SRF No. 0148483
County Project No. 091101
CSAH 112 – Phase 1
Project Advisory Committee (PAC) Meeting August 19, 2015; 8:00 am – 10:00 am
Orono City Hall MEETING RECORD
A project PAC meeting for the referenced project was held at the Orono City Hall on August 19, 2015, from 8:00 a.m. – 10:00 a.m. The following is a summary of the meeting based on the Agenda, which is attached to this record:
Meeting Summary 1. Introductions:
Nate Will opened the meeting. A copy of the meeting sign-in sheet is attached to this meeting record.
2. Review of July 15, 2015, Project Advisory Committee Meeting Record:
Nate asked that any comments on the Meeting Record from the July 15, 2015, meeting be sent electronically to him at SRF. No specific comments were provided by the PAC. Nate will post the meeting record on the project website at www.CSAH112.com on the status page.
3. Review of Previous Action Items:
The following action items were reviewed. Any items shown in grey require additional action, which is added to the action items from this meeting below.
Task Responsible
Party Due Date
Resolution
SRF is to prepare a memorandum to document the decision for constructing the Rapid Rectangular-Flashing Beacon (RRFB) at the intersection of CSAH 112 and Mill Street.
Nate Will 7/31/15 Ongoing
Discuss proposed a tree locations along the north side of CSAH 112, stretching from Mill Street to Martha Lane, with Gear West with property owner.
Scott Weske & Kristy Morter
8/15/15 Ongoing
SRF is to update the project website (www.csah112.com) to include the meeting record for PAC meeting held on 6/17/15.
Nate Will 7/20/15 Completed
Project Advisory Committee Meeting Record August 19, 2015 Page 2 of 6
www.CSAH112.com
Task Responsible
Party Due Date
Resolution
Provide updated copy of the Phase 1 Cost Summary to PAC that includes cost breakdown for discretionary items in the Hennepin County and City of Orono columns.
Nate Will 7/24/15 Completed, see discussion
below
Prepare a staging matrix that provides review of eight different options to convey local traffic through the Phase 1 project during construction. Prepare graphic representations of each option for future review and comments.
Nate Will 8/19/15 Completed, see discussion
below
Revise the Phase 1 proposed geometry and design files to relocate the trail from the south to the north side of CSAH 112 from Martha Lane east to Wolf Pointe Trail.
Nate Will 8/19/15 Completed, see discussion
below
Revise the Phase 1 detour route from CSAH 6 to use TH 12 between CSAH 6 and CSAH 101.
Nate Will 9/15/15 Ongoing, pending design
revisions
Investigate funding options for an overlay of Old Long Lake Road due to anticipation of additional local traffic during the Phase 1 project.
Kristy Morter 8/19/15 Completed, 8/4/15, see discussion
below
Investigate the County’s minimum traffic lane widths for staging through Phase 1.
Kristy Morter 7/24/15 Completed, 11’ lane width minimum
Contact MnDOT or the City of Wayzata to understand scope and schedule of proposed construction activities scheduled for the CSAH 101/TH 12 interchange.
Kristy Morter & Nate Will
8/19/15 Complete, 8/11/15
Investigate opportunity for utilizing the waters of Long Lake to expedite construction along the lake.
Nate Will 8/19/15 Completed, determined not
feasible
Phase 1 Cost Summary: Nate Will provided an updated copy of the Phase 1 Cost Summary to the PAC. He noted that additional cost breakdowns for discretionary items were noted in the Hennepin County and City of Orono columns. Nate recalled at the previous PAC meeting a discussion about whether the PAC preferred to have a chain link fence (black vinyl coated) or ornamental railing (matching the other railings in Phase 1) to be installed along the trail adjacent to the lake shore. He noted that a fence is required to protect trail users from the steep slope along the lake shore. It was noted that a guardrail is no longer proposed along the
Project Advisory Committee Meeting Record August 19, 2015 Page 3 of 6
www.CSAH112.com
lake since the roadway was shifted farther south to provide space for the trail and boulevard. Nate noted that the cost for a fence would be paid for through the County’s turnback agreement with MnDOT. However, the upcharge cost to construct an ornamental railing would not be covered by the turnback agreement. Nate noted the additional cost for the ornamental railing was approximately $160,000 to $180,000. Kristy Morter noted that the County would expect the City of Long Lake to cover this additional cost if the City selects the ornamental railing versus the chain link fence. Councilmember Olson requested that the Phase 1 Cost Summary be updated to include the estimated costs for the ornamental railing and the redesign cost for the trail. Kristy requested the PAC to review the Phase 1 Cost Summary and provide decisions at the next PAC meeting regarding the sidewalk along Symes Street and either to use chain link fence or ornamental railing.
Old Long Lake Road Overlay: Kristy noted that mill and overlay of a city street (Old Long Lake Road) is not eligible for turnback funding. She noted that the official project detour route is planned for TH 12 or alternatively County Road 6; therefore, county funding would not be available on a city street since other detour routes are available.
4. Discussion Items:
a. Staging / Traffic Control Matrix
Nate Will opened the discussion with a brief review of the staging discussion and direction received at the previous PAC meeting. He noted that further review of the eight options including costs, right of way impacts, duration of bypass, and graphics were developed and posted to the CSAH 112 project website in advance of this meeting. Nate provided a copy of the Staging Matrix and graphics to the PAC and several copies were provided to the public that attended the meeting. A copy of the matrix and graphics are attached to this meeting record. Nate presented the options in order from one through eight. He noted that Options One and Two (single lane) resulted in the same anticipated impacts, issues and construction costs. The general feeling was that Option One (westbound) would be preferred over Option Two as it brings traffic into the Long Lake/Orono area versus carrying traffic out such as eastbound. Options Three and Four (single lane with pedestrian access) yielded impacts and costs that were equal to each other. Nate indicated Options Three and Four includes constructing pavement to accommodate one lane of traffic and a pedestrian walkway adjacent to the traffic lane. The walkway area would be separated from the traffic lane with a portable concrete barrier. Nate mentioned these options were reviewed; however, the proposed pavement width is nearly the same as proposed in Option Six. It was noted during the meeting, that a pedestrian detour route could be implemented to route pedestrians over Trunk Highway via the pedestrian overpass that connects to Stoneridge Circle. The pedestrian detour would continue to Orchard Lane and eventually connect to Brown Road north to CSAH 112. Based upon the similar pavement width as compared to Option Six, the PAC felt Options Three and Four should be dismissed since a viable pedestrian detour could be implemented. Nate described Option Five (Single Lane with Signal Control) which includes a single traffic lane with traffic signals at either end of the one-lane bypass. He mentioned that based upon a traffic analysis, significant queue lengths up to 1/4 mile are anticipated during the peak hour traffic volumes, even
Project Advisory Committee Meeting Record August 19, 2015 Page 4 of 6
www.CSAH112.com
with reduced traffic due to construction activities. Nate noted that based upon figures and past experience, the traffic reduction anticipated thru the CSAH 112 corridor may be 1/3 less than current traffic volumes. It was noted that this option has some potential safety issues and concerns resulting from the long queue lengths (traffic back-up) and potential for head-on collisions if traffic does not safely clear the construction area. Kristy noted that the County does not favor this option due to the additive risks and safety concerns. Option Six (two lane bypass) was discussed by the PAC. This option provides two lanes of traffic along the lakeshore and has the highest estimated cost as compared to the other seven options. Nate noted that impacts to the existing parking lot at 1605 Wayzata Boulevard are anticipated. He mentioned this option would result in traffic using the bypass during the 2017/2018 winter since the overall construction of this option plus the permanent pavement section takes longer to construct as compared to Option One, Two, and Eight. It was noted that this option has the largest impact to the existing berm along the south side of CSAH 112, including existing utilities that may need to relocate twice. Nate noted that utility companies typically relocate once in a project and have been known to charge the right of way owner (County) for additional relocates. Nate mentioned that Option Six requires construction of a temporary steel sheet pile retaining wall to hold back the existing berm along the south side of CSAH 112. He noted that City of Long Lake staff had inquired about the possibility of making this temporary sheet pile wall permanent and what the estimated cost differential might be. Amber Klein mentioned the estimated additional cost to make the wall permanent would be approximately $750,000 to $850,000. Kristy noted the additional cost for the permanent wall would be the City of Long Lake should they decide to proceed with a permanent wall. Nate presented Option Seven (single lane AM/PM switch) which includes constructing a single lane bypass and allowing the traffic to go eastbound through the AM peak traffic then switch the direction to WB in advance of PM peak traffic flow. He noted several potential safety concerns with this option including U-turns, complex electronic signing and traffic control, daily traffic switches by the contractor, and increased risk to both the contractor and County. Option Eight (full closure) was briefly discussed. Nate mentioned that a temporary driveway would be need to provide access to 1605 Wayzata Boulevard and to serve the Southwood Shores Town Homes complex. The PAC discussed the eight options and agreed to focus primarily on two options (Option One and Option Six). The PAC requested additional breakdown of the bypass duration for each of the preferred options and a better understanding of the potential for additional costs for private utility relocations.
b. Revised geometry – Phase 1
Nate Will presented a layout showing the proposed Phase 1 project corridor with the revised location of the trail east of Martha Lane. A copy of the layout presented is attached to this meeting record. He noted that based upon a previous decision, the trail was relocated from the south to the north side of CSAH 112 east of Martha Lane. It was noted that the centerline of CSAH 112 was shifted south from the existing alignment in order to move the trail to the north while holding the proposed lake shore at the previous location. Nate mentioned that the retaining wall planned along the south side of CSAH 112, west of Wolf Pointe Trail, would be moved to the north side at Long Lake Creek.
Project Advisory Committee Meeting Record August 19, 2015 Page 5 of 6
www.CSAH112.com
5. Update of Ongoing Design Efforts:
a. Final Design
Nate Will noted that final design is temporarily on hold until the trail relocation revisions are incorporated into the final design drawings. Anticipated design process to begin in October pending a few remaining decisions.
b. Utility Coordination and Mapping
Due to limited time, no discussion occurred on this item.
c. Environmental Investigation
Due to limited time, no discussion occurred on this item.
