CITY OF CHASKA
The TH 212 Interchange and CSAH 44 ReconstructionPublic Information Meeting - September 19, 2018
• SW Chaska Plan• CSAH 44-Primary E-W
Connection and Entrance to Community
• Collector Roadways• Development• Community Park• School• Trails• Treatments
History and Background
CSAH 44 Vision
• Meets future traffic demand
• Parkway feel• Trails on both sides• Intersection lighting• Speed limit 40mph
from CSAH 61 to Percheron
• Vegetative screening
• Key intersection - Collector roadway with regional trails and proximity to residential neighborhood, future park, future school – Safety is critical
• Traffic speed is moderated by Roundabout, and streetscape and parkway features can also act as traffic calming devices
• Clear lines of sight between vehicles and pedestrians will be provided
• Pedestrian refuges provided in the splitter islands
• Good lighting is important
Savanna Way Vision
• Dedicated left and right turn lanes
• Pedestrian crossings at intersections:
• Medians serve as pedestrian refuges
• Intersection lighting• Signing and pavement
markings
• Future Considerations• Rectangular Rapid
Flashing Beacon
Percheron Blvd and Cascade/Founders Way
Construction Staging Factors
• Safety• Minimize Emergency Service
response times
• Safety• Safe conveyance of traffic through
construction zone
• Safety• Alternative construction traffic access
• Safety• Pedestrians and bikes
• Technical• Utility relocates – most on east end• Interchange provides access to Hwy
212 quickest• Fill material needed for CSAH 44
widening can be taken from interchange
• Alternative closures minimizes disruptions to neighborhoods
• Quality final product
Construction Staging Option 1
Construction Staging Option 2
Construction Staging Option 3
Construction Schedule Summary
Stage 1April-November 2019 Construct TH 212 interchange and CSAH 44 through Savanna Way
Stage 2April-September 2020 Construct CSAH 44 heading east to CSAH 61
• Project Website - https://www.hwy212interchange.com• Project Contacts
Matt Clark, Project ManagerCity Engineer, City of [email protected]
Dave Nelson, Consultant Project ManagerSRF Consulting [email protected]
Project Communications