22
1 CEDRAT TECHNOLOGIES Feedback on FP7 MSCA Feb 17, 2015 Frank Claeyssen CEDRAT TECHNOLOGIES

CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

1

CEDRAT TECHNOLOGIESFeedback on FP7 MSCA

Feb 17, 2015Frank Claeyssen

CEDRAT TECHNOLOGIES

Page 2: CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

2

AGENDA

� Cedrat Technologies at glance

� FP7 MSCA ITN IMESCON

� FP7 MSCA IAPP SMART-NEST

� Conclusion

Page 3: CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

33

� Innovative Mechatronic Technologies

o Piezoelectric & Magnetic

o Actuators, Sensors & Electronics

o Mechatronic & detection functions

� Activities

o Products : COTS & Custom

o Engineering : Consulting & Projects

o Training

� High-Tech SME HQ in Meylan,

near Grenoble (France)

� 40 employees

o Sales & Back office

o Engineering Teams : Electrical,

Mechanical & Mechatronic Eng.

o Lab & Production Team

CTEC at a glance

Page 4: CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

4

FP7 MSCA ITN IMESCON� PEOPLE 2010 Marie Curie Actions / Initial Training Networks

o Grant Agreement No 264672

o Project Officer – REA – Patrick Herlant

o Start date – May 1st, 2011

o End date – April 30th, 2015

o Project budget – 2,25 M.EUR

� Project partners:

o 6 Full Network Partners

o 5 Associated Partners

� Project goal: to recruit 12 researchers for total 324 fellow-months

o Recruitment of 11 Early Stage Researchers (ESR) - 312 fellow-months

o recruitment of 1 Experienced Researcher (ER) - 12 fellow months

Page 5: CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

5

FP7 MSCA ITN IMESCON� Full Network Partners (Level 1):

o Inst. of Fluid Flow Machinery, (IMP PAN), Poland, Coordinator

o University of Liverpool (LIV), UK

o Katholieke Universiteit Leuven (K.U.Leuven), Belgium

o LMS International NV (LMS), Belgium

o CEDRAT Technologies (CEDRAT), France

o Wytwornia Sprzetu Komunikacyjnego PZL-Swidnik (PZL-Swidnik), Poland

� Associated Partners (Level2):

o AGUSTA S.P.A. (Agusta), Italy

o Westland Helicopters (Westland), UK

o Fibre Optic Sensors and Sensing Systems (FOS&S), Belgium

o Academic Computer Centre in Gdansk (TASK), Poland

o Axsym Limited (Axsym), UK

Page 6: CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

6

FP7 MSCA ITN IMESCON� Recruitment

o publish job vacancy internationally

o webpages, press, conferences, mobility portals, etc.

o must be advertised via Euraxess webpage

o http://ec.europa.eu/euraxess/

o publish job vacancy on project’s and your institution’s webpage

Page 7: CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

7

FP7 MSCA ITN IMESCON� Recruitment

o recruit under employment contract with full social security, taxation, etc.

o full-time employment

o provide assistance in administrative procedures (visas, work permits, etc.)

o agree with recruited researcher Personal Career Development Plan

o ensure the fellow is trained under the project

o sign and submit obligatory documents (employment contract, DoC,

Personal Career Development Plan, questionnaires)

o provide secondment opportunities

o enable fellow access to the complementary training (i.e. grant writing,

project management, language classes, etc.)

o ensure the fellow participates in conferences, workshop, summer schools

Page 8: CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

8

FP7 MSCA ITN IMESCON� Eligibility / Experience years rule - full-time equivalent in research

o Early Stage Researchers (ESR)

• research experience ≤ 4 years

• no PhD

o Experienced Researchers (ER) still in their early career

• PhD or at least 4 years of research experience

• total research experience ≤ 5 years

� Eligibility / Mobility rule

o researchers must not have resided or carried out their main activity

(studies, work, etc.) in the country of their host organization for more than

12 months in the 3 years immediately prior to the reference date

Page 9: CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

9

FP7 MSCA ITN IMESCON� Grant = Costs :

o Cost category A – Living Allowance

• ESR – 36,700 EUR per year / ER – 56,400 EUR per year

o Cost category A – Mobility Allowance

• family – 800 EUR per fellow-month / no family – 500 EUR per fellow-month

o Cost category B – Travel Allowance

• one payment for every 12 months : ~ 1000 E depend on distance

o Cost category C – Career Exploratory Allowance

• fixed amount of 2,000 EUR

o Cost category D – Contribution to the participation expensesof researchers

• fixed rate of 600 EUR per fellow-month

o Cost category E – Expenses for the activities carried out by the host

• fixed amount of 1,200 EUR per fellow-month

o Cost category H – Overheads

• 10% of the total costs

Page 10: CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

10

FP7 MSCA ITN IMESCON

Page 11: CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

FP7 MSCA ITN IMESCON

11

Page 12: CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

FP7 MSCA ITN IMESCON

� At CTEC : 2 ESR recruitments via Euraxess

o N.9 : Alexander KRAS, Mechanical Engineer, Poland

o N.10 : Mouhanned BRAHIM, Electronic Engineer, Tunisia

o Duration = 18 months

o Contract = CDD

12

Page 13: CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

FP7 MSCA ITN IMESCON

� Innovative MEthodsof Separated Flow CONtrol in Aeronautics

o CTEC activities : Active flaps in helicopter blades

• Alexander KRAS : Amplified Piezo Actuator

• Mouhaned BRAHIM : High power electronics

13

Page 14: CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

14

FP7 IMESCON / A. Kras

� Development of a dedicated APA piezo actuator for flap

o CFRP shell (carbon/epoxy composite) for APA 500L

o Integrated Position Sensor (ECS type)

