CSE9020 Wk04 / 1

CSE9020 CASE STUDY Week 4

CSE9020 CASE STUDY Week 4

• Notices– The final Friday in Week 13 is the 24th October

• Questions– Unit Administration - Supervisor’s Roles

• Project Plan and Reporting

• Sample Data

• The Business Case is due this week

CSE9020 Wk04 / 2

CSE9020 Week 4CSE9020 Week 4

This week we are going to look (briefly) at

– Documents and Standards

and

– Some Aspects of Quality

CSE9020 Wk04 / 3

CSE9020 CASE STUDY Week1CSE9020 CASE STUDY Week1

Room Allocations:

Lecture Theatre - S Block, Link Theatre

6.00pm

Evening Supervisor Sessions:

B 4.58 - Monday - Erling Breaden

B 4.50 - Monday - Dempsey Chang

B 4.48 - Monday - Santosh Kulkarni

B4.45 - Monday - Joseph

All rooms are booked from 7.30pm

CSE9020 Wk04 / 4

CSE9020 Week 4CSE9020 Week 4

The Documents you are going to produce are – 1. The Business Case Justification (week 4)– 2. The Methodology and Quality Planning

Document (week 6)– 3. Standards to be used in the Preparation of the

User Manual (week 7)– 4. The Testing Strategy (week 8)– 5. The Outline of the Acceptance Test

Specification (week 10)– 6. The User Manual (week 13)

CSE9020 Wk04 / 5

CSE9020 Week 4CSE9020 Week 4

This means

(a) you will need to be clear as to the content of each of these documents

(b) your reports will need to be informative but precise and concise (short but meaningful)

(c) team members will probably be deployed to write parts of the reports

(d) the quality reviewer will need to ensure conformity of style and content

CSE9020 Wk04 / 6

CSE9020 Week 4CSE9020 Week 4

(e) each member of the team must be aware of the content of the complete document

(perhaps a ‘final reading’ session)

(f) the final total document must be quality assessed, amended if necessary, and then

certified as being the final and complete version

CSE9020 Wk04 / 7

CSE9020 Week 4CSE9020 Week 4

General Requirements for Documents

1. Each Document presented is to have– The Name of the Deliverable– The Group Number– The Group Members’ Names– The Group Members’ I.D. Numbers– The Unit Code and Name– The Supervisor’s Name– The Due Date– A Table of Contents– A Short Synopsis (Executive Summary)

CSE9020 Wk04 / 8

CSE9020 Week 4CSE9020 Week 4

General Requirements for Documents

2. The documents are to be produced using Word

3. Spell checking is to be used

4. Section numbering is to be used

5. If paragraphing numbering is required, the particular document standard is to be applied. Paragraph numbering is required for all documents which act as source documents for further development (e.g. the Testing Strategy and Acceptance Test Specifications)

CSE9020 Wk04 / 9

CSE9020 Week 4CSE9020 Week 4

6. Each submitted document is to have the Quality Reviewer’s certificate included

7. Each submitted document is to be accompanied by a Certificate which indicates the contribution of each member to the document’s content and style

8. The Certificate is to be signed by each member indicating acceptance of time, effort and skill contributions of the other members

A copy of the Certificate is available from the web page

CSE9020 Wk04 / 10

CSE9020 Week 4CSE9020 Week 4

Project Objectives are to be identified

Project Scope is to be identified

Project Responsibilities are to be identified (these may alter later as the project progresses and emphases change)

Project Risks are to be identified and a brief description of management of the risk included

Task Effort Estimates - at his stage these can only be rough assumptions, which will be further refined as the project progresses.

CSE9020 Wk04 / 11

CSE9020 Week 4CSE9020 Week 4

Task Effort Estimates (con’t);

A spreadsheet is the preferred approach - Microsoft Project would seem to be not necessary (and it is not a project requirement for you to rush off and develop skills in this software)

Activities must be assigned to each team member.

Later activities will probably have more than 1 member assigned to a task or tasks

The base unit of the ‘cost’ or ‘load’ is the person hour

CSE9020 Wk04 / 12

CSE9020 Week 4CSE9020 Week 4

As a guide, each phase of the project should consume a maximum 25% of the total effort

No phase should be less than 10% of the total effort

Quality effort should be in the range of 5% to 15% of the total project effort.

You should read the Quality Requirements Statement in the handout. Progress onto the Quality Forms which will then form the basis of the development of the Quality Index

CSE9020 Wk04 / 13

CSE9020 Week 4CSE9020 Week 4

Standards

These are outlined in the handout papers from Week 1.

They are to be followed, and need to be associated with each particular Document.

Where the standards are directed at the form of a document, don’t go overboard. The main objective should be to adhere to the standard to produce a valuable, quality document which meets the requirements.

You are not in the business of producing TV type products

CSE9020 Wk04 / 14

CSE9020 Week 4CSE9020 Week 4

Presentation of Documents:

Binding:

Documents of 10 pages or less can be stapled once, top left corner.

Larger documents should be bound either with a spiral binder or submitted in a two-ring A4 folder.

Plastic envelopes or documents wallets are not satisfactory

Printing:

There is no extra benefit in using colour printing. Variation of font and print style can be used at your discretion.

