings:CTP fittings on the same circuit can be tested immediately by switching the circuit breaker OFF for 18 seconds, and then back ON again. This action does not alter the schedule for the six-month synchronised test.

10:15 am

Scan FittingManually

Add FittingQuick Collect

Results

Groups Log book Faults Scan More

Not Collected (19)

Qwe

Collected (0)

123

123

546

10 sec.

3 times in 5 sec.

10 sec.

1. Hold for 6 sec — release when red LED turns green and then press again.

2. Each subsequent press will move the test date forward 30 days.Once done leave fitting for 60 sec to save the new test time

10:15 am

Groups Test Events Faults Scan More

Batch

LB1 – Section A

Test Collection date – 22-08-18Next Collection due – 21-02-19

Groups included – Engineering, Buisness, Admin, Gym Block 12, Car park A … etc

Exit Emergency

Page 11: CTP System Installation and operation guide€¦ · CTP System installation scenarios 3 New or complete upgrade i Installing a new CTP System in/on sites with ... and Manual test

20 21

More

10:15 am

Send Reports

Preferred Wholesaler

Add Wholesaler Account Details

Offline Mode

Unsynced Data

Reset Tooltips

Support

How to Videos

Profile

Change Password

Save

Log Out

V1.1.10(641)

Groups Logbook Faults Scan More

Log Book Entry10:15 am

Log book

Save

Test collection date

Fitting test date (optional or scan)

Next collection date

Test duration

Automatic 6 months from top

date

90 mins and 120 mins

8. The digital logbook

2. Set up logbookEnter the start date of the collection period.Date the fittings tested.The next test collection date.Duration required for a pass result (120min for initial test and 90min for subsequent tests.

Archiving and editing logbooksEach logbook can be archived once the next test report is required by sliding the logbook tab across and press archive. Previous test results are available to view in the site archive. To edit or delete logbooks click on edit at the top of the screen and select the logbook.

Create a single logbook or multiple logbooks on larger sites

Add all groups to the logbook or select the groups for each logbook you would like to create. Separate logbooks are ideal when the site is tested at different times or tested over long periods.

Log Book Edit

10:15 am

Log Book Report – 22-08-18

Create New Logbook Entry Create Report

Log Book Report – 22-02-18

Log Book Report – 22-08-17

Archived Log Book Reports

Test Collection date – 22-08-18Next Collection due – 21-02-19

Groups included – Engineering, Buisness, Admin, Gym Block 12, Car park A … etc

Site NameAddress

Groups Logbook Faults Scan More

Log Book Edit

10:15 am

Log Book Report – 22-08-18

Create New Logbook Entry Create Report

Log Book Report – 22-02-18

Log Book Report – 22-08-17

Archived Log Book Reports

Test Collection date – 22-08-18Next Collection due – 21-02-19

Groups included – Engineering, Buisness, Admin, Gym Block 12, Car park A … etc

Site NameAddress

Groups Logbook Faults Scan More

Log Book Edit

10:15 am

Log Book Report – 22-08-18

Create New Logbook Entry Create Report

Log Book Report – 22-02-18

Log Book Report – 22-08-17

Archived Log Book Reports

Test Collection date – 22-08-18Next Collection due – 21-02-19

Groups included – Engineering, Buisness, Admin, Gym Block 12, Car park A … etc

Site NameAddress

Groups Logbook Faults Scan More

Ground Floor

10:15 am

Not Collected (19) Collected (0)

ENTRY-GND-01-LCFPRO

FOYER-GND-02-LLIFE

HALL-GND-03-LLIFE

KITCHEN-GND-04-LLIFE

Groups Logbook Faults Scan More

Pass Fittings Fail Fittings Select All

Collect, log and report your test results faster than ever before with Quick Collect.

1. Create your logbook entry.

2. Select your group for collection.

3. Walk through and view the Status LED of the CTP fittings.

4. Tap each fitting to select it.

5. Press Pass or Fail .

6. Save your collection.

7. Send a test report to your email.

1. Access logbookThe CleverSparky app includes a simple digital logbook to manage the results of emergency lighting on each site. Each test will be saved as a logbook entry for easy access to the results and maintenance actions.Open the CleverSparky Mobile app and select your site. Click on the logbook button and then create a new logbook entry.