o Reliability, thermal issues

A.Kras,M.Brahim,T.Porchez,C.Bouchet, F.Claeyssen, CEDRAT TECHNOLOGIES, "Compact, Lightweight, and Efficient

Piezo-Actuation Chain for Aeronautical Applications", Conference Actuator 2014, Bremen, June 2014, 4p

Page 15: CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

15

FP7 IMESCON / M.BRAHIM

� Development of a Switching Amplifier SA75 for piezo

o Modeling to predict performance

o Internal close loop to improve THD

o Losses in the piezo ceramics due to the switching

M. Fournier, M. Brahim, T. Porchez, O. Sosnicki, New design of high Switching Power Amplifier for driving piezoelectric

actuators in aeronautic applications, 16th European Conference on Power Electronics and Applications (EPE'14-ECCE Europe),

26-28 Aug. 2014, 9p

Page 16: CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

FP7 MSCA ITN IMESCON

� Output

o APA-CRFP : Sales started in 2014

o SA75X amplifier : Sales started in 2014

o A.KRAS : Today employed at CEDRAT TECHNOLOGIES in France

o M.BRAHIM : Today in PhD at SUPELEC in France

16

Page 17: CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

17

FP7 MSCA IAPP SMART-NEST� PEOPLE 2010 Marie Curie Actions / Industry –Academia

Partnership and Pathways

o Grant Agreement No 284995

o Project Officer – REA J.B Veret

o Start date – January 1st, 2012

o End date – Dec 31th, 2015

o Project budget – 1,75 M.EUR

� Project partners:

o 6 Full Network Partners

� Project goal:

o 32 researchers exchanges for total 172 fellow-months

Page 18: CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

18

FP7 MSCA IAPP SMART-NEST� Full Network Partners (Level 1):

o IPPT, Poland, Coordinator

o ECL, France

o U.SARRLANDES, Germany

o Adaptronica, Poland

o Cedrat Technologies, France

o I-Deal, Germany

Page 19: CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

19

FP7 MSCA IAPP SMART-NESTN o

1 2 3 4 5 6 7 8 9 # 11 # 1 2 3 4 5 6 7 8 9 # 11 # 1 2 3 4 5 6 7 8 9 # 11 # 1 2 3 4 5 6 7 8 9 # 11 #