6. Open Discussion
No open discussion occurred at the meeting.
7. Follow Up Items/Action Items:
For tracking purposes, we have assigned a responsible party and a due date for completing the following action items, which were identified at the meeting:
Task Responsible
Party Due Date
SRF to update project website (www.csah112.com) to include meeting record for PAC meeting held on July 15, 2015.
Nate Will 8/26/15
Provide updated copy of the Phase 1 Cost Summary to PAC that includes line item costs for redesign costs, ornamental railing and permanent steel sheet pile retaining wall along existing berm.
Nate Will 9/16/15
Provide additional schedule details for Options One & Six from the Staging Matrix including approximate dates for various stages of work along the lake shore.
Nate Will 9/16/15
Review possibility for additional utility costs resulting from multiple utility relocations anticipated in Option Six.
Nate Will /
Kristy Morter
9/16/15
PAC members to provide decision on whether to proceed with Option One or Option Six of the Staging Matrix.
PAC 9/16/15
City of Long Lake to decide whether or not to delete the proposed sidewalk work from the north side of Symes Street.
Long Lake 9/16/15
8. Upcoming Meetings:
a. PMT Meeting: September 3, 2015; 1:00 pm – 2:30 pm
b. PAC Meeting: September 16, 2015; 8:00 am – 10:00 am
Project Advisory Committee Meeting Record August 19, 2015 Page 6 of 6
www.CSAH112.com
Meeting Record Revisions:
The preceding represents SRF Consulting Group’s understanding of the referenced meeting. If you identify discrepancies or items that require clarification, please contact Nate Will at SRF, via email at [email protected], or via telephone at (763) 249-6761.
NW/iaf
H:\Projects\8483\_Correspondence\Meetings\Meeting Records\PAC Meetings\150819_PAC\8483_CSAH 112_PACMeetingRecord_150819.docx
CSAH 112 Project Final Design – Phase 1
Project Advisory Committee (PAC) Meeting Sign-In Sheet Wednesday, August 19, 2015 (8:00 – 10:00 a.m.)
Please return to Nate Will, SRF Consulting Group, Inc. 8483”Meetings”
Present Name/Organization Mailing Address Phone Email
☒ Kristy Morter Hennepin County
1600 Prairie Drive Medina, MN 55340
612-596-0384 [email protected]
☒ Mike Turner SRF Consulting Group
1 Carlson Parkway, Suite 150 Minneapolis, MN 55447
763-249-6717 [email protected]
☐ Jessica Loftus City of Orono
P.O. Box 66 Crystal Bay, MN 55323
952-249-4601 [email protected]
☒ Scott Weske City of Long Lake
P.O. Box 606 Long Lake, MN 55356
952-473-6961x2 [email protected]
☒ Nate Will SRF Consulting Group
1 Carlson Parkway, Suite 150 Minneapolis, MN 55447
763-249-6761 [email protected]
☒ Adam Edwards City of Orono
P.O. Box 66 Crystal Bay, MN 55323
952-249-4661 [email protected]
☒ Liz Olson Long Lake City Council
P.O. Box 606 Long Lake, MN 55356
☒ Donny Chillstrom Long Lake Mayor
P.O. Box 606 Long Lake, MN 55356
612-710-0569 [email protected]
☒ Lili McMillan Orono Mayor
P.O. Box 66 Crystal Bay, MN 55323
612-840-8484 [email protected]
CSAH 112 Project Final Design – Phase 1
Project Advisory Committee (PAC) Meeting Sign-In Sheet Wednesday, August 19, 2015 (8:00 – 10:00 a.m.)
Please return to Nate Will, SRF Consulting Group, Inc. 8483”Meetings”
Name/Organization Mailing Address Phone Email
☐ Marty Schneider Long Lake City Council
1176 W. Wayzata Blvd. Long Lake, MN 55356
612-237-3843 [email protected]
☐ Tim Bruers Hennepin County
1600 Prairie Drive Medina, MN 55340
612-596-0393 [email protected]
☐ Michael Jischke SRF Consulting Group
1 Carlson Parkway, Suite 150 Minneapolis, MN 55447
763-267-6600 [email protected]
☒ Jim Cornick Orono City Council
Box 66 Crystal Bay, MN 55323
952-300-0954 [email protected]
☒ Jahn Dyvik Long Lake City Council
1780 Martha Lane Long Lake, MN 55356
612-202-7391 [email protected]
☐ Marv Wurzer Long Lake Public Works
450 Virginia Ave. Long Lake, MN 55356
612-720-4261 [email protected]
☒ Chris LaBounty City of Long Lake (WSB)
P.O. Box 606 Long Lake, MN 55356
763-231-4860 [email protected]
☒ Amber Klein SRF Consulting Group
1 Carlson Parkway, Suite 150 Minneapolis, MN 55447
763-452-4839 [email protected]
☒ Emily Lueth SRF Consulting Group
1 Carlson Parkway, Suite 150 Minneapolis, MN 55447
763-452-4724 [email protected]
SRF No. 0148483
County Project No. 091101
CSAH 112 – Phase 1
Project Advisory Committee (PAC) Meeting August 19, 2015; 8:00 am – 10:00 am
Orono City Hall AGENDA
1. Introductions (If Necessary): (5 Minutes)
2. Review of July 15, 2015 Project Advisory Committee Meeting Record: (5 Minutes)
3. Review of Previous Action Items: (5 Minutes)
Task Responsible Party
Due Date
Resolution
SRF to prepare memorandum to document decision for constructing the Rapid Rectangular-Flashing Beacon (RRFB) at intersection of CSAH 112 and Mill Street.
Nate Will 7/31/15 Ongoing
Discuss proposed tree locations along north side of CSAH 112, from Mill Street to Martha Lane, with Gear West with property owner.
Scott Weske & Kristy Morter
8/15/15 Ongoing
SRF to update project website (www.csah112.com) to include meeting record for PAC meeting held on 6/17/15.
Nate Will 7/20/15 Completed
Provide updated copy of the Phase 1 Cost Summary to PAC that includes cost breakdown for discretionary items in the Hennepin County and City of Orono columns.
Nate Will 7/24/15 Provide at next PAC meeting
Prepare a staging matrix that provides review of eight (8) different options to convey local traffic through the Phase 1 project during construction. Prepare graphic representations of each option for future review and comment.
Nate Will 8/19/15
Revise the Phase 1 proposed geometry and design files to relocate the trail from the south to the north side of CSAH 112 from Martha Lane east to Wolf Pointe Trail.
Nate Will 8/19/15
Revise the Phase 1 detour route from CSAH 6 to use TH 12 between CSAH 6 and CSAH 101.
Nate Will 9/15/15
Investigate funding options for an overlay of Old Long Lake Road due to anticipation of additional local traffic during the Phase 1 project.
Kristy Morter 8/19/15 Complete, 8/4/15
CSAH 112 PAC Meeting August 19, 2015 Page 2 of 2
Task Responsible Party
Due Date
Resolution
Investigate the County’s minimum traffic lane widths for staging through Phase 1.
Kristy Morter 7/24/15 11’ lane width minimum
Contact MnDOT or the City of Wayzata to understand scope and schedule of proposed construction activities scheduled for the CSAH 101/TH 12 interchange.
Kristy Morter & Nate Will
8/19/15 Complete, 8/11/15
Investigate opportunity for utilizing the waters of Long Lake to expedite construction along the lake.
Nate Will 8/19/15
4. Discussion Items: (50 Minutes)
a. Staging / Traffic Control Matrix (50 minutes)
b. Revised geometry – Phase 1 (15 minutes)
5. Update of ongoing design efforts (5 minutes)
a. Final Design
b. Utility Coordination
c. Environmental Investigation
6. Open Discussion (5 Minutes)
7. Follow Up Items/Action Items: (5 Minutes)
Task Responsible Party
Due Date
Resolution
8. Upcoming Meetings:
a. PMT Meeting: September 3, 2015; 1:00 pm – 2:30 pm
b. PAC Meeting: TBD ________, 2015; 8:00 am – 10:00 am
H:\Projects\8483\_Correspondence\Meetings\Agendas\PAC Meetings\150819_PAC\8483_CSAH 112_Agenda_PAC Meeting_150819.docx
STAGING MATRIX FOR TEMPORARY BYPASS OPTIONS
CSAH 112
1 Figure 1A/1B 5 Figure 5A/5B
Additional Cost for Bypass: +$230,000 Additional Cost for Bypass: +$850,000
Bypass Duration: ± 4 months (Aug '17 - Nov '17)
Bypass Duration: ± 10 months (Aug '17 - May '18)**
Right of Way Impacts: 14000 SF Right of Way Impacts: 10100 SF
2 Figure 2A/2B 6 Figure 6A/6B
Additional Cost for Bypass: +$230,000 Additional Cost for Bypass: +$1,430,000
Bypass Duration: ± 4 months (Aug '17 - Nov '17)
Bypass Duration: ± 10 months (Sept '17 - June '18)**
Right of Way Impacts: 14000 SF Right of Way Impacts: 18400 SF
3 Figure 3A/3B 7 Figure 7A/7B
Additional Cost for Bypass: +$1,080,000 Additional Cost for Bypass: +$810,000
Bypass Duration: ± 10 months (Sept '17 - June '18)**
Bypass Duration: ± 10 months (Aug '17 - May '18)**
Right of Way Impacts: 14000 SF Right of Way Impacts: 10100 SF
4 Single Lane (Eastbound Only) with Pedestrian Access Figure 4A/4B 8 Full Closure Figure 8A/8B
Additional Cost for Bypass: +$1,080,000 Additional Cost for Bypass: Base Value ($0)
Bypass Duration:± 10 months
(Sept '17 - June '18)**Closure Duration:
± 4 months (July '17 - Oct '17)
Right of Way Impacts: 14000 SF Right of Way Impacts: 14000 SF
Assumptions:
▪No construction in Long Lake during fish spawning (April 1-June 30)
▪Bypass Duration includes the duration that traffic will be on the bypass. Does not include time to construct or remove the bypass.
