STEP BY STEP PROJECT RELIABILITY MINEX-SYSTEMMINEX-components MX-rail fasteners Accessories
AN UPLIFTING CONCEPT CRANE TRACK BEAMCrane track beam Quality Site logistics
RAILSCustomer focus with profile
SLEEPERSPrecisely tailored solutions
PLANNING, MEASURING, DETECTING RAILCONTROL CRANE TRACK MEASURING SYSTEMFunctions Areas of use
SERVICE
Your route to a crane track
THE CRANE TRACK BEAM ON THE BUCHARD QUAY IN HAMBURGProven references
Tracks for container cranes and other transport vehicles haverequirements all of their own. The reason? Crane tracks are
generally used to transport particularly heavy loads at relatively
low speeds. We have therefore created a special technological
all-round package for you which will meet all the special con-
ditions of your project superbly. The cranetrack system.
An all-round track package.The crane track system.
8/12/2019 Crane Track Material
4/20
04
Step by step project reliability.
MINEX-system.MINEX stands for all the components relating to ourcrane track system. This gives our customers thecertainty that all the elements, from the foundationcasting component and pads to the rail fasteners,are part of a single system. So as far as you areconcerned, MINEX means project reliability.
8/12/2019 Crane Track Material
5/20
05
We supply the following MINEX-components
for the crane track system:
MX-rail fasteners MINEX-rail pads
MINEX-grout, the precision cement-based
casting compound
MINEX-EP Grout, the 2-component casting compound
MINEX-PUR 880-6, the elastic casting compound
MINEX-cladding tubes
MINEX-groove filler sections
MINEX-rail end stops
MINEX-rail beds
Excellent experience.MINEX-components.
We have been developing and building tracksystems on ballastless tracks made of con-crete, steel, asphalt or gravel for more than30 years. Excellent experience which wasused in the development of the MINEX-systemcomponents.
2
3
1
1 First fully automatic
container block storagefacility in the world
2 Measuring track and
servicing building
3 Port crane track
8/12/2019 Crane Track Material
6/20
06
We have developed two special fasteners
for our crane track system the MINEX-fastener system which is bolted to the
support plate and the MXA weld system.
Both solutions feature a guide plate
which holds the rail at the side without
clamping it. This prevents the displace-
ment of the rail caused by temperature
fluctuations and the transportation of
heavy loads having an adverse effect or
even damaging the fastening compo-
nents.
The flat design is sealed to prevent the
ingress of dirt into the system. The
push-through connection for the base
anchor consists of a zero play eccentric
component. This allows infinite lateral
adjustment.
Also available made of stainless steel.
Simply eccentric.MX-rail fasteners.
1 2
3
4
5
Sealed system
prevents the
ingress of dirt
Horizontal forces
only stress the bolt
for shearing
Held securely in
position by infinitely
laterally adjustable
eccentric component
Drop-forged
Free longitudinal
movement of the rail
Corner pressure
is prevented by
rounding the guide
plate
Particularly flat
design
1 Single bolt system (MINEX)
2 Double bolt system (MINEX)
3 Single weld system (MXA)
4 Double weld system (MXA)
5 Port crane track
8/12/2019 Crane Track Material
7/20
07
Economy, durability and safety.Accessories.
MS-rail pad
Further assurance of the dura-bility of the complete system is
provided by the elastic crane rail
pad for installing between the
rail foot and the rail bed. The
material is made of ethylvinyl-
acetate and offers outstanding
damping properties. It allows
the low friction longitudinal
movement of the rail, thus redu-
cing peak stresses and vibra-
tion. It also prevents corrosive
processes between the twocomponents. The result is the
great economy of the crane
rail bed.
MINEX-anchors
MINEX-casting compound
MINEX-grout has proved to bean ideal casting compound for
making a full, positive connec-
tion between the foundation
and the rail bed. This precision
cement-based casting mortar
can be pumped, does not shrink,
is very strong and cures in a
very short time. This means
that it can withstand even high
and multiple loads. MINEX-grout
is supplied ready-mixed. It only
has to be mixed with water onthe site. We recommend MINEX-
EP grout for particularly high
bending tensile stresses. Steel
sections which no longer have
their original cross-section
can be restored using elastic,
vibration-damping MINEX-PUR
880-6 rail casting compound.
MINEX-cladding tubes
If the foundation is cast in con-crete, MINEX-cladding tubes are
essential for creating recesses
for installing the MINEX-base
anchors. The tube is profiles
both inside and outside. This
gives it a firm hold in the con-
crete. All diameters between
40 and 200 mm are available
including two matching plastic
covers for each tube.