9. Using Quick Collect to gather test results

Page 12: CTP System Installation and operation guide€¦ · CTP System installation scenarios 3 New or complete upgrade i Installing a new CTP System in/on sites with ... and Manual test

22 23

More

10:15 am

Send Reports

Preferred Wholesaler

Add Wholesaler Account Details

Offline Mode

Unsynced Data

Reset Tooltips

Support

How to Videos

Profile

Change Password

Save

Log Out

V1.1.10(641)

Groups Logbook Faults Scan More

After completing routine fitting maintenance on your CTP site you can update the fitting details in CleverSparky by doing a maintenance report.

Select the Maintenance tab then Add Maintenance report.

Enter the Repair date.

Tap Repaired and scroll through the list of options. Select the maintenance that was performed, add in any notes if required and save.

If replacing a complete fitting you will then be taken to the Update fitting information screen where you can choose to scan the new CTP fitting to update the serial number details automatically or enter the new fitting details manually.Fittings will remain in your group list as a fault until the next test is performed and a test result entered.You can review maintenance performed on fitting by reviewing the Actioned column or by printing a maintenance report.

Click on the faults tab at the bottom of the screen (faulty fittings are also marked with a red dot in the fitting screen).Select a faulty fitting from the non actioned list.

Ground Floor

10:15 am

Scan Fitting

Send Report

Not Actioned (2) Actioned (10)

Groups Logbook Faults Scan More

ENTRY-GND-01-LCFPRO

FOYER-GND-02-LLIFE

HALL-GND-03-LLIFE

KITCHEN-GND-04-LLIFE

Add New Maintenance

10:15 am

Replaced FittingReplaced Battery

Replaced Control GearReplaced Lamp

Repair Date

05-09-2018

Repaired

Replaced Fitting

Add Notes

Save

Done

Groups Logbook Faults Scan More

Update Fitting Information

10:15 am

Serial Number

Fitting Type

Install Date

Save

Scan Fitting

Groups Logbook Faults Scan More

11. Menu options explained

Send Test, Fault and Maintenance reports.

Choose your preferred Wholesaler to order parts and replacement fittings. (coming soon)

Add in your wholesaler account details for their E-commerce store. (coming soon)

Select this when collecting results outside a mobile service area.

Refresh any Unsynced data from working offline.

Reset the handy hints that explain the pages within the app.

Contact us for help with any questions you have.

Set up guides and processes.

Edit your personal or business profile details.

Change your Login password.

Log out of your account here.

Select an option to Return.

10. Maintenance reports and faults

Page 13: CTP System Installation and operation guide€¦ · CTP System installation scenarios 3 New or complete upgrade i Installing a new CTP System in/on sites with ... and Manual test

24 25

12. The CleverSparky Web App 13. Frequently asked questions

BatteryHow long will CTP fittings run under test?When activated and put into test, CTP fittings will run on battery for up to a maximum of 10 mins past the required duration ie 130 mins for commissioning or for a delayed 24hr test (battery replacement) or 100 mins for regular testing. If a site loses power for more than 5 hours and the batteries are totally discharged, on return of power is all the timing for the next scheduled test retained? The batteries in a CTP fitting will run to nearly flat but will leave enough charge to keep the timer running for a maximum of 4-6 weeks. After any time longer than that you would have to recharge and reactivate/sync the fittings.

StandardsHow does AS/NZ2293 allow there to be no test switch for CTP fittings?AS/NZ2293 states that emergency lights must be tested either manually using a test switch or by an automatic testing system. Clevertest fittings fall into the latter category as they are deemed to be automatic testing.

Activation If fittings have had CTP previously activated, can you reset the timer/re-synchronise the fittings via the breaker?Yes, use the 6/2/2/2/2 method for activation and immediate test via the breaker, see Page 4 Step 3.When activating CTP at the fitting, how soon can you put the fitting into test?You will need to wait at least 60 seconds after activating CTP before initiating a test. Pushing the test button prior to 60 seconds starts the process for moving test dates forward one month for each press.