Impacts/Issues:
▪Complex traffic control with high risk to contractor/owner
▪Contractor to "clear" the bypass at AM/PM reversal
▪Potential for back ups/large number of U-turns
▪Signing needed all accesses between Wolf Pointe and Hwy 12 to indicate
current traffic direction
▪Tree removal at townhome property
▪Detour signing for eastbound & westbound
▪No pedestrian access
▪Emergency vehicle access/routing
▪Partial width (2-11' lanes) built in 2017, full width completed in 2018
**Bypass will be inplace during winter months
Impacts/Issues:
▪Significant tree removal at townhome property
▪Detour for westbound direction
▪Emergency vehicle access/routing
▪Complex private utility relocation (two relocations possible)
▪Partial width (2-11' lanes) built in 2017, full width completed in 2018
**Bypass will be inplace during winter months
Impacts/Issues:
▪Significant tree removal at townhome property
▪Detour routing for both directions
▪No pedestrian access
▪Emergency vehicle access/routing
▪Full width constructed in Year 1
Impacts/Issues:
▪Significant tree removal at townhome property
▪Detour for eastbound direction
▪Emergency vehicle access/routing
▪Complex private utility relocation (two relocations possible)
▪Partial width (2-11' lanes) built in 2017, full width completed in 2018
**Bypass will be inplace during winter months
Single Lane with Signal Control
Two Lanes
Single Lane (Eastbound AM/Westbound PM)
Single Lane (Westbound Only)
Single Lane (Eastbound Only)
Single Lane (Westbound Only) with Pedestrian Access
Impacts/Issues:
▪Significant tree removal at townhome property
▪Detour for eastbound direction
▪No pedestrian access
▪Emergency vehicle access/routing
▪Partial width (2-11' lanes) built in 2017, full width completed in 2018
Impacts/Issues:
▪Significant tree removal at townhome property
▪Detour for westbound direction
▪No pedestrian access
▪Emergency vehicle access/routing
▪Partial width (2-11' lanes) built in 2017, full width completed in 2018
Impacts/Issues:
▪Significant tree removal at townhome property
▪No pedestrian access
▪Significant impacts to 1605 Wayzata Blvd property
▪Complex private utility relocation (two relocations needed)
▪Partial width (2-11' lanes) built in 2017, full width completed in 2018
**Bypass will be inplace during winter months
Impacts/Issues:
▪Complex traffic control with high risk to contractor/owner
▪Signal needed at 1605 Wayzata Blvd to prevent driver confusion
▪Long queue lengths/back ups/U-turns
▪Tree removal at townhome property
▪No pedestrian access
▪Partial width (2-11' lanes) built in 2017, full width completed in 2018
**Bypass will be inplace during winter months
PRELIMINARY8/13/15
SUBJECT TO CHANGE
FLAG
FLAG
FLAG
1605
EATING
HEALTHY
SUTTON
SEATTLE
PRODUCE
FATHERS
FOUNDING
PERI
METE
R 30 F
T
AREA 1
5 SF
AREA
= 15 SQ
'REM
= 48 SQ
'
PERIMET
ER = 30 '
PERI
METE
R 30 F
T
AREA 1
5 SF
PERI
METE
R 30 F
T
AREA 1
5 SF
PERI
METE
R 30 F
T
PERI
METE
R 30 F
T
11'
ORCHARD LA
BNSF RAILWAY
TH12
A
B
A
B
1601
1595 323
331
339
342
1345
315
330
318
PERI
METE
R 30 F
T
PERIMETER 30 FT
PERI
METE
R 30 F
T
PERIMETER 30 FT
AREA 15 SF
PERI
METE
R 30 F
T
PERIMETER 30 FT
11'
11'
PERI
METE
R 30 F
T
PERIMETER 30 FT
C
D
C
D
MA
TC
HLIN
E - S
EE B
EL
OW
MA
TC
HLIN
E - S
EE A
BO
VE
1000
scale in feet
50
H:\
Proje
cts\8
483\C
AD
_BIM\G
raphics\Sta
gin
g\8
483_
Option 1
_Graphic A.d
gn
Figure 1A
8/10/2015Job #
Temporary Bypass Option 1 - Single Lane (Westbound Only)
CSAH 112 - Phase 1
Hennepin County
LEGEND
CONSTRUCTION ZONE
TEMPORARY PAVEMENT
DIRECTION OF TRAFFIC FLOWTRAFFIC BARRIER
TEMPORARY BYPASS LIMITS
INPLACE RIGHT OF WAY
201
1135
1140
1145
1150
220
221
1155
1160
1165
OHWL=944.3 FT.
LONG LAKE
MA
RT
HA
LA
LO
NG
LA
KE
CR
EE
K
CE
METER
Y R
D
WOLF P
OI
NTE TR
CEMETERY RD
CONSTRUCTIONCLOSED DURINGDRIVEWAY ACCESS
CONSTRUCTIONCLOSED DURING TRAIL ACCESS
EASEMENTTEMPORARY
TREE REMOVALSSIGNIFICANT
PRELIMINARY8/12/15
SUBJECT TO CHANGE
LONG LAKE
LONG LAKE
LONG LAKE
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
FENCE
NOISE
INP MnDOT
INP R/W
INP R/W
OHW 944.3
INP 15" STM
INP 8" WM
THRU
11'
PROP RIPRAP
REMOVED VIA. LARGE CRANE
COFFERDAM INSTALLED /
TEMPORARY SHEET PILE
1:
1
1:2
CL CSAH 112
1142+50
SINGLE LANETEMPORARY ROAD
WORK ZONE
PAVEMENT SECTION
TO EXTEND UP AND BENEATH
GEOTEXTILE SPECIAL
15'
11' 11'
INP R/W
INP R/W
INP 8" WM
THRU
11'
PROP RIPRAP
REMOVED VIA. LARGE CRANE
COFFERDAM INSTALLED /
TEMPORARY SHEET PILE
OHW 944.3
1:
1
1:4
CL CSAH 112
1148+50
SINGLE LANETEMPORARY ROAD
EXCAVATION (CITY)PROP WATER MAIN
15'
WORK ZONE
11' 11'
BUILDING
BLDG 31'MIN. DIST. TO
INP R/W
INP R/W
8" WM
THRU
11'
THRU
11'
PROP RIPRAP
REMOVED VIA. LARGE CRANE
COFFERDAM INSTALLED /
TEMPORARY SHEET PILE
OHW 944.3
1:
1
1:4
CL CSAH 112
1152+00
TWO LANESTEMPORARY ROAD
1:3
EXCAVATION (CITY)PROP WATER MAIN
26'
WORK ZONE
11' 11'
INP R/W
INP 8" WM
1:3
RETAINING
WALL 1:2
WETLAND
DELIN.
CL CSAH 112
1157+25
POND HWL 947.3
CLPROP CREEK
EXCAVATION (CITY)PROP WATER MAIN
WORK ZONE
THRU
11'
THRU
11'
26'GUARDRAIL
TWO LANESPROPOSED ROAD
60 70 80607080 0 10 20 30 40 501020304050
60 70 80607080 0 10 20 30 40 501020304050
60 70 80607080 0 10 20 30 40 501020304050
60 70 80607080 0 10 20 30 40 501020304050
H:\
Proje
cts\8
483\C
AD
_BIM\G
raphics\Sta
gin
g\8
483_
Option 1
_Cross S
ection_
Graphic B.d
gn
Figure 1B
8/10/2015Job #
Temporary Bypass Option 1 - Cross Sections
CSAH 112 - Phase 1Hennepin County
SECTION A-A (STA. 1142+50)
SECTION D-D (STA. 1157+25)
SECTION C-C (STA. 1152+00)
SECTION B-B (STA. 1148+50)
PRELIMINARY8/12/15
SUBJECT TO CHANGE
FLAG
FLAG
FLAG
1605
EATING
HEALTHY
SUTTON
SEATTLE
PRODUCE
FATHERS
FOUNDING
PERIMETER 30 FT
PERIMETER 30 FT
AREA 15 SF
PERIMETER 30 FT
REM 35 SF
AREA 15 SF
PERIMETER 30 FT
PERI
METE
R 30 F
T
AREA 1
5 SF
PERI
METE
R 30 F
T
11'
PERI
METE
R 30 F
T
ORCHARD LA
BNSF RAILWAY
TH12
A
B
A
B
1601
1595 323
331
339
342
1345
315
330
318
PERI
METE
R 30 F
T
PERIMETER 30 FT
PERI
METE
R 30 F
T
PERIMETER 30 FT
AREA 15 SF
11'
11'
PERIMETER 30 FT
PERI
METE
R 30 F
T
PERI
METE
R 30 F
T
PERIMETER 30 FT
C
D
C
D
MA
TC
HLIN
E - S
EE B
EL
OW
MA
TC
HLIN
E - S
EE A
BO
VE
1000
scale in feet
50
H:\
Proje
cts\8
483\C
AD
_BIM\G
raphics\Sta
gin
g\8
483_
Option 2
_Graphic A.d
gn
Figure 2A
8/10/2015Job #
Temporary Bypass Option 2 - Single Lane (Eastbound Only)
CSAH 112 - Phase 1
Hennepin County
LEGEND
CONSTRUCTION ZONE
TEMPORARY PAVEMENT
TRAFFIC BARRIER
TEMPORARY BYPASS LIMITS
INPLACE RIGHT OF WAY
DIRECTION OF TRAFFIC FLOW
201
1135
1140
1145
1150
220
221
1155
1160
1165
OHWL=944.3 FT.