1
2 3 4
MINEX-cladding tubeStone boltThreaded anchorFlat anchor
1 MINEX-pad
2 Cladding tube with twocover caps (left), top
cladding tube with cover
cap and bottom with
cover cap with nail edge
(centre)
3 MINEX-PUR 880-6
4 MINEX-grout precision
casting compound
8/12/2019 Crane Track Material
8/20
08
MINEX-groove filler section
The MINEX-groove filler section offers plenty
of benefits. This innovation can be suppliedfor any form of rail and is easy to install and
maintain. When installed it prevents frost
damage, the gulley drain from blocking
and the rails and rail bed from floating in
aggressive water. But the system has also
proved to be superb from a safety point of
view. It guarantees safe crossing for road
vehicles and helps to prevent personnel
accidents.
MINEX-rail end stops
MINEX-rail end stops can be supplied in
standard form or in bespoke designs tomeet your requirements for all loads.
We can supply three different designs:
Crane track stops with baffle plates,
Crane track stops with cellulose buffers,
Crane track stops with hydraulic buffers.
We can also supply other products for
the construction of ballastless tracks, for
example in high bay shelving warehouses
or for working trench systems in railway
depots.
Economy, durability and safety.Accessories.
1
3
2
4
1 MINEX-end stop with cellulose
buffer, clamped
2 MINEX-end stop with hydraulic
buffer, clamped3 MINEX-filler section
4 MINEX-end stop with baffle plate
8/12/2019 Crane Track Material
9/20
An uplifting concept.The crane track beam.
In areas in which heavy loads aretransported, experience has shownthat the foundations can suffer settle-ment. In conjunction with HHLA CTBautechnik we have developed apioneering crane track to prevent highcost repair work and long down times.The design of this innovation includesthe facility to raise the entire systemretrospectively. This offers our custo-mers massive time and therefore costsavings.
09
8/12/2019 Crane Track Material
10/20
10
Raise, underpour, continue.Crane track beam.
Rising operating loads, rapidly increasing volumes of bulkgoods for loading and unloading and even larger and heaviercranes require crane tracks which guarantee good positionalstability and therefore high positioning accuracy. This meansthat foundation settlement must be detected early and com-pensated by a raising and levelling concept.
The technological answer to this
challenge is provided by a new
development which we havedeveloped in conjunction with
HHLA CT Bautechnik. The crane
track beam. The system con-
sists of monolithic longitudinal
concrete beams (comprising
reinforced prefabricated concrete
parts) on flat foundations and
connected by in-situ concrete
joints. A sophisticated raising
concept allows the rail to be
raised by up to 10 centimetres
after it has suffered settlement.
By raising and underpouring thelongitudinal beam it is possible
to raise the entire structure by a
further 2 times 10 centimetres,
making a total retrospective
adjustment capacity of 30 centi-
metres.
1
2 3
1 ThyssenKrupp crane
track beam in use
2 MRS87A
3 AS86
8/12/2019 Crane Track Material
11/20
11
Born of experience and ideal for everyday use.Quality.
The development of the crane track system, which is reliableeven under heavy crane loads and high traffic frequency,was monitored by several well-known engineering agencies,companies and universities. It was also subjected to stringentpractical tests by specialists. In addition to a demonstrationof the raising concept, a major series of tests confirmed theload capacity of the system and went well beyond expectations.A system born of experience and ideal for everyday use.
Another element of our quality
concept is our certification toDIN EN ISO 9001. The docu-
mentation required for this
ensures full traceability of all
components is possible at any
time. Batch numbers mean that
every beam and all the compo-
nents in it can be traced back
precisely to the date of produc-
tion.
We will be delighted to advise
you with the planning and de-sign of your new crane track.
1 2
1 ThyssenKrupp crane track beam
2 Detailed photograph: MINEX-crane rail
fasteners
8/12/2019 Crane Track Material
12/20
12
Smooth planning.Site logistics.
Prompt commissioning contributes to theeconomy of a project. With this in mind weensure very detailed plans for delivery andsite logistics during the construction work.
We prefabricate the concrete
elements at our plant. The
length of an element essentially
depends on the existing trans-
port capacities. Depending on
the terms of the project we alsoinstall all the necessary com-
ponents.
Whether it is direct to the instal-
lation crane or to a temporary
storage facility we deliver the
goods to correspond to the pro-
gress on site and always just in
time. That means that we canensure that everything runs
smoothly on site.
After completion After height correction using
compensating plates
Height correction by raising
and underpouring the beam
1
2 3
1 Installation
2 Final alignment
3 Production of the
planed subgrade
8/12/2019 Crane Track Material
13/20
13
Customer focus with profile.Rails.