1 P erso n Pa ying ins t itut io n

Star

t1 A [ADAPTRONICA], [PL], [IPPT], [PL], [N ] ER2 10 1 2 3 4 5 6 7 8 9 # D. Wiącek ADAPT RONICA2 A [ADAPTRONICA], [PL], [ECL],[ FR],[ N] ER1 5 1 2 3 4 5 J. Biczyk ECL3 A [ADAPTRONICA], [PL], [ECL],[ FR],[ N] ER2 8 1 2 3 4 5 6 7 8 K. Sekuła ECL4 A [IDEAL], [DE], [Y] [ECL],[ FR],[ N] ESR 8 1 2 3 4 5 6 7 8 A. Lozak ECL5 B [ADAPTRONICA], [PL], [ LZPQ],[DE],[N ] ER2 10 1 2 3 4 5 6 7 8 9 # M .Kokot ADAPT RONICA6 A [IDEAL], [DE], [Y] [ LZPQ],[DE],[N ] ER1 9 1 2 3 4 5 6 7 8 9 E. P etrova IDEAL7 A [IPPT], [PL], [N] [ ADA PTRONICA ], ER2 10 1 2 3 4 5 6 7 8 9 # A. Świercz ADAPT RONICA8 A [ ECL],[ FR],[N ] [ ADA PTRONICA ], ESR 8 1 2 3 4 5 6 7 8 M . Khar rat ADAPT RONICA9 A [ ECL],[ FR],[N ] [ ADA PTRONICA ], ER1 4 1 2 3 4 O. Bareil le ECL10 A [LZPQ],[DE],[N] [ ADA PTRONICA ], ESR 4 1 2 3 4 G. Seiler LZ PQ11 A [LZPQ],[DE],[N] [ ADA PTRONICA ], ER1 4 1 2 3 4 R.S. Venkat LZ PQ12 A [LZPQ],[DE],[N] [ ADA PTRONICA ], ER1 9 1 2 3 4 5 6 7 8 9 G. Seiler LZ PQ13 A [IPPT], [PL], [N] [CEDRAT], [FR] , [Y] ER2 5 1 2 3 4 5 T.G. Zieliński CEDR AT14 A [IPPT], [PL], [N] [CEDRAT], [FR] , [Y] ER1 2 1 2 Ł.No wak CEDR AT15 A [IPPT], [PL], [N] [CEDRAT], [FR] , [Y] ER2 2 1 2 G.Mikułowski CEDR AT16 A [IPPT], [PL], [N] [CEDRAT], [FR] , [Y] ER2 2 1 2 P.Pawło wski CEDR AT17 A [IPPT], [PL], [N] [CEDRAT], [FR] , [Y] ESR 5 1 2 3 4 5 P.Wójc ick i CEDR AT18 A [IPPT], [PL], [N] [CEDRAT], [FR] , [Y] ER2 2 1 2 C. Graczyko wskiCEDR AT19 A [ ECL],[ FR],[N ] [CEDRAT], [FR] , [Y] ESR 4 1 2 3 4 Z. Z ergo un CEDR AT20 A [ ECL],[ FR],[N ] [CEDRAT], [FR] , [Y] ER1 7 1 2 3 4 5 6 7 M .Co llet/ O.Bareil leECL21 A [LZPQ],[DE],[N] [CEDRAT], [FR] , [Y] ER1 4 1 2 3 4 R.S. Venkat LZ PQ22 A [LZPQ],[DE],[N] [CEDRAT], [FR] , [Y] ER1 6 1 2 3 4 5 6 ? LZ PQ23 A [IPPT], [PL], [N] [IDEAL], [ DE], [Y] ER2 2 1 2 P.Pawło wski IDEAL24 A [IPPT], [PL], [N] [IDEAL], [ DE], [Y] ER2 2 1 2 C.Graczykowski IDEAL25 A [IPPT], [PL], [N] [IDEAL], [ DE], [Y] ER2 2 1 2 G.Mikułowski IDEAL26 A [IPPT], [PL], [N] [IDEAL], [ DE], [Y] ER2 2 1 2 T.G. Zieliński IDEAL27 A [IPPT], [PL], [N] [IDEAL], [ DE], [Y] ER1 2 1 2 R. Wiszowaty IDEAL28 A [IPPT], [PL], [N] [IDEAL], [ DE], [Y] ER1 5 1 2 3 4 5 G. Kno r IDEAL29 A [ ECL],[ FR],[N ] [IDEAL], [ DE], [Y] ESR 4 1 2 3 4 J.-L. Chris ten IDEAL30 A [ ECL],[ FR],[N ] [IDEAL], [ DE], [Y] ESR 4 1 2 3 4 F. Yu IDEAL31 A [ ECL],[ FR],[N ] [IDEAL], [ DE], [Y] ER1 12 1 2 3 4 5 6 7 8 9 # 11 # ? ECL32 A [LZPQ],[DE],[N ] [IDEAL], [DE], [Y] ER1 9 1 2 3 4 5 6 7 8 9 R.S. Venkat LZ PQ

##4 5 6 #7 #8 #

cont ra

ct type (A -

cont ract, B -stipen

d)

[Sending insti tution]

[Count ry] [ Commer cial secto r Y /N]

[Host ing / Recruiting

instit ution] [Country] [Commerial secto r Y/N ]

Type

# ##2 3 ## # ## ## # # # ## # # # # ## # ## #9 11 # ## # # #

Total

PM

Y ear 1 2012 Year 2 2013 Y ear 3 2014 Year 4 2015

##

Page 20: CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

20

FP7 MSCA IAPP SMART-NEST� Smart Techno. for Transport Safety - Innovation Cluster Nesting

o CTEC activities

• Structural Health Monitoring (SHM)

• New actuators, motors & dampers

o Secondments of 7 researchers

Page 21: CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

21

FP7 MSCA IAPP SMART-NEST� Secondments for CTEC

o N.23 from LZPQ: Ramanan Venkat, 3 months, 2013

• Testing of Electronics LWDS for piezo SHM

o N.18 from IPPT: Pawel Wójcicki, 5 months, 2013

• Design of Electronics (acquisition) for piezo SHM

o N.17 from IPPT: Piotr Pawłowski, 2 months, 2014

• Testing of Piezo motor

o N.19 from IPPT: Cezary Graczykowski, 2 months, 2014

• Modelling of Piezo motor

o N.13 from IPPT: Thomas Zieliński, 4 months, 2014

• Analysis of Piezo motor vibration & noise

o N.15 from IPPT: Gregorz Mikułowski, 2 months, 2014

• Design of Electromagnetic dampers

Page 22: CTec-v2.0 Feedback on MSCA 2015-03-16 · CTEC at a glance. 4 FP7 MSCA ITN IMESCON PEOPLE 2010 Marie Curie Actions / Initial Training Networks o Grant Agreement No 264672 o Project

CONCLUSION on MSCA ITN & IAPP� ITN

o Young engineer to recruit & train

o Large Contract duration

o Low skill, but good flexibility (due to recruitment & training & duration)

o Interesting solution for R&D and recruiting engineer

o High impact on CTEC business

� IAPP

o Experimented researcher (with high salary) provided by a Lab

o Short Contract duration

o High skill, but not so flexible (due to specialization & short duration)

o Interesting solution for R&D when very good match with company

o Medium impact on CTEC business but to be seen in the future …