LONG LAKE
MA
RT
HA
LA
LO
NG
LA
KE
CR
EE
K
CE
METER
Y R
D
WOLF P
OI
NTE TR
CEMETERY RD
CONSTRUCTIONCLOSED DURINGDRIVEWAY ACCESS
CONSTRUCTIONCLOSED DURING TRAIL ACCESS
EASEMENTTEMPORARY
TREE REMOVALSSIGNIFICANT
PRELIMINARY8/12/15
SUBJECT TO CHANGE
LONG LAKE
LONG LAKE
LONG LAKE
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
FENCE
NOISE
INP MnDOT
INP R/W
INP R/W
OHW 944.3
INP 15" STM
INP 8" WM
THRU
11'
PROP RIPRAP
REMOVED VIA. LARGE CRANE
COFFERDAM INSTALLED /
TEMPORARY SHEET PILE
1:
1
1:2
CL CSAH 112
1142+50
SINGLE LANETEMPORARY ROAD
WORK ZONE
PAVEMENT SECTION
TO EXTEND UP AND BENEATH
GEOTEXTILE SPECIAL
15'
11' 11'
INP R/W
INP R/W
INP 8" WM
THRU
11'
PROP RIPRAP
REMOVED VIA. LARGE CRANE
COFFERDAM INSTALLED /
TEMPORARY SHEET PILE
OHW 944.3
1:
1
1:4
CL CSAH 112
1148+50
SINGLE LANETEMPORARY ROAD
EXCAVATION (CITY)PROP WATER MAIN
15'
WORK ZONE
11' 11'
BUILDING
BLDG 31'MIN. DIST. TO
INP R/W
INP R/W
8" WM
THRU
11'
THRU
11'
PROP RIPRAP
REMOVED VIA. LARGE CRANE
COFFERDAM INSTALLED /
TEMPORARY SHEET PILE
OHW 944.3
1:
1
1:4
CL CSAH 112
1152+00
TWO LANESTEMPORARY ROAD
1:3
EXCAVATION (CITY)PROP WATER MAIN
26'
WORK ZONE
11' 11'
INP R/W
INP 8" WM
1:3
RETAINING
WALL 1:2
WETLAND
DELIN.
CL CSAH 112
1157+25
POND HWL 947.3
CLPROP CREEK
EXCAVATION (CITY)PROP WATER MAIN
WORK ZONE
THRU
11'
THRU
11'
26'GUARDRAIL
TWO LANESPROPOSED ROAD
60 70 80607080 0 10 20 30 40 501020304050
60 70 80607080 0 10 20 30 40 501020304050
60 70 80607080 0 10 20 30 40 501020304050
60 70 80607080 0 10 20 30 40 501020304050
SECTION A-A (STA. 1142+50)
SECTION D-D (STA. 1157+25)
SECTION C-C (STA. 1152+00)
SECTION B-B (STA. 1148+50)
H:\
Proje
cts\8
483\C
AD
_BIM\G
raphics\Sta
gin
g\8
483_
Option 2
_Cross S
ection_
Graphic B.d
gn
Figure 2B
8/10/2015Job #
Temporary Bypass Option 2 - Cross Sections
CSAH 112 - Phase 1Hennepin County PRELIMINARY
8/12/15SUBJECT TO CHANGE
FLAG
FLAG
FLAG
1605
EATING
HEALTHY
SUTTON
SEATTLE
PRODUCE
FATHERS
FOUNDING
PERI
METE
R 30 F
T
AREA 1
5 SF
AREA
= 15 SQ
'REM
= 48 SQ
'
PERIMET
ER = 30 '
PERI
METE
R 30 F
T
AREA 1
5 SF
PERI
METE
R 30 F
T
AREA 1
5 SF
PERI
METE
R 30 F
T
PERI
METE
R 30 F
T
11'
5'
ORCHARD LA
BNSF RAILWAY
TH12
A
B
A
B
1601
1595 323
331
339
342
1345
315
330
318
PERI
METE
R 30 F
T
PERIMETER 30 FT
PERI
METE
R 30 F
T
PERIMETER 30 FT
AREA 15 SF
PERI
METE
R 30 F
T
PERIMETER 30 FT
11'
11'
PERI
METE
R 30 F
T
PERIMETER 30 FT
C
D
C
D
MA
TC
HLIN
E - S
EE B
EL
OW
MA
TC
HLIN
E - S
EE A
BO
VE
1000
scale in feet
50
H:\
Proje
cts\8
483\C
AD
_BIM\G
raphics\Sta
gin
g\8
483_
Option 3
_Graphic A.d
gn
Figure 3A
8/10/2015Job #
Temporary Bypass Option 3 - Single Lane (Westbound Only) with Pedestrian Access
CSAH 112 - Phase 1
Hennepin County
LEGEND
CONSTRUCTION ZONE
TEMPORARY PAVEMENT
TRAFFIC BARRIER
TEMPORARY SHEET PILE
TEMPORARY BYPASS LIMITS
INPLACE RIGHT OF WAY
DIRECTION OF TRAFFIC FLOW
201
1135
1140
1145
1150
220
221
1155
1160
1165
OHWL=944.3 FT.
LONG LAKE
MA
RT
HA
LA
LO
NG
LA
KE
CR
EE
K
CE
METER
Y R
D
WOLF P
OI
NTE TR
CEMETERY RD
CONSTRUCTIONCLOSED DURINGDRIVEWAY ACCESS
(+/- 7' HIGH)SHEET PILE WALLTEMPORARY
EASEMENTTEMPORARY
TREE REMOVALSSIGNIFICANT
PRELIMINARY8/12/15
SUBJECT TO CHANGE
LONG LAKE
LONG LAKE
LONG LAKE
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
THRU
11'
PILE INSTALLED
TEMPORARY SHEET
15'
WALK
5'
W/PED ACCESS
ONE LANE TEMPORARY ROAD
FENCE
NOISE
INP MnDOT
INP R/W
INP R/W
OHW 944.3
INP 15" STM
INP 8" WM
PROP RIPRAP
REMOVED VIA. LARGE CRANE
COFFERDAM INSTALLED /
TEMPORARY SHEET PILE
1:
1
1:2
CL CSAH 112
1142+50
PAVEMENT SECTION
TO EXTEND UP AND BENEATH
GEOTEXTILE SPECIAL
WORK ZONE
11'11'
INP R/W
INP R/W
INP 8" WM
THRU
11'
PROP RIPRAP
REMOVED VIA. LARGE CRANE
COFFERDAM INSTALLED /
TEMPORARY SHEET PILE
OHW 944.3
1:
1
1:4
CL CSAH 112
1148+50
SINGLE LANETEMPORARY ROAD
EXCAVATION (CITY)PROP WATER MAIN
15'
WORK ZONE
11' 11'
BUILDING
BLDG 31'MIN. DIST. TO
INP R/W
INP R/W
8" WM
THRU
11'
THRU
11'
PROP RIPRAP
REMOVED VIA. LARGE CRANE
COFFERDAM INSTALLED /
TEMPORARY SHEET PILE
OHW 944.3
1:
1
1:4
CL CSAH 112
1152+00
TWO LANESTEMPORARY ROAD
1:3
EXCAVATION (CITY)PROP WATER MAIN
26'
WORK ZONE
11' 11'
INP R/W
INP 8" WM
1:3
RETAINING
WALL 1:2
WETLAND
DELIN.
CL CSAH 112
1157+25
POND HWL 947.3
CLPROP CREEK
EXCAVATION (CITY)PROP WATER MAIN
WORK ZONE
THRU
11'
THRU
11'
26'GUARDRAIL
TWO LANESPROPOSED ROAD
60 70 80607080 0 10 20 30 40 501020304050
60 70 80607080 0 10 20 30 40 501020304050
60 70 80607080 0 10 20 30 40 501020304050
60 70 80607080 0 10 20 30 40 501020304050
SECTION A-A (STA. 1142+50)
SECTION D-D (STA. 1157+25)
SECTION C-C (STA. 1152+00)
SECTION B-B (STA. 1148+50)
H:\
Proje
cts\8
483\C
AD
_BIM\G
raphics\Sta
gin
g\8
483_
Option 3
_Cross S
ection_
Graphic B.d
gn
Figure 3B
8/10/2015Job #
Temporary Bypass Option 3 - Cross Sections
CSAH 112 - Phase 1Hennepin County PRELIMINARY
8/12/15SUBJECT TO CHANGE
FLAG
FLAG
FLAG
1605
EATING
HEALTHY
SUTTON
SEATTLE
PRODUCE
FATHERS
FOUNDING
PERIMETER 30 FT
PERIMETER 30 FT
AREA 15 SF
PERIMETER 30 FT
REM 35 SF
AREA 15 SF
PERIMETER 30 FT
PERI
METE
R 30 F
T
AREA 1
5 SF
PERI
METE
R 30 F
T
11'
PERI
METE
R 30 F
T
5'
ORCHARD LA
BNSF RAILWAY
TH12
A
B
A
B
1601
1595 323
331
339
342
1345
315
330
318
PERI
METE
R 30 F
T
PERIMETER 30 FT
PERI
METE
R 30 F
T
PERIMETER 30 FT
AREA 15 SF
11'
11'
PERIMETER 30 FT
PERI
METE
R 30 F
T
PERI
METE
R 30 F
T
PERIMETER 30 FT
C
D
C
D
MA
TC
HLIN
E - S
EE B
EL
OW
MA
TC
HLIN
E - S
EE A
BO
VE
1000
scale in feet
50
H:\
Proje
cts\8
483\C
AD
_BIM\G
raphics\Sta
gin
g\8
483_
Option 4
_Graphic A.d
gn
Figure 4A
8/10/2015Job #
Temporary Bypass Option 4 - Single Lane (Eastbound Only) with Pedestrian Access
CSAH 112 - Phase 1
Hennepin County
LEGEND
CONSTRUCTION ZONE
TEMPORARY PAVEMENT
TRAFFIC BARRIER
TEMPORARY SHEET PILE
TEMPORARY BYPASS LIMITS
INPLACE RIGHT OF WAY
DIRECTION OF TRAFFIC FLOW
201
1135
1140
1145
1150
220
221
1155
1160
1165
OHWL=944.3 FT.