Every crane track project is different. As a systemsupplier we can therefore always supply you preciselythe rail section that your crane track project needs.Whether it is for heavy or lightweight loads, frequencyor rare traffic, high or low design heights, continuousor discontinuous mounting the requirements of yourproject decide the track type.
That is why we supply a particu-
larly wide range of sections:
A sections to DIN 536-1
Special sections
Flat-bottom sections
Field track rails
Grooved rails
Rectangular sections
and many other sections
as well.
Depending on the requirements
of your project we can also offerprecision machining. We manu-
facture the precise lengths you
require, complete all the step
and mite cuts that may be
needed, drill the holes required
for lugs, screw connections and
earth connections and bend
every rail precisely using the
planning specifications if neces-
sary.
60 x 40 A45 A100 30E1 49E1 60E1 RiPh37A AS86 MRS221
1
2 3
4
5
1 Step cut
2 90 cut
3 Angled cut
4 Bending plan
5 Flat-bottomed rails
8/12/2019 Crane Track Material
14/20
14
Precisely tailored solutions.Sleepers.
We will use wooden or concrete
sleepers for your crane trackdepending on the terms of your
project. If heavy loads are likely,
the concrete sleeper is an ideal
component. If the main require-
ment is for elasticity, the wooden
sleeper is the better alternative.
In any event, to order we can
supply your sleepers including
plates for all conventional rail
sections.
We manufacture wooden slee-
pers (both impregnated anduntreated) at our own plant in
Gross Oesingen. We use a range
of timber types for this purpose,
including beech, oak, spruce,
ekki and mora, and process them
to produce precisely tailored
top quality products. They are
impregnated using the pressure
method and the WEI Type C
product.
1 3 4
5
2
1 Crane track on concrete sleepers
2 Impression crane track
3 Crane track on concrete sleepers
with system W
4 Wooden sleeper yard
5 Crane track on wooden sleepers
with system KS
8/12/2019 Crane Track Material
15/20
15
Planning, measuring, detecting.The Railcontrol crane track measuring system.
The precise measurement of a crane track has become an integralpart of the overall crane track system. We use our Railcontrolmeasuring system during the acceptance procedure and as part
of our planning. Railcontrol has also proved to be very useful forresearching the causes of excessive wear. The early detection andrectification of defects helps to save massive costs.
8/12/2019 Crane Track Material
16/20
16
Automatically precise.Functions.
The automated process developed by ThyssenKrupp
GfT Gleistechnik GmbH in conjunction with Vermes-sungsbro Hanack und Partner is suitable for a wide
range of tasks:
Checking compliance with the tolerances set
out in VDI 3576, ISO 12488-1, etc.
Measuring in laden (crane moving) and unladen
state (standstill). The difference can be used to
form conclusions about the movements as the
crane is moving.
Error analysis in the event of problems whilst the
crane is moving or if the track suffers excessive wear.
Monitoring by means of tachymetric measure- ments which integrates the results in a high
level coordinate network.
Ability to take measurements whilst operations
continue.
Tolerance deviations to regulations
1 2
1 Port crane track
2 Indoor crane track
3 Angled crane track
4 Intermodal terminal
5 High bay shelvingwarehouse
B C ES max
Position deviation Height deviation Level Gauge centre dimension
S min
8/12/2019 Crane Track Material
17/20
17
Railcontrol can be used on any crane track. After being
placed on the rail it moves automatically using its owndrive unit. This enables it to take continuous, fast and
precise 3-D measurements.
The tachymeter records the gauge, position and height
of the rail with great precision along with the offset and
angle of the rail and plots all the data on evaluation gra-
phics using a special software package. This gives the
customer a plastic load picture. If these investigations
show that repair work is required, we can find a compe-
tent contractor for you.
Project phases in which we use Railcontrol:
Before commissioning new cranes on existing
crane tracks
To document the position and height of new
crane tracks
For damage assessment and evaluation
As part of preventive maintenance procedures
To assess the capacity use of an indoor construction
For quality assurance and wear reduction purposes
For health and safety procedures
For every phase.Areas of use.
4 5
3
8/12/2019 Crane Track Material
18/20
18
Your route to a crane track.Service.
In addition to what we can offers in terms of the Rail-
control measuring system we also offer a wide rangeof other services. For example we can help you with
project and budget planning and can help you develop
a crane track system that is precisely tailored to your
needs.
We use a specially adapted crane track design program
for this purpose. Using a wide range of material and
load parameters we calculation the potential capacity
for you. To order we can supply all the verifiable static
calculations you will need.
The crane track configurator on our homepagewww.tkgftgleistechnik.de is an ideal tool to provide an
initial estimate. This allows you to compile all the crane
track components you need to suit your requirements.
We will be delighted to hold discussions with you on
the basis of these documents.