Deactivating CTPCan you turn CTP self-testing off? Yes, Press the test button on the fitting 6 times in 10 seconds. After 3 presses the LED will discharge, press another 3 times to disable CTP.

Replacing fittings/Battery – 24hr delayed testWhen you replace a battery do the fittings test for 120 mins?If you initiate a 24hr delayed test it will always run for 120 mins. If you replace a battery during maintenance a 24hr delayed test should always be done.

Sites

UNIT/LEVEL ADDRESS BUSINESS NAME BUILDING NAME CREATED AT

Search

To start populating your sites,click on the addsite button below

+ Add Site

Clever Tower6 Tronic Street

NAME FITTINGS FAULTS CREATED AT

CSV Upload TemplateBack to sites

Groups

Logbook

Faults

Deleted Fittings

Site Details

To start populating your sites,click on the addsite button below

+ Add Site

Upload CSV ReportClever Tower6 Tronic Street

NAME FITTINGS FAULTS CREATED AT

CSV Upload TemplateBack to sites

Groups

Logbook

Faults

Deleted Fittings

Site Details

To start populating your sites,click on the addsite button below

+ Add Site

Upload CSV Report

Go to cleversparky.com on your pc

Download csv and upload csv templates

Clevertronics - 2018-01-03 to 2018-01-10 - Test Results Report - 2018-10-25

SerialNumber

DeviceReference

AssetCode

GroupID

GroupName

Building Level Location ProductCode

Test Date RequiredDuration

TestDuration

TestFault

TestResult

Next Test

00000022 EM2 3 Level 1 officearea

Marketing area CLIFE-PRO 03/01 /2018 90 90 N/A Pass 05/07/2018

00000025 EM3 1 Ground Leveloffices

Hallway CLIFE-PRO 03/01 /2018 90 90 N/A Pass 05/07/2018

0000A53E EM4 1 Ground Leveloffices

Lunch Room CLIFE 04/01 /2018 90 90 N/A Pass 05/07/2018

0000A04B EM5 1 Ground Leveloffices

QA Enginering CLIFE 04/01 /2018 90 90 N/A Pass 05/07/2018

0000A520 EM6 2 Ground LevelFactory

QA Repair room1

CLIFE 04/01 /2018 90 90 N/A Pass 05/07/2018

0000002A EM7 2 Ground LevelFactory

Surface Mountroom

CLIFE-PRO 03/01 /2018 90 90 N/A Pass 05/07/2018

0000000C EX1 3 Level 1 officearea

Finance CUBPRO 03/01 /2018 90 90 N/A Pass 05/07/2018

0000000D EX10 1 Ground Leveloffices

Front office CUBPRO 03/01 /2018 90 90 N/A Pass 05/07/2018

00000003 EX3 3 Level 1 officearea

Reception Stairs CUBLED 04/01 /2018 90 90 N/A Pass 05/07/2018

0000002C EX4 1 Ground Leveloffices

Front door CUBPRO 03/01 /2018 90 90 N/A Pass 05/07/2018

0000000E EX5 1 Ground Leveloffices

Hallway to frontdoor

CUBPRO 03/01 /2018 90 90 N/A Pass 05/07/2018

0000ABBF EX6 2 Ground LevelFactory

Factory side door CCFLED 04/01 /2018 90 90 N/A Pass 05/07/2018

0000ABBE EX7 2 Ground LevelFactory

Factory backdoor

CCFLED 04/01 /2018 90 90 N/A Pass 05/07/2018

0000B38B EX8 2 Ground LevelFactory

Door to office CCFLED 04/01 /2018 90 90 N/A Pass 05/07/2018

0000ABBA EX9 2 Ground LevelFactory

QA repair sidedoor

CCFLED 04/01 /2018 90 90 N/A Pass 05/07/2018

01234578 ery 2 Ground LevelFactory

Reception CLIFE-PRO 03/01 /2018 90 90 Battery Fail 05/07/2018

Completed register

Clevertronics - 2018-01-03 to 2018-01-10 - Test Results Report - 2018-10-25

SerialNumber

DeviceReference

AssetCode

GroupID

GroupName

Building Level Location ProductCode

Test Date RequiredDuration

TestDuration

TestFault

TestResult