LONG LAKE
MA
RT
HA
LA
LO
NG
LA
KE
CR
EE
K
CE
METER
Y R
D
WOLF P
OI
NTE TR
CEMETERY RD
CONSTRUCTIONCLOSED DURINGDRIVEWAY ACCESS
(+/- 7' HIGH)SHEET PILE WALLTEMPORARY
EASEMENTTEMPORARY
TREE REMOVALSSIGNIFICANT
PRELIMINARY8/12/15
SUBJECT TO CHANGE
LONG LAKE
LONG LAKE
LONG LAKE
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
THRU
11'
PILE INSTALLED
TEMPORARY SHEET
15'
WALK
5'
W/PED ACCESS
ONE LANE TEMPORARY ROAD
FENCE
NOISE
INP MnDOT
INP R/W
INP R/W
OHW 944.3
INP 15" STM
INP 8" WM
PROP RIPRAP
REMOVED VIA. LARGE CRANE
COFFERDAM INSTALLED /
TEMPORARY SHEET PILE
1:
1
1:2
CL CSAH 112
1142+50
PAVEMENT SECTION
TO EXTEND UP AND BENEATH
GEOTEXTILE SPECIAL
WORK ZONE
11'11'
INP R/W
INP R/W
INP 8" WM
THRU
11'
PROP RIPRAP
REMOVED VIA. LARGE CRANE
COFFERDAM INSTALLED /
TEMPORARY SHEET PILE
OHW 944.3
1:
1
1:4
CL CSAH 112
1148+50
SINGLE LANETEMPORARY ROAD
EXCAVATION (CITY)PROP WATER MAIN
15'
WORK ZONE
11' 11'
BUILDING
BLDG 31'MIN. DIST. TO
INP R/W
INP R/W
8" WM
THRU
11'
THRU
11'
PROP RIPRAP
REMOVED VIA. LARGE CRANE
COFFERDAM INSTALLED /
TEMPORARY SHEET PILE
OHW 944.3
1:
1
1:4
CL CSAH 112
1152+00
TWO LANESTEMPORARY ROAD
1:3
EXCAVATION (CITY)PROP WATER MAIN
26'
WORK ZONE
11' 11'
INP R/W
INP 8" WM
1:3
RETAINING
WALL 1:2
WETLAND
DELIN.
CL CSAH 112
1157+25
POND HWL 947.3
CLPROP CREEK
EXCAVATION (CITY)PROP WATER MAIN
WORK ZONE
THRU
11'
THRU
11'
26'GUARDRAIL
TWO LANESPROPOSED ROAD
60 70 80607080 0 10 20 30 40 501020304050
60 70 80607080 0 10 20 30 40 501020304050
60 70 80607080 0 10 20 30 40 501020304050
60 70 80607080 0 10 20 30 40 501020304050
SECTION A-A (STA. 1142+50)
SECTION D-D (STA. 1157+25)
SECTION C-C (STA. 1152+00)
SECTION B-B (STA. 1148+50)
H:\
Proje
cts\8
483\C
AD
_BIM\G
raphics\Sta
gin
g\8
483_
Option 4
_Cross S
ection_
Graphic B.d
gn
Figure 4B
8/10/2015Job #
Temporary Bypass Option 4 - Cross Sections
CSAH 112 - Phase 1Hennepin County PRELIMINARY
8/12/15SUBJECT TO CHANGE
FLAG
FLAG
FLAG
1605
EATING
HEALTHY
SUTTON
SEATTLE
PRODUCE
FATHERS
FOUNDING
PERI
METE
R 30 F
T
REM
35 S
F
AREA 1
5 SF
PERI
METE
R 30 F
T
AREA 1
5 SF
PERI
METE
R 30 F
T
PERI
METE
R 30 F
T
PERIMETER 30 FT
PERIMETER 30 FT
PERIMETER 30 FT
AREA 15 SF
PERIMETER 30 FT
REM 35 SF
AREA 15 SF
PERI
METE
R 30 F
T
AREA 1
5 SF
11'
ORCHARD LA
BNSF RAILWAY
TH12
A
B
A
B
1601
1595 323
331
339
342
1345
315
330
318
PERIMETER 30 FT
PERI
METE
R 30 F
T
PERIMETER 30 FT
PERI
METE
R 30 F
T
PERIMETER 30 FT
PERI
METE
R 30 F
T
PERIMETER 30 FT
11'
11'11'
11'
C
D
C
D
MA
TC
HLIN
E - S
EE B
EL
OW
MA
TC
HLIN
E - S
EE A
BO
VE
1000
scale in feet
50
H:\
Proje
cts\8
483\C
AD
_BIM\G
raphics\Sta
gin
g\8
483_
Option 5
_Graphic A.d
gn
Figure 5A
8/10/2015Job #
Temporary Bypass Option 5 - Single Lane with Signal Control
CSAH 112 - Phase 1
Hennepin County
LEGEND
CONSTRUCTION ZONE
TEMPORARY PAVEMENT
TRAFFIC BARRIER
TEMPORARY SIGNAL
TEMPORARY BYPASS LIMITS
DIRECTION OF TRAFFIC FLOW
INPLACE RIGHT OF WAY
201
1135
1140
1145
1150
220
221
1155
1160
1165
OHWL=944.3 FT.
LONG LAKE
MA
RT
HA
LA
LO
NG
LA
KE
CR
EE
K
CE
METER
Y R
D
WOLF P
OI
NTE TR
CEMETERY RD
CONSTRUCTIONCLOSED DURINGDRIVEWAY ACCESS
CONSTRUCTIONCLOSED DURINGDRIVEWAY ACCESS
CONSTRUCTIONCLOSED DURING TRAIL ACCESS
EASEMENTTEMPORARY
REMOVALSTREE
REMOVALSTREE
PRELIMINARY8/12/15
SUBJECT TO CHANGE
LONG LAKE
LONG LAKE
LONG LAKE
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
FENCE
NOISE
INP MnDOT
INP R/W
INP R/W
OHW 944.3
INP 15" STM
INP 8" WM
THRU
11'
PROP RIPRAP
REMOVED VIA. LARGE CRANE
COFFERDAM INSTALLED /
TEMPORARY SHEET PILE
1:
1
1:2
CL CSAH 112
1142+50
SINGLE LANETEMPORARY ROAD
WORK ZONE
PAVEMENT SECTION
TO EXTEND UP AND BENEATH
GEOTEXTILE SPECIAL
15'
11' 11'
INP R/W
INP R/W
INP 8" WM
THRU
11'
PROP RIPRAP
REMOVED VIA. LARGE CRANE
COFFERDAM INSTALLED /
TEMPORARY SHEET PILE
OHW 944.3
1:
1
1:4
CL CSAH 112
1148+50
SINGLE LANETEMPORARY ROAD
EXCAVATION (CITY)PROP WATER MAIN
15'
WORK ZONE
11' 11'
BUILDING
BLDG 31'MIN. DIST. TO
THRU
11'
1:3
ONE LANETEMPORARY ROAD
15'
INP R/W
INP R/W
8" WM
PROP RIPRAP
REMOVED VIA. LARGE CRANE
COFFERDAM INSTALLED /
TEMPORARY SHEET PILE
OHW 944.3
1:
1
1:4
CL CSAH 112
1152+00
EXCAVATION (CITY)PROP WATER MAIN
WORK ZONE
11' 11'
INP R/W
INP 8" WM
1:3
RETAINING
WALL 1:2
WETLAND
DELIN.
CL CSAH 112
1157+25
POND HWL 947.3
CLPROP CREEK
EXCAVATION (CITY)PROP WATER MAIN
WORK ZONE
THRU
11'
THRU
11'
26'GUARDRAIL
TWO LANESPROPOSED ROAD
60 70 80607080 0 10 20 30 40 501020304050
60 70 80607080 0 10 20 30 40 501020304050
60 70 80607080 0 10 20 30 40 501020304050
60 70 80607080 0 10 20 30 40 501020304050
SECTION A-A (STA. 1142+50)
SECTION D-D (STA. 1157+25)
SECTION C-C (STA. 1152+00)
SECTION B-B (STA. 1148+50)
H:\
Proje
cts\8
483\C
AD
_BIM\G
raphics\Sta
gin
g\8
483_
Option 5
_Cross S
ection_
Graphic B.d
gn
Figure 5B
8/10/2015Job #
Temporary Bypass Option 5 - Cross Sections
CSAH 112 - Phase 1Hennepin County PRELIMINARY
8/12/15SUBJECT TO CHANGE
FLAG
FLAG
FLAG
1605
EATING
HEALTHY
SUTTON
SEATTLE
PRODUCE
FATHERS
FOUNDING
PERI
METE
R 30 F
T
PERI
METE
R 30 F
T
PERI
METE
R 30 F
T
AREA 1
5 SF
PERIMETER 30 FT
AREA 15 SF
PERIMETER 30 FT
PERIMETER 30 FT
PERI
METE
R 30 F
T
AREA 1
5 SF
PERI
METE
R 30 F
T
AREA 1
5 SF
PERIMETER 30 FT
AREA 15 SF
11'
11'
ORCHARD LA
BNSF RAILWAY
TH12
A
B
A
B
1601
1595 323
331
339
342
1345
315
330
318
PERI
METE
R 30 F
T
PERIMETER 30 FT
PERI
METE
R 30 F
T
PERIMETER 30 FT
AREA 15 SF
11'
11'
PERI
METE
R 30 F
T
PERIMETER 30 FT
C
D
C
D
MA
TC
HLIN
E - S
EE B
EL
OW
MA
TC
HLIN
E - S
EE A
BO
VE
1000
scale in feet
50
H:\
Proje
cts\8
483\C
AD
_BIM\G
raphics\Sta
gin
g\8
483_
Option 6
_Graphic A.d
gn
Figure 6A
8/10/2015Job #
Temporary Bypass Option 6 - Two Lanes
CSAH 112 - Phase 1
Hennepin County
LEGEND
CONSTRUCTION ZONE
TEMPORARY PAVEMENT
TRAFFIC BARRIER
TEMPORARY SHEET PILE
TEMPORARY BYPASS LIMITS
INPLACE RIGHT OF WAY
DIRECTION OF TRAFFIC FLOW
201
1135
1140
1145
1150
220
221
1155
1160
1165
OHWL=944.3 FT.
