CPIT Meeting – April 26, 2011
Columbia Pike Implementation Team(CPIT) Meeting
April 26, 2011
CPIT Meeting – April 26, 2011
Agenda
Introductions / purpose of meeting
Multimodal project:
– Recap
– Concept Design
– Analysis
– Next Steps
Parallel Bike Network Study update
Pike Transit Initiative update
Summary
PHOTO
CPIT Meeting – April 26, 2011
Recap
Concept design as of last CPIT meeting
Feedback since last meeting
– Your comments — thank you!
– Additional meetings with civic associations
– “Back of curb” considerations
Response: Modified concept design
Your feedback is requested tonight on revised design
CPIT Meeting – April 26, 2011
Project Vision and Objectives
Vision: Near-term implementation of a complete street thatachieves an appropriate balance of travel modes and thatsupports future high-quality, high-frequency transit service
Objectives:– Build on Street Space Planning Task Force recommendations
– Coordinate with many other on-going efforts
– Provide a complete street design to meet Arlington, VDOT, andFHWA approvals
– Complete a multimodal transportation analysis
– Complete necessary environmental studies and NEPAdocumentation
CPIT Meeting – April 26, 2011
Street Design Considerations
Balance between pedestrian, bicycle, transit, and vehicle spaces
Achieve 56-ft cross section– Include left turn lanes/medians
– Eliminate right turn lanes and bus pull-outs
Behind curb line:– Wider sidewalks
– Street trees, planting strips
– On street parking
– “Furniture zone”
Bicycle accommodations
Drainage
Utilities
Additional ROW
CPIT Meeting – April 26, 2011
Proposed Near-Term Typical Plan
CPIT Meeting – April 26, 2011
Proposed Near-Term Typical CrossSection
CPIT Meeting – April 26, 2011
CPIT Meeting – April 26, 2011
Segment: County line/S. Jefferson St. to east of S. Frederick St.56-ft cross section: AchievedBetween curbs: Medians, new signal/WB left turn lane at Frederick, driveway accessBehind curbs: Sidewalks, landscaping, cycle tracks (Jeff to Fred), on street parking,
transit stops, shared use sidewalk (north side, Frederick to Four MileRun)
CPIT Meeting – April 26, 2011
CPIT Meeting – April 26, 2011
Segment: East of S. Frederick St. to east of S. Four Mile Run Dr.56-ft cross section: Achieved with exception of Four Mile Run Bridge areaBetween curbs: Medians, new WB left turn lane at Four Mile Run Dr., driveway access,
no left turns in/out at Arlington Mill (except for emergency vehicles)Behind curbs: Sidewalks, landscaping, trail connections, transit stops/super stops,
shared use sidewalk (north side, Frederick to Four Mile Run)
CPIT Meeting – April 26, 2011
CPIT Meeting – April 26, 2011
Cross Section – West of S.Dinwiddie St.
CPIT Meeting – April 26, 2011
CPIT Meeting – April 26, 2011
Segment: East of S. Four Mile Run Dr. to east of S. Taylor St.56-ft cross section: Achieved east of S. Wakefield St. onlyBetween curbs: Medians, new left turn lanes at Thomas & Taylor, full access maintained
for most driveways, left turns in/out eliminated at one drivewayBehind curbs: Sidewalks, landscaping/walls, transit stops, realignment of Thomas
CPIT Meeting – April 26, 2011
CPIT Meeting – April 26, 2011
Segment: East of S. Taylor St. to east of S. Quincy St.56-ft cross section: AchievedBetween curbs: Medians, pedestrian refuges, new left turn lanes at Quincy, full access
maintained for side streets and most drivewaysBehind curbs: Sidewalks, landscaping, on street parking, transit stops, elimination of 3
driveways
CPIT Meeting – April 26, 2011
CPIT Meeting – April 26, 2011
Cross Section – West of S.Oakland St.
CPIT Meeting – April 26, 2011
CPIT Meeting – April 26, 2011
Segment: East S. Quincy St. to east of S. Glebe Road56-ft cross section: Achieved to west of OaklandBetween curbs: Medians, ped refuge, new traffic signal at Oakland, access maintainedBehind curbs: Sidewalks, landscaping, on street parking, transit stops
CPIT Meeting – April 26, 2011
CPIT Meeting – April 26, 2011
Segment: East of S. Glebe Rd. to S. Cleveland St.56-ft cross section: Achieved east of GarfieldBetween curbs: Median in Town Center area, full access maintained for most drivewaysBehind curbs: Sidewalks, landscaping, transit stops/super stop
CPIT Meeting – April 26, 2011
CPIT Meeting – April 26, 2011
Cross Section – West of S.Cleveland St.
CPIT Meeting – April 26, 2011
CPIT Meeting – April 26, 2011
Segment: S. Cleveland St. to east of S. Courthouse Road56-ft cross section: AchievedBetween curbs: Medians, pedestrian refuges, full access maintained for most driveways,
consolidation of some drivewaysBehind curbs: Sidewalks, landscaping, transit stops, shred use sidewalk (north side,
Courthouse to Quinn)
CPIT Meeting – April 26, 2011
CPIT Meeting – April 26, 2011
Segment: East of S. Courthouse Road to Washington Blvd interchange56-ft cross section: Achieved to S. Rolfe St.Between curbs: Medians, pedestrian refuges, full access eliminated for some driveways,
new signals at Rolfe and Queen (VDOT), new WB left turn lane at QueenBehind curbs: Sidewalks, some landscaping, transit stops, shared use sidewalk (north
side, Courthouse to Quinn)
CPIT Meeting – April 26, 2011
CPIT Meeting – April 26, 2011
Cross Section – West of S. RolfeSt.
CPIT Meeting – April 26, 2011
CPIT Meeting – April 26, 2011
Segment: Washington Blvd interchange to west of Air Force Memorial56-ft cross section: AchievedBetween curbs: Medians, pedestrian refuges, new signal at Orme, full access maintained
for side streets and 2 driveways, 2 driveways eliminated, EB left turnlanes at Orme Street and new “Nash Street”
Behind curbs: Sidewalks, limited/no landscaping, transit stops, shared use sidewalk(north side, Orme to Joyce)
CPIT Meeting – April 26, 2011
CPIT Meeting – April 26, 2011
Cross Section – East of FutureNash St.
CPIT Meeting – April 26, 2011
CPIT Meeting – April 26, 2011
Segment: West of Air Force Memorial to S. Joyce St./S. Southgate Road56-ft cross section: AchievedBetween curbs: Wider median to match existing, ped refuge, access maintainedBehind curbs: Sidewalks, landscaping, multiuse trail (north side, Orme to Joyce)
CPIT Meeting – April 26, 2011
Community Input Process
Goal: inform/seek feedback
Website: www.pikemultimodal.com
CPIT meetings and public meetings
“Progress on the Pike” e-newsletter onArlington website
Presentations
– Transportation Commission
– County Board