CRUISE TERMINAL ADVISORY PANEL
Meeting of
April 19, 2007
Berth LOA ─ 1,300 ft.
$135k (East)
5 -10,000 cu.yds
Avg. Annual Dredge Costs
PIER 94 / 96
Berth LOA ─ 1,138 ft.
Berth LOA ─ 2,317 ft.
Berth LO
A ─
1,296 ft.
$500 k (All berths + Approach)
110 - 125,000 cu.yds
Avg. Annual Dredge CostsPIER 80
Berth LO
A ─
1,300 ft.
- Unknown -
Avg. Annual Dredge Costs
PIER 70
Berth LO
A ─
1,000 ft.
Berth LOA ─ 1,300 ft.
$0 k ─ (East)
$? k ─ (South)
Avg. Annual Dredge Costs
PIER 50
Ber th LO
A ─
623 ft.
$0 (East)
Avg. Annual Dredge Costs
PIERS 30 / 32
Ber
th
LO
A
─
1,35
8 ft
. $750k ─ (East)30 – 40,000 cu.yds
Avg. Annual Dredge Costs
PIER 27
$870k ─ (East)
$480k ─ (West)
50-65,000 cu.yds
Ber
th L
OA
─
1,
055
ft.
Ber
th L
OA
─ 8
07 f
t.
Avg. Annual Dredge Costs
PIER 35