LONG LAKE
MA
RT
HA
LA
LO
NG
LA
KE
CR
EE
K
CE
METER
Y R
D
WOLF P
OI
NTE TR
CEMETERY RD
CONSTRUCTIONCLOSED DURINGDRIVEWAY ACCESS
CONSTRUCTIONCLOSED DURING TRAIL ACCESS
PARKING AREAPOTENTIAL
EASEMENTTEMPORARY
EASEMENTTEMPORARY
TREE REMOVALSSIGNIFICANT
PRELIMINARY8/12/15
SUBJECT TO CHANGE
LONG LAKE
LONG LAKE
LONG LAKE
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
THRU
11'
PILE INSTALLED
TEMPORARY SHEET
26'
THRU
11'
FENCE
NOISE
INP MnDOT
INP R/W
INP R/W
OHW 944.3
INP 15" STM
INP 8" WM
PROP RIPRAP
REMOVED VIA. LARGE CRANE
COFFERDAM INSTALLED /
TEMPORARY SHEET PILE
1:
1
1:2
CL CSAH 112
1142+50
PAVEMENT SECTION
TO EXTEND UP AND BENEATH
GEOTEXTILE SPECIAL
WORK ZONE TWO LANESTEMPORARY ROAD
11' 11'
THRU
11'
THRU
11'
TWO LANESTEMPORARY ROAD
26'
INP R/W
INP R/W
INP 8" WM
PROP RIPRAP
REMOVED VIA. LARGE CRANE
COFFERDAM INSTALLED /
TEMPORARY SHEET PILE
OHW 944.3
1:
1
1:4
CL CSAH 112
1148+50
EXCAVATION (CITY)PROP WATER MAIN
WORK ZONE
BUILDING
BLDG 20'MIN. DIST. TO
11' 11'
INP R/W
INP R/W
8" WM
THRU
11'
THRU
11'
PROP RIPRAP
REMOVED VIA. LARGE CRANE
COFFERDAM INSTALLED /
TEMPORARY SHEET PILE
OHW 944.3
1:
1
1:4
CL CSAH 112
1152+00
TWO LANESTEMPORARY ROAD
1:3
EXCAVATION (CITY)PROP WATER MAIN
26'
WORK ZONE
11' 11'
INP R/W
INP 8" WM
1:3
RETAINING
WALL 1:2
WETLAND
DELIN.
CL CSAH 112
1157+25
POND HWL 947.3
CLPROP CREEK
EXCAVATION (CITY)PROP WATER MAIN
WORK ZONE
THRU
11'
THRU
11'
26'GUARDRAIL
TWO LANESPROPOSED ROAD
60 70 80607080 0 10 20 30 40 501020304050
60 70 80607080 0 10 20 30 40 501020304050
60 70 80607080 0 10 20 30 40 501020304050
60 70 80607080 0 10 20 30 40 501020304050
SECTION A-A (STA. 1142+50)
SECTION D-D (STA. 1157+25)
SECTION C-C (STA. 1152+00)
SECTION B-B (STA. 1148+50)
H:\
Proje
cts\8
483\C
AD
_BIM\G
raphics\Sta
gin
g\8
483_
Option 6
_Cross S
ection_
Graphic B.d
gn
Figure 6B
8/10/2015Job #
Temporary Bypass Option 6 - Cross Sections
CSAH 112 - Phase 1Hennepin County PRELIMINARY
8/12/15SUBJECT TO CHANGE
FLAG
FLAG
FLAG
1605
EATING
HEALTHY
SUTTON
SEATTLE
PRODUCE
FATHERS
FOUNDING
PERI
METE
R 30 F
T
REM
35 S
F
AREA 1
5 SF
PERI
METE
R 30 F
T
AREA 1
5 SF
PERI
METE
R 30 F
T
PERI
METE
R 30 F
T
PERIMETER 30 FT
PERIMETER 30 FT
PERIMETER 30 FT
AREA 15 SF
PERIMETER 30 FT
REM 35 SF
AREA 15 SF
PERI
METE
R 30 F
T
AREA 1
5 SF
11'
ORCHARD LA
BNSF RAILWAY
TH12
A
B
A
B
1601
1595 323
331
339
342
1345
315
330
318
PERIMETER 30 FT
PERI
METE
R 30 F
T
PERIMETER 30 FT
PERI
METE
R 30 F
T
PERIMETER 30 FT
PERI
METE
R 30 F
T
PERIMETER 30 FT
11'
11'11'
11'
C
D
C
D
MA
TC
HLIN
E - S
EE B
EL
OW
MA
TC
HLIN
E - S
EE A
BO
VE
1000
scale in feet
50
H:\
Proje
cts\8
483\C
AD
_BIM\G
raphics\Sta
gin
g\8
483_
Option 7
_Graphic A.d
gn
Figure 7A
8/10/2015Job #
Temporary Bypass Option 7 - Single Lane (Eastbound AM/Westbound PM)
CSAH 112 - Phase 1
Hennepin County
LEGEND
CONSTRUCTION ZONE
TEMPORARY PAVEMENT
DIRECTION OF TRAFFIC FLOWTRAFFIC BARRIER
TEMPORARY BYPASS LIMITS
INPLACE RIGHT OF WAY
201
1135
1140
1145
1150
220
221
1155
1160
1165
OHWL=944.3 FT.
LONG LAKE
MA
RT
HA
LA
LO
NG
LA
KE
CR
EE
K
CE
METER
Y R
D
WOLF P
OI
NTE TR
CEMETERY RD
CONSTRUCTIONCLOSED DURINGDRIVEWAY ACCESS
CONSTRUCTIONCLOSED DURING TRAIL ACCESS
CONSTRUCTIONCLOSED DURINGDRIVEWAY ACCESS
EASEMENTTEMPORARY
REMOVALSTREE
REMOVALSTREE
PRELIMINARY8/12/15
SUBJECT TO CHANGE
LONG LAKE
LONG LAKE
LONG LAKE
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
960
950
940
FENCE
NOISE
INP MnDOT
INP R/W
INP R/W
OHW 944.3
INP 15" STM
INP 8" WM
THRU
11'
PROP RIPRAP
REMOVED VIA. LARGE CRANE
COFFERDAM INSTALLED /
TEMPORARY SHEET PILE
1:
1
1:2
CL CSAH 112
1142+50
SINGLE LANETEMPORARY ROAD
WORK ZONE
PAVEMENT SECTION
TO EXTEND UP AND BENEATH
GEOTEXTILE SPECIAL
15'
11' 11'
INP R/W
INP R/W
INP 8" WM
THRU
11'
PROP RIPRAP
REMOVED VIA. LARGE CRANE
COFFERDAM INSTALLED /
TEMPORARY SHEET PILE
OHW 944.3
1:
1
1:4
CL CSAH 112
1148+50
SINGLE LANETEMPORARY ROAD
EXCAVATION (CITY)PROP WATER MAIN
15'
WORK ZONE
11' 11'
BUILDING
BLDG 31'MIN. DIST. TO
THRU
11'
1:3
ONE LANETEMPORARY ROAD
15'
INP R/W
INP R/W
8" WM
PROP RIPRAP
REMOVED VIA. LARGE CRANE
COFFERDAM INSTALLED /
TEMPORARY SHEET PILE
OHW 944.3
1:
1
1:4
CL CSAH 112
1152+00
EXCAVATION (CITY)PROP WATER MAIN
WORK ZONE
11' 11'
INP R/W
INP 8" WM
1:3
RETAINING
WALL 1:2
WETLAND
DELIN.
CL CSAH 112
1157+25
POND HWL 947.3
CLPROP CREEK
EXCAVATION (CITY)PROP WATER MAIN
WORK ZONE
THRU
11'
THRU
11'
26'GUARDRAIL
TWO LANESPROPOSED ROAD
60 70 80607080 0 10 20 30 40 501020304050
60 70 80607080 0 10 20 30 40 501020304050
60 70 80607080 0 10 20 30 40 501020304050
60 70 80607080 0 10 20 30 40 501020304050
SECTION A-A (STA. 1142+50)
SECTION D-D (STA. 1157+25)
SECTION C-C (STA. 1152+00)
SECTION B-B (STA. 1148+50)
H:\
Proje
cts\8
483\C
AD
_BIM\G
raphics\Sta
gin
g\8
483_
Option 7
_Cross S
ection_
Graphic B.d
gn
Figure 7B
8/10/2015Job #
Temporary Bypass Option 7 - Cross Sections
CSAH 112 - Phase 1Hennepin County PRELIMINARY
8/12/15SUBJECT TO CHANGE
FLAG
FLAG
FLAG
1605
EATING
HEALTHY
SUTTON
SEATTLE
PRODUCE
FATHERS
FOUNDINGCLOSED
ROAD
F FF FF FF F F F
CLOSED
ROAD
F FF FF FF F F F
ORCHARD LA
BNSF RAILWAY
TH12
1601
1595 323
331
339
342
1345
315
330
318
FF F F F F
ROAD CLOSED
LOCAL TRAFFIC ONLY
0.2 MILES AHEAD
PERI
METE
R 30 F
T
PERIMETER 30 FT
AREA 15 SF
11'
11'
PERI
METE
R 30 F
T
PERIMETER 30 FT
PERI
METE
R 30 F
T
PERIMETER 30 FT
C
D
C
D
MA
TC
HLIN
E - S
EE B
EL
OW
MA
TC
HLIN
E - S
EE A
BO
VE
1000
scale in feet
50
H:\
Proje
cts\8
483\C
AD
_BIM\G
raphics\Sta
gin
g\8
483_
Option 8
_Graphic A.d
gn
Figure 8A
8/10/2015Job #
Temporary Bypass Option 8 - Full Closure
CSAH 112 - Phase 1
Hennepin County
LEGEND
CONSTRUCTION ZONE
TEMPORARY PAVEMENT
TRAFFIC BARRIER
TEMPORARY BYPASS LIMITS
INPLACE RIGHT OF WAY
DIRECTION OF TRAFFIC FLOW
201
1135
1140
1145
1150
220
221
1155
1160
1165
OHWL=944.3 FT.
