DEP Interceptor
Atlantic Ave Interchange & Van Voorhees Park/Ramp
BBP Offices
Columbia Heights Bridge
1
2
3
Tour Route
1
2
3
4
Columbia Heights Bridge
Pier 2 Uplands
Montague Turnaround
Joralemon Access Point
Brooklyn Bridge Portal
BQE TOURMay 29, 2019
One BBP
Joralemon Access
LEGEND
Subway Lines
4
Promenade
Cranberry Fan Plant
Clark St Fan Plant
Montague Fan Plant
Montague Substation
5
5 Atlantic Avenue Interchange
York Street Cantilever
As presented to the BQE Expert Panel for informational/background purposes only https://bqe-i278.com/en/expert-panel/documents
NYC Transit Infrastructure In Project Area
BQE Map with NYCT Facilities
As presented to the BQE Expert Panel for informational/background purposes only https://bqe-i278.com/en/expert-panel/documents
NYCT Facilities: Site Pictures
Furman Street at Cranberry, #6332
As presented to the BQE Expert Panel for informational/background purposes only https://bqe-i278.com/en/expert-panel/documents
NYCT Facilities: Site Pictures
Furman Street at Clark, #7230
As presented to the BQE Expert Panel for informational/background purposes only https://bqe-i278.com/en/expert-panel/documents
NYCT Facilities: Site Pictures
Clark Street NYCT Infrastructure
As presented to the BQE Expert Panel for informational/background purposes only https://bqe-i278.com/en/expert-panel/documents
NYCT Facilities: Site Pictures
Furman Street at Montague, #5105
As presented to the BQE Expert Panel for informational/background purposes only https://bqe-i278.com/en/expert-panel/documents
NYCT Facilities: Site Pictures
Pierrepoint-Furman Street Substation, supplies 2,3 Train
As presented to the BQE Expert Panel for informational/background purposes only https://bqe-i278.com/en/expert-panel/documents
NYCT Facilities: Site Pictures
Montague-Furman Street Substation, supplies R Train
As presented to the BQE Expert Panel for informational/background purposes only https://bqe-i278.com/en/expert-panel/documents
NYCT Facilities: Substations
As presented to the BQE Expert Panel for informational/background purposes only https://bqe-i278.com/en/expert-panel/documents
NYCT Facilities: Fan Plants
As presented to the BQE Expert Panel for informational/background purposes only https://bqe-i278.com/en/expert-panel/documents
DEP Infrastructure
DEP Sewer
DEP Regulator
As presented to the BQE Expert Panel for informational/background purposes only https://bqe-i278.com/en/expert-panel/documents
DEP Infrastructure Considerations
DEP Infrastructure – Maintenance Needs/Access:• Interceptor: Cleaned every 2-5 years with
Vactor Truck. Requires access to manholes every 300 feet and at least 20 feet vertical clearance.
• Regulator: Monthly physical inspections; cleaning/repairs 2-3 times per year.
• Water Mains/Sewers: Infrequent maintenance based on complaints; need 24/7 accessibility.
DEP Infrastructure – Project Considerations:• 10 foot interceptor sewer requires either protection or relocation
• Further analysis will determine which is necessary and feasibility of both options • Relocation, if necessary, would likely be under Brooklyn Bridge Park and would require a
major capital project.
As presented to the BQE Expert Panel for informational/background purposes only https://bqe-i278.com/en/expert-panel/documents
Interceptor Relocation Example
Interceptor Construction
As presented to the BQE Expert Panel for informational/background purposes only https://bqe-i278.com/en/expert-panel/documents
As presented to the BQE Expert Panel for informational/background purposes only https://bqe-i278.com/en/expert-panel/documents
±Public Open Space
Adjacent to the BQE
Brooklyn Heights Promenade
Van VoorheesPlayground
GolcondaPlayground
Brooklyn Bridge Park
TrinityParkHillside
Park
Bridge Park 2
Adam YauchPark
Clumber Corner
As presented to the BQE Expert Panel for informational/background purposes only https://bqe-i278.com/en/expert-panel/documents