CSE9020 Wk04 / 15

The Quality PlanThe Quality Plan

CSE9020 Wk04 / 16

CSE9020 Week 2Quality PlanQuality Plan

CSE9020 Week 2Quality PlanQuality Plan

Q. What is it ?

A. It is the policy and procedures required for control of projects

It needs a set of development standards and procedures and clear definition of the deliverable (s) from the stages used in the development

Quality is the ability of a product to meet (or to exceed) the agreed/defined user specifications

It MUST be an integral part of the product - NOT an add-on

CSE9020 Wk04 / 17

CSE9020 Week 2Quality PlanQuality Plan

CSE9020 Week 2Quality PlanQuality Plan

This is another way of saying that quality is built into the produce from its initialisation - not as an afterthought

A well developed, and enforced, quality plan will focus on• the scope of work to be done• the deliverables• the standards and their use• the system environment• the various reviews, their outcomes and the effect on

the development (extra effort, change of direction ..)• sign offs required• change management (= management of change)

CSE9020 Wk04 / 18

CSE9020 Week 2Quality PlanQuality Plan

CSE9020 Week 2Quality PlanQuality Plan

Quality is associated and directed at:

- Content

- Continuity

- Accuracy

- Presentation

- Cohesiveness

- Problem Solution

CSE9020 Wk04 / 19

CSE9020 Week 2Quality PlanQuality Plan

CSE9020 Week 2Quality PlanQuality Plan

You should include some comments about your team’s attitude, strategy, acceptance and recognition of a Quality Plan.

How are you going to apply the Quality Plan ?

Here are a few suggestions:-

A clear, agreed work breakdown

No moonlighting or ‘all my own work’ approach

Size each task so that it can be understood, assigned, and monitored

Make sure each task has a deliverable, and that the deliverable matches the requirement

CSE9020 Wk04 / 20

CSE9020 Week 2Quality PlanQuality Plan

CSE9020 Week 2Quality PlanQuality Plan

Inspect (and correct where necessary) each deliverable

Have walkthroughs - a ‘state of the project’ review

Have deliverable test plans - any major points omitted, any errors, any non-alignment with other deliverables ?

Listen carefully to your Quality Reviewer - reach agreement by consensus - don’t ‘hang out’.

CSE9020 Wk04 / 21

CSE9020 Week 2Quality PlanQuality Plan

CSE9020 Week 2Quality PlanQuality Plan

Quality Plan Standards identify the policies and procedures to be adopted and followed by the team. (they may be slightly different from other teams)

The Quality Plan probably includes– An Interviewing Standard– Standards for Meetings– User Manual– Testing– Reviews– Project Methodology

CSE9020 Wk04 / 22

CSE9020 Week 2Quality PlanQuality Plan

CSE9020 Week 2Quality PlanQuality Plan

And equally importantly -

There must be some tangible way which ‘proves’ that each standard has been employed

The development of the method must be correctly managed

Some random thoughts:

The team coordinator should produce a statement outlining the need for for both a quality plan, and for its implementation.

Each team member should be aware of the responsibility placed on them (and others) and accept and follow all standards. If you are in doubt, ask the Team Co-Ordinator

CSE9020 Wk04 / 23

CSE9020 Week 2Quality PlanQuality Plan

CSE9020 Week 2Quality PlanQuality Plan

• What aspects need standards ?

• How’s this for starters -– Project Management– Development Development– Testing

CSE9020 Wk04 / 24

CSE9020 Week 2Quality PlanQuality Plan

CSE9020 Week 2Quality PlanQuality Plan

Quality System : format, structure, procedures, standards

Documentation Control : Adherence to the standards

Internal Reviews and checks : Detect nonconformity early ? Change standards, procedures

Accurate and rapid access to these standards - each team member to have a copy (diskette , CD-Rom - CD Reader ?)

Any problems with sending standards via email ?

Acknowledgement of receipt ?

CSE9020 Wk04 / 25

CSE9020 Week 2Quality PlanQuality Plan

CSE9020 Week 2Quality PlanQuality Plan

And finally -----

Have you identified the RISKS in your project ?

What are they ?

Have you prioritised them ?

What’s your Plan B if Plan A shows some cracks ?

CSE9020 Wk04 / 26

CSE9020 Wk04 / 27

A ReminderA Reminder

The Methodology and Quality Planning Document is due in Week 6

and

The Standards for the User Manual Document is due in

Week 7

CSE9020 Wk04 / 28

CSE9020 Week 4CSE9020 Week 4

And I’m not too sure if these are authentic …

A pilot entered this into the log

‘Something loose in the cockpit’

and the mechanic’s entry was

‘Something tightened in the cockpit’

And this was also noted:

‘Evidence of leak on right main landing gear’

with this fix

‘Evidence removed’

CSE9020 Wk04 / 29

A Slight Variation of Shakespeare’s MACBETH

Act 4

A Slight Variation of Shakespeare’s MACBETH

Act 4

When shall we all meet again

In thunder, lightning or in rain

When the hurlyburly’s done

When the battle’s lost and won

That will follow the set of sun

Where the place ?

Upon the heath, but better in the Link

There to muse with me , I think

Why so ? Week 5 : Renee Gedge/Erling Breaden Conflict and Resolution

Week 6 : Erling Breaden Extreme Programming