LONG LAKE
MA
RT
HA
LA
LO
NG
LA
KE
CR
EE
K
CE
METER
Y R
D
WOLF P
OI
NTE TR
CEMETERY RD
CONSTRUCTIONCLOSED DURING TRAIL ACCESS
CONSTRUCTIONCLOSED DURINGDRIVEWAY ACCESS
EASEMENTTEMPORARY
TREE REMOVALSSIGNIFICANT
PRELIMINARY8/12/15
SUBJECT TO CHANGE
LONG LAKE
960
950
940
960
950
940
960
950
940
960
950
940
INP R/W
INP R/W
8" WM
THRU
11'
THRU
11'
PROP RIPRAP
REMOVED VIA. LARGE CRANE
COFFERDAM INSTALLED /
TEMPORARY SHEET PILE
OHW 944.3
1:
1
1:4
CL CSAH 112
1152+00
TWO LANESTEMPORARY ROAD
1:3
EXCAVATION (CITY)PROP WATER MAIN
26'
WORK ZONE
11' 11'
INP R/W
INP 8" WM
1:3
RETAINING
WALL 1:2
WETLAND
DELIN.
CL CSAH 112
1157+25
POND HWL 947.3
CLPROP CREEK
EXCAVATION (CITY)PROP WATER MAIN
WORK ZONE
THRU
11'
THRU
11'
26'GUARDRAIL
TWO LANESPROPOSED ROAD
60 70 80607080 0 10 20 30 40 501020304050
60 70 80607080 0 10 20 30 40 501020304050
SECTION D-D (STA. 1157+25)
SECTION C-C (STA. 1152+00)
H:\
Proje
cts\8
483\C
AD
_BIM\G
raphics\Sta
gin
g\8
483_
Option 8
_Cross S
ection_
Graphic B.d
gn
Figure 8B
8/10/2015Job #
Temporary Bypass Option 8 - Cross Sections
CSAH 112 - Phase 1Hennepin County PRELIMINARY
8/12/15SUBJECT TO CHANGE
SRF Consulting Group, Inc. CSAH 112Hennepin County Project 091101
Last Update: 8/17/15
TOTALS COUNTY TURNBACK FUNDHENNEPIN COUNTY
CITY OF ORONO
CITY OF LONG LAKE
Construction $13,789,162 $13,789,162
R/W $378,075 $378,075Subtotal $14,167,237 $14,167,237
Construction $121,000 $60,500 $60,500R/W $12,818 $6,409 $6,409
Subtotal $133,818 $66,909 $66,909
$59,600 $1,500 $119,400
$168,200 $60,600 $107,500 $26,100 $6,100 $46,900
Subtotal: $595,900 $253,900 $68,200 $273,800
$90,000 $29,700 $60,300
$60,000 $19,800 $40,200
$170,300 $26,300 $144,000
$30,200 $30,200
$102,400 $102,400
$15,349,855 $14,167,237 $370,309 $94,500 $717,809
Construction cost includes 18% Engineering and Construction Administration. Proposed items to be bid as a bid alternative with Phase 1.Costs based upon 2015 unit pricing.Values are rounded.City of Orono discretionary items reflect Council decisions made on June 22, 2015.
PHASE 1 (Willow Drive to Wolf Pointe Trail)
Base
Additional Trail & Sidewalk
Green Text indicates City proposed contribution to discretionary project elements. Blue Text indicates Hennepin County proposed contribution to discretionary project elements. Discretionary spending item cost will be shared by the County and City based on policy. Items listed are current as of May 20th, 2015 PAC meeting.
Subtotal ‐ Phase 1
Symes St. Sidewalk
Additional Lighting Accessories (banner & planter arms/mounts (no banner, no baskets), flag mounts (no flags), elec. outlets on separate circuit)
Utility Full Burial ‐ Long LakeFrom Cemetery Road to Wolf Pointe Trail
Utility Full Burial ‐ Long LakeFrom Cemetery Road west 700'
Streetscape (2 Gateway Monuments ‐ Long Lake)
Lighting (poles, foundations, wire) (50/50 split) Ornamental Trees, shrubs, tree grates, plants)
Additional Lighting and Streetscape
Colored Concrete & Exposed Aggregate Concrete & Ornamental Fence Separa ng Walks from Parking Lots
H:\Projects\8483\HI-MU\EXCEL\Estimate\150817_Phase1CostSummary_60% .xlsx
ST
OC
K PI
LE
ST
OC
K PI
LE
STOCK PILE
STOCK PILE
STOCK PILE
FL
AG
FL
AG
FL
AG
FLAG
FLAG
FLAG
FLAG
FLAG
FLAG
FLAG
FLAG
FLAG
FLAG
FLAG
AUTO BODY
ELITE
2325
Jo MAC'S AUTOS
545
WELDING
REPAIR AND
PERRY'S TRUCK
525
& MORE TLC
OUTDOOR
520
TRANSPORT INC.
BUSING BULK
2160
ELECTRIC INC.
MI LOW
2065
ENGINEERING INC.
LAKE
2085
HARVEST MOON
2380
SERVICE 800
2190
BANK
COMMUNITY
LAKE
1964
& RESTAURANT
RED ROOSTER BAR
1832
RUN & SOCCER
GEAR WEST SKI,
1786
2120
2060
540
520 2045
515
425
570
450
1895
1877
1798
1790
1788
1784
1780
1776
323
331
339
342
1345
315
303
292
330
318
306
289
2070
VACANT
580
PARTS
AUTO
NA PA
2365
VACANT
2073
COFFEE
CARIBOU
KARATE
NATIONAL
TANNERS
BODY GLOW
CLEANERS
PILGRIM
FITNESS
ANYTIME
NAILS
FABULOUS
RIDGE
STONE
MURPHY
PAPA
CENTERS
PRINTING
BUDGET
2069
SENIOR LIVING
ORONO WOODS
2040
MUSEUM
PIONEER
1945
VACANT
1905
1880 FAMILY DENTISTRY
1882 FAMILY INSURANCE
AMERICAN
1890
AND SPA OF DISTINCTION
HAIR ENVY SALON
1870 DENTAL
LONG LAKE
STATE FARM
1854 VETERINARY
LONG LAKE
CAPITAL
CORE GLOBAL1844
1850 WELLNESS
ALIGN HEALTH &
SUBWAY
EL PAR IAN
ACORNS
LITTLE DOMINOS
LIBRARY
HENNEPIN COUNTY
1865
TRUE VALUE
1605
EATING
HEALTHY
SUTTON
SEATTLE
PRODUCE
FATHERS
FOUNDING
JEWELRY
ALBERS
1935
CINDI
NAILS BY
INSURANCE
FARMERS
REPAIR
FURNITURE
WAYZATA
QUICK
1948
GENERAL STORE
BIG ISLAND
2160
COIN LAUNDRY
CONSIGNMENT
EKEKO
SALON 12
GROOM ROOM
2160
CLUB MUTTS
1977
MB
432
448
1843 1828
1802
ONE STOP AUTO
455
REPAIR
APPLIANCE
S.O.S.
2265
EQUIPMENT
MINNESOTA
2315
BARN
LIQUOR
2067
ADRENALINE
GEAR WEST
1810
TOWNHOUSES
SOUTHWOOD SHORES
1595
TOWNHOUSES
SOUTHWOOD SHORES
1601
CROSSFIT
TRUE CHAMPION
CITY HALL
LONG LAKE
PRIMO
WINE & SPIRITS
LAKESIDE FINE
1916
SUPER AMERICA
2400
RE CYCLERS
WASTE
525
LANDSCAPING
GARDEN CENTER &
GOTTEN BROWS.
2350
AND GLASS
AUTO BODY
CHARLIE'S
2205
SKIING
WELL
WELL
MBMBMBMBMBMBMBMB
FLAG
WELL
MB
MB
FLAG
WE
LL
CITY OF ORONO
CITY OF LONG LAKE
CITY OF ORONO
CITY OF LONG LAKECSAH 112
CSAH 112
DANIELS ST.
SH
AU
GH
NE
SS
Y
AV
E.
WI
LL
OW
DR.
VI
RGI
NI
A
AV
E.
LA
KE ST.
MILL ST.
MA
RT
HA
LA.
SY
MES S
T.
TA
MA
RA
CK
AV
E.
BRI
MH
AL
L
AV
E.
BNSF RAILWAY
ORCHARD LA.
BR
OW
N
RD. (
CS
AH 146)
35
SP
EE
D
LI
MI
T
40
SP
EE
D
LI
MI
T
SP
EE
D
LI
MI
T
40
(40 MPH)
LOW SPEED
e = NC
2000' R
(40 MPH)
LOW SPEED
e = NC
2000' R
(35 MPH)
LOW SPEED
e = NC
700' R
(30 MPH)
LOW SPEED
e = NC
500' R
13 PARKING SPACES
13 P
AR
KI
NG SP
AC
ES
SP
EE
D
LI
MI
T
30
SP
EE
DLI
MI
T
40
SP
EE
DLI
MI
T
35
SP
EE
D
LI
MI
T
40
BR
OW
N
RD.