For further information go to
www.tkgftgleistechnik.de
1
2
3
1 Rail storage facility
2 Service vehicle
3 Advice
4 Railcontrol
measurement log
4
8/12/2019 Crane Track Material
19/20
19
The Port of Hamburg occupies position 8 in the list of globalcontainer ports. During the 2005 financial year it exceededthe 8 million mark for the first time by handling a total of8.1 million containers. In 2006 its total handling numbersincreased to 8.9 million containers. This makes the port thefastest growing in Northern Europe. Plenty of reasons forHamburger Hafen und Logistik AG (HHLA) to extend itsBurchard Quay Container Terminal.
Proven references.The crane track beam at the Burchard Quay in Hamburg.
The port authority chose our crane track
beam as the rail system for its cranes. Inaddition to high requirements in terms of
quality, load capacity and economy, the
main reasons behind this decision were its
fast installation and the possibility to install
the system whilst port operations conti-
nued.
A triple rail mounted gantry (TRMG) was
installed. This system comprises two small
cranes on the inner rails and a large crane
on the outer ones. This solution provides a
great deal of flexibility in the stacking block.Some 29 of these blocks will be built by the
end of the project. Each block is around
375 metres long. Placed one after the
other, these crane tracks have an over-all
length of more than 40 km.
The project at the Burchard Quay Container
Terminal provides more impressive evidence
of what we can provide.
Photos: HHLA
Other references
Airbus ArcelorMittal Audi Bayer BWG
Deutsche Bahn AG Fraunhofer Institut Gottwald
HKM Honda Japan Liebherr Meyerwerft Rheinbraun RWE Sandvik Schweden Solvay Stelcon Unilever Stump Indonesien Vattenfall Volkswagen
8/12/2019 Crane Track Material
20/20
SALES
Regional office
NorthVahrenwalder Str. 20530165 Hannover GermanyPhone:+49 511 6703-25Fax: +49 511 6703-37
WestHollestr. 7a
45127 Essen GermanyPhone: +49 201 844-563745Fax: +49 201 844-563750
EastRotherstr. 710245 Berlin GermanyPhone:+49 30 628901-15Fax: +49 30 628901-20/-21
SouthFrstenrieder Str. 26781377 Mnchen GermanyPhone:+49 89 7871-300Fax: +49 89 7871-343
South-West
Weilimdorfer Str. 74/ 270839 Gerlingen GermanyPhone: +49 7156 430730Fax: +49 7156 430740
EXPORT SALES
ExportHollestr. 7a45127 Essen GermanyPhone: +49 201 844-563764Fax: +49 201 844-563757
MANUFACTURING PLANT
HolzschwellenwerkAm Bahnhof 229393 Gro Oesingen GermanyPhone:+49 5838 9905-0Fax: +49 5838 9905-79
Location of sales
Waidmannstr. 2622769 Hamburg GermanyPhone:+49 40 85340-700Fax: +49 40 85340-701
An der Kreuzkirche 601067 Dresden GermanyPhone:+49 351 4902040Fax: +49 351 4902480
Dortmunder Str. 268219 Mannheim GermanyPhone:+49 621 8906-120/-121Fax: +49 621 8906-122
MRT Track &Services Co., Inc.270 Broad Street07003 Bloomfield NJ-USAPhone:+1 973 748-8899Fax: +1 973 748-9243
ThyssenKrupp WeichenbauObere Stahlindustrie 444793 Bochum GermanyPhone:+49 234 9114-343Fax: +49 234 9114-557
Humboldtstr. 304105 Leipzig GermanyPhone: +49 341 6017054Fax: +49 341 6017055
ThyssenKrupp
GfT Polska Sp. z o.o.
Al. Slowackiego 6630-004 Krakw PolandPhone: +48 12 6204130Fax: +48 12 2677548
Betrieb IndustrieweichenAm Wasserturm 3b06869 Coswig/Anhalt GermanyPhone: +49 34903 4741-0Fax: +49 34903 4741-20
VertriebsbereichWaggonausrstungRotherstr. 710245 Berlin GermanyPhone:+49 30 628901-15Fax: +49 30 628901-22
Betrieb SpannmittelAm Wasserturm 3b06869 Coswig/Anhalt GermanyPhone:+49 34903 4741-0Fax: +49 34903 4741-24
ThyssenKrupp LangschienenLadestr. 839175 Knigsborn GermanyPhone:+49 39292 6958-17Fax: +49 39292 6958-20
bjectto
alterations
09/2012e
ThyssenKrupp GfT Gleistechnik GmbH
Hollestr. 7a 45127 Essen Germany
Phone +49 201 844-563710 Fax +49 201 844-563714
www.tkgftgleistechnik.de [email protected]