Next Test

00000022 EM2 3 Level 1 officearea

Marketing area CLIFE-PRO 03/01 /2018 90 90 N/A Pass 05/07/2018

00000025 EM3 1 Ground Leveloffices

Hallway CLIFE-PRO 03/01 /2018 90 90 N/A Pass 05/07/2018

0000A53E EM4 1 Ground Leveloffices

Lunch Room CLIFE 04/01 /2018 90 90 N/A Pass 05/07/2018

0000A04B EM5 1 Ground Leveloffices

QA Enginering CLIFE 04/01 /2018 90 90 N/A Pass 05/07/2018

0000A520 EM6 2 Ground LevelFactory

QA Repair room1

CLIFE 04/01 /2018 90 90 N/A Pass 05/07/2018

0000002A EM7 2 Ground LevelFactory

Surface Mountroom

CLIFE-PRO 03/01 /2018 90 90 N/A Pass 05/07/2018

0000000C EX1 3 Level 1 officearea

Finance CUBPRO 03/01 /2018 90 90 N/A Pass 05/07/2018

0000000D EX10 1 Ground Leveloffices

Front office CUBPRO 03/01 /2018 90 90 N/A Pass 05/07/2018

00000003 EX3 3 Level 1 officearea

Reception Stairs CUBLED 04/01 /2018 90 90 N/A Pass 05/07/2018

0000002C EX4 1 Ground Leveloffices

Front door CUBPRO 03/01 /2018 90 90 N/A Pass 05/07/2018

0000000E EX5 1 Ground Leveloffices

Hallway to frontdoor

CUBPRO 03/01 /2018 90 90 N/A Pass 05/07/2018

0000ABBF EX6 2 Ground LevelFactory

Factory side door CCFLED 04/01 /2018 90 90 N/A Pass 05/07/2018

0000ABBE EX7 2 Ground LevelFactory

Factory backdoor

CCFLED 04/01 /2018 90 90 N/A Pass 05/07/2018

0000B38B EX8 2 Ground LevelFactory

Door to office CCFLED 04/01 /2018 90 90 N/A Pass 05/07/2018

0000ABBA EX9 2 Ground LevelFactory

QA repair sidedoor

CCFLED 04/01 /2018 90 90 N/A Pass 05/07/2018

01234578 ery 2 Ground LevelFactory

Reception CLIFE-PRO 03/01 /2018 90 90 Battery Fail 05/07/2018

The CleverSparky Web app is the essential site management tool for managing and reporting the testing of multiple sites. It offers additional capabilities to the Mobile version of the app. such as :• Invite and manage multiple users under your business account.• Employees or contractors can be granted various levels of access and

permissions depending on their role within your business.• Save time by bulk uploading of data for larger sites via Excel file.• Transfer sites between business accounts – Perfect if you are installing

the emergency lighting but not doing the ongoing testing.• Easily create Business sub accounts.

Page 14: CTP System Installation and operation guide€¦ · CTP System installation scenarios 3 New or complete upgrade i Installing a new CTP System in/on sites with ... and Manual test

26

Page 15: CTP System Installation and operation guide€¦ · CTP System installation scenarios 3 New or complete upgrade i Installing a new CTP System in/on sites with ... and Manual test

clevertronics.com.au

CTP-GDE-021219

Victoria195 Chesterville RoadMoorabbin VIC 3189Phone: +61 3 9559 2700Fax: +61 3 9559 2799

New South Wales9 Distribution Place Seven Hills NSW 2147Phone: +61 2 8805 6400 Fax: +61 2 8805 6444

Queensland2/8-12 Monte-Khoury DriveLoganholme QLD 4129Phone: +61 7 3442 9700Fax: +61 7 3442 9777

Western Australia12 Milly Court Malaga WA 6090 Phone: +61 8 9248 3720 Fax: +61 8 9248 3725

South Australia U2/19 Main TerraceRichmond SA 5033Phone: +61 8 8301 8800Fax: +61 8 8351 8286

Auckland Unit 22/761 Great South Road Penrose Auckland 1061 Phone: +64 800 548 448

Christchurch163C Wordsworth Street Sydenham Christchurch 8023 Phone: +64 092 224 635