SP
EE
D
LI
MI
T
30
RETAINING WALL C
RETAINING WALL G
REINFORCED SOIL SLOPE
WALL FRETAINING
WALL ERETAINING
WALL ARETAINING
WALL BRETAINING
WALL DRETAINING
SP
EE
D
LI
MI
T
50
SECTION I
TYPICAL
SECTION I
TYPICAL
SECTION J
TYPICAL
SECTION J
TYPICAL
SE
CTI
ON
M
TYPI
CAL
SE
CTI
ON
M
TYPI
CAL
SECTION N
TYPICAL
SECTION N
TYPICAL
SECTION P
TYPICAL
SECTION P
TYPICAL
SE
CTI
ON
X
TYPI
CAL
SE
CTI
ON
X
TYPI
CAL
SECTION K
TYPICAL
SECTION K
TYPICAL
SE
CTI
ON L
TYPI
CAL
SE
CTI
ON L
TYPI
CAL
SECTION O
TYPICAL
SECTION O
TYPICALSECTION RTYPICAL
SECTION RTYPICAL
LC
THRU
11.0' 11.0'
B624 C&G
12.0'
WALK
10.0'
B624 C&G
CSAH 112
CSAH 112
WALKLT. TURN
CONT.
4.0'
SHLD
LC
THRU
2.0%
THRU
11.0'
B624 C&G
WALK
10.0'
B624 C&G
CSAH 112
CSAH 112
2.0%1.5%1.5%
4.0'
SHLD
DESIGN SPEED = 30 MPH
TYPICAL SECTION - L
GRADE
PROFILE
2.0% 2.0% 2.0%
VAR (1:4)
(OR FLATTER)
VAR (1:4)
(OR FLATTER)
B612 C&G
LOTPARKING
2.8' 4.0'-14.0'
RT TURNSHLD/
8.0'5.0' 4.4'
LC
THRU
11.0' 11.0'
B624 C&G
12.0'
WALK
10.0'
B624 C&G
CSAH 112
CSAH 112
WALKLT. TURN
CONT.
4.0'
SHLDPARKING
LC
THRU
2.0%
THRU
11.0'
B424 C&G
WALK
10.0'
B624 C&G
CSAH 112
CSAH 112
2.0%
WALK
1.5%1.5%
4.0'
SHLDPARKING
DESIGN SPEED = 30 MPH
TYPICAL SECTION - M
GRADE
PROFILE
2.0% 2.0% 2.0%
4.0%
10.0'12.0'-14.0'
B624 C&GB624 C&G
3.0'
8.0'
6.2' TO
LC
THRU
12.0'
GRADE
PROFILE
2.0% 2.0%
THRU
12.0'
B624 C&G
BLVD
12.0'
2.0% 2.0%
2.0'
1.5%
BLVD
VAR (1:4)
(OR FLATTER)
B624 C&G
CSAH 112
CSAH 112
2.0%
2.0'
VAR (1:4)
(OR FLATTER)
1.5%2.0%
9.0' 6.0'
WALKTRAIL
10.0' 14.0'
RT TURNLT. TURN
CONT.
DESIGN SPEED = 30-40 MPH
TYPICAL SECTION - I
4.0% 4.0%
VAR (1:4)
(OR FLATTER)
(OR FLATTER)
VAR (1:3)
14.0'
RT TURN
9.0'
LC
THRU
12.0'
GRADE
PROFILE
2.0% 2.0%
THRU
12.0'
B624 C&G
BLVD
12.0'
2.0% 2.0%
2.0'
1.5%
BLVD
VAR (1:4)
(OR FLATTER)
B624 C&G
CSAH 112
CSAH 112
2.0%1.5%
9.0' 6.0'
WALKTRAIL
10.0'
4.0% 4.0%
14.0'
RT TURN
4.0'
SHLD
DESIGN SPEED = 30 MPH
TYPICAL SECTION - K
9.0'
LT. TURN
VAR.
B624 C&GB624 C&G
3.0'
2.0'
VAR.
LC
THRU
12.0'
GRADE
PROFILE
2.0% 2.0%
THRU
12.0'
B624 C&G
BLVD
12.0'
2.0% 2.0%
4.5'
1.5%
BLVD
B624 C&G
CSAH 112
CSAH 112
2.0%
2.0'
VAR (1:4)
(OR FLATTER)
1.5%2.0%
9.0' 6.0'
WALKTRAIL
10.0' 14.0'
RT TURNLT. TURN
CONT.
4.0% 4.0%
9.0'
VAR (1:4)
(OR FLATTER)
DESIGN SPEED = 30 MPH
TYPICAL SECTION - J
8.0'
SHLD
CSAH 112
DESIGN SPEED = 30 MPH
TYPICAL SECTION - N
LC
THRU
11.0'
GRADE
PROFILE
2.0% 2.0%
THRU
11.0'
B624 C&G
12.0'
2.0% 2.0%
B624 C&G
CSAH 112
2.0%
LT. TURN
CONT.
4.0'
SHLDPARKING
10.0'1.0'
VAR (1:2)
(OR FL
ATTER)
VAR (1:4)
(OR FLATTER)
BLVD
5.0'
4.0%1.5%
10.0'-16.0'
WALK
CSAH 112
DESIGN SPEED = 30 MPH
TYPICAL SECTION - O
B624 C&GB624 C&G
SHLDBLVDVAR
1.5%
TRAIL
10.0' 7.0'4.0'-8.0'
SHLD
4.0'-8.0'
BLVD
5.0'
LC
THRU
11.0'
GRADE
PROFILE
2.0% 2.0%
THRU
11.0'
2.0% 2.0%
CSAH 112
LT. TURN
CONT.
0.0'-12.0'
VAR (1:2)
(OR FL
ATTER)
(OR FLATTER)
VAR (1:3)
4.0%4.0%
CSAH 112
DESIGN SPEED = 30 MPH
TYPICAL SECTION - P
BLVD
B624 C&G
2.0%
8.0'
SHLD
4.5'
1.5%
TRAIL
10.0'
B424 C&G
BLVD
2.0%
8.0'
SHLD
5.0'
4.0%
LC
THRU
11.0'
GRADE
PROFILE
2.0% 2.0%
THRU
11.0'
CSAH 112
SHORELINE
1:1
TYP
REINFORCED
SOIL
SLOPE
VAR (1:2)
(OR FL
ATTER)
BLVD
7.0'
4.0%
1.5%
TRAIL
10.0'
DESIGN SPEED = 30 MPH
TYPICAL SECTION - X
LC
15.0' 15.0'
SYMES ST.
VAR VAR1.5%
6.0'
WALK SHARED LN SHARED LN
SHARED LANE TRAIL
SHORELINE STABLIZATION
LEGEND
RAISED MEDIANS & CURBS
PAVED SHOULDERS
PAVED ROADWAY
EXISTING RIGHT OF WAY
BITUMINOUS TRAILS & BIKEWAYS
PROPOSED TRAFFIC SIGNAL
RETAINING WALL
GUARDRAIL
PROPOSED RIGHT OF WAY
(TOE OF SLOPE)
PRELIMINARY CONSTRUCTION LIMITS
WETLANDS
CONCRETE SIDEWALKS & TRAILS
H:\Projects\8483\CAD_BIM\Layout\8483_loa.dgn
PROPOSED TEMPORARY EASEMENT
PROPOSED PERMANENT EASEMENT
(RAPID RECTANGULAR FLASHER BEACON)
PROPOSED PEDESTRIAN FLASHER SYSTEM
CITY LIMITS
PROPOSED DECIDUOUS/ORNAMENTAL TREE
PROPOSED DRY POND LOCATION
TEMPORARY CONSTRUCTION
PAVEMENT REMOVAL
SUBJECT TO CHANGE
PRELIMINARY
SHORELINE STABLIZATION
LEGEND
RAISED MEDIANS & CURBS
PAVED SHOULDERS
PAVED ROADWAY
EXISTING RIGHT OF WAY
BITUMINOUS TRAILS & BIKEWAYS
PROPOSED TRAFFIC SIGNAL
RETAINING WALL
GUARDRAIL
PROPOSED RIGHT OF WAY
(TOE OF SLOPE)
PRELIMINARY CONSTRUCTION LIMITS
WETLANDS
CONCRETE SIDEWALKS & TRAILS
H:\Projects\8483\CAD_BIM\Layout\8483_loa.dgn
PROPOSED TEMPORARY EASEMENT
PROPOSED PERMANENT EASEMENT
(RAPID RECTANGULAR FLASHER BEACON)
PROPOSED PEDESTRIAN FLASHER SYSTEM
CITY LIMITS
PROPOSED DECIDUOUS/ORNAMENTAL TREE
PROPOSED DRY POND LOCATION
TEMPORARY CONSTRUCTION
PAVEMENT REMOVAL
SUBJECT TO CHANGE
PRELIMINARY
2000 100
scale in feet
CSAH 112 PHASE 1 LAYOUT
10901095
1100
1105
1110
1115
1120
1125
100
101
120
121
140
141
160
163
180
185
10
14
191
193
200
201
220
221
401
402
1130
1135
1140
1145
1150
1155
1160
1165
LONG LAKE
LONG LAKE
WOLF P
OI
NTE TR.
CE
METER
Y R
D.
US 12
(30 MPH)
LOW SPEED
e = NC
1000' R
(30 MPH)
LOW SPEED
e = NC
3000' R
LONG LAKE CITY TRAIL
LO
NG
LA
KE
CR
EE
K
BLVD
5.7'
CSAH 112
DESIGN SPEED = 40 MPH
TYPICAL SECTION - R
2.0%
8.0'
SHLDBLVD
7.0'
4.0%
B624 C&G
VAR (1:3)
(OR FLATTER)
4.0%
30.0'
CLEAR ZONE
5.0'
4.0%
8.0'
SHLD
VAR (1:2)
(OR FL
ATTER)
LC
THRU
11.0'
GRADE
PROFILE
2.0%
THRU
11.0'11.0'
2.0% 2.0%
CSAH 112
LT. TURN
2.0%
GUARDRAIL