WINTER • 2017TEXAS DEPARTMENT OF TRANSPORTATION
D A L L A S D I S T R I C T
I-35E PROJECT (SH 183 TO LP 12)CSJ: 0196-03-198 (DALLAS COUNTY)
ESTIMATED COSTSEstimated Construction Cost $200 M
SOURCE: TxDOT TxDOT graphic
PROGRAMMING STATUS
MTP (2040 Metropolitan Transportation Plan) NO
UTP (2017 Unified Transportation Program) NO
STIP (Statewide Transportation Implementation Program, 2017-2020)
NO
SOURCE: TxDOT TxDOT graphic
PROJECT TIMELINE
SOURCE: TxDOT TxDOT graphic
August 2030 – Estimated Letting
June 8, 2005 – FHWA FONSI Environmental Clearance
20302005
2006 - 2029
TBD – Design, Planning & Development; Funding Procurement
General Purpose Lanes General Purpose Lanes General Purpose Lanes General Purpose Lanes
PROPOSED TYPICAL SECTION
TxDOT graphicSOURCE: Texas Department of Transportation.
EXISTING TYPICAL SECTION
PURPOSE AND NEEDIncrease capacity to accomodate growth along the corridor. Extend the I-35E Corridor improvements from the other I-35E projects already in progress, by widening the highway and adding additional lanes in each direction.
PROJECT DETAILS
Limits: I-35E from SH 183 to Loop 12
CSJ: 0196-03-198
Description: Reconstruct and widen from six (6) to eight (8) lanes
Project Length: 2.5 miles
PROJECT STATUSThis project is not in the 2017 Unified Transportation Program and it is not yet funded.
Dallas District Office4777 E. Highway 80Mesquite, TX 75150
CONTACT INFORMATIONDan Perge, P.E.
TxDOT Dallas Advance Project Development Director(214) 320-6283
NOTE: Highlighted areas are not drawn to exact scale. TxDOT graphic