Critique of PU A&T Site Plan Alain L. Kornhauser, PhD
11/29/2012
2
3
The Arts Campus Can be built without Once Again
Moving the Dinky
4
Lewis Center for the Arts
At-grade Access 2 Lot 7
Below-grade Access 2 Lot 7
Pedestrian Access
• Build all of Arts Campus• Access Lot 7• Create Pedestrian Access• Reduce Traffic Conflicts
A&TP3
5
Lewis Center for the Arts
At-grade Access 2 Lot 7
Below-grade Access 2 Lot 7
Pedestrian Access
• Build all of Arts Campus• Access Lot 7• Create Pedestrian Access• Reduce Traffic Conflicts
Below-grade access: Very feasible because Garage’s 8’2”Ceiling Constraint
South Entrance
North Entrance
A&TP3
C-400
6
Lewis Center for the Arts
At-grade Access 2 Lot 7
Below-grade Access 2 Lot 7
Pedestrian Access
• Build all of Arts Campus• Access Lot 7• Create Pedestrian Access• Reduce Traffic Conflicts
At-grade access: Very feasible because Pedestrian & Vehicular grade Xings of Dinky currently exist @ Princeton Jct. & Faculty Rd.
@ Princeton Jct.
@ Faculty Rd.
A&TP3
7
According to NJ Transit*:
AlsoGrade Crossings aren’t Rare
*NJT has stated in response to an OPRA request that it has no documentation about any request by the University for a grade crossing at this location
8
As Proposed
A&TP1
9
As Proposed:Without Moving the DinkyAccess at-grade North of Lot 7
A&TP1
10
As Proposed:Without Moving the DinkyAccess under Tracks South of Lot 7
A&TP1
11
PU can even extend Blair Walk without touching the Dinky
Blair Walk: Beatrix Farrand’s Magnolias - Existing Blair Walk: Magnolia Extension – without touching the Dinky
A&TP47 A&TP48
12
is in Violation of an Easement
Major Issue:
A Substantial Portion of the Site Plan (3.5 acres)
Restricting Development to “Public Transportation Purposes”
13
The Land (with Restricted Development Rights)
Purchased from NJT by PU in 1984Excerpts from the “1984 “Sales Agreement”
1.584 acres in Borough; 1.98 acres in Township*
*’85 Deed
14
Why the University agreed to the Easement
15
Planning the Move Contemplated by the 1984 Contract (DP 2/18/88)
16
Google Earth with Property Boundaries
1.584 acres in Borough; 1.98 acres in Township* * ‘85 Deed
17
Google Earth with Property Boundaries
18
Project Site w Easement Boundary
C-101
19
As Proposed Construction
within easement for public transportation
Question:Doesn’t the Planning Board have the obligation to not violate legitimate easements?(A: easements are rights of individuals, zonings are rights of communities; both need to be enforces by Planning Boards)
A&TP1
C-205
20
Proposes “Elements”
Major Issue:
A Substantial Portion of the Site Plan
on Lands Not Owned by the Applicant
Google Earth with Property Boundaries 21
Google Earth with Borough Property Boundaries Highlighted 22
23
Google Earth & Site Plan with Borough Property Boundaries Highlighted A&TP1
So…the Site Plan includes “elements” on land(s) NOT owned by the University.
• Princeton Borough• Others?
So…the Site Plan includes “elements” on land(s) NOT owned by the University.
• Princeton Borough• Others?
Question: Are these other Owner(s) co-applicants?
24
Traffic Impacts
25
The Roundabout
26
Even with the grading, Roundabout is on an undesirable slope
27
Many Conflicts in Tight Traffic Circle
• Bicycle Conflicts• Vehicle Conflicts• Pedestrian Conflicts• This is a Mess
A&TP21
28
A Better Circulation Plan…
• Make the whole McCarter Block a “Roundabout”– Conflicts are distributed to
locations each having long parallel one-way lanes
– Northbound flows are oriented toward their natural direction up University Place
– Southbound flows are organized down Alexander St.
– More angled parking provided along Univ. Place
A&TP1
29
University Place Currently Serves the Master Plan Adequately
• Community Favors: Dinky over BRT
• Master Plan says nothing about a “Wawa” (which creates most of the current problems)
• Pedestrian crossing, traffic flow and safety are improved with ONE- WAY around McCarter
A&TP10
30
What about the other four (4) Pedestrian Crossings?
31
Traffic Analysis Insufficiently Accurate to Measure Delay to 0.3 Seconds!
32
Hypothetical & Unsubstantiated
Base on Unsubstantiated Lot 7 Route Choice
Based on Unsubstantiated “Total” Build-out
33
Traffic Study Does NOT allow the Universityto make these estimates
• Traffic study did NOT follow cars from Alexander to/from Elm Drive that would allow them to make these claims.
• Numbers are “pulled out of the air”!
• Access Road Transfers Internal VMT to Alexander St.
• Places a substantial amount of traffic on the Access Road next to the “Transit Plaza”
34
The Proposed Transit Plaza
35
This is our Station and our Community’s Gateway
In Pristine Original Historic Form & Function!!
36
Proposed Transit Plaza is “Shoe Horned” “Down the Hill”
• Safety (Traffic & Pedestrian Conflicts) worse than now exists on Univ. Place
• “Backing out” of “Wawa” parking now on both sides of 2-way lane
• Permit Parking farther away
37
Conflicts in “Shoe Horned” Transit Plaza
• Vehicle Conflicts• Pedestrian Conflicts• This is Fundamentally
Unsafe
38
Other Safety Issues
• Backing into 2-way Traffic is Unsafe
• Kiss&Ride Now Requires Pedestrian Xings
• Parked Buses Create Turn Visibility Issues
• This is a Mess
A&TP95
39
Short Term & Metered Parking a Substantially Longer Walk
40
ADA “Platform” Accessibility
• Proposed Range: 305’ - 365 ’
– Not 180’ - 365 ’
• Comparable to Existing
Proposed Plan – Range 305’ – 365’
41
This is our Station and our Community’s Gateway
In Pristine Original Historic Form & Function!!
42
I Urge the Planning Board to…
• Request that Nassau Hall voluntarily withdraw its Site Plan and, post-haste, resubmit a Site Plan that does not move the Dinky terminus
• Then, praise for the Arts Campus will not be plagued by the negative safety, mobility, environmental and historic preservation consequences of the dislocation of the station.
43